Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Chris Kukulski, City Manager
Anna Rosenberry, Administrative Services Director
SUBJECT: Adoption of the Solid Waste Fund (Collection & Recycling) Capital
Improvement Plan (CIP) for FY15-19.
AGENDA ITEM TYPE: Consent
MEETING DATE: December 9, 2013
RECOMMENDATION: Adopt the Solid Waste Fund (Collection & Recycling) Capital
Improvement Plan (CIP) for FY15-19.
BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital
Improvements Plan and submit it to the Commission by December 15th.
Public Works and other city staff met in October to develop the attached Capital Plan for the
equipment and capital needs of the Solid Waste Fund. The attached capital replacement
schedule is needed to continue operations for garbage collection and the recycling program as
they currently stand.
This plan works in concert with the existing Solid Waste Rate study that was adopted this past
year; funding annual capital replacement at an amount similar to annual depreciation expense
noted in the rate study.
There are three new items for this year, with details found on the items sheets attached:
35
SW39 – Update Solid Waste Rate Study
SW40 – Overlay Landfill Road
SW41 – Convenience Site Relocation
NOTE: Items related to soil gas mitigation at the landfill are NOT included in this CIP (They are
currently drafted into the General Fund CIP). This plan only contains items that are supported
by the collection and recycling customer revenues.
UNRESOLVED ISSUES: SW41 – Convenience Site Relocation anticipates some funding
support coming from the Solid Waste District, who manages the site. This will need to be
developed and negotiated with the District.
ALTERNATIVES: As suggested by the City Commission. If the Commission is does
not wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda.
FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the
Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for
FY15.
Report compiled on: November 27, 2013
Attached: Draft - Solid Waste Fund CIP
36
Solid Waste Collection & RecyclingCapital Improvement PlanFinancial Summary Current YearFY14 FY15 FY16 FY17 FY18 FY19Projected Beginning Reserve Balance Dedicated to CIP 650,209$ 296,342$ 413,243$ 117,559$ 106,800$ 74,984$ Plus: Revenues Dedicated to CIP 306,117$ 334,944$ 364,316$ 394,241$ 398,184$ 402,166$ Less: Scheduled CIP Project Costs (659,984)$ (218,043)$ (660,000)$ (405,000)$ (430,000)$ (290,000)$ Projected Year‐End Cash Dedicated to CIP 296,342$ 413,243$ 117,559$ 106,800$ 74,984$ 187,150$ Assumptions Made for Revenue Estimates: Current YearFY14 FY15 FY16 FY17FY18 FY19Estimated Annual Revenues 2,550,979$ 2,550,979$ 2,576,489$ 2,602,254$ 2,628,276$ 2,654,559$ Estimated Annual Increase in Revenues ‐ 1% 1% 1% 1% 1%Total Estimated Revenues 2,550,979$ 2,576,489$ 2,602,254$ 2,628,276$ 2,654,559$ 2,681,105$ Current Revenues Dedicated to CIP % 10.0% 12.0% 13.0% 14.0% 15.0% 15.0% Plus: Increase Dedicated to CIP 2.0% 1.0% 1.0% 1.0% 0.0% 0.0% Total % Dedicated to CIP 12.0% 13.0% 14.0% 15.0% 15.0% 15.0%ProjectedProjectedTotal Estimated Revenues Dedicated to CIP306,117$ 334,944$ 364,316$ 394,241$ 398,184$ 402,166$ Note: 2012 Rate Study identifies $367,000 in total annual depreciation expense.700,000600,000500,000400,000300,000200,000100,0000FY15 FY16 FY17 FY18 FY19 UnscheduledSolid Waste Projects & Equipment 37
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY16UnscheduledFY15FY17FY18FY19Solid Waste CollectionPW01COLLECTIONSHOPS FACILITY EXPANSION PLAN$10,000SW30COLLECTIONSIDE LOAD PACKER ‐ REPLACEMENT$138,043SW31COLLECTIONSIDE LOAD REPLACEMENT TRUCK$290,000SW32COLLECTIONFRONTLOAD REPLACEMENT TRUCK$270,000SW33COLLECTIONSIDE LOAD PACKER ‐ REPLACEMENT`$140,000SW36COLLECTIONSIDE LOAD REPLACEMENT TRUCK$290,000SW37COLLECTIONSIDE LOAD PACKER REPLACEMENT$140,000SW38COLLECTIONSIDE LOAD TRUCK REPLACEMENT$290,000SW35CURBSIDECURBSIDE RECYCLING TRUCK REPLACEMENT$220,000SW39SOLID WASTEUPDATE SOLID WASTE RATE STUDY$35,000SW40SOLID WASTEOVERLAY LANDFILL ROAD$70,000SW41SOLID WASTECONVENIENCE SITE RELOCATION$10,000$100,000Summary for Solid Waste Collection (12 items)Totals by year:$218,043 $660,000 $405,000FY15FY16FY17UnscheduledFY19$290,000$430,000FY1838
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
PW01
DEPARTMENT
COLLECTION
PROJECT NAME
SHOPS FACILITY EXPANSION PLAN
FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
The construction of the new Vehicle Maintenance Shop at the Lower Yards on Rouse Avenue in FY10/FY11 was Phase I in
expanding and improving our ability to service equipment, store vehicles, and provide work space for Public Works, Parks, and
Facilitiy services. Questions remain about the long-term plan for construction, location, and expansion for: Streets, Sign & Signal,
Forestry, Water/Sewer Operations, Solid Waste Collection & Recycling, Facilities, and Parks & Cemetery departments. This
project would develop a master plan. In scheduling this project, we are recommending waiting until after the Vehicle Maintenance
Division is relocated to its new shop and the interior improvements are made to the Shop at Rouse and Tamarack Street for the
remaining divisions.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
From related divisions: General Fund 20% ($10,000), Water Fund 20% ($10,000), Wastewater Fund 20% ($10,000), Street
Maintenance Fund 20% ($10,000), Solid Waste Fund 20% ($10,000).
