INVITATION TO BID
NOTICE IS HEREBY GIVEN that the City of Bozeman, Montana, is accepting sealed bids for
the:
CITY OF BOZEMAN BOGERT POOL SANDBLASTING, PAINTING AND MAIN
DRAIN REPLACEMENTPROJECT\
Sealed bids for structural and component improvements to the City of Bozeman’s BOGERT
SWIMMING POOL will be received by the City Clerk, City Hall, 121 N. Rouse Avenue, P.O.
Box 1230, Bozeman, Montana 59771-1230 until 2:00 p.m., mountain standard time,
Tuesday, November 26th, 2013, and then publicly opened and read aloud.
Please write the name of the project: BOGERT POOL SANDBLASTING, PAINTING
AND MAIN DRAIN REPLACEMENT on the front of the sealed bid.
The physical address is:
City Clerk’s Office, Suite 202, City Hall, 121 N. Rouse Avenue, Bozeman, Montana.
The mailing address is:
City Clerk’s Office, Suite 202, City Hall, P.O. Box 1230, Bozeman, Montana, 59771.
Bids must be received before 2:00 p.m. Tuesday, November 26th, 2013. Original copies must
be submitted – no faxed of electronic bids will be accepted. Bids will be opened and read
following the close of bids.
The project is detailed in the Instructions to Bidders, Bid Specifications, Bid Form, and
Construction Agreement. This project is for sandblasting the interior pool surface to remove
multiple layers of paint, repairing any pool lining that is torn loose during the sandblasting,
repainting the interior pool surface, and replacing the main pool drain.
Pursuant to 7-1-4127, Montana Code Annotated (MCA), Further requirements for this project
including the Instructions to Bidders, Bid Specifications, Bid Form, and Construction Agreement
may be obtained at the office of the City Clerk, City Hall, 121 North Rouse, Suite 202, Bozeman,
Montana 59771, telephone number (406) 582-2320, by e-mail at agenda@bozeman.net, or
interest parties may download the project requirements at www.bozeman.net under the
“Business” tab, and the RFP/BID drop down menu. For further questions pertaining to this
invitation to bid, please contact Aquatics Director Dan McCarthy at (406) 582-2906.
As required by the Instructions to Bidders, any entity submitting a bid under this invitation must
sign and return the required affirmation stating that they will not discriminate on the basis of
race, color, religion, creed, sex, age, marital status, national origin, or because of actual or
perceived sexual orientation, gender identity or disability in the performance of the work under
this invitation should it be awarded to that entity. Each entity submitting under this invitation
shall also recognize in writing the eventual Construction Agreement will contain a provision
prohibiting discrimination as described above and this prohibition on discrimination shall apply
to the hiring and treatment of the Contractor’s employees and to all subcontracts.
Also as required by the Instructions to Bidders, each bid or proposal must be accompanied by a
Certified Check, Cashier's Check, or Bid Bond payable to the City of Bozeman, Montana, in an
amount not less than ten percent (10%) of the total amount of the bid.
No bid may be withdrawn after the scheduled time for the public opening of bids, which is 2:00
p.m. local time, Tuesday, November 26th, 2013.
The City reserves the right to reject any or all bids received, to waive informalities, to postpone
the award for a period of not to exceed Sixty (60) days, and to accept the bid which is in the best
interests of the City.
Dated at Bozeman, Montana, this 6th day of November, 2013
Stacy Ulmen, CMC
City Clerk, City of Bozeman
Published Bozeman, Montana
Sunday, November 10, 2013
Sunday, November 17, 2013
1
INSTRUCTIONS TO BIDDERS (City of Bozeman Bogert Pool Sand Blasting, Painting, and Main Drain Replacement)
BID DOCUMENTS: The bid documents for the City of Bozeman Bogert Pool Sand Blasting,
Painting, and Main Drain Replacement (the “Project”) include the Invitation to Bid, this Instruction to
Bidders, the Bid Specifications, the Construction Agreement and the Bid Form. BIDS: All bids must be legibly written in ink. No alterations by erasures or interlineations will be
permitted in bids or in the printed forms. Each bid shall be enclosed in a sealed envelope addressed to: Bozeman City Clerk, PO Box 1231 Bozeman, Montana 59715, or physically delivered to the address on
the Invitation to Bid and endorsed on the outside of the envelope with the words: Bogert Pool Sand
Blasting, Painting, and Main Drain Replacement.
Bids shall be strictly in accordance with the prescribed Bid Form. Any modifications thereof or
deviations there from may be considered as sufficient cause for rejection. Bids carrying riders or
qualifications to the bid being submitted may be rejected as irregular.
Each bid shall indicate the total bid price. The price quoted in a bid shall include all items of labor, materials, tools, equipment and other costs necessary to fully complete the Project to the Bid Specifications. Any items omitted from the Bid Specifications which are clearly necessary for the completion of the
Project shall be considered a portion of the Project although not directly specified or called for in the Bid Specifications.
All parts and materials shall be new. In all cases, materials must be furnished as specified.
The City reserves the right and shall be at liberty to inspect all materials and workmanship at any time during the Project and shall have the right to reject all materials and workmanship which do
not conform to the Bid Specifications. However, the City is under no duty to make inspection, and if no inspection is made, the chosen contractor shall not be relieved of any obligation to furnish materials and workmanship strictly in accordance with the Bid Specifications.
BID SECURITY: To be considered, the bid must be accompanied by a bid security unconditionally
payable to the City of Bozeman for ten percent (10%) of the total amount of the bid and attached as Exhibit 1 on the Bid Form. Each Bidder shall expressly covenant in the bid that if the Bidder is awarded the bid, the Bidder will, within thirty (30) days after the bid is awarded, enter into the Construction
Agreement with the City of Bozeman in substantially the same form as shown on the Construction
Agreement. Bid security must be provided in a form specified in §18-1-203, MCA, which includes, but is not limited to, certified check, cashier’s check, bank draft, bid bond, guaranty bond, or surety bond. Bid
security through a bid, guaranty or surety bond must be issued by a surety company authorized to do business in the State of Montana. The bid security protects and indemnifies the City against the failure or refusal of the successful Bidder to timely enter into the Construction Agreement.
SIGNATURE OF BIDDERS: Each bid must be signed in ink by the Bidder with the Bidder’s full name
and business address or place of residence. If the Bidder is a firm or partnership, the name and residence
of each member must be inserted. If the bid is submitted by or in behalf of a corporation, it must be signed in the name of the corporation by a corporate official authorized to bind the corporation and who
shall also affix the corporate seal of the corporation to the bid. Any bid by a corporation signed by a
2
person other than a corporate officer must be accompanied by a power of attorney showing that person’s
authority to sign for the corporation.
ONLY ONE PROPOSAL: No Bidder may submit more than one bid. Two bids under different names
will not be received from one firm, partnership, association, or corporation.
RESPONSIBILITY OF AGENT: Any person signing a bid as the agent of another, or of others, may
be required to submit satisfactory evidence of authority to so sign.
TITLE: The position title of any person executing the bid or Agreement shall be clearly indicated
beneath the signature. RESPONSIBLE BIDDER: Bidder is not deemed a responsible bidder if Bidder is delinquent in
payment of property taxes or special improvement district assessments within the City of Bozeman for at least six (6) months.
Any Bidder required by the Bozeman Municipal Code to have a general business license in the City of Bozeman must obtain such license before a bid can be awarded to a bidder.
EXAMINATION OF DOCUMENTS/SPECIFICATIONS: Before submitting a bid, each Bidder should examine the Bid Specifications, these Instructions to Bidders, the Bid Form, and the Construction
Agreement thoroughly and become familiar with federal, state, and local laws, ordinances, rules, and
regulations that may, in any manner, affect the cost or delivery of the goods.
INTERPRETATION OF CONTRACT DOCUMENTS: If any person contemplating submission of a
bid is in doubt as to the true meaning of any part of the specifications or the Construction Agreement, that person may submit a written request to the City for an interpretation thereof. The person submitting the
request will be responsible for its prompt delivery. Any interpretation of the proposed Construction Agreement will be made only by an addendum duly issued and a copy of any such addendum will be mailed or delivered to each person receiving the specifications.
