HomeMy WebLinkAboutApprove Resolution 4493, Change Order 1 for the North 7th Ave. Lighting Improvements Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Dustin Johnson, Project Engineer Richard Hixson, City Engineer SUBJECT: North 7th Ave. Lighting Improvements Change Order #1 MEETING DATE: November 18, 2013 AGENDA ITEM TYPE: Consent Agenda RECOMMENDATION: Authorize City Manager to sign North 7th Lighting Improvements Contract Change Order #1, increasing the amount of the Contract by $28,146.00 for a total contract price of $602,631.00. BACKGROUND: On October 15, 2012, the City Commission authorized award of the bid for the North 7th Lighting Improvements to Yellowstone Electric out of Billings Montana. Due to the size of the project it was broken into specific phases, and the board determined they would start the project on the north end of the corridor and move south towards Main Street. This initial phase would install lights from the I-90 off-ramp to Juniper Street. This Change Order is broken down into eight separate components listed as PR 001 through PR 008. These items are almost exclusively attributed to the complexity of the utilities within the N. 7th corridor. In each of these circumstances Yellowstone Electric had to modify the project due to utility conflicts, missing conduit, missing easements, or faulty record drawings. These types of modifications are typical for work within a major street such as N. 7th Ave. because of how crowded the corridor is with public and private utilities. The one exception was a light pole knock down listed in PR 008. The knock down of a pole was the result of a delivery truck that drove over the curb. The truck was identified and the city will be reimbursed for all expenses for this cost. The total cost of this item was $6,077. 50 FISCAL EFFECTS: Of the total $28,146 for this change order $22,069 will be paid for by the North Seventh Urban Renewal Board. The remaining $6,077 will be reimbursed by the responsible party for the knock down of the light pole. ALTERNATIVES: As suggested by the City Commission. Attachments: Change Order #1 Commission Resolution 4493 Report compiled on: 11/5/2013 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70