New
Replacement
Equipment
Project
FY17
$10,000
FY18 FY19
39
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW30
DEPARTMENT
COLLECTION
PROJECT NAME
SIDE LOAD PACKER - REPLACEMENT
FY15
$138,043
FY16 Unscheduled
DESCRIPTION OF PROJECT
This item is to replace the garbage packer on Asset #3452. The division is averaging 2,000 hours per year on the side load trucks.
The chassis should be good for 12,000-14,000 hours with proper maintenance. Therefore replacing the packer bodies every four
years will save about $140,000 and maximize the value of the chassis. The packers are what generally wear out first. The grabber
arm functions around 400 repetitions per day times 4 days per week is 1,600 reps per week times 4.33 equals 7,000 reps per
month or 93,528 per year. With a life expectancy of four years that is 336,000 reps.
ALTERNATIVES CONSIDERED
Buy new trucks with new chassis and body. Continue to operate with increasing repair costs, down time lowering resale value.
Lease new truck and packer for $75,000 annually if one is available.
ADVANTAGES OF APPROVAL
Saves $140,000 every 4 years per side load truck. With four side load trucks and 2 backup trucks, this adds up quickly.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: $10,000
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY17 FY18 FY19
40
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW31
DEPARTMENT
COLLECTION
PROJECT NAME
SIDE LOAD REPLACEMENT TRUCK
FY15 FY16
$290,000
Unscheduled
DESCRIPTION OF PROJECT
Replacement of a current front-line residential collection truck, Asset #3367. This truck will will have over 12,000 hours at time
of replacement.
ALTERNATIVES CONSIDERED
Continue to operate the existing truck with increasing operating and maintenance costs.
Lease a new, (or used), truck.
ADVANTAGES OF APPROVAL
Allow the division to continue to provide excellent service to over 7000 customers. Increased fuel economy; Reduced exhaust
emissions; Less down time; Increased productivity
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Operating and maintenance costs should be reduced by replacing an aging unit with a new more fuel efficient, cleaner running truck
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY17 FY18 FY19
41
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW32
DEPARTMENT
COLLECTION
PROJECT NAME
FRONTLOAD REPLACEMENT TRUCK
FY15 FY16
$270,000
Unscheduled
DESCRIPTION OF PROJECT
This truck is a replacement for Asset #3421; the collection of residential and commercial refuse. The new truck will ensure
continued efficient, cost-effective refuse collection that will allow the Division to meet the demands of a growing city while
maintaining the standards the Bozeman residents expect.
ALTERNATIVES CONSIDERED
To use existing truck that will have more than 10,000 hours of hard use. Repair costs will continue to increase and the resale
value will continue to decrease. The truck will also take an inordinate amount of shop time to maintain.
ADVANTAGES OF APPROVAL
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Maintenance costs: $12,000/year
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY17 FY18 FY19
42
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW33
DEPARTMENT
COLLECTION
PROJECT NAME
SIDE LOAD PACKER - REPLACEMENT`
FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
This item is the replacement of equipment on one of our side-loading garbage trucks. It will replace the 2008 Curbtenter Packer
on Asset #3455 - 2008 Craine Carrier Chassis. The chassis should be good for 12,000-14,000 hours with proper maintenance.
Therefore replacing the packer bodies every four years will save about $140,000 and maximize the value of the chassis. The
packers are what generally wear out first. The grabber arm functions around 400 repetitions per day times 4 days per week is
1,600 reps per week times 4.33 equals 7,000 reps per month or 93,528 per year. With a life expectancy of four years that is
336,000 reps.
ALTERNATIVES CONSIDERED
Buy new trucks with new chassis and body. Continue to operate with increasing repair costs, down time lowering resale value.
