Loading...
HomeMy WebLinkAboutNEW Z13131_Ellis_View_PUD SR.pdfPage 1 of 29 Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Date: City Commission public hearing is on November 4, 2013 Project Description: A preliminary Planned Unit Development in conjunction with a major subdivision with nine residential lots, two open space parcels, and a park parcel. Eight relaxations to development standards are requested as part of the project. Project Location: 3601 Good Medicine Way. It is legally described as Lot 4A, Minor Subdivision 35C, located in the NE 1/4, Section 25, Township 2 South, Range 5 East, P.M.M., Gallatin County, Montana. Recommendation: Approval with conditions Recommended Motion: Having reviewed the application materials, considered public comment, and considered all of the information presented, I hereby adopt the findings presented in the staff report for application Z-13131 and move to approve the preliminary planned unit development with conditions and subject to all applicable code provisions and including relaxations 1-4 and 6-8. Report Date: Thursday, October 31, 2013 Staff Contact: Chris Saunders, Policy and Planning Manager TABLE OF CONTENTS SECTION 1 - MAP SERIES .................................................................................................... 2 SECTION 2- RECOMMENDED CONDITIONS OF APPROVAL ....................................... 5 SECTION 3 - CODE REQUIREMENTS REQUIRING PLAN CORRECTIONS ................. 8 SECTION 4 - RECOMMENDATION AND FUTURE ACTIONS ........................................ 8 SECTION 5 –REQUESTED RELAXATIONS ....................................................................... 5 SECTION 6 - STAFF ANALYSIS........................................................................................... 9 Applicable Plan Review Criteria, Section 38.19.100, BMC. .............................................. 9 Applicable Conditional Use Permit Review Criteria, Section 38.19.100, BMC .............. 18 Applicable Planned Unit Development Review Criteria, Section 38.20.090.E, BMC ..... 21 APPENDIX A –ADVISORY CODE CITATIONS ............................................................... 24 APPENDIX B – PROJECT SITE ZONING AND GROWTH POLICY ............................... 26 APPENDIX C – DETAILED PROJECT DESCRIPTION AND BACKGROUND.............. 27 APPENDIX D – NOTICING AND PUBLIC COMMENT ................................................... 28 APPENDIX E - OWNER INFORMATION AND REVIEWING STAFF ............................ 28 APPENDIX F –PLANNED UNIT DEVELOPMENT INTENT ........................................... 28 Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 2 of 29 Sec. 38.20.010. Intent. ...................................................................................................... 28 SECTION 1 - MAP SERIES Vicinity Map showing adjacent zoning Surrounding Zoning and Land Uses North: Single detached homes: zoned RS, Residential Suburban South: Open Space and future commercial: zoned RS, Residential Suburban East: Single detached homes: zoned RS, Residential Suburban West: Unannexed, agriculture: zoned RS, Residential Suburban Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 3 of 29 Vicinity Map from Growth Policy Figure 3-1 Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 4 of 29 Parks and Open Space Vicinity Map Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 5 of 29 SECTION 2 –REQUESTED RELAXATIONS The following relaxations have been requested. The majority are related to the street and sewer improvements. A detailed description of each requested relaxation is attached. This is an extract from the Plat Supplements section of the subdivision application. 1) Section 38.27.060.A Allow Park Frontage to have less than 100% direct street frontage. This relaxation is addressed under site plan criterion 8. 2) Section 38.24.090.D.3 Access – Separation between the intersections of S. 3rd Ave and Ellis View Loop to be approximately 2 feet closer together than normal. This relaxation is addressed under site plan criterion 6. 3) Section 38.24.050.A.1 Street right of way width and construction standards – To provide a narrower right-of-way width for Ellis View Loop of 53 feet. This relaxation is addressed under site plan criterion 6. 4) Section 38.24.060.A Street Improvement Standards – to have a smaller curve radii on a smaller street. This relaxation is addressed under site plan criterion 6. 5) Design standard for required all weather access to sewer manhole – provide manholes which do not have an all weather access road. This relaxation is addressed under site plan criterion 12. 6) Section 38.23.070.A.3 Municipal water, sanitary sewer, and storm sewer systems – To not install the master planned trunk sewer along S. 3rd Avenue. Sewer access is proposed along an existing sewer easement to the southeast. This relaxation is addressed under site plan criterion 12. 7) Section 38.24.010.A Streets – To not construct the S. 3rd Avenue road cross section to the standards normally required for a collector street. This relaxation is addressed under site plan criteria 5 and 6. 8) Section 38.24.080.A Sidewalks – To construct a gravel fines trail along Good Medicine Way in lieu of a standard concrete sidewalk. This relaxation is addressed under site plan criterion 6. SECTION 3- RECOMMENDED CONDITIONS OF APPROVAL Please note that these conditions are in addition to any required code provisions identified in this report. These conditions are specific to the planned unit development. Additional conditions may apply to the subdivision of the property being processed concurrently with this planned unit development. Recommended Conditions of Approval: 1. The proffered park improvements shall be constructed as described in Plat Supplement section Q and the proposed park master plan Appendix I of the application; and in accordance with the City of Bozeman’s park development standards unless a relaxation is approved. 2. The area of park as depicted on the subdivision plat shall not be reduced in size. Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 6 of 29 3. A section shall be included within the covenants to be recorded with the property which clearly identifies those provisions to which the City is a party and noting that those sections may not be revised without the City’s consent. 4. No changes to the terms of the covenants which address municipal code requirements or conditions may be made without written approval of the City. 5. No property may be removed from the property owner’s association without written approval of the City. 6. The covenants shall be revised to specifically state whether or not Accessory Dwelling Units are permitted within the development. 7. A front yard minimum setback of 20 feet to the main façade of the house and 25 feet to the vehicle entrance to the garage or other parking area shall be provided. 8. A side yard minimum setback of 8 feet shall be provided. 9. A rear yard minimum setback of 20 feet shall be provided. 10. The yard facing Good Medicine Way is a rear yard for the purpose of determining yard setbacks. 11. Fence heights within the development may not exceed four feet. 12. Lot coverage for each lot in the Ellis View Estates shall not exceed 25% of the total area of the lot. 13. A public access easement shall be provided for those portions of the Good Medicine Way trail which lie outside of the existing public right of way. 14. A one foot wide no access strip shall be placed along the western border of Lots 6 and 9 prohibiting vehicle access to South 3rd and along the eastern border of Lots 1-4 prohibiting vehicle access to Good Medicine Way. 15. The bicycle lane on the east side of South 3rd Avenue shall be extended from its current end point at the intersection with Wagonwheel Road to the southern property line of the development. Any tapers or transitions shall occur within the public right of way past the southern property line. A connection of similar width of trail from the end of the bicycle lane to the existing adjacent trail on the south side of the property in the designated open space of Sundance Springs shall be provided. 16. Temporary irrigation or other support necessary to fully reestablish the vegetation in the open space area disrupted by construction shall be provided for at least two years. If private improvements or vegetation within an easement are disrupted they shall be returned to essentially preconstruction condition. 17. A trail totem conforming to the City of Bozeman standard shall be provided at the beginning point of the trail within the public park identifying the trail as public access. 