TIME OF COMPLETION: The time of performance of the Project delivery of the goods to be purchased is a basic consideration of the award of bid. It is necessary that each Bidder satisfy the City of
the Bidder’s ability to deliver the Project within the stipulated time. ADDENDA: If applicable, any addenda issued during the time of bidding, or forming a part of the
specifications provided to Bidder for the preparation of Bidder’s proposal, shall be covered in the bid and shall be made a part of the Construction Agreement. Receipt of each addendum shall be acknowledged in
the bid. Any bid in which all issued addenda are not acknowledged will be considered incomplete and
will not be read. WITHDRAWAL OF BID: No Bidder may withdraw any bid for a period as specified in the Invitation
to Bid after the date and hour set for the opening declared herein. Prior to that time, Bidder may withdraw a bid by written request. The request to withdraw a bid must be signed in the same manner and
by the same person or persons who signed the bid. ACCEPTANCE AND REJECTION OF BIDS: The City reserves the right to accept or reject the bids
in the best interest of the City. The City reserves the right to waive informalities and irregularities in any
bid submitted, to reject non-conforming, non-responsive or conditional bids, to correct arithmetic errors without changing unit price, and postpone awarding of the Construction Agreement for a period not
exceeding sixty (60) days. AWARD OF BID: If the bid is to be awarded, City will award the bid to a responsible Bidder whose bid
is most responsive as determined solely by the City and which conforms to all material terms and
3
conditions of the bidding documents and proposed Construction Agreement, is lowest in price, is in the
best interest of the project, and other factors considered. The award may be based on the lowest
responsive cumulative base bid plus any added alternate schedules the City determines to include with the project. The successful Bidder will be notified by letter mailed to the address shown on the bid that the
bid has been accepted and that Bidder has been awarded the bid.
CANCELLATION OF AWARD: The City reserves the right to cancel the award of any bid at any time
before the complete execution of the Construction Agreement by all parties without any liability against the City. EXECUTION AND APPROVAL OF AGREEMENT: The Construction Agreement is available for review with the Bozeman City Clerk shall be signed by the successful Bidder and returned within the time shown on the bid. If the Construction Agreement is not executed by the City within fifteen (15) days
following receipt from Bidder of the signed Agreement, Bidder has the right to withdraw the bid without penalty. The Construction Agreement is not effective until it has been fully executed by all of the parties thereto.
FAILURE TO EXECUTE AGREEMENT: Failure to execute the Construction Agreement shall be
just cause for annulment of the award. In the event of such annulment, the bid guarantee shall be
forfeited to the City, not as a penalty, but as liquidation of damages sustained. Award may then be made to the next lowest responsible and qualified Bidder, or the project may be re-advertised as the City may
decide.
PAYMENT: Payment for all goods purchased under the Construction Agreement will be made by the
City within the time period specified in and in accordance with the procedures outlined therein.
NON-DISCRIMINATION: In accordance with law, each entity submitting a bid shall affirm on the
form provided by the City that the Bidder shall not discriminate in the performance of the work called for in the Bid Specifications on the basis of race, color, religion, creed, sex, age, marital status, national origin, or because of actual or perceived sexual orientation, gender identity or disability as specified in the Construction Agreement.
It is further understood that any person who is in violation of this clause shall be barred forthwith from
receiving awards of any purchase from the City of Bozeman unless a satisfactory showing is made that discriminatory practices have ceased, and the recurrence of such acts is unlikely.
BID FORM 1
BID FORM
BOGERT POOL SAND BLASTING, PAINTING,
AND MAIN DRAIN REPLACEMENT PROJECT P.O. BOX 1230 CITY OF BOZEMAN BOZEMAN, MONTANA 59771
TO: City Clerk 121 North Rouse Ave.
P.O. Box 1230
Bozeman, Montana 59771-1230
THE UNDERSIGNED BIDDER, having familiarized themselves with the Work required by the Contract Documents, the site(s) where the work is to be performed, local labor conditions and all
laws, regulations, municipal ordinances and other factors which may affect the performance of the
Work, and having satisfied himself of the expense and difficulties attending performance of the
work:
HEREBY PROPOSES and agrees, if this bid is accepted, to enter into an Agreement, in the form
attached, to perform all work for the restoration of the BOGERT POOL, including the assumption of
all obligations, duties, and responsibilities necessary for the successful completion of the contract
and the furnishing of all materials and equipment required to be incorporated in, and form a
permanent part of, the work; tools, equipment, supplies, transportation, facilities, labor, superintendence, and services required to perform the Work; Bonds, Insurance and Submittals; all as
indicated or specified in the Contract Documents to be performed or furnished by Contractor within
the time and for the prices set forth in the following schedules.
Sealed Bids are due in the office of the City Clerk, second floor of City Hall by 2:00p.m., Tuesday, November 26, 2013. At which time the bids will be opened, read, and reviewed by city staff and then will contact the selected contractor to schedule the work.
Please turn in this full page package for your bid. No electronic versions will be accepted. Mailed
bids must be received by the date and time specified. Please submit the bid in a sealed envelope with the title – Bogert Pool Sand Blasting, Painting, and Main Drain Replacement and list the
name of your firm on the outside of the sealed bid envelope.
The physical address is: City Clerk’s Office, Suite 202, City Hall, 121 North Rouse Ave., Bozeman,
MT.
The mailing address is: City Clerk’s Office, Suite 202, City Hall, P.O. Box 1230, Bozeman, MT.,
59771.
The City reserves the right to reject any and all Responses to Bids received or to waive bid informalities. The City of Bozeman is an Equal Opportunity Employer.
BID FORM 2
The undersigned bidder agrees to be bound by this Bid for a period not to exceed 60 days.
The undersigned Bidder agrees to furnish the required Bonds and to enter into a contract within fifteen (15) calendar days after Owner's acceptance of this Bid, and further agrees to complete all
Work within the time specified per schedule after commencement of the contract time as defined in
the General Conditions.
The contract specifies that Contractor shall begin the Construction Project in the spring of 2014, after receiving a notice to proceed from City and the weather has provided the proper environmental
conditions as required by the paint manufacturer. The contractor shall have all work completed
within 30 days after beginning.
Where multiple schedules are awarded under a single Contract, the contract times shall run concurrently unless separate notices to proceed are issued for the awarded schedules.
Liquidated Damages shall be as specified in the attached Scope of Work of the Agreement Form.
The undersigned Bidder agrees that the unit prices shall govern in checking the Bid, and should a discrepancy exist in the total prices and total amount of Bid as listed above, after extensions are
checked and corrections made, if any, the total amount of the Bid as corrected shall be used in
awarding the contract.
The undersigned Bidder agrees that he has been afforded access to the construction site and has performed those independent site investigations as he deemed necessary.
The undersigned Bidder hereby certifies the following:
A) That this Bid is genuine and is not made in the interest of, or on behalf of, any undisclosed person, firm, or corporation, and is not submitted in conformity with any agreement or rules of any
group, association, organization, or corporation;
B) That he has not directly or indirectly solicited any other Bidder to put in a false or sham Bid;
C) That he has not solicited or induced any person, firm, or corporation to refrain from bidding;
D) That he has not sought by collusion to obtain for himself any advantage over any other Bidder or
over the Owner.
E) That he is not currently operating beyond the contract time on any previously awarded public
works contract as defined and required by Article 15-50-203, MCA, as amended.
The undersigned Bidder(s) either singularly or as a joint venture hereby certifies (certify) pursuant to
Article 37-71-203, MCA, that he (they) is (are) duly and regularly licensed.
BID FORM 3
Following is a summary of the proposed scope of work identified at the pre-construction walk
through conducted on Tuesday, October 8, 2013. The purpose of the project is to renovate the
pool lining at Bogert Pool and to modify the existing pool drains to meet current safety codes for
swimming pools.
In addition to the bid number provided, the contractor is asked to provide a construction time line
outlining the critical steps and stages of the project and a calendar showing how the work will be
completed.
Upon award, the contractor will complete the contract document that was provided during the
walk through, an electronic version can be provided. The contractor will also need to provide
proof of insurance at the rates specified and a performance bond for the project.
The job will be subject to both state and local rules including: state prevailing wage rates; 1% Mt. Dept. of Revenue Withholding; and City of Bozeman non-discrimination resolution.
The identified work components include:
This project is for a renovation of the pool lining at Bogert Pool and replacement of the existing
pool drains to meet current safety codes for swimming pools. Work will include the following:
Sand blast all interior surfaces of the existing pool surface materials to remove existing
layers of inefficient multiple painting coats in order to prepare the pool for a clean painted surface using techniques and equipment customary for the work.
Repair any pool lining material damaged during the sand blasting, any cracks on the pool
lining, and cover any exposed rebar prior to painting.
Replace the existing pool drains with a duel drain opening configuration in order to meet
current safety standards for pools. The drain replacement specifications are included as
an attachment developed by Morrison-Maierle Inc.
Prepare the surface for painting by, at a minimum triple rinsing the pool and using an acid etching technique.
Paint the interior of the pool with Paralon 2 rubber chlorinated based paint or similar.
The work will need to meet the required health standards and the Gallatin County Health Department will inspect the work prior to final approval.
BID FORM 4
BIDDER agrees to perform all the work described in the CONTRACT DOCUMENTS for the
following lump sum:
TOTAL CONTRACT BID PRICE $_________________________
(Written Bid Price Number)
ESTIMATED COSTS OF PROJECT COMPONENTS:
Sand Blasting $________________ Estimated Cost Per Square Foot For Blown Out Lining $________________
Estimated Cost Per Lineal Foot for Crack Repairs $________________
Pool Drain Replacement $________________
Surface Preparation Prior to Painting $________________
Painting The Pool Liner $________________
The undersigned Bidder acknowledged receipt of the following Addenda, which have been
considered in preparation of this Bid:
No._____________________________ Dated____________________
No._____________________________ Dated____________________
No._____________________________ Dated____________________
No._____________________________ Dated___________________
Submitted this _____ day of _____________________, 2013.
