HomeMy WebLinkAbout12-9-13 Wastewater Fund.pdf Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Chris Kukulski, City Manager Anna Rosenberry, Administrative Services Director SUBJECT: Adoption of the Wastewater Fund Capital Improvement Plan (CIP) for FY15-19. AGENDA ITEM TYPE: Action MEETING DATE: December 9, 2013 RECOMMENDATION: Adopt the Wastewater Fund Capital Improvement Plan (CIP) for FY15-19. BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital Improvements Plan and submit it to the Commission by December 15th. Staff met in October and November to develop the attached draft schedules. The Wastewater Fund CIP tracks the capital equipment replacements and construction projects for Wastewater Operations (collection system) and the Water Reclamation Facility (WRF). Items of Note: • WWIF15 - Flanders Mill – Hidden Valley Trunk Main and Lift Station is included on the Utility schedule, with no cost for the Utility shown. Total project cost on the Impact Fee CIP is $13,500,000. This is an impact fee project that will likely need underwriting support from the Utility. We are uncertain if there are project costs that would need to be paid for by the 109 Utility; ie. Non-capacity expanding project costs. These details will be firmed up once design of the main and lift station are completed. • WW29 – Energy Recovery (Methane Co-Generation) Project, has been moved back on the schedule. It is believed that the project will yield operational savings after a relatively short pay-back period, but we don’t have any engineering estimates substantiating that at this point. In the schedule, we won’t have enough cash to pay for construction without borrowing. At the point we are ready to move forward, a more detailed financing proposal, including estimated energy savings, will be brought forward. These levels of capital expenditure are in line with our adopted rate models. However, our current rate models do not include paying costs or underwriting coverage for the WWIF15 - Flanders Mill – Hidden Valley Trunk Main and Lift Station project. We will need to track on these items as we move forward with rates in the coming years. UNRESOLVED ISSUES: Estimated costs for WW44 – Modify Flotation Thickeners are not available at this point. We anticipate having those ready for Budget Preparation in January. ALTERNATIVES: As suggested by the City Commission. If the Commission is does not wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda. FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for FY15. Report compiled on: November 27, 2013 Attached: Draft Wastewater Fund CIP 110 Wastewater Fund Capital Improvement PlanFinancial SummaryCurrent YearFY14FY15FY16 FY17 FY18 FY19UnscheduledProjected Beginning Reserve Balance Dedicated to CIP 1,899,728$     2,024,582$         1,750,941$     1,846,106$     1,942,462$  2,295,579$     ‐$                   Plus:  Wastewater Revenues Dedicated to CIP1,278,504$     1,316,859$         1,356,365$     1,397,056$     1,438,967$  1,482,137$     ‐$                   Less:  Scheduled CIP Project Costs(1,153,650)$    (1,590,500)$       (1,261,200)$    (1,300,700)$   (1,085,850)$ (1,810,050)$   (8,000,000)$    Projected Year‐End Cash Dedicated to CIP2,024,582$     1,750,941$         1,846,106$     1,942,462$     2,295,579$  1,967,666$     (8,000,000)$    Assumptions Made for Revenue Estimates:Current YearFY14FY15FY16FY17 FY18 FY19Estimated Annual Wastewater Revenues6,206,330$        6,392,520$           6,584,295$       6,781,824$       6,985,279$    7,194,837$         Estimated Annual Increase3.0%3%3%3%3%3%Total Estimated Revenues6,392,520$        6,584,295$           6,781,824$       6,985,279$       7,194,837$    7,410,683$       Current Revenues Dedicated to CIP %20.0%20.0% 20.0% 20.0% 20.0% 20.0%  Plus:  Increase Dedicated to CIP0.0%0.0%0.0%0.0% 0.0%0.0%  Total % Dedicated to CIP20.0%20.0% 20.0% 20.0% 20.0% 20.0%TtlEti tdRDdi tdt CIP1 278 504$1 316 859$1 356 365$1 397 056$1 438 967$1 482 137$ProjectedProjectedTotal Estimated Revenues Dedicated to CIP1,278,504$       1,316,859$          1,356,365$       1,397,056$      1,438,967$   1,482,137$      9,000,0008,000,0007,000,0006,000,0005,000,0004,000,0003,000,0002,000,0001,000,0000Wastewater Fund Projects & Equipment 111 CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY16UnscheduledFY15FY17FY18FY19Wastewater FundWW35PUBLIC WORKSGRANITE XP UPGRADE$18,000WW36PUBLIC