18. The park master plan has several incorrect references which shall be corrected prior to any final action to approve the PUD. 19. The remaining water rights, or cash in lieu thereof due for the property shall be paid with the filing of the final plat in accordance with Section 38.23.180, BMC. Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 7 of 29 20. Plans and specifications and a detailed design report for water and sewer main extensions, storm sewer and the public street, prepared by a Professional Engineer, shall be provided to and approved by the City Engineer and the Montana Department of Environmental Quality. The Applicant shall also provide Professional Engineering services for construction inspection, post-construction certification, and preparation of mylar record drawings. Construction shall not be initiated on the public infrastructure improvements until the plans and specifications have been approved and a pre-construction conference has been conducted. All plans and specification shall comply with the current version (including all addenda) of the City of Bozeman Design Standards and Specifications Policy and the City of Bozeman Modifications To Montana Public Works Standard Specifications Sixth Edition that have been adopted at the time of approval of the plans and specifications. No building permits shall be issued prior to substantial completion and City acceptance of the required infrastructure improvements. 21. The Montana Fish, Wildlife and Parks, SCS, Montana Department of Environmental Quality and Army Corps of Engineer's shall be contacted regarding the proposed project and any required permits (i.e., 310, 404, Turbidity exemption, etc.) shall be obtained prior to Final Site Plan approval. 22. Ditch relocation or modification: a. The Montana Fish, Wildlife and Parks shall be contacted by the Applicant regarding the proposed relocation and any required permits (i.e., 310, 404, Turbidity exemption, etc.) shall be obtained prior to Final Site Plan approval. b. The Applicant shall comply with all parts of section 38.23.060.D for any ditch relocation or modification. 23. Easements for the water and sewer main extensions shall be a minimum of 30 feet in width, with the utility located in the center of the easement. In no case shall the utility be less than 10 feet from the edge of easement. 24. Project phasing shall be clearly defined including installation of infrastructure with the plans and specifications infrastructure drawings submitted for engineering review. 25. The developer shall make arrangements with the City Engineer's office to provide addresses for all individual lots in the subdivision prior to filing of the final plat. 26. All proposed private utilities to serve the subdivision shall be shown on the public infrastructure plans and specifications. 27. Prior to acceptance of publically owned infrastructure, the contractor shall provide a Maintenance Bond with the developer/owner equal to 20% of the actual cost of the improvements to correct any deficiencies in workmanship and/or materials which are found during the two year warranty period. The City of Bozeman shall be named as dual oblige on the bond. 28. The applicant shall submit with the application for final plan review and approval, a written narrative stating how each of the conditions of preliminary plan approval and noted code provisions have been satisfactorily addressed, and shall include a digital copy (pdf) of the entire final plan submittal. This narrative shall be in sufficient detail to direct the reviewer to the appropriate plat, plan, sheet, note, covenant, etc. in the submittal. Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 8 of 29 29. The east half of South 3rd Avenue shall be constructed to a collector standard as shown in the Greater Bozeman Area Transportation Plan alone the entire frontage of the subdivision. This shall include tapers meeting AASHTO standards to transition back to the existing roadway width on the north and south. 30. The master planned 12” trunk sewer main shall be installed along the entire frontage of the subdivision as shown on the Wastewater Facility Plan. 31. An all weather access road shall be provided to all manholes that are located outside a street or parking area. 32. If an all weather surface is required to be provided to access sewer manholes an alternative support material for the outer sections shall be provided so that the all weather surface within the Ellis View Estates and Sundance Springs open spaces or any private lot appears as no more than a 6 foot wide gravel fines pedestrian trail. SECTION 4 - CODE REQUIREMENTS REQUIRING PLAN CORRECTIONS A. Private utility easements shall be provided per Section 38.23.060.B and depicted on the final PUD plan and final plat. B. The location of existing water and sewer mains shall be properly depicted. Proposed main extensions shall be noted as future work. SECTION 5 - RECOMMENDATION AND FUTURE ACTIONS Project Name: Ellis View Estates planned unit development preliminary plan File: Z-13131 The DRB considered the application on June 26, 2013 and recommended conditional approval of the application. The Development Review Committee (DRC) held multiple meetings to consider the application and after finding the application had adequate material to proceed recommended approval of the application. The Planning Board conducted a public hearing on the related subdivision on October 15, 2013 and made a recommendation to the City Commission. The Recreation and Parks Advisory Board subdivision review committee considered the application and recommends conditional approval. The City Commission will consider the proposal on November 4, 2013. The City Commission public hearing will occur at 121 North Rouse Avenue, Bozeman MT, in the City Commission room at 6 pm. Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 9 of 29 SECTION 6 - STAFF ANALYSIS Analysis and resulting recommendations are based on the entirety of the application materials, municipal codes, standards, and plans, public comment, and all other materials available during the review period. Collectively this information is the record of the review. The analysis below is a summary of the completed review. Applicable Plan Review Criteria, Section 38.19.100, BMC. The site is not within an overlay district and does not have any applicable special use review criteria unique to the project. All planned unit developments are subject to the conditional use review criteria and the planned unit development review criteria in addition to the regular site plan criteria. Review of the related subdivision will occur under application P-13019. Staff has not identified various code provisions that are currently unmet by this application that are not included with the requested PUD relaxations. The applicant must comply with all provisions of the Bozeman Municipal Code, which are applicable to this project, prior to receiving final plan approval. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or State law. In considering applications for plan approval under this title, the advisory boards and City Commission shall consider the following: 1. Conformance to and consistency with the City’s adopted growth policy This development proposal for residential infill development is in conformance with the Bozeman Community Plan. Figure 3-1 of the growth policy designates the property as Suburban Residential indicating that there is a semi-rural configuration in the surrounding property. The land use designation is described on page 3-11 of the growth policy and in Appendix B of this report. The property has been annexed prior to development as recommended. The property is zoned Residential Suburban which is an implementing district for the Suburban Residential land use designation as shown in growth policy appendix C. The property has the correct designation on the future land use map and no inconsistencies with goals, objectives, or policies have been identified at this time. 2. Conformance to this chapter, including the cessation of any current violations The final plan for the PUD shall comply with the standards identified in the BMC. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or State law. There are no known violations of municipal ordinance currently occurring on the site. The Residential Suburban district does not have a required minimum density but the lot sizes are determined through the PUD review process. Setbacks are discussed below in site plan criterion 10. The subdivision review is also subject to Chapter 38, Unified Development Code. The applicant has requested eight relaxations from various standards applicable to the project. The relaxations are listed in Section 2 of this report. The relaxations are addressed individually under the appropriate review criteria below. If the relaxations are approved Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 10 of 29 through the PUD process then the project will conform to the chapter. Compliance with the chapter also includes the criteria for conditional use permits and planned unit development. Compliance with conditions of approval is a requirement of the chapter. The compliance will be demonstrated through a combination of the final plat, final PUD plan, and plans and specifications for infrastructure. 3. Conformance with all other applicable laws, ordinances, and regulations No known existing non-conforming circumstances with non-municipal code provisions have been identified. The final plan will be reviewed to ensure compliance with this section. The applicant will require appropriate permits to cross the ditch with a sewer line. The plans and specifications for municipal infrastructure will be reviewed by the City’s Engineering division and Park Department prior to any work commencing. Such permits and reviews will be required to be in hand prior to beginning any work. The plans for future homes will be evaluated against the requirements of the International Building Code at the time application is made for a building permit. 4. Relationship of site plan elements to conditions both on and off the property The proposed design provides for buffers to adjacent uses, open spaces are placed adjacent to existing open spaces on neighboring properties. The proposed landscaping for the open space and park is appropriate in scale and character. The trail network connects to and continues the existing trail segments and provides new safe pedestrian routes outside of the driving area of Good Medicine Way. The adjacent properties are also zoned as RS both in the City and under Gallatin County’s zoning jurisdiction. The ditch which passes through the southeast corner of the property is unimpeded by the proposed development. The Design Review Board has recommended condition 10 to limit fence heights to not more than four feet. This restriction is to provide a transition between the open character of the Sundance Springs development to the south and the heavily hedged areas to the north and east. The fence height limit will also prevent the development from being a fenced off enclave isolated from adjacent properties. Integration with adjacent development is a requirement of the PUD criteria. 5. The impact of the proposal on the existing and anticipated traffic and parking conditions The proposed Ellis View Loop will provide all vehicle access to the proposed lots. Condition 13 requires a no access strip to restrict vehicle access to the street. The development is anticipated to generate approximately 87 new vehicle trips per day. South 3rd Avenue is a collector street and provides the connection from Ellis View Loop to the rest of the community. The present capacity of S. 3rd Avenue is adequate to carry the additional traffic. See application appendix D. No material impact is expected on parking. Ellis View Loop will provide on street parking opportunities. The City’s land use regulations require provision of off-street parking with more parking provided for larger numbers of bedrooms. Street frontage along the park and open space adjacent to Ellis View Loop will provide enough on-street parking for 20 vehicles. The park frontage provides required parking area for park users. The character of the park is informal and trail oriented. The provided street frontage should provide adequate parking for all park users. Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 11 of 29 A relaxation has been requested (number 7) to not build the standard City cross section for the eastern side of S. 3rd Avenue but to retain a more rural character with borrow ditch and no curbing; this also means that no on-street parking will be provided along S. 3rd Avenue. All of the proposed lots will have on-street parking even with no parking provided along S. 3rd Avenue. This criterion addresses PUD requested relaxations 7 and 8. 6. Pedestrian and vehicular ingress and egress A no vehicle access strip is proposed to be placed along Good Medicine Way. Condition 13 memorializes this by establishing a no access strip. A bicycle lane extension along the east side of S. 3rd Avenue is required by Condition 14. This provides for the required non- motorized access along the S. 3rd Ave. frontage of the project. This is also related to the requested relaxation number seven to not construct the standard full width of collector street for S. 3rd Avenue. If the Commission is to grant the relaxation there should be an off-setting public benefit. The extension of the bicycle lane from its current end at the intersection of Wagonwheel Rd to the south end of the development and the connection to the trail network will provide a safety improvement and functional transportation improvement in the same corridor as the requested relaxation. Without the relaxation the development will be required to build their frontage as a standard collector cross section which will not match any section north or south and will leave an isolated section of bike lane with no connection to the north. A waiver of right to protest creation of special improvement districts for improvement to S. 3rd Ave. was recorded as part of the annexation agreement for the property. There are two trail extensions included with the application. One is a continuation along Good Medicine Way including provision of required easements per Condition 12. The trail along Good Medicine Way is in lieu of a standard concrete sidewalk as required by the municipal code. This is relaxation number 8. The continuation of the trail rather than placement of a concrete sidewalk is in keeping with the existing character of the pedestrian network in the area. Placement of the trail will provide a better connection as there is presently no dedicated pedestrian facility along Good Medicine Way. The other trail connects Ellis View Loop through the public park area to the existing trail system in the adjacent Sundance Springs open space. Sidewalks will be provided on both sides of the Ellis View Loop. Adequate pedestrian and vehicular ingress and egress are provided. The applicant has requested relaxation to design standards for Ellis View Loop including a narrower right of way width, a smaller separation distance between intersections of Ellis View Loop and S 3rd Avenue, and design radii (relaxations 2-4). The constructed cross section of Ellis View Loop will comply with the transportation standards for a small residential street with 31 feet width of asphalt. The relaxation is to narrow the right of way width proportionate to the reduced asphalt width and to have a tighter curve radius. The narrowness of the street at 31 feet acts to reduce speed which allows for a smaller radius. The Fire Department and Sanitation have not objected to the relaxations. The applicant has requested that the street be publicly maintained. The constructed cross section is consistent with the features of the city’s standards. The separation requirement for access points to collector streets is recommended at 330 feet from right of way to right of way in 38.24.0980, BMC. There are no conflicting intersections on the west side of S. 3rd Avenue. The requested relaxation is approximately 23 feet or 7%. The purpose of the separation requirement is to help preserve the functionality of collector Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 12 of 29 and arterial streets to carry traffic with reduced conflict points to improve public safety. The same number of access points would be provided if the park land were reduced in size so the access point were moved to the south. Such movement would reduce separation between the new Ellis View intersection and the existing Little Horse Drive intersection. There appears to be no material detriment from the relaxation. The Development Review Committee reviewed and recommends approval of the relaxations for Ellis View Loop. This criterion addresses PUD requested relaxations 2, 3, 4, 7 and 8. 