SIGNATURE OF BIDDER:__________________________________________ Montana Contractor Registration Number______________________________
If an individual:_____________________________________________
BID FORM 5
doing business as_____________________________________________
If a Partnership: by ________________________________________________
Partner _____________________________________________
If a Corporation:_____________________________________________
(a) ____________________________________________
by ____________________________________________
(Seal &
Title___________________________________________ Attest)
Business Address of Bidder: __________________________________
____________________________________________________________
If Bidder is a joint venture, other party must sign below:
Montana License Number and Class______________________________
If an Individual:_______________________________________ doing
business as _________________________________________________.
If a Partnership: __________________________________________
by ________________________________Partner
__________________________________________
If a Corporation:____________________________________________
(a)______________________________Corporation
by _________________________________________
(Seal & Title________________________________________ Attest)
Construction Agreement for Bogert Pool Sand Blasting, Painting and Main Drain Replacement Page 1 of 25
CONSTRUCTION AGREEMENT
This Construction Agreement is made this ____ day of______, 2013, by and between
the CITY OF BOZEMAN, MONTANA, a municipal self-governing Charter government organized and existing under the laws of the State of Montana, P.O. Box 1231, Bozeman,
Montana 59771-1231 (“City”), and_______, a_______, of (ADDRESS), MT. (ZIP),
(“Contractor”).
Recitals
A. The City issued a request for bids for the construction project known as Bogert
Pool Sand Blasting, Painting, and Main Drain Replacement (the “Construction Project”)
pursuant to the requirements of all applicable statutes, rules, regulations, and ordinances.
B. The City analyzed all responses to the request received pursuant to its standard
practices and the requirements of all applicable statutes, rules, regulations, and ordinances.
C. The City determined the Contractor was the lowest most responsible bidder
on________, 2013 and desires now to enter into this Agreement.
NOW THEREFORE, in consideration of the covenants, agreements, representations,
and warranties contained herein, the parties agree as follows:
Agreement
1. Work to be Performed:
a. A description of the Construction Project and Contractor’s duties is set
forth in the Invitation to Bid, Instruction to Bidders, Bid Specifications and this Agreement which are attached hereto and incorporated herein by this reference, and the
specifications provided by the City as included in the Scope of Work as attached herein
as Exhibit A.
b. Prior to the commencement of any work on the Construction Project, Contractor’s representatives and City’s representatives shall hold a meeting to establish a
working understanding among the parties as to the scope of the Construction Project and
duties of the Contractor. At this meeting, Contractor and City shall resolve any
outstanding issues related to the Specifications and Scope of Work. If the parties are
unable to resolve these issues and the City fails, refuses, or is unable to approve the same, no work shall commence on the Construction Project until such issues are resolved and
the City approves the changes to the Specifications and Scope of Work.
c. Except as provided elsewhere in this Agreement, Contractor shall furnish
all the labor, materials, equipment, tools, and services necessary to perform and complete the Construction Project.
Construction Agreement for Bogert Pool Sand Blasting, Painting and Main Drain Replacement Page 2 of 25
d. During work on the Construction Project, and as part of the final
completion of the Construction Project, Contractor shall clean up the site of the
Construction Project, including the removal and satisfactory disposal of all waste,
garbage, excess materials, equipment, temporary buildings, the removal or grading of all embankments made for construction purposes, the filling in of all excavations, and the
performance of any other work necessary to restore the site to at least as good order and
condition as at the commencement of the Construction Project.
2. City-Supplied Materials: There will be no City supplied materials for this Construction Project.
3. Time of Performance:
a. Contractor shall begin the Construction Project in the spring of 2014, after receiving a notice to proceed from City and the weather has provided the proper environmental conditions as
required by the paint manufacturer. The contractor shall have all work completed within 30 days
after beginning. The Contractor shall comply with the Construction Schedule, as shown in
Exhibit B. Time is of the essence of completion of all work and each phase of the Construction
Project.
b. The Construction Schedule is subject to the City’s approval. Contractor’s
construction plan, methods of operation, materials used, and individuals and
subcontractors employed (collectively “Contractor’s Resources”) are subject to the City’s
approval at all times during the term of this Agreement, and must be such as to ensure the completion of the work in compliance with the deadlines set in the Construction Schedule
during the term of this Agreement. In the event the City determines the Contractor’s
Resources are inadequate to meet the approved Construction Schedule, the City may
order the Contractor to accelerate its performance to give reasonable assurances of timely
completion and quality results. Acceleration under this section shall not be deemed a Change Order as defined in Section 5b below and the Contractor shall receive no
equitable adjustment for such acceleration. Nothing in this section shall be interpreted to
relieve the Contractor of its duties and responsibilities to plan for and complete the
Construction Project in a timely manner according to the Construction Schedule.
4. Liquidated Damages: If the Construction Project is not completed within the
time provided by this Agreement, the City may deduct for each day the Construction Project
remains uncompleted the sum of Five Hundred Dollars ($500.00) from the compensation
hereinafter specified and retain that sum as payment for liquidated damages sustained by reason
of the Contractor’s failure to complete the Construction Project on time.
5. Compensation:
a. City shall pay to Contractor, and Contractor shall accept as full payment
for the performance of this Agreement and the Construction Project, the amount of ___________Dollars ($______) referred to as the Total Compensation, as paid in accordance with Exhibit C, Compensation Schedule, attached hereto.
Construction Agreement for Bogert Pool Sand Blasting, Painting and Main Drain Replacement Page 3 of 25
b. If work not included within the original Specifications and Scope of Work
documents is requested by City, such additional work and the related compensation shall
be agreed to in writing by both parties prior to commencement of the additional work and shall be subject to a “Change Order” pursuant to the Change of Work Specifications set
forth in Exhibit D.
c. Monthly progress payments and final payment will be made only in
accordance with the terms of a completed Compensation Schedule to be approved by the City’s Representative. All invoices must be submitted to the City’s Representative.
d. City shall retain five percent (5%) of the total amount of Total
Compensation to be paid to the Contractor to ensure compliance with the terms and
conditions of this Agreement and the timely completion of the Construction Project and any and all “punch list” items (“Retainage Amount”). The Retainage Amount shall be
paid to Contractor thirty (30) days after the City’s final acceptance of the portion of work
for which a separate price is stated in the specifications for the Construction Project.
e. Upon acceptance of final payment and for other good and valuable consideration, Contractor shall and hereby does release and forever discharge City, its
officers, agents, and employees of and from any and all claims, demands, actions, causes
of action, obligations, and liabilities of every kind and character whatsoever, in law and
in equity, whether now known or in the future discovered, arising from or related to this
Agreement or the Construction Project that Contractor may have or assert against City, its officers, agents, and employees.
6. Inspection and Testing:
a. City has the right to inspect and test any and all work performed by Contractor or any of its subcontractors on the Construction Project. Contractor shall
allow City and its agents access to the Construction Project at all times and shall provide
every reasonable facility for the purpose of such inspection and testing, including
temporarily discontinuing portions of the work or uncovering or taking down portions of
the finished work. Any inspection and testing performed by the City and its agents is for the sole benefit of the City and shall not relieve the Contractor of its duty, responsibility,
and obligation to ensure that the work strictly complies with the terms and conditions of
this Agreement and all applicable laws including building and safety codes. City’s
inspection and testing shall not be deemed or considered acceptance by the City of any
portion of the Construction Project. City’s inspection and testing shall not serve to nullify, amend, or waive any warranties provided by the Contractor under this
Agreement.
b. Contractor shall, without charge, replace any material or correct any work
found by the City or its agents to be defective or otherwise not in compliance with the terms and conditions of this Agreement. In the event Contractor fails to replace or
correct any defective work or materials after reasonable written notice by the City to do
Construction Agreement for Bogert Pool Sand Blasting, Painting and Main Drain Replacement Page 4 of 25
so, the City may take such corrective action, either with its own materials and employees
or by retaining any third party to do so, and deduct the cost and expense of such
corrective action from the Contractor’s compensation.
7. Partial Utilization of Construction Project: City shall have the right to use or
occupy any portion of the Construction Project that City and Contractor mutually agree is
substantially completed and constitutes a separately functioning and usable part of the
Construction Project for its intended purpose without significant interference with Contractor’s
performance of the remaining portions of the Construction Project. In the event City takes possession of any portion of the Construction Project, such possession shall not be deemed an
acceptance of the Construction Project, in whole or in part. Contractor shall still be required to
conduct any final testing of the portions in the possession of the City. City’s use of any portion
of the Construction Project shall not be grounds for extensions of any construction deadlines or a
change in the Contractor’s compensation. Contractor’s warranties shall run from the completion of the total Construction Project and not from the date the City may take possession of selected
portions of the Construction Project.
