Loading...
HomeMy WebLinkAboutChange Order No. 1 Modification of Contract with R & R Taylor Change Order # I TAYLOR CONSTRUCTION INC. Date: October 18, 2013 To: City of Bozeman Job Name: City Hall Masonry 20 East Olive Job Number: 2012-036 Bozeman, MT 59715 Contract Date: 07/31/13 Attn: We hereby agree to make the change(s) specified below: ADD: 1. The masonry repairs are as follows: Demolition limited to the red outlined areas in four locations designated in the attached pictures. Removal and replacement of any units with face damage in outlined areas. Degraded joints in proposed areas to be removed and replaced. In labeled area 1, 2, and 3 proposed units to be used are 4x4x12"walnut. In labeled area 4 proposed units to be undamaged original units from previous masonry repair. No visible damage shown on the solder or cap in area 1, 2 and 3. Therefore no repair shall extend into the solder course causing cap or roof repair. No other areas included in proposed removal or repair. Other areas of damage, primarily at northeast exterior stairwell are too extensive to guarantee structural viability at point of removal. 7 619.00 Original Contract Amount: $ 51,173.00 Previous Authorized Change Orders: 0.00 Previous Contract Total: $ 51,173.00 Current Change Order Amount: 7,619.00 New Contract Amount: $ 58,792.00 Contract Time will be increased 14 Days City of Bozeman R R aylor Construction Inc. Date: 1 d C'Z d— 1� Date: Z4 ACCEPTED—The above prices and specifications of this Change Order are satisfactory and hereby accepted. All work is to be performed under same Terms and Conditions as specified in original Contract unless otherwise stipulated. NOTE: This Change Order becomes part of and in conformance with the existing contract. Please sign and return one copy to our office 1775 Love Lane - Bozeman, MT 59718 • Tel: (406)-587-4451 • Fax: (406)-586-7508