7. Landscaping, including the enhancement of buildings, the appearance of vehicular use, open space, and pedestrian areas, and the preservation or replacement of natural vegetation The proposed landscaping palette and design appears to conform to the requirements of Article 38.26, Landscaping. A total of 15 performance points is required for the private open spaces and 15 are shown as having been provided. See the landscaping plan contained within Appendix I of the application for details. The applicants are proposing to use native species where appropriate. No conditions are needed to address this review criterion. 8. Open space The UDC requires certain superior performance from PUDs above and beyond that required for regular site plans. One option is to provide extra on-site open space, (separate from the dedicated parkland requirement). This is established under the PUD performance criteria below but interrelates with this criterion. The applicant has requested a relaxation to not provide 100% frontage around the entire dedicated park perimeter (relaxation 1). Per Section 38.27.060 the City may consider less than 100% frontage under certain conditions. The proposed park is being placed adjacent to existing publicly accessible open space which has pedestrian access provided by an existing trail and which connects to open space which is bounded by a street; therefore a street is not required to be located on the southern boundary. The eastern side of the park has a proposed trail extension to connect to a nearby existing trail. Additional property is provided with the park dedication. A minimum area of 11,761 square feet of park is required. An area of 18,184 is provided. The street frontage which is not being installed on the east edge of the park space would have provided parking for four vehicles which would require approximately 1,450 square feet of paving for access and parking stalls. The development has provided an additional 4,973 square feet of park area over and above the minimum required. Therefore, additional park area has been provided and direct pedestrian access is provided. The additional 4,993 square feet meets the intent of providing constructed improvements and the request for the relaxation is therefore consistent with the intent of Section 38.27.060 and staff supports the grant of the relaxation. The trail connections provide good linkage of open space to existing facilities. To identify public access and facilitate the use of the trails a totem marker is being required by Condition 15. The applicant has proffered certain park improvements as identified in Plat Supplement Q and the park master plan Appendix I. The City is relying upon these representations and proffer to meet requirements of the review criteria for site plan compliance and PUD qualitative excellence. Therefore Conditions 1 and 2 require that these items be provided and not changed without City authorization. This criterion addresses PUD relaxation 1. Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 13 of 29 The applicant will be required to provide the landscaping of the park and common open spaces prior to the recording of the final plat for the development. If any work remains to be done it must be financially guaranteed. The frontage improvements for sidewalks and street trees must meet the minimum landscaping requirements of Article 38.27. 9. Building location and height The proposed PUD does not include specific building designs. No relaxation is requested from the base height regulations of 38.08.060, BMC. See setback discussion below. 10. Setbacks Section 38.08.050.B establishes the setbacks for the RS, Residential Suburban district. As noted in that section, the setbacks for all newly created lots in the RS district are established through the PUD process. The preliminary PUD proposes setbacks of: front yard 20 feet, side yard 5 feet and rear yard 20 feet. These are slightly larger than the setbacks normally found in the R-1 district which would allow a 15 foot front yard setback along Ellis View Loop. The proposed setbacks are considerably smaller than those established for previously existing lots in the RS district of 35 foot front and 25 foot for side and rear yards. The RS zoning district is typically placed in areas with environmental constraints. Therefore, larger lot size and yards are appropriate to provide for adequate building areas which avoid the constrained areas. In the circumstances of this application the environmental features, the ditch and slope area, are protected by being placed within common open spaces and not within individual lots. There are no other environmental restrictions on the property. The adjacent properties are developed on a range of lot sizes with the more recent lots in Sundance Springs being smaller with a larger percentage of common open spaces rather than lower density individual lots. A balance can be found in this development between the City’s goals to encourage density of development on municipal services and the need to respect the character of the existing adjacent development. An open space or park area has been provided on the perimeter of the development. This provides some separation from adjacent lower density areas and the open areas are proposed to be landscaped. The overall proposed density is slightly higher than adjacent Sundance Springs but is consistent with the RS expectations. A balance between the local circumstances, previous development, and the various aspirations and standards of the City may be achieved with minor adjustments to the proposed setbacks. An additional setback for the garage vehicle entry will encourage a greater quality of street character by emphasizing the main home façade. A garage setback of 25 feet is achievable and provides a 5 foot incentive to bring the main façade of the home forward giving it more visual prominence. A slightly wider side yard setback of 8 feet will provide some assurance of a more open character which is consistent with the large amounts of open space and larger setbacks for the adjacent existing homes; while not unduly restricting the design flexibility of the proposed lots which vary between 10,152 and 16,883 square feet. With combined total of 16 feet of side yard setback the narrowest proposed lot, Lot 4 which is wedge shaped, would still have an accessible frontage of forty feet. The setbacks are established by condition so they are specifically identified in an action to approve the project. Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 14 of 29 An existing overflow ditch is depicted in the southeast corner of the project site. As a ditch, there is no defined setback requirement as there is for a natural water course. Ditch maintenance easements are required to be provided by Section 38.23.060.D, BMC. 11. Lighting New street lighting is proposed to conform to municipal standards. Lighting is only required at the intersections of S. 3rd Avenue and Ellis View Loop. 12. Provisions for utilities, including efficient public services and facilities A) Private utilities will be provided within established easements or through new easements to be established with the final plat. Section 38.23.060 sets minimum standards which will be verified during final plat review. B) Public utilities provided to the site include transportation. Access to the street system is given by S. 3rd Avenue and the proposed Ellis View Loop. Access for transportation appears adequate. Criterion 5, impact on traffic and parking, Criteria 6, Pedestrian and vehicular ingress and egress address transportation. C) Water services will be provided by a new water main to be placed under Ellis View Loop and connected to the existing water main underneath S. 3rd Avenue. Adequate capacity exists in the City’s water system to accommodate this additional development. The applicant must provide cash-in-lieu of water rights in accordance with Section 38.23.180 at the time of final plat. D) Sanitary sewer capacity exists at the City’s water reclamation facility. Piping connecting the new lots to existing piping must be installed. Sewer pipe location options are very sensitive to the depth of pipe and the grade between existing and proposed development. The preference is to use gravity flow sewers as they are more dependable and less costly for both the public and private parties. There are several options which will use gravity flow. The sewer main routing initially proposed with the application will go from the south leg of Ellis View Loop, through the new park and open space in a new dedicated utility easement, and connect to an existing public utility easement which terminates at Peace Pipe Drive. The existing public utility easement was provided with the Sundance Springs PUD and passes through open space which is covered with native vegetation. The easement passes between two homes on Lots 24 and 25. The proposed sewer distance is approximately 700 feet and includes four manholes which are not under a roadway. The route requires four manholes to address changes in direction of the pipe. A map of the easement alignment from the Sundance Springs final plat is provided below with the route marked in red. Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 15 of 29 The City requires an all weather access to the sewer manholes as part of its design standards. The sewer maintenance trucks are quite heavy, in excess of 30 tons, and need good support, beyond what soil alone will provide, to prevent them from becoming stuck. Each manhole is visited typically annually, more often if needed to ensure that the pipe stays clear and can function as needed. Typically the access way must be at least 12 feet wide. The applicant has requested relaxation 5 to not provide an all weather access to sewer manholes. The DRC does not support this relaxation. The requirement for access is normally met by an overlying public street. However, that alternative is not available for the initial alignment proposed with this project. An all weather access road is usually constructed of compacted rock and binders. This would be very visually disruptive to the character of the existing and proposed open space. Other alternatives to a gravel road do exist to provide the structural support required for the maintenance trucks which would lessen the visual disruption of the access road. Condition 18 requires use of an alternative support material. The material is not specified so the best option can be determined during the infrastructure design phase. The option is provided in Condition 18 to completely vegetate the access road if the applicant so desires or the Commission so directs. There is a section of the sewer easement which passes through the new parkland and so the access would double as a trail section which will connect to the existing Sundance Springs trail system. As the sewer line leaves the park the entire access way could be vegetated. Establishment of replacement vegetation will require supportive irrigation. A period of at least two years of function has been included on the basis of past experience by the City in establishing natural landscapes. Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 16 of 29 Several alternative alignments have been considered and continue to be evaluated as of the writing of this report. 1) Install the master planned sewer line under S. 3rd Avenue. The current endpoint of the sewer stops at Cambridge Drive. It is approximately 2,300 feet from Cambridge Drive to the northern intersection of S. 3rd Ave. and Ellis View Loop. The line would cross annexed and unannexed developed areas. Only nine homes will be constructed with this development. To have such a long pipe run with such a light flow may contribute to maintenance issues as there may not be continuous momentum in the flow to keep the pipe clear. Eventually when the property to the west develops additional flow will resolve that issue but there is no schedule or ability to predict for when that might happen. 2) The applicant could construct a more direct connection from the proposed main location in the project open space through the adjacent Sundance Springs open space to intersect with the existing sewer at the intersection of Peace Pipe and White Eagle Drive. There is no existing easement for this route. An easement would need to be obtained from the Sundance Springs Homeowners Association who owns the property. The route would be a straight line and would not require manholes outside of a street and therefore would not require an access road. This would be about half the distance of pipe and therefore less expensive for the applicant to install and the City to maintain. The route would cross the ditch and be very shallow at that point. It would be necessary to obtain permission from the ditch owner to install a culvert and add additional cover to protect the sewer line. The DRC has no objection to this route but it will require cooperation from at least two private parties to obtain the legal ability to install it. The alternate route is shown in red. Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 17 of 29 This criterion addresses PUD requested relaxations 5 and 6. 13. Site surface drainage The design of the pond in open space 2 and associated landscaping appears to conform to applicable standards. Specific design details will be finalized with the storm water engineering review. Maintenance of the surface drainage facilities is the responsibility of the home owners association. The detention pond is designed so in the event of excess flow the additional water will be directed to the borrow ditch along South 3rd Avenue. The final design of the detention pond will be evaluated during the plan and specification review for infrastructure. 14. Loading and unloading areas No formal loading and unloading areas are required with the proposed residential project. 15. Grading The site is relatively flat with a slight slope mostly to the southeast. The SE corner drops more quickly to the SE where the ditch is located. Relatively minor grading of the site is anticipated with this application in order to accommodate new storm water drainage provisions. Grading will be addressed in detail with the grading plans required for the storm water and street design. Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 18 of 29 16. Signage No signage is requested as part of this application. Any future subdivision identification sign will require a sign permit. No certificate of appropriateness is required. 17. Screening The only required screening for this project is the standard code requirements for screening of mechanical equipment. No mechanical equipment or location is identified at this time. As individual building permits are submitted for homes the issue will be evaluated. 18. Overlay district provisions Not applicable 19. Other related matters, including relevant comment from affected parties As of the writing of this report, eight public comments had been received. Primary concerns from the public comment relate to: 1) the route of the required sewer line (eight comments); 2) the aesthetic and practical consequences of its construction on the open space and adjacent private property owners (eight comments); 3) control of access to Good Medicine Way (one comment); 4) architectural and landscape compatibility (one comment); 5) development timeline (one comment). The proposed conditions or alternatives identified in this report will address the public comments. The public comments are attached to this report. 20. If the development includes multiple lots that are interdependent for circulation or other means of addressing requirement of this title, whether the lots are either: Configured so that the sale of individual lots will not alter the approved configuration or use of the property or cause the development to become nonconforming or The subject of reciprocal and perpetual easements or other agreements to which the City is a party so that the sale of individual lots will not cause one or more elements of the development to become nonconforming. Not applicable. 21. Compliance with article 8 of chapter 10 of the Bozeman Municipal Code. Not applicable. 22. Phasing of development No phasing is proposed. Applicable Conditional Use Permit Review Criteria, Section 38.19.100, BMC E. In addition to the review criteria of section 38.19.100, the review authority shall, in approving a conditional use permit, determine favorably as follows: Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 19 of 29 1. That the site for the proposed use is adequate in size and topography to accommodate such use, and all yards, spaces, walls and fences, parking, loading and landscaping are adequate to properly relate such use with the land and uses in the vicinity; The proposed open spaces, landscape plan, park, and fence restrictions proposed in the covenants along with the larger setbacks proposed as conditions of approval address these issues. Project uses are open space/park which is adjacent to existing open space; and residences. The lots are of a size adequate to allow reasonable construction. 