8. Related Work at the Site: Nothing in this Agreement shall prevent or preclude
City, through its own employees or by contract with any third party, from performing other work related to the Construction Project at the construction site; provided such related work is not
otherwise addressed in this Agreement and provided such related work does not otherwise
interfere with Contractor’s performance of this Agreement or the completion of the Construction
Project. Contractor shall afford any City employee, agent or representative, or any third party
under contract with the City to perform the related work, proper and safe access to the site of the Construction Project, a reasonable opportunity for the introduction and storage of materials and
equipment, the opportunity to perform the related work, and shall properly coordinate the
Contractor’s work on the Construction Project with the related work.
9. Contractor’s Warranties: Contractor represents and warrants as follows: a. Unless otherwise specified by the terms of this Agreement, all materials
and equipment used by Contractor on the Construction Project shall be new and where
not otherwise specified, of the most suitable grade for their intended uses.
b. All workmanship and materials shall be of a kind and nature acceptable to the City.
c. All equipment, materials, and labor provided to, on, or for the
Construction Project must be free of defects and nonconformities in design, materials, and workmanship.
d. Contractor and its sureties are liable for the satisfaction and full
performance of all warranties.
e. Contractor shall give its personal attention to the faithful prosecution of the completion of the Construction Project and Contractor, or its duly authorized
Construction Agreement for Bogert Pool Sand Blasting, Painting and Main Drain Replacement Page 5 of 25
representative assigned to serve as the Construction Project Manager, shall be personally
present at the site of the Construction Project during working hours for the term of this
Agreement until the completion of the Construction Project.
f. Contractor shall have a copy of this Agreement including the Scope of
Work on the site of the Construction Project at all times.
g. Contractor has examined all available records and made field
examinations of the site of the Construction Project. Contractor has knowledge of the field conditions to be encountered during the Construction Project. Contractor has
knowledge of the types and character of equipment necessary for the work, the types of
materials needed and the sources of such materials, and the condition of the local labor
market.
h. Contractor is responsible for the safety of the work and shall maintain all
lights, guards, signs, temporary passages, or other protections necessary for that purpose
at all times.
i. All work must be performed at Contractor’s risk, and Contractor shall promptly repair or replace all damage and loss to City property at its sole cost and
expense regardless of the reason or cause of the damage or loss; provided, however,
should the damage or loss be caused by an intentional or negligent act of the City, the risk
of such loss shall be placed on the City.
j. Contractor is responsible for any loss or damage to materials, tools, or
other articles used or held for use in the completion of performance of the Construction
Project.
k. Contractor’s performance must be without damage or disruption to any other work or property of the City or of others and without interference with the
operation of existing machinery or equipment.
l. Title to all work, materials, and equipment covered by any payment of
Contractor’s compensation by City, whether directly incorporated into the Construction Project or not, passes to City at the time of payment, free and clear of all liens and
encumbrances.
m. Contractor represents that the Contractor has reviewed and understands
the Specifications and the Scope of Work, has visited the site of the Construction Project and is familiar with local conditions under which the Construction Project is to be performed, has correlated personal observations with the requirements of the
Specification and the Scope of Work, and has notified the City’s Representative of and
obtained clarification of any discrepancies which have become apparent prior to
commencement of activities on the Construction Project.
Construction Agreement for Bogert Pool Sand Blasting, Painting and Main Drain Replacement Page 6 of 25
n. The Contractor further warrants that the work performed by the Contractor
and its sub-contractors will conform to the requirements of the Specification and the
Scope of Work and will be free from defects. Work, materials, or equipment not
conforming to these requirements may be considered defective. The Contractor’s warranty excludes remedy for damage or defect caused by abuse, alterations to the work
not executed by the Contractor, improper or insufficient maintenance, improper
operation, or normal wear and tear and normal usage. If required by the City’s
Representative, the Contractor shall furnish satisfactory evidence as to the kind and
quality of materials and equipment
10. Delays and Extensions of Time: If Contractor’s performance of this Agreement
is prevented or delayed by any unforeseen cause beyond the control of the Contractor, including
acts or omissions of the City, Contractor shall, within ten (10) days of the commencement of any
such delay, give the City written notice thereof. Further, Contractor shall, within ten (10) days of the termination of such delay, give the City written notice of the total actual duration of the
delay. If the City is provided with these required notices and if the City, in its sole discretion,
determines that the cause of the delay was not foreseeable, was beyond the control of the
Contractor, and was not a result of the fault or negligence of the Contractor, then the City will
determine the total duration of the delay and extend the time for performance of the Agreement accordingly. Unless the delay is caused by the intentional interference of the City with the
Contractor’s performance, Contractor shall make no claim for damages or any other claim other
than for an extension of time as herein provided by reason of any delays.
11. Suspension: a. The City may, by written notice to the Contractor and at its convenience
for any reason, suspend the performance of all or any portion of the work to be performed
on the Construction Project (“Notice of Suspension”). The Notice of Suspension shall set
forth the time of suspension, if then known to the City. During the period of suspension, Contractor shall use its best efforts to minimize costs associated with the suspension.
b. Upon Contractor’s receipt of any Notice of Suspension, unless the notice
requires otherwise, Contractor shall: (1) immediately discontinue work on the date and to
the extent specified in the Notice of Suspension; (2) place no further orders or subcontracts for materials, services, or equipment; (3) promptly make every reasonable effort to obtain suspension upon terms satisfactory to City of all orders, subcontracts, and
rental agreements to the extent that they relate to the performance of the work suspended;
and (4) continue to protect and maintain the Project, including those portions on which
work has been suspended. c. As compensation for the suspended work, Contractor will be reimbursed
for the following costs, reasonably incurred, without duplication of any item, and to the
extent that such costs directly resulted from the suspension: (1) a standby charge paid
during the period of suspension which will be sufficient to compensate Contractor for keeping, to the extent required in the Notice of Suspension, Contractor’s organization and equipment committed to the Project in standby status; (2) all reasonably incurred costs
Construction Agreement for Bogert Pool Sand Blasting, Painting and Main Drain Replacement Page 7 of 25
for the demobilization of Contractor’s and subcontractor’s crews and equipment; (3) an
equitable amount to reimburse Contractor for the cost to protect and maintain the Project
during the period of suspension; and (4) an equitable adjustment in the cost of performing
the remaining portion of the work post-suspension if, as a direct result of the suspension, the cost to Contractor of subsequently performing the remaining work on the
Construction Project has increased or decreased.
d. Upon receipt of written notice by the City to resume the suspended work
(“Notice to Resume Work”), Contractor shall immediately resume performance of the suspended work as to the extent required in the Notice to Resume Work. Any claim by
Contractor for time or compensation described in Section 11(c) shall be made within
fifteen (15) days after receipt of the Notice to Resume Work and Contractor shall submit
a revised Construction Schedule for the City’s review and approval. Contractor’s failure
to timely make such a claim shall result in a waiver of the claim.
e. No compensation described in Section 11(c) shall be paid and no
extension of time to complete the Construction Project shall be granted if the suspension
results from Contractor’s non-compliance with or breach of the terms or requirements of
this Agreement.
12. Termination for Contractor’s Fault:
a. If Contractor refuses or fails to timely do the work, or any part thereof, or
fails to perform any of its obligations under this Agreement, or otherwise breaches any terms or conditions of this Agreement, the City may, by written notice, terminate this
Agreement and the Contractor’s right to proceed with all or any part of the Construction
Project (“Termination Notice Due to Contractor’s Fault”). The City may then take over
the Construction Project and complete it, either with its own resources or by re-letting the
contract to any other third party, and may immediately take possession of and use such materials, appliances, tools, and equipment as may be on the site and which may be
necessary for the completion of the Construction Project.
b. In the event of a termination pursuant to this Section 12, Contractor shall
be entitled to payment only for those services Contractor actually rendered. In the case of a lump sum or unit price contract, Contractor shall not be entitled to any further payment
until the Construction Project has been completed. Upon completion of the Construction
Project, if the unpaid balance of the Contractor’s compensation exceeds the cost to the
City of completing the work, including all costs paid to any subcontractors or third
parties retained by the City to complete the Construction Project and all administrative costs resulting from the termination (“City’s Cost for Completion”), such excess shall be
paid to the Contractor. If the City’s Cost for Completion exceeds the unpaid balance of
the Contractor’s compensation, then Contractor and its sureties shall be liable for and
shall pay the difference, plus interest at the rate applicable to court judgments, to the City.
c. Any termination provided for by this Section 12 shall be in addition to any
other remedies to which the City may be entitled under the law or at equity.
Construction Agreement for Bogert Pool Sand Blasting, Painting and Main Drain Replacement Page 8 of 25
d. In the event of termination under this Section 12, Contractor shall, under
no circumstances, be entitled to claim or recover consequential, special, punitive, lost
business opportunity, lost productivity, field office overhead, general conditions costs, or lost profits damages of any nature arising, or claimed to have arisen, as a result of the
termination.