Lease new truck and packer for $75,000 annually if one is available.
ADVANTAGES OF APPROVAL
Saves $140,000 every 4 years per side load truck. With four side load trucks and 2 backup trucks, this adds up quickly.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: $10,000
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY17
$140,000
FY18 FY19
43
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW35
DEPARTMENT
CURBSIDE
PROJECT NAME
CURBSIDE RECYCLING TRUCK REPLACEMENT
FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
This would be a new chassis and new sideload recycling body, to replace the exising Curbside Recycling Truck, which is expected
to be at the end of its useful life in 2017.
ALTERNATIVES CONSIDERED
Lease
ADVANTAGES OF APPROVAL
To maintain a level of service to the curbside recycling customers
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Maintenance costs are $15,000/year & Operating costs are $15,000/year
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY17
$220,000
FY18 FY19
44
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW36
DEPARTMENT
COLLECTION
PROJECT NAME
SIDE LOAD REPLACEMENT TRUCK
FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
Side Load Replacement Truck
ALTERNATIVES CONSIDERED
To keep existing truck in service that will have over 10,000 hours of hard use. Repair costs & down time will continue to
increase, making truck unreliable for garbage collection.
ADVANTAGES OF APPROVAL
Minimize repairs & down time. To improve safety and provide reliable customer service.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual operating and maintenance costs = $27,000
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY17 FY18
$290,000
FY19
45
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW37
DEPARTMENT
COLLECTION
PROJECT NAME
SIDE LOAD PACKER REPLACEMENT
FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
This replacement packer will be placed on an existing chassis, thus extending the life of the overall unit. The old packer will be
traded in. New packers advancement in materials used have led to extend the life of the packer. Given the high amount of
mechanical parts in motion, new packers wear out within 5 years (8,000 hours) of use.
ALTERNATIVES CONSIDERED
To continue to operate existing packer with increased repair costs and down time.
ADVANTAGES OF APPROVAL
To minimize repair costs and having reliable equipment to provide high customer service expectations.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual operating and maintenance costs = $10,000
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY17 FY18
$140,000
FY19
46
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW38
DEPARTMENT
COLLECTION
PROJECT NAME
SIDE LOAD TRUCK REPLACEMENT
FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
Replacement of a current front-line residential collection truck, asset #3452.
ALTERNATIVES CONSIDERED
Continue to operate the existing truck with increasing operating & maintenance costs. Lease a new (or used) truck.
ADVANTAGES OF APPROVAL
Allows the division to continue to provide excellent service to customers. Increased fuel economy; reduced exhaust emissions;
less down time; increased productivity
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Operating & Maintenance Costs should be reduced by replacing an aging unit with a new, more fuel efficient, cleaner running truck
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY17 FY18 FY19
$290,000
47
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW39
DEPARTMENT
SOLID WASTE
PROJECT NAME
UPDATE SOLID WASTE RATE STUDY
FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
Update to 2012 Rate Study.
ALTERNATIVES CONSIDERED
Continue basing rates on 2012 Study
ADVANTAGES OF APPROVAL
Updating the rate study every 5 years will allow the division to ensure that they can continue operating and providing services at a
fair rate
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY17
$35,000
FY18 FY19
48
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW40
DEPARTMENT
SOLID WASTE
PROJECT NAME
OVERLAY LANDFILL ROAD
FY15
$70,000
FY16 Unscheduled
DESCRIPTION OF PROJECT
Overlay Landfill Road, as it extends through the property from Story Mill Road to the Solid Waste Shop.
ALTERNATIVES CONSIDERED
Let the road continue to deteriorate and patching; eventually have to reconstruct
ADVANTAGES OF APPROVAL
An overlay will extend the life of the road
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Reduce maintenance costs for many years
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY17 FY18 FY19
49
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW41
DEPARTMENT
SOLID WASTE
PROJECT NAME
Convenience Site Relocation
FY15
$10,000
FY16
$100,000
Unscheduled
DESCRIPTION OF PROJECT
This project would identify a more suitable location for the existing Logan Landfill Convenience Station, located at the City Landfill
property on Story Mill Road. The first year would fund the engineering work to determine a more suitable site on the Landfill
property; likely to include features such as below grade roll-off containers for more convenient disposal. The second year would
fund the actual construction costs related to the relocation of the existing equipment.
ALTERNATIVES CONSIDERED
Continue to operate at its existing site.
ADVANTAGES OF APPROVAL
The Site would have easier-to-use disposal options, like grade-level disposal containers. The Convenience Station would become
less-obtrusive use on the property; less of the activities would be visible to ajacent properties.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Make the site less visible and make use of the site more convenient.
FUNDING SOURCES
Solid Waste Fund, with potential reimbursement from the Solid Waste District.
New
Replacement
Equipment
Project
FY17 FY18 FY19
50