2. That the proposed use will have no material adverse effect upon the abutting property. Persons objecting to the recommendations of review bodies carry the burden of proof; No material adverse effects have been identified. The development of the site will generate additional traffic and demand for utilities but the additional service demands are within capability to provide service. The conditions as proposed mitigate issues of impact on abutting property. On-site open space and park land has been provided to meet demand by new residents and to provide buffers to adjacent properties. Conditions have been proposed to establish setbacks and lot coverage appropriate to the development. With these conditions the residential use is acceptable on the site. Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 20 of 29 3. That any additional conditions stated in the approval are deemed necessary to protect the public health, safety and general welfare. Such conditions may include, but are not limited to: Only those needing to be addressed beyond the site plan criteria are noted. a. Regulation of use; No special regulations of use are required. The covenants should be explicit about whether accessory dwelling units are intended or not intended to be allowed within the development. b. Special yards, spaces and buffers; c. Special fences, solid fences and walls; The Design Review Board has recommended a restriction on fence heights of four feet as discussed under the site plan review criteria above. d. Surfacing of parking areas; e. Requiring street, service road or alley dedications and improvements or appropriate bonds; f. Regulation of points of vehicular ingress and egress; g. Regulation of signs; h. Requiring maintenance of the grounds; i. Regulation of noise, vibrations and odors; j. Regulation of hours for certain activities; k. Time period within which the proposed use shall be developed; l. Duration of use; m. Requiring the dedication of access rights; and n. Other such conditions as will make possible the development of the city in an orderly and efficient manner. As proposed the design does not appear to require extraordinary conditions except as have been identified under the site plan criteria. To avoid repetition please see those sections. Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 21 of 29 F. In addition to all other conditions, the following general requirements apply to every conditional use permit granted: 1. That the right to a use and occupancy permit shall be contingent upon the fulfillment of all general and special conditions imposed by the conditional use permit procedure; and 2. That all of the conditions shall constitute restrictions running with the land use, shall apply and be adhered to by the owner of the land, successors or assigns, shall be binding upon the owner of the land, his successors or assigns, shall be consented to in writing, and shall be recorded as such with the county clerk and recorder's office by the property owner prior to the issuance of any building permits, final plan approval or commencement of the conditional use. The necessary recording of documents will be addressed as part of the final site plan process; and will be required to be recorded prior to the approval of the final site plan for the planned unit development. Applicable Planned Unit Development Review Criteria, Section 38.20.090.E, BMC 2. In addition to the criteria for all site plan and conditional use reviews, the following criteria will be used in evaluating all planned unit development applications. a. All development. All land uses within a proposed planned unit development shall be reviewed against, and comply with, the applicable objectives and criteria of the mandatory "all development" group. (1) Does the development comply with all city design standards, requirements and specifications for the following services: water supply, trails/walks/bike ways, sanitary supply, irrigation companies, fire protection, electricity, flood hazard areas, natural gas, telephone, storm drainage, cable television, and streets? All required private utilities are provided for with utility easements. The easements will be created through the recording of the final plat with the Gallatin County Clerk and Recorder. A non-standard street section is proposed as allowed by Article 38.24. The proposed cross section includes services for pedestrians. Extension of public utilities is proposed for water and sewer. Storm drainage will be addressed privately per the City’s standards. The design standards will be applied by the Engineering Division and Parks Division before any work begins. Detailed review will occur through the subdivision review process. Proposed trails appear to be in logical locations and continue the existing character. An access easement is needed for portions of the Good Medicine Way trail. No flood hazard areas have been identified. (2) Does the project preserve or replace existing natural vegetation? No significant woody vegetation exists on the site which is covered in grasses. The proposed landscaping plan identifies revegetation procedures for disturbed areas which will remain as open space. A condition has been suggested by staff for the reestablishment of vegetation in areas which are disturbed for construction of the sewer main. There is a considerable amount of weeds on the property. A weed management plan is provided with the associated subdivision. Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 22 of 29 (3) Are the elements of the site plan (e.g., buildings, circulation, open space and landscaping, etc.) designed and arranged to produce an efficient, functionally organized and cohesive planned unit development? Yes, the design layout and private design covenants provides a cohesive set of standards. (4) Does the design and arrangement of elements of the site plan (e.g., building construction, orientation, and placement; transportation networks; selection and placement of landscape materials; and/or use of renewable energy sources; etc.) contribute to the overall reduction of energy use by the project? The proposed extensions of the trail system will facilitate travel by walking and bicycling which reduces overall energy use. Location as an infill development reduces total travel distances. The building code will apply energy efficiency standards at the time of building construction. The extension of the bike lane along S. 3rd will advance the development of the City’s non-motorized travel network. (5) Are the elements of the site plan (e.g., buildings, circulation, open space and landscaping, etc.) designed and arranged to maximize the privacy by the residents of the project? Yes, the open space placement helps provide for privacy by buffering the development from adjacent uses. (6) Park land. Does the design and arrangement of buildings and open space areas contribute to the overall aesthetic quality of the site configuration, and has the area of park land or open space been provided for each proposed dwelling as required by section 38.27.020. The required parkland is provided. See discussion above under site plan criteria eight. (7) Performance. All PUDs shall earn at least 20 performance points. The project meets the required performance standard by providing option (b) Additional open space. An area of 31,882 square feet is required to provide enough private open space to meet this performance standard. An area of 38,362 of private open space has been provided. More than the minimum area of public parkland has also been provided. Collectively the park and open space is 31% of the net project area. (8) Is the development being properly integrated into development and circulation patterns of adjacent and nearby neighborhoods so that this development will not become an isolated "pad" to adjoining development? The pedestrian system and open spaces integrate into adjacent development. Significant public comment was received during the annexation of this project from adjacent residents asking that the new development not connect to Good Medicine Way. The proposed design respects that public comment. The use of the site is for residential uses and open space which is consistent in character of use with adjoining development. b. Residential. Planned unit developments in residential areas (R-S, R-1, R-2, R-3, R-4, RMH and R-O zoning districts) may include a variety of housing types designed to enhance the natural environmental, conserve energy, recognize, and to the maximum extent possible, preserve and promote the unique character of neighborhoods, with provisions for a mix of Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 23 of 29 