13. Termination for City’s Convenience:
a. Should conditions arise which, in the sole opinion and discretion of the City, make it advisable to the City to cease work on the Construction Project, City may
terminate this Agreement by written notice to Contractor (“Notice of Termination for
City’s Convenience”). The termination shall be effective in the manner specified in the
Notice of Termination for City’s Convenience and shall be without prejudice to any claims that the City may otherwise have against Contractor.
b. Upon receipt of the Notice of Termination for City’s Convenience, unless
otherwise directed in the Notice, the Contractor shall immediately cease work on the
Construction Project, discontinue placing orders for materials, supplies, and equipment for the Construction Project, and make every reasonable effort to cancel all existing orders or contracts upon terms satisfactory to the City. Contractor shall do only such
work as may be necessary to preserve, protect, and maintain work already completed, in
progress, or in transit to the construction site.
c. In the event of a termination pursuant to this Section 13, Contractor is entitled to payment only for those services Contractor actually rendered and materials
actually purchased or which Contractor has made obligations to purchase on or before the
receipt of the Notice of Termination for City’s Convenience, and reasonably incurred
costs for demobilization of Contractor’s and any subcontractor’s crews. It is agreed that any materials that City is obligated to purchase from Contractor will remain the City’s sole property.
d. The compensation described in Section 13(c) is the sole compensation due
to Contractor for its performance of this Agreement. Contractor shall, under no circumstances, be entitled to claim or recover consequential, special, punitive, lost business opportunity, lost productivity, field office overhead, general conditions costs, or
lost profits damages of any nature arising, or claimed to have arisen, as a result of the
termination.
14. Limitation on Contractor’s Damages; Time for Asserting Claim:
a. In the event of a claim for damages by Contractor under this Agreement,
Contractor’s damages shall be limited to contract damages and Contractor hereby
expressly waives any right to claim or recover consequential, special, punitive, lost business opportunity, lost productivity, field office overhead, general conditions costs, or
lost profits damages of any nature or kind.
Construction Agreement for Bogert Pool Sand Blasting, Painting and Main Drain Replacement Page 9 of 25
b. In the event Contractor wants to assert a claim for damages of any kind or
nature, Contractor shall provide City with written notice of its claim, the facts and
circumstances surrounding and giving rise to the claim, and the total amount of damages sought by the claim, within ten (10) days of the facts and circumstances giving rise to the
claim. In the event Contractor fails to provide such notice, Contractor shall waive all
rights to assert such claim.
15. Representatives: a. City’s Representative: The City’s Representative for the purpose of this
Agreement shall be James Goehrung (Facilities Superintendant) or such other individual
as City shall designate in writing which may include Dan McCarthy (Aquatics Manager).
Whenever approval or authorization from or communication or submission to City is required by this Agreement, such communication or submission shall be directed to
James Goehrung as the City’s Representative and approvals or authorizations shall be
issued only by such Representative; provided, however, that in exigent circumstances
when City’s Representative is not available, Contractor may direct its communication or
submission to other designated City personnel or agents as listed above and may receive approvals or authorization from such persons.
b. Contractor’s Representative: The Contractor’s Representative for the
purpose of this Agreement shall be __________ or such other individual as Contractor
shall designate in writing. Whenever direction to or communication with Contractor is required by this Agreement, such direction or communication shall be directed to Contractor’s Representative; provided, however, that in exigent circumstances when
Contractor’s Representative is not available, City may direct its direction or
communication to other designated Contractor personnel or agents.
16. Locating Underground Facilities: Contractor shall be responsible for obtaining
and determining the location of any underground facilities, including but not limited to, the
location of any pipelines or utility supply, delivery, or service lines in accordance with the
provisions of §69-4-501, et seq., MCA. Contractor shall make every effort to avoid damage to
underground facilities and shall be solely responsible for any damage that may occur. If City personnel assume responsibility for locating any underground facilities, this fact shall be noted in
writing prior to commencement of such location work.
17. Permits: Contractor shall provide all notices, comply with all applicable laws,
ordinances, rules, and regulations, obtain all necessary permits, licenses, including a City of Bozeman business license, and inspections from applicable governmental authorities, pay all fees
and charges in connection therewith, and perform all surveys and locations necessary for the
timely completion of the Construction Project.
18. Ownership of Documents; Indemnification: All plans, designs, drawings, specifications, documents, sample results and data, in whatever medium or format, originated or
prepared by or for Contractor in contemplation of, or in the course of, or as a result of this
Construction Agreement for Bogert Pool Sand Blasting, Painting and Main Drain Replacement Page 10 of 25
Agreement or work on the Construction Project, shall be promptly furnished to the City (“City
Documents and Information”). All City Documents and Information shall be the exclusive
property of the City and shall be deemed to be works-for-hire. Contractor hereby assigns all
right, title, and interest in and to the City Documents and Information, including but not limited to, all copyright and patent rights in and to the City Documents and Information. Neither party
grants to the other any express or implied licenses under any patents, copyrights, trademarks, or
other intellectual property rights, except to the extent necessary to complete its obligations to the
other under this Agreement.
19. Laws and Regulations: Contractor shall comply fully with all applicable state
and federal laws, regulations, and municipal ordinances including, but not limited to, all
workers’ compensation laws, all environmental laws including, but not limited to, the generation
and disposal of hazardous waste, the Occupational Safety and Health Act (OSHA), the safety
rules, codes, and provisions of the Montana Safety Act in Title 50, Chapter 71, MCA, all applicable City, County, and State building and electrical codes, the Americans with Disabilities
Act, and all non-discrimination, affirmative action, and utilization of minority and small business
statutes and regulations.
20. Non-discrimination: The Contractor shall have a policy to provide equal employment opportunity in accordance with all applicable state and federal anti-discrimination laws, regulations, and contracts. The Contractor shall not refuse employment to a person, bar a
person from employment, or discriminate against a person in compensation or in a term,
condition, or privilege of employment because of race, color, religion, creed, political ideas, sex,
age, marital status, national origin, actual or perceived sexual orientation, gender identity, physical or mental disability, except when the reasonable demands of the position require an age, physical or mental disability, marital status or sex distinction. The Contractor shall be subject to
and comply with Title VI of the Civil Rights Act of 1964; Section 140, Title 2, United States
Code, and all regulations promulgated thereunder. The Contractor shall require these
nondiscrimination terms of its sub-contractors providing services under this agreement. 21. Intoxicants; DOT Drug and Alcohol Regulations: Contractor shall not permit
or suffer the introduction or use of any intoxicants, including alcohol or illegal drugs, upon the
site of the Construction Project. Contractor acknowledges it is aware of and shall comply with
its responsibilities and obligations under the U.S. Department of Transportation (DOT) regulations governing anti-drug and alcohol misuse prevention plans and related testing. City
shall have the right to request proof of such compliance and Contractor shall be obligated to
furnish such proof.
22. Labor Relations:
a. Contractor shall post a legible statement of all wages and fringe benefits to
be paid to the Contractor’s employees and the frequency of such payments (i.e., hourly
wage employees shall be paid weekly). Such posting shall be made in a prominent and
accessible location at the site of the Construction Project and shall be made no later than the first day of work. Such posting shall be removed only upon the final completion of
the Construction Project and the termination of this Agreement.
Construction Agreement for Bogert Pool Sand Blasting, Painting and Main Drain Replacement Page 11 of 25
b. In performing the terms and conditions of this Agreement and the work on
the Construction Project, Contractor shall give preference to the employment of bona fide
residents of Montana, as required by §18-2-403, MCA, and as such, term is defined by §18-2-401(1), MCA. When making assignments of work, Contractor shall use workers
both skilled in their trade and specialized in their field of work for all work to which they
are assigned.
c. Pursuant to §§18-2-403 and 18-2-422, MCA, Contractor shall pay wages, benefits, and expenses as set forth in the Montana Prevailing Wage Rage for Building
Construction Services, effective February 1, 2013 and applicable to Gallatin County,
Montana which schedule is incorporated herein. Contractor shall pay all hourly wage
employees on a weekly basis. Violation of the requirements set forth in the above State
of Montana schedule of prevailing wage rates may subject the Contractor to the penalties set forth in §18-2-407, MCA. Contractor shall maintain payroll records and provide
certified copies to the City. Contractor shall maintain such payroll records during the
term of this Agreement, the course of the work on the Construction Project, and for a
period of three (3) years following the date of final completion of the Construction
Project and termination of this Agreement.
d. In the event that, during the term of this Agreement and throughout the
course of Contractor’s performance of the Construction Project, any labor problems or
disputes of any type arise or materialize which in turn cause any work on the
Construction Project to cease for any period of time, Contractor specifically agrees to take immediate steps, at its own expense and without expectation of reimbursement from
City, to alleviate or resolve all such labor problems or disputes. The specific steps
Contractor shall take to resume work on the Construction Project shall be left to the
discretion of Contractor; provided, however, that Contractor shall bear all costs of any
related legal action. Contractor shall provide immediate relief to the City so as to permit the work on the Construction Project to resume and be completed within the time frames
set forth in the Construction Schedule at no additional cost to City.
e. Contractor shall indemnify, defend, and hold the City harmless from any
and all claims, demands, costs, expenses, damages, and liabilities arising out of, resulting from, or occurring in connection with any labor problems or disputes or any delays or
stoppages of work associated with such problems or disputes.
