Loading...
HomeMy WebLinkAboutResolution 4487 Change Order 1 modification of Contract with R & R Taylor Construction COMMISSION RESOLUTION NO. 4487 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH R&R TAYLOR CONSTRUCTION INC,BOZEMAN, MONTANA. WHEREAS, the City Commission did, on the 24th day of June 2013, authorize award of the bid for the City Hall Masonry Repair Project of the City Hall Building, Bozeman, Montana-, and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and R& R Taylor Construction Inc, Bozeman, Montana, as contained in Change Order 41, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 4th day of November, 2013. �pA��V C uwtl. � 4".ir�ydueryWn. � �yM'+�'��✓'r�aiw'"". N'�•w»w SEAN A. DECKER Mayor ATTEST: i ry er�i.9✓ rtN' .,... n 4' e STPVIET+;, CM C Ci C er t , APPROVED AS TO FORM: �- ilea E SULLI'VAN City.Attorney Change �l � Order 4� � ����0�m TAY������ � � R CONSTRUCTION INC. Date: October 18. 2813 To: City nfBozeman Job Name- City Hall Masonry 2O East Olive Job Number: 2012-036 Bozeman, Ml[ 59715 Contract Date: 07/31/13 Attn: We hereby agree hn make the change(s) specified below: AM 1. The masonry repairs are osfo]lows� Demolition limited to the red outlined areas in four locations designated in the attached pictures. Removal and replacement of any units with face damage in outlined areas. Degraded joints in proposed areas to be removed and replaced. |n labeled area 1, 2, and 3 proposed units tobe used are 4n4x12''walnut, In labeled area proposed units to be undamaged original units from p^av|nue masonry repair. No visible damage shown on the solder or cap in area 1. 2 and 3. Therefore no repair shall extend into the molder course causing cap or roof repair. No other areas included in proposed removal orrepair. Other areas of dameQe, primarily at northeast exterior stairwell are too extensive 1oguarantee structural viability at point of removal, Original Contract Amount: $ 5l~T73.Q0 Previous Authorized Change Orders: 8-00 Previous Contract Total: $ 5l`l73.0Q Current Change Order Amount: New Contract Amount: $ 58,792.00 Contract Time will be increased 14 Days City of Bozeman R F&�7Raylor Construction Inc. 8 Date: d? Date: ACCEPTED—Theahovepriusamdspedfimation of this Change Order are satisfactory and hereby accepted. All work (sto be performed under same Terms and Conditions as specified in original Contract unless otherwise stipulated. NOTE: This Change Order becomes pact of and in conformance with the existing contract. Please sign and return one copy to our office 1775 Love Lame - Bozeman, MT 59718 , Tel. (406)-587'4451 " Fax: (406)-586'7508