limited commercial development. For purposes of this section, "limited commercial development" means uses listed in the B-1 neighborhood service district (article 10 of this chapter), within the parameters set forth below. All uses within the PUD must be sited and designed such that the activities present will not detrimentally affect the adjacent residential neighborhood. The permitted number of residential dwelling units shall be determined by the provision of and proximity to public services and subject to the following limitations: (1) On a net acreage basis, is the average residential density in the project (calculated for residential portion of the site only) consistent with the development densities set forth in the land use guidelines of the city growth policy? Yes, the Suburban Residential land use designation describes a preexisting pattern of lots being two acres or less. The proposed development has lots of less than two acres in size. Generally, the growth policy encourages infill development at densities respectful to but which may be higher than what may be currently in place. The lot sizes are considerably above the minimums required for other single detached homes in other zoning districts in the City. (2) Does the project provide for private outdoor areas (e.g., private yards, patios and balconies, etc.) for use by the residents and employees of the project which are sufficient in size and have adequate light, sun, ventilation, privacy and convenient access to the household or commercial units they are intended to serve? Private yards are provided. Open spaces are also provided which allow for separation from adjacent properties. The size of the open spaces conforms to City standards. (3) Does the project provide for outdoor areas for use by persons living and working in the development for active or passive recreational activities? Public park is provided and connections to the extensive existing trail system in the area. The nature of the park is more naturalized in keeping with the character of the adjacent open spaces. The trail networks provide opportunity for a variety of active uses and link to more developed recreational areas through the community trail network. (4) If the project is proposing a residential density bonus as described below, does it include a variety of housing types and styles designed to address community wide issues of affordability and diversity of housing stock? No density bonus is requested. (5) Is the overall project designed to enhance the natural environment, conserve energy and to provide efficient public services and facilities? Yes, the density of the project provides for less energy use and more efficient public services by shortening travel distances and length of required utility extensions. The existing ditch on the site is protected and enhanced with landscaping. Providing a higher density development places less demand on municipal services both with initial installation and long term maintenance. Several alternatives for sewer main routing are discussed above. (6) Residential density bonus. If the project is proposing a residential density bonus (30 percent maximum) above the residential density of the zoning district within which the project is located and which is set forth in article 8 of this chapter, does the proposed project exceed the established regulatory design standards (such as for Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 24 of 29 setbacks, off-street parking, open space, etc.) and ensure compatibility with adjacent neighborhood development? The number of dwelling units obtained by the density bonus shall be determined by dividing the lot area required for the dwelling unit type by one plus the percentage of density bonus sought. The minimum lot area per dwelling obtained by this calculation shall be provided within the project. Those dwellings subject to chapter 10, article 8, shall be excluded in the base density upon which the density bonus is calculated. No bonus is requested. (7) Limited commercial. If limited commercial development, as defined above, is proposed within the project, is less than 20 percent of the gross area of the PUD designated to be used for offices or neighborhood service activities not ordinarily allowed in the particular residential zoning district? No limited commercial is proposed. (8) Does the overall PUD recognize and, to the maximum extent possible, preserve and promote the unique character of neighborhoods in the surrounding area? Yes, the PUD is a lower density development on larger lots which is the existing character. The pattern is similar to the adjacent Sundance Springs development which is also within the City limits and zoned as Residential Suburban. The adjacent development to the north and east is not annexed and must be on substantially larger lots to provide onsite water and sewer treatment. It is expected that these county parcels will annex and redevelop to a higher density over time but will be unlikely to meet the typical city densities due to slopes, watercourses, and similar site constraints. APPENDIX A –ADVISORY CODE CITATIONS The following code provisions are identified for informational purposes as the project moves forward. These will need to be addressed as part of the final site plan application or other process step. a. Section 38.20.060 requires the applicant to submit a final plan within 12 months of preliminary approval containing all of the conditions, corrections and modifications to be reviewed and approved by the Department of Community Development. The director will set the required number of copies. This is the final step in the site zoning entitlement process. An application form and fee is required in addition to the final plan set submittal. b. Section 38.28.060.A.3 requires a sign permit to be obtained prior to establishing a subdivision identification sign or other permanent sign. c. Section 38.20.060 states that the project must be completed within two years of final approval, or said approval shall become null and void. Prior to the lapse of one year, the applicant may seek an extension of one additional year from the Community Development Director. For your information, Code requirement. d. Section 38.39.030 requires that the applicant shall provide for private improvements certification by the architect, landscape architect, engineer and other applicable professionals that all improvements including, but not limited to landscaping, ADA accessibility requirements, private infrastructure, or other requirement elements were installed in Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 25 of 29 accordance with the approved site plan, plans and specifications. For your information. This will be required prior to occupancy following construction. e. All construction activities shall comply with section 38.39.020.A.2 of the Unified Development Code. This shall include routine cleaning/sweeping of material that is dragged to adjacent streets. The City may require a guarantee as allowed for under this section at any time during the construction to ensure any damages or cleaning that are required are complete. The developer shall be responsible to reimburse the City for all costs associated with the work if it becomes necessary for the City to correct any problems that are identified. f. Section 38.39.030 requires that all infrastructure improvements including 1) water and sewer main extensions, and 2) public streets, curb/gutter, sidewalks fronting parks, open space, rear yard frontages or other non-lot frontages, and related storm drainage infrastructure improvements shall be financially guaranteed or constructed prior to Final Plat approval. City standard residential sidewalks shall be constructed on all public street frontages of a property prior to occupancy of any structure on the property. Upon the third anniversary of the plat recordation of any phase of the subdivision, any lot owner who has not constructed said sidewalk shall, without further notice, construct within 30 days said sidewalk for their lot(s), regardless of whether other improvements have been made upon the lot. This condition shall be included on the final plat for the subdivision. g. Storm water Master Plan: Per Chapter 40, BMC a Storm water Master Plan for the subdivision for a system designed to remove solids, silt, oils, grease and other pollutants from the runoff from the private and public streets and all lots must be provided to and approved by the City Engineer. The master plan must depict the maximum sized retention