23. Subcontractors:
a. Contractor may employ subcontractors for any work on the Construction
Project. Contractor shall provide City with a list of all subcontractors employed.
b. Contractor remains fully responsible for the acts and omissions of any
subcontractor, just as Contractor is for its own acts and omissions, and Contractor shall remain fully responsible and liable for the timely completion of the Construction Project.
Construction Agreement for Bogert Pool Sand Blasting, Painting and Main Drain Replacement Page 12 of 25
c. Contractor is solely liable for any and all payments to subcontractors.
Contractor shall hold all payments received from the City in trust for the benefit of
subcontractors, and all such payments shall be used to satisfy obligations of the
Construction Project before being used for any other purpose. Contractor shall make any payments due to any subcontractor within seven (7) days of Contractor’s receipt of
payment, including a proportional part of the retainage Contractor has received from the
City. In the event of a dispute regarding any subcontractor’s invoice, Contractor shall
promptly pay the undisputed amount to the subcontractor and notify the subcontractor in
writing of the amount in dispute and the reasons for the dispute. Any withholding of payment must comply with the requirements of §28-2-2103, MCA. In the event
Contractor is unwilling or unable to make timely and proper payment to any
subcontractor, City may elect to withhold any payment otherwise due to Contractor and
upon seven (7) days’ written notice to Contractor, may pay subcontractor by direct or
joint payment.
24. Indebtedness and Liens: Before City may make any final payment to
Contractor, Contractor shall furnish City with satisfactory proof that there are no outstanding
debts or liens in connection with the Construction Project. If the Contractor allows any
indebtedness to accrue to subcontractors or others during the progress of the work, and fails to pay or discharge the same within five (5) days after demand, then City may either withhold any
money due to Contractor until such indebtedness is paid or apply the same towards the discharge
of the indebtedness. If any lien or claim is filed or made by any subcontractor, material supplier,
or any other person, the Contractor shall immediately notify the City and shall cause the same to
be discharged of record within thirty (30) days after its filing.
25. Hazard Communication: Contractor shall comply with all hazard
communication requirements dictated by the Environmental Protection Agency, the Montana
Department of Agriculture, OSHA, Hazard Communications Standard, 29 CFR 1910.1200, and
applicable City ordinances. Contractor shall supply a chemical list, the associated material safety data sheets (MSDS), and other pertinent health exposure data for chemicals that the
Contractor’s, subcontractor’s or the City’s employees may be exposed to while working on City
property during the course of the Construction Project. One copy of this documentation must be
delivered to City to the attention of the City’s Representative. This documentation must be
delivered before work involving these chemicals may commence.
26. Accounts and Records: During the term of this Agreement and for two (2) years
following the City’s final acceptance of the Construction Project, Contractor shall maintain
accounts and records related to the Construction Project. Upon reasonable notice, City shall
have the right to inspect all such accounts and records, including but not limited to, Contractor’s records, books, correspondence, instructions, drawings, specifications, field and site notes, receipts, invoices, bills, contracts, or other documents relating to the Construction Project.
27. Indemnification; Insurance; Bonds:
a. To the fullest extent permitted by law, Contractor shall release, and shall
protect, defend, indemnify, and hold harmless the City, its agents, representatives,
Construction Agreement for Bogert Pool Sand Blasting, Painting and Main Drain Replacement Page 13 of 25
employees, and officers (collectively referred to for purposes of this Section as the City)
from and against any and all claims, demands, actions, fees and costs (including
attorney’s fees and the costs and fees of and expert witness and consultants), losses,
expenses, liabilities (including liability where activity is inherently or intrinsically dangerous) or damages of whatever kind or nature connected therewith and without limit
and without regard to the cause or causes thereof or the negligence of any party or parties
that may be asserted against, recovered from or suffered by the City occasioned by,
growing or arising out of or resulting from or in any way related to: (i) the negligent,
reckless, or intentional misconduct of the Contractor; (ii) any negligent, reckless, or intentional misconduct of any of the Contractor’s subcontractors or suppliers; or (iii) the
negligent, reckless, or intentional misconduct of any other third party.
Such obligation shall not be construed to negate, abridge, or reduce other rights or
obligations of indemnity that would otherwise exist as to an indemnitee described in this Section. The indemnification obligations of this Section must not be construed to negate,
abridge, or reduce any common-law or statutory rights of the indemnitee(s) which would
otherwise exist as to such indemnitee(s).
Contractor’s indemnity under this Section shall be without regard to and without any right to contribution from any insurance maintained by City.
Should any indemnitee described herein be required to bring an action against the
Contractor to assert its right to defense or indemnification under this Agreement or under
the Contractor’s applicable insurance policies required below the indemnitee shall be entitled to recover reasonable costs and attorney fees incurred in asserting its right to
indemnification or defense but only if a court of competent jurisdiction determines the
Contractor was obligated to defend the claim(s) or was obligated to indemnify the
indemnitee for a claim(s) or any portion(s) thereof.
In the event of an action filed against City resulting from the City’s performance under
this Agreement, the City may elect to represent itself and incur all costs and expenses of
suit.
These obligations shall survive termination of this Agreement and completion of the Construction Project.
b. In addition to and independent from the above, during the life of this Agreement
and for a minimum of one (1) year following the date of expiration of Contractor’s
warranties as provided Section 9 of this Agreement, Contractor shall at Contractor’s expense maintain those insurances as may be required by City as set forth in Exhibit E
through an insurance company or companies duly licensed and authorized to conduct
insurance business in Montana which insures the liabilities and obligations specifically
assumed by the Contractor in subsection (a) of this Section. The insurance coverage shall
not contain any exclusion for liabilities specifically assumed by the Contractor in subsection (a) of this Section.
Construction Agreement for Bogert Pool Sand Blasting, Painting and Main Drain Replacement Page 14 of 25
Within ten (10) days following execution of this Agreement, Contractor shall provide
City with proof of such insurance in the form of a certificate of insurance indicating that
such insurance is in full force and effect and shall provide such additional proof including
copies of policies and applicable endorsements when requested by City thereafter during the term of the Construction Project.
Contractor shall notify City sixty (60) days prior to the expiration of any such required
insurance coverage and shall ensure such required insurance coverage is timely renewed
so that there is no lapse in coverage during the time such insurance must remain in place. Contractor shall notify City within two (2) business days of Contractor’s receipt of notice
that any required insurance coverage will be terminated or Contractor’s decision to
terminate any required insurance coverage for any reason.
The insurance and required endorsements must be in a form suitable to City.
The City must approve all insurance coverage and endorsements prior to the Contractor commencing work.
For liabilities assumed hereunder, the City of Bozeman, its officers, agents, and employees shall be endorsed as an additional or named insured on a primary non-contributory basis on both the Commercial General and Automobile Liability policies.
c. Contractor shall maintain those security guarantees set forth on the
attached Exhibit F, Required Bonds. 28. Taxes: Contractor is obligated to pay all taxes of any kind or nature and make all
appropriate employee withholdings. Contractor understands that all contractors or
subcontractors working on a publicly funded project are required to pay or have withheld from
earnings a license fee of one percent (1%) of the gross contract price if the gross contract price is Five Thousand Dollars ($5,000) or more. This license fee is paid to the Montana Department of
Revenue.
29. Dispute Resolution:
a. Any claim, controversy, or dispute between the parties, their agents,
employees, or representatives shall be resolved first by negotiation between senior-level
personnel from each party duly authorized to execute settlement agreements. Upon
mutual agreement of the parties, the parties may invite an independent, disinterested
mediator to assist in the negotiated settlement discussions.
b. If the parties are unable to resolve the dispute within thirty (30) days from
the date the dispute was first raised, then such dispute shall be resolved in a court of
competent jurisdiction in compliance with the Applicable Law provisions of this
Agreement.
Construction Agreement for Bogert Pool Sand Blasting, Painting and Main Drain Replacement Page 15 of 25
30. Survival: Contractor’s indemnification and warranty obligations shall survive the
termination or expiration of this Agreement for the maximum period allowed under applicable
law.
31. Headings: The headings used in this Agreement are for convenience only and are
not be construed as a part of the Agreement or as a limitation on the scope of the particular
paragraphs to which they refer.
32. Waiver: A waiver by City of any default or breach by Contractor of any covenants, terms, or conditions of this Agreement does not limit City’s right to enforce such covenants, terms, or conditions or to pursue City’s rights in the event of any subsequent default
or breach.
33. Severability: If any portion of this Agreement is held to be void or unenforceable, the balance thereof shall continue in effect.
34. Applicable Law: The parties agree that this Agreement is governed in all
respects by the laws of the State of Montana and the parties expressly agree that venue will be in
Gallatin County, Montana, and no other venue. 35. Binding Effect: This Agreement is binding upon and inures to the benefit of the
heirs, legal representatives, successors, and assigns of the parties.
36. Amendments: This Agreement may not be modified, amended, or changed in any respect except by a written document signed by all parties.