WORKSWEB MAPPING SYSTEM INTEGRATION$45,000WW27WRF PLANTWATERSHED STUDY AND STREAM MODELING$60,000$60,000$60,000$60,000$60,000WW28WRF PLANTDESIGN PHASE II ‐ WRF PLANT IMPROVEMENTS$5,230,000WW29WRF PLANTENERGY RECOVERY (METHANE CO‐GENERATION) PROJECT$2,200,000$350,000WW33WRF PLANTINSTALL SECOND SCREW PRESS AND ENCLOSURE$220,000WW35WRF PLANTREPLACE COMMERCIAL MOWER$13,000WW36WRF PLANTUPGRADE TRUCK BARN$36,000WW37WRF PLANTUPGRADE OLD PLC'S AND FIRMWARE$29,000WW38WRF PLANT#3 PERFORATED SCREEN & WASHER COMPACTOR$140,000WW39WRF PLANTSANDLAST & PAINT OLD CLARIFIER DRIVES, BEACHES, BAFFLES & WEIRS (6 TOTAL)$15,000$15,000$15,000WW40WRF PLANTUV BUILDING SHADING MATERIAL$15,000WW41WRF PLANTREPLACE 4" DUCTILE PIPE THROUGH DEWATERING BASEMENT WITH GLASS LINED PIPE$15,000WW42WRF PLANTPRIMARY CLARIFIER COVERS$350,000$350,000$350,000WW43WRF PLANTSEAL MIXER FLANGES ON DIGESTER 1$20,000WW44WRF PLANTMODIFY FLOTATION THICKENERWW45WRF PLANTFINAL CLARIFIER LAUNDER COVERS$40,000$40,000$40,000$40,000WW46WRF PLANTCONCRETE PAD FOR ROLLOFF TRUCK CONTAINERS.$14,000112 CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY16UnscheduledFY15FY17FY18FY19PW01WW OPSSHOPS FACILITY EXPANSION PLAN$10,000WW07WW OPSENGINEERING/DESIGN FOR ANNUAL WASTEWATER PIPE REPLACEMENTS$22,500$22,500$22,500$22,500$22,500WW08‐15WW OPSWASTEWATER PIPE REPLACEMENT PROGRAM ‐ CONSTRUCTION IN 2015$914,000WW08‐16WW OPSWASTEWATER PIPE REPLACEMENT PROGRAM ‐ CONSTRUCTION IN 2016$952,700WW08‐17WW OPSWASTEWATER PIPE REPLACEMENT PROGRAM ‐ CONSTRUCTION IN 2017$803,200WW08‐18WW OPSWASTEWATER PIPE REPLACEMENT PROGRAM ‐ CONSTRUCITON IN 2018.$963,350WW08‐19WW OPSWASTEWATER PIPE REPLACEMENT PROGRAM ‐ CONSTRUCTION IN 2019$1,027,550WW26WW OPSFLUSHER VAC TRUCK REPLACEMENT$365,000WWIF15WWATER IFFLANDERS MILL ‐ HIDDEN VALLEY TRUNK MAIN AND LIFT STATIONSummary for  Wastewater Fund (27 items)Totals by year:$1,590,500 $1,261,200 $1,300,700$8,000,000FY15FY16FY17UnscheduledFY19$1,810,050$1,085,850FY18113 CIP Project Fund Wastewater Fund PROJECT NUMBER PW01 DEPARTMENT WW OPS PROJECT NAME SHOPS FACILITY EXPANSION PLAN FY15 FY16 Unscheduled DESCRIPTION OF PROJECT The construction of the new Vehicle Maintenance Shop at the Lower Yards on Rouse Avenue in FY10/FY11 was Phase I in expanding and improving our ability to service equipment, store vehicles, and provide work space for Public Works, Parks, and Facilitiy services. Questions remain about the long-term plan for construction, location, and expansion for: Streets, Sign & Signal, Forestry, Water/Sewer Operations, Solid Waste Collection & Recycling, Facilities, and Parks & Cemetery departments. This project would develop a master plan. In scheduling this project, we are recommending waiting until after the Vehicle Maintenance Division is relocated to its new shop and the interior improvements are made to the Shop at Rouse and Tamarack Street for the remaining divisions. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES From related divisions: General Fund 20% ($10,000), Water Fund 20% ($10,000), Wastewater Fund 20% ($10,000), Street Maintenance Fund 20% ($10,000), Solid Waste Fund 20% ($10,000). New Replacement Equipment Project FY17 $10,000 FY18 FY19 114 CIP Project Fund Wastewater Fund PROJECT NUMBER WW07 DEPARTMENT WW OPS PROJECT NAME ENGINEERING/DESIGN for ANNUAL WASTEWATER PIPE REPLACEMENTS FY15 $22,500 FY16 $22,500 Unscheduled DESCRIPTION OF PROJECT This item provides for design work to be completed every-other year, in anticipation of the Annual System Upgrades. As the Wastewater Operations Division televises (views) the existing system, maintenance projects become apparent. As annual televising continues, other more-urgent projects may be identified and designed under this project heading. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Provides for design of necessary sewer system maintenance work. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Wastewater Utility Fund New Replacement Equipment Project FY17 $22,500 FY18 $22,500 FY19 $22,500 115 CIP Project Fund Wastewater Fund PROJECT NUMBER WW08-15 DEPARTMENT WW OPS PROJECT NAME WASTEWATER PIPE REPLACEMENT PROGRAM - Construction in 2015 FY15 $914,000 FY16 Unscheduled DESCRIPTION OF PROJECT PROJECT AREA: S. 3rd Ave: W. Olive St - W. Lincoln St S. 4th Ave: W. Babcock St - W. Olive St S. 4th Ave: W. College St - W. Lincoln St S. 5th Ave: W. Olive St - W. Lincoln St W. Babcock St: S. 6th Ave - S. Grand Ave W. Olive St: S. 6th Ave - S. 3rd Ave Alley N of Koch: S. 5th Ave - E. End. After budget approval July 1, 2014, this project would complete design, bid and begin construction in the Spring/Summer of 2015, at the end of FY15. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Provides for the construction of necessary sewer system maintenance work. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Wastewater Utility Fund New Replacement Equipment Project FY17 FY18 FY19 116 CIP Project Fund Wastewater Fund PROJECT NUMBER WW08-16 DEPARTMENT WW OPS PROJECT NAME WASTEWATER PIPE REPLACEMENT PROGRAM - Construction in 2016 FY15 FY16 $952,700 Unscheduled DESCRIPTION OF PROJECT PROJECT AREA: Interstate/walmart: N. Rouse Ave - N. 3rd Ave Pea Cannery Line: N. Rouse Ave - End Juniper Street: N. Rouse Ave - E. Tamarack St N. Rouse Ave: Humane Society - Bridger Center Dr Bridger Center Main: Bridger Drive - N End of Main Industrial Dr: Trunk Main - Half way to Griffin. After budget approval July 1, 2015, this project would complete design, bid and begin construction in the Spring/Summer of 2016, at the end of FY16. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Provides for the construction of necessary sewer system maintenance work. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Wastewater Utility Fund New Replacement Equipment Project FY17 FY18 FY19 117 CIP Project Fund Wastewater Fund PROJECT NUMBER WW08-17 DEPARTMENT WW OPS PROJECT NAME WASTEWATER PIPE REPLACEMENT PROGRAM - Construction in 2017 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT PROJECT AREA: Alley N of Story: S 5th Ave - E. End Alley N of Dickerson: S 5th Ave - E. End, Alley N of Alderson: S 5th Ave - E. End W. College St: S 5th Ave - E. End, W. College St: S 4th Ave - S. 3rd Ave Alley N. of Harrison: S. 5th Ave - S. 4th Ave, Alley N. of Cleveland: S. 5th Ave - S. 4th Ave S. 6th Ave: W. Babcoc St - Alley N. of Olive, S. 6th Ave: W. Story St - W. Grant St S. 7th Ave: Alley N of Olive - W. Story St, S. 7th Ave: W. Story St - W. Harrison W. Olive St: S. 6th Ave - S. 7th Ave, W. Story St: S. 6th Ave - S. 7th Ave Alley btwn 7th & 8th: Alley N of Olive - Alley N. of Koch Alley btwn 7th & 8th: Alley N of Dickerson - W. Harrison St.. After budget approval July 1, 2016, this project would complete design, bid and begin construction in the Spring/Summer of 2017, at the end of FY17. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Provides for the construction of necessary sewer system maintenance work. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Wastewater Utility Fund New Replacement Equipment Project FY17 $803,200 FY18 FY19 118 CIP Project Fund Wastewater Fund PROJECT NUMBER WW08-18 DEPARTMENT WW OPS PROJECT NAME WASTEWATER PIPE REPLACEMENT PROGRAM - Construciton in 2018. FY15 FY16 Unscheduled DESCRIPTION OF PROJECT Alley N of Babcock: S. 11th Ave-Alley E. of 7th: W Babcock St: S. 11th- S. 10th Ave.: Alley N of Olive: S. 6th Ave-S 7th Ave.: Alley N Of Olive: S. 11th Ave.- Alley E of 8th: Alley btwn 8th&9th: Alley N of Olive-W. College St: S. 9th St.: W. Main St.-Alley N of Olive: Alley btwn 9th&10th: Alley N of Olive- W. College St: S. 10th Ave: W. Main St – W. Harrison St: W. Harrison St: S. 6th Ave – S 10th Ave. After budget approval July 1, 2017, this project would complete design, bid and begin construction in the Spring/Summer of 2018, at the end of FY18. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Provides for the construction of necessary sewer system maintenance work. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Wastewater Utility Fund New Replacement Equipment Project FY17 FY18 $963,350 FY19 119 CIP Project Fund Wastewater Fund PROJECT NUMBER WW08-19 DEPARTMENT WW OPS PROJECT NAME WASTEWATER PIPE REPLACEMENT PROGRAM - Construction in 2019 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT PROJECT AREA: Alley W of S 10th Ave: Alley N of Olive- W. Koch St. Alley W of S 10th Ave: N of Dickerson – W. Alderson St. Alley W of S 10th Ave: N of College- W. College St. W. Curtiss St: S. 10th Ave-Alley W of S. 10th. W. Curtiss St.: Alley W of S. 11th. Chequamegon Village: All internal mains. W. Koch St: Alley W of S. 10th- Alley W of S. 12th. Alley W of S 11th Ave: Alley S of Alderson – University. W. Villard St: N. 7th Ave- N. 8th Ave. N. 8th Ave: W. Villard – W. Beall St. N. 8th Ave: W. Beall St – W. Mendenhall St. Alley N of Main St: N. 9th Ave _ N. 7th Ave. Alley W of 8th Ave: W. Durston Rd – W. Villard St. W. Villard St : Alley W of N 8th – N. 9th Ave. N. 9th Ave: W. Villard St – W. Main St. W. Beall St: N. 8th Ave – N. 9th Ave. Alley W of 9th Ave: W. Durston Rd – W. Villard St. W. Villard St: Alley W of 9th Ave – N. 10th Ave. N. 10th Ave : W. Villard St- W. Main St. Alley W. of 10th Ave: W. Durston Rd – W. Mendenhall St. W. Lamme St: N. 9th Ave – N. 11th Ave. After budget approval July 1, 2018, this project would complete design, bid and begin construction in the Spring/Summer of 2019, at the end of FY18. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Provides for the construction of necessary sewer system maintenance work. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Wastewater Utility Fund New Replacement Equipment Project FY17 FY18 FY19 $1,027,550 120 CIP Project Fund Wastewater Fund PROJECT NUMBER WW26 DEPARTMENT WW OPS PROJECT NAME FLUSHER VAC TRUCK REPLACEMENT FY15 $365,000 FY16 Unscheduled DESCRIPTION OF PROJECT Replacement of the City’s Flusher Vac Truck. This flusher vac truck is used daily to excavate around critical infrastructure i.e. fiber optics, gas, and electric lines in addition to flushing and vacuuming sewer mains. At time of replacement, this truck will be approximately 10 years old. The existing truck will be sold at auction. ALTERNATIVES CONSIDERED Continue to use older vehicle which will be costly to maintain. ADVANTAGES OF APPROVAL Increased reliability and safety for staff and wastewater operations. This piece of equipment eliminates costly repairs because we can avoid hitting utilities with a hoe and utilize the vacuum instead. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Operating and repair costs are expected to be lower than the existing vehicle. FUNDING SOURCES 100% Wastewater utility fund New Replacement Equipment Project FY17 FY18 FY19 121 CIP Project Fund Wastewater Fund PROJECT NUMBER WW27 DEPARTMENT WRF PLANT PROJECT NAME Watershed Study and Stream Modeling FY15 $60,000 FY16 $60,000 Unscheduled DESCRIPTION OF PROJECT Develop a comprehensive, multi-year watershed study and computer model for the East Gallatin River which would enable the City and DEQ to better determine stream load allocations and develop a more scientifically valid TMDL for the river segment we discharge to. This will require annual field sample collection, laboratory analytical work and detailed computer modeling using calibrated data. This multi-year study would consist of $45,000 in consulting and computer modeling fees for at least two fiscal years (FY14 and FY15) and stream sampling/lab fees of $15,000 each year. Craig recommends we should be prepared to continue this work beyond FY15 as necessary. ALTERNATIVES CONSIDERED Not undertake this work and risk having to accept the TMDL and waste load allocations the DEQ has proposed in their original draft documents. This decision could greatly limit our ability to appeal future nutrient limitations and could result in non- compliance. ADVANTAGES OF APPROVAL This watershed study will greatly enhance the City’s understand of our impact on the East Gallatin River and enable us to more successfully negotiate future permit limitations with the DEQ. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED None, unless additional stream sampling is desired in subsequent years. FUNDING SOURCES 100% Wastewater Fund New Replacement Equipment Project FY17 $60,000 FY18 $60,000 FY19 $60,000 122 CIP Project Fund Wastewater Fund PROJECT NUMBER WW28 DEPARTMENT WRF PLANT PROJECT NAME DESIGN PHASE II - WRF PLANT IMPROVEMENTS FY15 FY16 Unscheduled $5,230,000 DESCRIPTION OF PROJECT In January 2006 Morrison & Maierle Consulting Engineers completed a comprehensive Wastewater Facilities Plan. The plan recommends the City proceed with a 3-phased project schedule that includes the construction of the new Water Reclamation Facility (WRF), capable of handling our increased flows while also reducing the amount of Total Nitrogen discharged to the East Gallatin River. Phase two is expected to include one new primary clarifier, more BNR reactor basins, clarifiers, tertiary membrane filtration, liquid sludge storage tanks, anaerobic digestion, and an effluent re-use pumping station. The capacity expanding (impact fee eligible) elements are: bioreactor basins, clarifiers, and pumping station. It is possible that this phase of the project could be further divided into phase 2A and phase 2B, if necessary. ALTERNATIVES CONSIDERED A variety of treatment technologies and alternatives are presented in the January 2006 Wastewater Facilities Plan. ADVANTAGES OF APPROVAL Major capital expansion of the Bozeman WRF will enable the City to meet its estimated demand for wastewater services and still produce a high quality effluent that is in full compliance with the City’s MPDES discharge permit. Expansion of the Bozeman WRF is consistent with the City’s long-term need to accommodate rapid growth and economic development in the Gallatin Valley. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating & Maintenance Costs: no estimates at this time. FUNDING SOURCES Total Design Cost: $5,230,000. We estimate the majority of the project costs are related to regulation and maintenance issues and would be borne by the Utility Fund. Half are related to capacity expansion, and would be borne by Impact Fees. 50% Wastewater Fund, 50% Wastewater Impact Fee Fund. New Replacement Equipment Project FY17 FY18 FY19 123 CIP Project Fund Wastewater Fund PROJECT NUMBER WW29 DEPARTMENT WRF PLANT PROJECT NAME ENERGY RECOVERY (METHANE CO-GENERATION) PROJECT FY15 FY16 Unscheduled $2,200,000 DESCRIPTION OF PROJECT Consistent with the goals of the City’s Climate Action Plan & Sustainability Programs, the Bozeman WRF staff and Public Works Director recommend we move forward with our proposed investigation and installation of a methane recovery and co- generation system. This system will produce an average of 175 kW of electricity and 974,000 BTU/hour of thermal output using a generator powered entirely by WRF digester gas. This project has the potential to save the City at least $180,000 in electricity costs and substantially lower the carbon footprint of the new Bozeman WRF. This project would be implemented in 3 phases including (1) a feasibility / cost effectiveness study, (2) project engineering / design and (3) the purchase and installation of appropriate technology for the co-generation of electricity at the Bozeman WRF. Year 1: Project Feasibility Study. Year 2: Project Engineering Design - $350,000. Year 3: Equipment Purchase and Installation - $2,200,000. ALTERNATIVES CONSIDERED Continue to flare our digester methane gas. Micro-turbines and fuel-cells have been analysed and continue to be possible alternative energy recovery technologies for this project. Our research to date suggests the most proven technology currently available to help us accomplish our energy recovery goals is likely to be a GE Jenbacher internal combustion engine and heat recovery system. ADVANTAGES OF APPROVAL Current plant waste gases will be captured and utilized to reduce plant operating costs. The project has an estimated net dollar savings of $230,000 per year. It supports the City's Municipal Climate Action Plan goals. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Once construction is funded, this project results in an estimated net dollar SAVINGS of $230,000/year. FUNDING SOURCES Wastewater Fund, other grants or community partners. New Replacement Equipment Project FY17 FY18 FY19 $350,000 124 CIP Project Fund Wastewater Fund PROJECT NUMBER WW33 DEPARTMENT WRF PLANT PROJECT NAME Install second Screw Press and Enclosure FY15 FY16 Unscheduled $220,000 DESCRIPTION OF PROJECT Engineering study and installation of screw press with or without an enclosure. ALTERNATIVES CONSIDERED Increase sludge storage to delay the problem of limited processing capacity. ADVANTAGES OF APPROVAL The second screw press would provide needed redundancy if a screw press breaks down. It would provide extra sludge processing capacity now and for future needs. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED If used to increase processing capacity, the extra operating costs would include electricity, polymer use and additional cake hauling. FUNDING SOURCES Wastewater Fund New Replacement Equipment Project FY17 FY18 FY19 125 CIP Project Fund Wastewater Fund PROJECT NUMBER WW35 DEPARTMENT WRF PLANT PROJECT NAME Replace Commercial Mower FY15 FY16 $13,000 Unscheduled DESCRIPTION OF PROJECT Replacement of 2001 Mower for use on the WRF grounds. ALTERNATIVES CONSIDERED Continue replacing parts as needed. ADVANTAGES OF APPROVAL Replacement parts will become more difficult to find as the mower ages. The increasing maintenance will mean less time for groundskeeping. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED No additional operating costs. May reduce maintenance costs. FUNDING SOURCES Wastewater Funds. New Replacement Equipment Project FY17 FY18 FY19 126 CIP Project Fund Wastewater Fund PROJECT NUMBER WW35 DEPARTMENT PUBLIC WORKS PROJECT NAME GRANITE XP UPGRADE FY15 FY16 $18,000 Unscheduled DESCRIPTION OF PROJECT We currently use a Microsoft Access based solution (GraniteXP) for storing our Sewer/Stormwater CCTV inspection records. This project will upgrade the database to a Microsoft SQL format. ALTERNATIVES CONSIDERED Keep using Microsoft Access. ADVANTAGES OF APPROVAL Microsoft SQL provides a more stable database platform for long-term storage of CCTV data. This also provides the ability to integrate with other systems as well as improved reporting capabilities. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Potential for increased annual software maintenance costs. FUNDING SOURCES General Fund New Replacement Equipment Project FY17 FY18 FY19 127 CIP Project Fund Wastewater Fund PROJECT NUMBER WW36 DEPARTMENT PUBLIC WORKS PROJECT NAME WEB MAPPING SYSTEM INTEGRATION FY15 $45,000 FY16 Unscheduled DESCRIPTION OF PROJECT Database system integration throughout the organization will provide users with (read-only) access to the most current and reliable information specific to their needs within one browser. This project will integrate the following databases through customized GIS (web) views for each Department: Sungard, Cityworks, MicroPAVER, Laserfiche, Firehouse, DOR ORION, etc. ALTERNATIVES CONSIDERED Keep database systems isolated. ADVANTAGES OF APPROVAL This project will provide access to a variety of information, thus leveraging the power of individual systems in one easy-to-use format. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Maintenance (first year included) = $7,000 FUNDING SOURCES There are numerous funding sources, including the Utility Funds, General Fund, Street Assessment Fund. At budget time, the full project costs will be split among the group. New Replacement Equipment Project FY17 FY18 FY19 128 CIP Project Fund Wastewater Fund PROJECT NUMBER WW36 DEPARTMENT WRF PLANT PROJECT NAME Upgrade Truck Barn FY15 $36,000 FY16 Unscheduled DESCRIPTION OF PROJECT Upgrade truck barn to provide storage for rolloffs; frame, insulate, sheetrock and heat 1/2 of truck barn for rolloff storage during winter months. ALTERNATIVES CONSIDERED Build a heated storage building to house rolloffs during winter months. ADVANTAGES OF APPROVAL No additional storage area would have to be built saving the structure construction costs. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED No additional costs. FUNDING SOURCES Wastewater Funds New Replacement Equipment Project FY17 FY18 FY19 129 CIP Project Fund Wastewater Fund PROJECT NUMBER WW37 DEPARTMENT WRF PLANT PROJECT NAME Upgrade Old PLC's and Firmware FY15 $29,000 FY16 Unscheduled DESCRIPTION OF PROJECT THREE PLC'S WILL HAVE THEIR PROCESSORS UPGRADED AND ALL PLC'S WILL HAVE THEIR FIRMWARE UPGRADED. A NEWER VERSION OF PROGRAMMING SOFTWARE WILL BE INSTALLED. ALTERNATIVES CONSIDERED Do nothing. ADVANTAGES OF APPROVAL THE CITY WILL BE ABLE TO HAVE A STANDARD VERSION OF FIRMWARE AND SOFTWARE THAT WILL ALLOW UPGRADING ALL PLC'S AT THE WRF IN THE FUTURE ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED No new operating costs. FUNDING SOURCES Wastewater Funds New Replacement Equipment Project FY17 FY18 FY19 130 CIP Project Fund Wastewater Fund PROJECT NUMBER WW38 DEPARTMENT WRF PLANT PROJECT NAME #3 Perforated Screen & Washer Compactor FY15 FY16 $140,000 Unscheduled DESCRIPTION OF PROJECT Extensive Engineering will be needed to install an additional influent huber screen in head works building because of limited space. Additional screening capacity is needed because during a storm event this summer the influent flow meter pegged out over 15 mgd. ALTERNATIVES CONSIDERED Do nothing. ADVANTAGES OF APPROVAL THE TWO EXISTING SCREENS ARE RUNNING MOST OF THE YEAR SO IF ONE GOES DOWN THERE IS NO REDUNDANCY. HAVING A THIRD SCREEN WOULD PREVENT A HIGH FLOW EVENT FROM OVER FLOWING THE BYPASS CHANNEL INFLUENT GATE. THIS UNSCREENED FLOW CONTAINS MATERIAL THAT CAN PLUS PIPING AND PUMPS CAUSING DAMAGE & EXTRA MAINTENANCE. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED IF PLACED IN A TWO SCREEN ROTATION, THE ONLY EXTRA COSTS WOULD BE AN ANNUAL INSPECTION WITH PARTS REPLACEMENT PLUS CLEANING OF THE SCREEN & CAHNEL IT IS IN. IF USED TO INCREASE CAPACITY, EXTRA ELECTRICITY WOULD BE USED BUT LESS CHANNEL CLEANING WOULD NEED TO BE PERFORMED. FUNDING SOURCES Wastewater Funds New Replacement Equipment Project FY17 FY18 FY19 131 CIP Project Fund Wastewater Fund PROJECT NUMBER WW39 DEPARTMENT WRF PLANT PROJECT NAME Sandlast & Paint old clarifier drives, beaches, baffles & weirs (6 total) FY15 $15,000 FY16 $15,000 Unscheduled DESCRIPTION OF PROJECT Sandblast and paint old clarifier drives, beaches, baffles weirs. ALTERNATIVES CONSIDERED Do nothing ADVANTAGES OF APPROVAL Replace lost & chipping paint on old clarifiers to prevent deterioration of existing infrastructure. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED No new operating costs. FUNDING SOURCES Wastewater Funds New Replacement Equipment Project FY17 $15,000 FY18 FY19 132 CIP Project Fund Wastewater Fund PROJECT NUMBER WW40 DEPARTMENT WRF PLANT PROJECT NAME UV Building Shading Material FY15 $15,000 FY16 Unscheduled DESCRIPTION OF PROJECT Netting or covering to place over roof and sides of UV Building during the summer to reduce solar radiation heating the building. ALTERNATIVES CONSIDERED Installing a larger cooling system in the PLC compartment. ADVANTAGES OF APPROVAL LESS POWER WOULD BE USED BY THE VENTILATION SYSTEM AND THE PLC COOLING SYSTEM. KEEPING THE PLC CABINET COOLER WILL PREVENT THE UPS FROM FAULTING. THIS UPS POWER THE PLC AND THE TROJAN UV CONTROL SYSTEM. WHEN THE UV SYSTEM LOOSES POWER IT FAULTS TO A CONDITION OF ALL CHANNELS OPEN AND ALL LAMPS ON. THIS CONDITIONS IS NOT NEEDED TO REDUCE E-COLI BACTERIA AND WASTES POWER. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Man hours needed to place the shading on in the spring and take the shading off in the fall. FUNDING SOURCES Wastewater Funds New Replacement Equipment Project FY17 FY18 FY19 133 CIP Project Fund Wastewater Fund PROJECT NUMBER WW41 DEPARTMENT WRF PLANT PROJECT NAME Replace 4" Ductile Pipe Through Dewatering Basement with Glass Lined Pipe FY15 $15,000 FY16 Unscheduled DESCRIPTION OF PROJECT Replace 4; Cement Lined Ductile Pipe with Glass Lined pipe in the basement of sludge de-watering building. ALTERNATIVES CONSIDERED Do nothing ADVANTAGES OF APPROVAL THIS PIPE IS INSTALLED IN THE CEILING OF THE SLUDGE DE-WATERING BUILDING BASEMENT WITH NUMEROUS ELBOWS WHICH DOES NOT ALLOW ACCESS TO FLUSHING FOR REMOVAL OF STRUVITE OR BLOCKAGES. INSTALLING GLASS LINED PIPE & FITTINGS WILL REDUCE THE POSSIBILITY OF NEEDING TO FLUSH THE PIPE. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED No additional costs. FUNDING SOURCES Wastewater Funds New Replacement Equipment Project FY17 FY18 FY19 134 CIP Project Fund Wastewater Fund PROJECT NUMBER WW42 DEPARTMENT WRF PLANT PROJECT NAME Primary Clarifier Covers FY15 FY16 Unscheduled $350,000 DESCRIPTION OF PROJECT INSTALLING A GEODESIC DOME COVER WITH 8 FOOT SIDE WALLS ON A PRIMARY CLARIFIER. THE INSTALLATION WOULD INCLUDE A DOOR, TWO SKYLIGHTS AND A VENT TUBE. ALSO CLARIFIER DRIVE MOTOR AND CONTROLS WOULD HAVE TO BE EXPLOSION PROOF. ALTERNATIVES CONSIDERED Do nothing ADVANTAGES OF APPROVAL COVERING THE PRIMARY CLARIFIERS WILL ALLOW ODOR CONTROL & ELIMINATE CLEANING & PAINTING. CLEANING & PAINTING OF ALL RAILINGS AND CATWALKS IS AN ON-GOING MAINTENANCE ISSUE TO REMOVE GREASE & DROPPINGS DEPOSITED BY BIRDS. COVERS ON PRIMARY CLARIFIERS WOULD ALLOW SOME CLARIFIERS NOT TO BE USED DURING THE WINTER ALLOWING MORE NEEDED CARBON TO ENTER THE BIO-TRAINS. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Only maintenance of odor control would be additional. FUNDING SOURCES Wastewater Funds New Replacement Equipment Project FY17 $350,000 FY18 FY19 $350,000 135 CIP Project Fund Wastewater Fund PROJECT NUMBER WW43 DEPARTMENT WRF PLANT PROJECT NAME Seal Mixer Flanges on Digester 1 FY15 $20,000 FY16 Unscheduled DESCRIPTION OF PROJECT This project replaces the concrete that has been eaten away by H2S on the mixer flanges of Digester 1, extending its useful life and improving operator safety. The mixers would have to be pulled and the concrete sealing surface under the mixer flanges rebuilt. ALTERNATIVES CONSIDERED Inject epoxy into flange area to seal flange. ADVANTAGES OF APPROVAL REPLACE CONCRETE THAT HAS BEEN EATEN AWAY BY H2S TO INSURE STRUCTURAL INTEGRITY OF THE MIXER SUPPORT AREA AND PROVIDE A TIGHT SEAL. PREVENT H2S AND METHANE GAS LEAKAGE FOR OPERATOR SAFETY. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED No additional operating costs. FUNDING SOURCES Wastewater Funds New Replacement Equipment Project FY17 FY18 FY19 136 CIP Project Fund Wastewater Fund PROJECT NUMBER WW44 DEPARTMENT WRF PLANT PROJECT NAME Modify Flotation Thickener FY15 FY16 Unscheduled DESCRIPTION OF PROJECT Modify the existing flotation thickener to improve WRF processes. ALTERNATIVES CONSIDERED INCREASE THE BIO-TRAIN MASS, ADD MG(OH)2 AND MICRO C 2000 TO THE BIO-TRAINS TO TREAT THE INCREASED AMMONIA LOAD ADVANTAGES OF APPROVAL Treating the return side stream will reduce the load on the bio-trains and reduce chemical costs associated with these loads. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Electrical costs for compressor, mixer and pumps. FUNDING SOURCES Wastewater Funds New Replacement Equipment Project FY17 FY18 FY19 137 CIP Project Fund Wastewater Fund PROJECT NUMBER WW45 DEPARTMENT WRF PLANT PROJECT NAME Final Clarifier Launder Covers FY15 $40,000 FY16 $40,000 Unscheduled DESCRIPTION OF PROJECT To cover effluent launder of one final clarifier a year (4 total) to eliminate algal growth in the launder. THE BRUSH SYSTEM REQUIRES CONTINUAL MAINTENANCE. THERE IS RISK OF BRUSHES BREAKING OFF AND FALLING INTO THE CLARIFIER THAT MAY BLOCK THE WASTING HOPPER ALTERNATIVES CONSIDERED CURRENTLY A BRUSH SYSTEM IS USED TO REDUCE THE AMOUNT OF ALGAL GROWTH WHICH REQUIRES CONTINUAL MAINTENANCE. ADVANTAGES OF APPROVAL COVERING THE CLARIFIERS WILL ELIMINATE CURRENT MAINTENANCE AND HELP REDUCE POTENTIAL HAZZARDS. MAINTENANCE WOULD BE CUT TO TWICE A YEAR ALLOWING OPERATORS TO SPEND TIME ON OTHER DUTIES AT THE PLANT. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Reduce oeprating costs (time & materials) FUNDING SOURCES Wastewater Funds New Replacement Equipment Project FY17 $40,000 FY18 $40,000 FY19 138 CIP Project Fund Wastewater Fund PROJECT NUMBER WW46 DEPARTMENT WRF PLANT PROJECT NAME Concrete Pad for Rolloff Truck Containers. FY15 $14,000 FY16 Unscheduled DESCRIPTION OF PROJECT Pour 20'x40' concrete pad or two tracks to support steel wheels of sludge cake hauling rolloffs in front and behind truck loading garage. ALTERNATIVES CONSIDERED Lay Steel strips anchored on asphalt to support steel wheels ADVANTAGES OF APPROVAL STEEL REINFORCED CONCRETE WOULD BE PURED WHERE THE ASPHALT HAS BEEN REMOVED, WITH A STEEL PLATE ON TOP EVEN WITH THE ASPHALT SURFACE. THIS CONFIGURATION WOULD BE STRONGER AND BE A LEVEL SURFACE THAT WILL ALLOW EASIER SNOW PLOWING ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED No additional costs FUNDING SOURCES Wastewater Funds New Replacement Equipment Project FY17 FY18 FY19 139 CIP Project Fund Wastewater Fund PROJECT NUMBER WWIF15 DEPARTMENT WWATER IF PROJECT NAME FLANDERS MILL - HIDDEN VALLEY TRUNK MAIN AND LIFT STATION FY15 FY16 Unscheduled DESCRIPTION OF PROJECT THIS PROJECT IS PRIMARILY AN IMPACT FEE ELIGIBLE PROJECT. How much of the project costs will be borne by the Utility is uncertain at this point in time. The project consists of the installation of large diameter sewer from Huffine Lane to the City Water Reclamation Facility along the Cottonwood-Flanders Mill- Hidden Valley alignment as identified in the Wastewater Facility Plan. It also includes a Regional Lift Station located at the north of the alignment and the installation of the force-main necessary to complete the project. $200,000 in design costs and $13,300,000 in construction costs. ALTERNATIVES CONSIDERED Limit development in the area served by this trunk sewer to that which can currently be served. ADVANTAGES OF APPROVAL This project will significantly increase the area which can be served by the City’s wastewater treatment infrastructure making development in this corridor possible. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual operating and maintenance costs. Impact fees may not be used to finance those costs. The City’s wastewater utility will pay for these costs which are estimated to be a small increment of the City’s system as a whole. FUNDING SOURCES 70% Wastewater Impact Fees (est.) = $9.3M 30% Development contribution =$4M. Some of this project could potentially be funded with Utility dollars, or a loan for the impact fee portion of the project underwritten by the Utility. New Replacement Equipment Project FY17 FY18 FY19 140