basin location, show location of and provide easements for adequate drainage ways within the subdivision to transport runoff to the storm water receiving channel. The plan shall include sufficient site grading and elevation information (particularly for the basin site, drainage ways and finished lot grades), typical storm water detention/retention basin and discharge structure details, basin sizing calculations and a storm water maintenance plan. h. Per Chapter 40, BMC a Storm Water Management Permit (SMP) must be submitted and approved by the City Engineer prior to Final Site Plan Approval. The SMP requires submittals of an application form and a Storm Water Management Plan in compliance with the City of Bozeman’s Storm Water Management Ordinance #1763. The SMP is independent of any other storm water permitting required from the State of Montana, and does not fulfill the requirement to obtain a Storm Water Pollution Prevention Plan (SWPPP) if they are required for this development. A copy of the Notice of Intent (NOI), the Storm Water Pollution Prevention Plan (SWPPP), and the approval letter from the Montana Department of Environmental Quality shall be submitted to the City. Any storm water ponds located within a park or open space shall be designed and constructed to be conducive to the normal use and maintenance of the open space. Storm water ponds for runoff generated by the subdivision (e.g., general lot runoff, public or private streets, common open space, parks, etc.) shall not be located on easements within privately owned lots. Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 26 of 29 While the runoff from the individual lots will be dependent on the intensity of use on each lot, the maximum sizing of the storm retention facilities for each lot will be established based on maximum site development. Final facility sizing may be reviewed and reduced during design review of the FSP for each lot. i. The applicant shall submit a construction route map dictating how materials and heavy equipment will travel to and from the site in accordance with section 38.39.020.A.1 of the Unified Development Ordinance. This shall be submitted as part of the final site plan for site developments, or with the infrastructure plans for subdivisions. It shall be the responsibility of the applicant to ensure that the construction traffic follows the approved routes. APPENDIX B – PROJECT SITE ZONING AND GROWTH POLICY Zoning Designation and Land Uses: The subject property is zoned “R-S” (Residential Suburban District). The intent of the R-S District is “to allow open space, resource protection and primarily single-household development in circumstances where environmental constraints limit the desirable density. All new subdivision and site plan developments in this district shall be subject to the provisions of article 20 of this chapter, pertaining to planned unit development, and shall be developed in compliance with the adopted city growth policy.” Adopted Growth Policy Designation: The property is designated as “Suburban Residential” in the Bozeman Community Plan. The Plan indicates that “This category indicates locations generally outside of City limits, but within the planning area, where a land development pattern has already been set by rural subdivisions. Subdivisions in this area are generally characterized by lots two acres in size or less. It is probable that portions of this area may be proposed for annexation within the next twenty years. The area is able to be served with municipal water and sewer services with appropriate extensions of main lines. Any further development within this area should be clustered to preserve functional open space. Individual septic and well services are discouraged. If development is proposed within reasonable access distances to waste water and water services, annexation to the City should be completed prior to development.” Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 27 of 29 APPENDIX C – DETAILED PROJECT DESCRIPTION AND BACKGROUND Project Description The site is located at 3601 Good Medicine Way. The site is 5.01 acres in size. The proposal is to subdivide an existing parcel in the R-S (Residential Suburban) District to create nine (9) single-household residential lots, two open space lots, and parkland parcel. Accessory dwelling units are not being addressed in the covenants. The Planned Unit Development (PUD) review is required in R-S Districts. No variances are being requested with the application. However, the Applicant has requested eight relaxations in the PUD application. A subdivision to create the nine lots is being processed concurrently with the PUD. Project Background The parent tract was created through Amended Plat of Minor Subdivision No. 35 filed with the Gallatin County Clerk & Recorder in November of 1980. A note on plat stated Lot 4, the subject property, “is to be used as a church site and accessory uses of a church.” This restriction was later removed. The property was annexed by the City in October, 2012 through Resolution 4415. The Applicant requested an initial zoning designation of R-1 (Residential Single Household Low Density) and was approved for R-S. After annexation the property went through a Pre-Application subdivision and PUD concept review. The proposed preliminary plat and plan is substantially similar to the pre-application proposal including nine residential lots, two open space lots and a park. Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 28 of 29 APPENDIX D – NOTICING Noticing was provided by posting the site, publication of a legal advertisement in the Bozeman Daily Chronicle, and by mailing a notice to all landowners within 200 feet of the perimeter of the planned unit development. Notice was provided at least 15 and not more than 45 days prior to the City Commission public hearing on November 4, 2013. APPENDIX E - OWNER INFORMATION AND REVIEWING STAFF Owner/Applicant: Mahar Montana Home, 1627 W. Main Street, #370, Bozeman MT 59718 Representative: C&H Engineering and Surveying, 1091 Stoneridge Drive, Bozeman, MT 59718 Report By: Chris Saunders, Policy and Planning Manager APPENDIX F –PLANNED UNIT DEVELOPMENT INTENT Sec. 38.20.010. Intent. A. It is the intent of the city through the use of the planned unit development (PUD) concept, to promote maximum flexibility and innovation in the development of land and the design of development projects within the city. Specifically, with regard to the improvement and protection of the public health, safety and general welfare, it shall be the intent of this chapter to promote the city's pursuit of the following community objectives: 1. To ensure that future growth and development occurring within the city is in accord with the city's adopted growth policy, its specific elements, and its goals, objectives and policies; 2. To allow opportunities for innovations in land development and redevelopment so that greater opportunities for high quality housing, recreation, shopping and employment may extend to all citizens of the city area; 3. To foster the safe, efficient and economic use of land and transportation and other public facilities; 4. To ensure adequate provision of public services such as water, sewer, electricity, open space and public parks; 5. To avoid inappropriate development of lands and to provide adequate drainage, water quality and reduction of flood damage; 6. To encourage patterns of development which decrease automobile travel and encourage trip consolidation, thereby reducing traffic congestion and degradation of the existing air quality; 7. To promote the use of bicycles and walking as effective modes of transportation; 8. To reduce energy consumption and demand; 9. To minimize adverse environmental impacts of development and to protect special features of the geography; 10. To improve the design, quality and character of new development; Z-13131, Staff Report for the Ellis View Estates Preliminary Planned Unit Development Page 29 of 29 11. To encourage development of vacant properties within developed areas; 12. To protect existing neighborhoods from the harmful encroachment of incompatible developments; 13. To promote logical development patterns of residential, commercial, office and industrial uses that will mutually benefit the developer, the neighborhood and the community as a whole; 14. To promote the efficient use of land resources, full use of urban services, mixed uses, transportation options, and detailed and human-scale design; and 15. To meet the purposes established in section 38.01.040