37. No Third-Party Beneficiary: This Agreement is for the exclusive benefit of the
parties, does not constitute a third-party beneficiary agreement, and may not be relied upon or
enforced by a third party.
38. Counterparts: This Agreement may be executed in counterparts, which together
constitute one instrument.
39. Assignment: Contractor may not assign this Agreement in whole or in part without the prior written consent of the City. No assignment will relieve Contractor of its
responsibility for the performance of the Agreement and the completion of the Construction
Project. Contractor may not assign to any third party other than Contractor’s subcontractors on
the Construction Project, the right to receive monies due from City without the prior written
consent of City.
40. Authority: Each party represents that it has full power and authority to enter into
and perform this Agreement and the person signing this Agreement on behalf of each party has
been properly authorized and empowered to sign this Agreement.
41. Independent Contractor: The parties agree and acknowledge that in the
performance of this Agreement and the completion of the Construction Project, Contractor shall
Construction Agreement for Bogert Pool Sand Blasting, Painting and Main Drain Replacement Page 16 of 25
render services as an independent contractor and not as the agent, representative, subcontractor,
or employee of the City. The parties further agree that all individuals and companies retained by
Contractor at all times will be considered the agents, employees, or independent contractors of
Contractor and at no time will they be the employees, agents, or representatives of the City.
42. Agreement Documents: All work on the Construction Project shall be
performed by Contractor in accordance with all of the terms and conditions of this Agreement
and the Project Manual which are incorporated herein by this reference:
Exhibit A: Scope of Work
Exhibit B: Construction Schedule
Exhibit C: Compensation Schedule
Exhibit D: Change of Work Specifications
Exhibit E: Required Insurance Coverage Exhibit F: Required Bonds
43. Integration: This Agreement and all Exhibits attached hereto constitute the
entire agreement of the parties. Covenants or representations not contained therein or made a
part thereof by reference, are not binding upon the parties. There are no understandings between the parties other than as set forth in this Agreement. All communications, either verbal or written, made prior to the date of this Agreement are hereby abrogated and withdrawn unless
specifically made a part of this Agreement by reference.
IN WITNESS WHEREOF, Contractor and City have caused this Agreement to be executed, effective on the date written above, and intend to be legally bound thereby.
CITY OF BOZEMAN, MONTANA ____________, CONTRACTOR
By: _______________________________ By: Chris A. Kukulski, City Manager Print Name:
Title:
APPROVED AS TO FORM (§18-2-406, MCA):
By: _______________________________
Greg Sullivan, City Attorney
Construction Agreement for Bogert Pool Sand Blasting, Painting and Main Drain Replacement Page 17 of 25
Exhibit A
Scope of Work 1. For replacement of the main pool drain, all work as shown on the drawings, sheet P-1
through P-3, prepared by Morrison-Maierle, entitled City of Bozeman Bogert Pool Main
Drain Replacement.
2. For sandblasting and painting the interior pool surface, the Contractor shall take all steps
necessary to create a pool surface that complies with Admin. R. Mont. Sect. 37.115.504
(2013). The pool surface includes all interior surfaces below deck level including the
gutter rim and all other interior surfaces.
The Contractor shall take all steps necessary to protect all inlets and drains from damage.
The surface shall be constructed of materials that are nontoxic to humans and the
environment, are impervious and enduring, will provide a smooth and easily cleanable surface without cracks or open joints (excluding structural joints) and which is free of any
slip, trip, or other injury hazard. In addition, the surface must be slip-resistant and shall
not cause injury to feet during normal use. Moreover, the colors, patterns, or finishes of
the pool interior shall not obscure objects or surfaces within the pool. The walls and floor
shall be white or light pastel in color. Earth floors are not permitted for pools, spas, or other water features.
To complete the above, the Contractor shall: (i) sandblast all interior surfaces of the pool
using techniques and equipment customary for the work; (ii) prepare the surface for
painting by, at a minimum, triple rinsing the pool and using an acid etching technique; and (iii) paint the interior of Bogert Pool with Paralon 2 rubber chlorinated based paint or
similar.
Work shall stop immediately if excess damage to pool walls is caused by the
sandblasting. Contractor and City Representatives will develop and agree on a scope of work and compensation schedule to complete repairs.
3. The Gallatin City-County Health Department (Health Department) shall inspect the final
work of the Contractor and approve the completed work. Should the Health Department determine any work is deficient or does not comply with applicable rules or laws the
Contractor shall correct such deficiencies.
Construction Agreement for Bogert Pool Sand Blasting, Painting and Main Drain Replacement Page 18 of 25
Exhibit B
Construction Schedule
The Construction Project shall begin in the spring of 2014 immediately after the weather has provided the proper environmental conditions as required by the paint manufacturer. The
contractor shall have all work completed within 30 days after beginning.
Construction Agreement for Bogert Pool Sand Blasting, Painting and Main Drain Replacement Page 19 of 25
Exhibit C Compensation Schedule
Contractor shall not demand or be entitled to receive payment for any work on the
Construction Project, in whole or in part, except in the manner set forth herein. Pursuant to
Section 5.a, above, the City shall, upon invoice from the Contractor, make the Initial Payment.
The City will not withhold a Retainage Amount from the Initial Payment; however, the amount of the Initial Payment shall be included in the Total Compensation to which the Retainage
Amount applies.
Monthly Progress Payments
A. After the commencement of work on the Construction Project, the Contractor may
request monthly progress payments by submitting an Application for Payment to the City’s
Representative during each successive calendar month. The Application for Payment must be
based upon the actual or estimated percentage of work completed and materials supplied on the
Construction Project prior to the date of the Application and shall be filled out and signed by the Contractor shall attach all supporting documentation to the Application, including certified
payroll records and receipts, to verify that the work claimed in the Application has been
completed. Only one Application for Payment may be submitted within a calendar month.
B. Beginning with the second Application for Payment, each Application shall also include the Contractor’s Affidavit of Payment of Debts and Claims provided by the City’s
Representative and signed by the Contractor stating that all previous monthly progress payments
received have been applied on account to discharge Contractor’s obligations associated with the
prior Applications for Payment.
C. City shall promptly review all Applications for Payment and, within twenty-one
(21) days after receipt of each Application, determine whether a progress payment should be
disapproved in whole or in part. An Application for Payment is considered to have been
received when it is submitted to City’s Representative and is considered approved unless prior to
the expiration of the 21-day period the City provides the Contractor with a written statement containing specific items that are being disapproved. A progress payment or any portion may be
disapproved upon a claim of: (1) unsatisfactory job progress; (2) failure to remedy defective
construction work or materials; (3) disputed work or materials; (4) failure to comply with
material provisions of this Agreement, drawings, plans, specifications for the Construction Project, or other required documents, including but not limited to, payroll certifications,
insurance coverage, bonding, lien releases, warranties, material certifications, and test data; (5)
failure of Contractor to make timely payment for claims including, but not limited to claims for
labor, equipment, materials, subcontracts, taxes, fees, professional services, rent, and royalties; (6) damages to the City; (7) the existence of reasonable evidence that the Agreement cannot be completed for the unpaid balance of the Agreement’s Compensation; and (8) Contractor’s non-
compliance with applicable federal, state, and local laws, rules, and ordinances.
D. The City will furnish Contractor a written statement specifying a reason for
disapproval that is listed in Section C above for which approval of the Application for Payment
Construction Agreement for Bogert Pool Sand Blasting, Painting and Main Drain Replacement Page 20 of 25
or a portion thereof is being withheld. If the City disapproves only a portion of an Application
for Payment, the remainder of the Application for Payment is considered approved.
E. If the City approves a monthly progress payment, the City shall withhold the five percent (5%) Retainage Amount from the total payment requested in the Application for
Payment and may withhold an amount that is sufficient to pay the direct expenses that the City
may reasonably expect will be necessary to correct any claim based on the eight (8) items set out
in Section C above. City shall tender the balance of the approved monthly progress payment to
Contractor within seven (7) days following the approval.
F. Contractor understands that the Montana Public Contractors’ Gross Receipts Tax
requires all contractors or subcontractors working on a publicly funded project to pay or have
withheld from earnings one percent (1%) of the gross contract price if the public contract price,
including subcontracts attached thereto, is Five Thousand Dollars ($5,000) or more. If required, the City will withhold this tax from any payment made to Contractor and will remit the amount
withheld to the Montana Department of Revenue. Contractor must withhold the tax from
payments made to subcontractors by Contractor.
G. City’s approval of any progress payment shall not operate as City’s acceptance of any portion of the Construction Project as complete or free of defects or nonconformities, nor
shall it operate as a waiver of Contractor’s obligations under the Agreement including, but not
limited to, Contractor’s testing and warranty obligations.
Final Payment
A. Upon completion of the Construction Project, Contractor shall submit a final
Application for Payment to the City’s Representative seeking payment of the remaining balance
of Contractor’s compensation, including all retainage amounts. Contractor shall attach all
supporting documentation and receipts to the final Application for Payment to verify that the Construction Project has been fully and finally completed in compliance with all terms and
conditions of the Agreement, including complete and legally effective releases or waivers of all
liens or encumbrances that have been filed against the Construction Project, and a consent from
all of Contractor’s sureties to final payment. In addition, Contractor shall include an Affidavit of
Payment of Debts and Claims as provided by the City’s Representative and signed by the Contractor stating that all previous monthly progress payments received have been applied on
account to discharge Contractor’s obligations associated with the Construction Project and that
the prior Applications for Payment and all claims asserted by any person arising from or related
to the Construction Project have been settled or satisfied. In the event any claims have not been
settled or satisfied, the Affidavit shall contain a complete listing of such claims, the name and address of each person making a claim, the facts and circumstances surrounding each claim, the
amount of each claim, and the efforts made to date by Contractor to resolve, settle or satisfy each
claim.
B. City shall promptly review the final Application for Payment and, within twenty-one (21) days after receipt of the request, determine whether it should be disapproved in whole
or in part. The final Application for Payment is considered to have been received when it is
Construction Agreement for Bogert Pool Sand Blasting, Painting and Main Drain Replacement Page 21 of 25
submitted to City’s Representative and is considered approved unless the City’s Representative
provides the Contractor with a written statement containing specific items that are being
disapproved prior to the expiration of the 21-day period. A final payment or any portion may be
disapproved upon a claim of: (1) unsatisfactory job progress; (2) after City’s final inspection of the Construction Project, Contractor has not completed all punch list items and failed to remedy
defective construction work or materials; (3) disputed work or materials; (4) failure to comply
with material provisions of this Agreement, drawings, plans, specifications for the Construction
Project, or other required documents including, but not limited to, payroll certifications,
insurance coverage, bonding, lien releases, warranties, material certifications, and test data; (5) failure of Contractor to make timely payment for claims including, but not limited to, claims for
labor, equipment, materials, subcontracts, taxes, fees, professional services, rent, and royalties;
(6) claims have been brought or liens have been filed against Contractor or the City related to the
Construction Project, or any such claims have not been properly documented in Contractor’s
Affidavit; (7) damage to the City; (8) Contractor has not delivered all maintenance and operating instructions, marked-up record documents, and any other documents relating to the Construction
Project as required by City; and (9) the Contractor is not in compliance with applicable federal,
state, and local laws, rules, and ordinances and has not remedied the noncompliance.
C. The City’s Representative will furnish Contractor a written statement specifying a reason for disapproval that is listed in Section B above for which approval of the final
Application for Payment or a portion thereof is being withheld. If the City disapproves only a
portion of an Application for Payment, the remainder of the Application for Payment is
considered approved.
D. Final payment is due and payable within fourteen (14) days of the City’s
Representative’s approval, but City may withhold an amount that is sufficient to pay the direct
expenses that the City may reasonably expect will be necessary to correct any claim based on the
nine (9) items set out in Section B above and any tax withholding required by law.
Construction Agreement for Bogert Pool Sand Blasting, Painting and Main Drain Replacement Page 22 of 25
Exhibit D
Change of Work Specifications
A. City may, at any time or from time to time, order changes, additions, deletions, or revisions to the work on the Construction Project by submitting a written Change Order to
Contractor on a form as provided by the City. Upon receipt of any Change Order, Contractor
shall comply with the terms of the changed work as reflected in the Change Order.
B. City and Contractor shall negotiate in good faith for an agreement as to any increase or decrease in the Contractor’s compensation that results from any Change Order. The
increased or decreased Contractor’s compensation shall be set forth in the Change Order and
both the City and the Contractor shall sign the Change Order as an indication of their respective
acceptance of the changes and modifications to the Agreement. In the event the City and Contractor are unable to agree upon the increase or decrease in Contractor’s compensation resulting from any Change Order, such increase or decrease shall be determined as follows:
1. Increases to Contractor’s compensation shall be calculated as follows and shall be
evidenced by Contractor’s submission to the City of its actual supporting documentation including time slips/cards, invoices, and receipts:
a. by unit prices otherwise set forth in the Agreement or subsequently agreed
upon;
b. by an agreed upon lump sum; or
c. by the cost of the work and an agreed upon mark-up for Contractor’s
overhead and profit, with the costs of the work determined as follows:
(i) Contractor’s actual, direct payroll expenses for the cost of labor. Payroll expenses shall only include actual gross wages paid, without any
deductions, withholding, or overhead. The agreed upon mark-up fee shall
cover Contractor’s liability insurance, workers’ compensation, and Social
Security taxes applicable to said wages, Contractor’s reasonable profit, the costs for the use of small tools and equipment not otherwise classified under heavy equipment use, and Contractor’s general overhead expenses.
(ii) Contractor’s actual cost of materials, including actual
transportation costs, for all materials supplied by Contractor. (iii) Costs for the use of heavy equipment and the transportation of the
same. Such costs shall be the actual rental fees incurred for the use of the
heavy equipment and the actual costs of transporting such heavy
equipment to and from the site of the Construction Project.
Construction Agreement for Bogert Pool Sand Blasting, Painting and Main Drain Replacement Page 23 of 25
2. Decreases to Contractor’s compensation shall be determined by the City’s good
faith estimate. If Contractor disagrees with such good faith estimate, Contractor can avail
itself of the Dispute Resolution provisions set forth in the Agreement.
C. Except for minor modifications in the work not involving an increase of costs or
Contractor’s compensation and not inconsistent with the purposes of the work required by the
Agreement, and except in an emergency situation which endangers life or property, no change to
the work requirements shall be made unless pursuant to a written Change Order duly executed.
D. Contractor shall not be entitled to any increase in the Contractor’s compensation
or the extension of any deadlines set forth in Construction Schedule with respect to any work
performed by Contractor that is not required by the terms and conditions of the Agreement and is
not contained in a duly executed Change Order.
Construction Agreement for Bogert Pool Sand Blasting, Painting and Main Drain Replacement Page 24 of 25
Exhibit E
Required Insurance Coverage
Contractor shall purchase and maintain insurance coverage as required by Section 27(b) and as set forth below.
Required Insurance Coverage:
1. Commercial General Liability $1,000,000 per occurrence (bodily injury and property damage) $2,000,000 aggregate
2. Products and Completed Operations $2,000,000
3. Automobile Liability (all owned, hired, non-owned) $1,000,000 property damage/bodily
injury; $2,000,000 annual aggregate - $1,000,000 Combined
Single Limit
4. Workers’ Compensation Not less than statutory limits
5. Employers’ Liability $1,000,000 per occurrence; $2,000,000 annual aggregate; $1,000,000 Each Accident $1,000,000 Disease per Employee
$1,000,000 Disease Policy Limit
6. Professional Liability (E&O)
$1,000,000 per claim; $2,000,000 annual aggregate Commercial General Liability
includes Design and Installation Errors and Omissions Liability coverage per form HS0445.
7. Contractual Liability Insurance $1,000,000 per occurrence (covering indemnity obligations) $2,000,000 aggregate
Construction Agreement for Bogert Pool Sand Blasting, Painting and Main Drain Replacement Page 25 of 25
Exhibit F
Required Bonds
Contractor shall make, execute, purchase, maintain and deliver to City performance and payment bonds in an amount at least equal to the Contractor’s compensation under this
Agreement, conditioned that the Contractor shall faithfully perform of all of Contractor’s
obligations under this Agreement and pay all laborers, mechanics, subcontractors, material
suppliers and all persons who supply the Contractor or Contractor’s subcontractors with provisions, provender, material, or supplies for performing work on the Construction Project. All bonds must be obtained with a surety company that is duly licensed and authorized to
transact business within the state of Montana and to issue bonds for the limits so required. The
surety company must have a Best’s Financial Strength Rating of A, as rated by the A. M. Best
Co., or an equivalent rating from a similar rating service. All bonds must remain in effect throughout the life of this Agreement and for a minimum of one (1) year following the date of expiration of Contractor’s warranties. A certified copy of the agent’s authority to act must
accompany all bonds signed by an agent. If the surety on any bond furnished by Contractor is
declared bankrupt or becomes insolvent or its right to do business within the state of Montana is
terminated, Contractor shall promptly notify City and shall within twenty (20) days after the event giving rise to such notification, provide another bond with another surety company, both of which shall comply with all requirements set forth herein.
Bond Types and Amounts:
1. Performance Bond Equal to Contractor’s Total Compensation 2. Labor and Materials Bond Equal to Contractor’s Total Compensation
NON-DISCRIMINATION AFFIRMATION FORM
_________________________ [name of entity submitting] hereby affirms it will not discriminate
on the basis of race, color, religion, creed, sex, age, marital status, national origin, or because
of actual or perceived sexual orientation, gender identity or disability in the performance of
work performed for the city of Bozeman, if a contract is awarded to it, and also recognizes the
eventual contract, if awarded, will contain a provision prohibiting discrimination as described
above and that this prohibition shall apply to the hiring and treatment of the
_________________________ [name of entity submitting] employees and to all subcontracts it
enters into in performance of the agreement with the city of Bozeman.
Signature of Bidder: ______________________________
Person authorized to sign on behalf of the bidder