Loading...
HomeMy WebLinkAboutCompletion Certifcate for SRF-11281 Bozeman Sewer System Revenue Bond 2010H DEPARTMENT OF NATURAL RESOURCES AND CONSERVATION STEVE BULLOCK,GOVERNOR 1625 ELEVENTH AVENUE STATE OF MONTANA DIRECTOR'S OFFICE. (406)444-2074 PO BOX 201601 � o oq_nx x FAX. (4:06)444-26'84 HELENA,MONTANA 59620-1601 MEMOjUNDUM To: Sean Becker, :Mayor City of Bozeman From: Anna Miller, Financial Advisor Department of Natural Resources and nse ation Date: September 26,2013 Re: Bozeman Sewer System Re e Bond 2010H SRF-11281 $9,573,000 Attached is the Completion Certificate for this loan. Please review, sign and return to me at: Anna Miller Conservation and Resource Development Division PO Box 201601 Helena, MT 5962.0-1601 1 would like to have this back by November 8, 2013. A signed copy will be sent back to the City. This completion certificate is a requirement with the State Revolving Fund Program. Please give me a call at 444-6689 if you have any questions.. enc. cc: Joan Specking—DNRC w/o Anna Rosenberry—Bozeman w/ Chris Kukulski—Bozeman w/ Debbie Kuykendall—US Bank w/o Paul LaVigne DEQ w/ Bozeman WWTP SRFW-11281 $9,573,000 DIRECTOR'S CONSERVATION&RESOURCE RESERVED WATER RIGHTS OIL&GAS TRUST LAND MANAGEMENT OFFICE DIVISION COMPACT COMMISSION DIVISION DIVISION (406)444-2074 (406)444-6667 (406)444-6841 (406)444-6675 (406)444-2074 $9,573,000 Sewer System Revenue Bond (DNRC Water Pollution Control State Revolving Loan Program), Series 2010H City of Bozeman, Montana CERTIFICATE OF COMPLETION We, Sean Becker, and Chris Kukulski,hereby certify that we are on the date hereof the duly qualified and acting Mayor, and City Manager, respectively, of the City of Bozeman (the "City"), and that: 1. Pursuant to Resolution No. 4299, duly adopted by the City Commission of the City on November 1, 2010, entitled "Resolution Relating to $9,573,000 Sewer System Revenue Bond (DNRC Water Pollution Control State Revolving Loan Program), Series 2010H; Authorizing the Issuance and Fixing the Terms and Conditions Thereof' (the "Resolution"),the City issued its Sewer System Revenue Bond(DNRC Water Pollution Control State Revolving Loan Program), Series 2010H, of the City, dated, as originally issued, as of November 1, 2010 in the maximum aggregate principal amount of$9,573,000 (the"Bond"). We have reviewed the Resolution and the Resolution No. 4299 adopted by the City Council of the City on November 1, 2010, including, without limitation, Articles 11 and III thereof, and the definitions relating thereto. The Bond Resolution is referred to as (the "Resolution"). Terms used with initial capital letters but undefined herein shall have the meanings given them in the Resolution, unless the context hereof clearly requires otherwise. 2. The Bond was issued to finance the cost of acquiring or constructing certain improvements to the wastewater treatment plant system of the City(the"System"), generally described in Exhibit A to the Resolution (the "Project"). The Project was completed on May 25, 2012, substantially in accordance with the plans and specifications therefor on file with the DEQ, including any changes therein made with the written consent of an Authorized DNRC or DEQ Officer, except for minor defects in the Project, which the City has ordered to be remedied or minor items of work and materials awaiting seasonal completion. Construction of the Project has complied with all federal and state standards, including, without limitations,EPA regulations and standards. The Project was placed in service on May 25, 2012. Attached as Exhibit A to this Certificate is a certificate of an engineer stating that the Project has been completed substantially in accordance with the plans and specifications now in effect, which conform to those on file with the DEQ and substantially in compliance with all federal and state standards applicable. The City has accepted the Project and we are authorized to make a certification to that effect. 3. All costs of the Project have been paid and the City hereby waives its right to any remaining Committed Amount not advanced or to be advanced upon delivery hereof and specifically confirms and agrees that no Reserve Amounts are needed and that any unadvanced Committed Amount is released. 4. The City has spent the following amounts from proceeds of the Bond in connection with the Project: Architect and Engineer $ 1,113,202.00 Construction $ 7,777,173.00 Debt Service Reserve $ 682,625.00 Total $ 9,573,000.00 5. The Trustee has delivered to the City a copy of Schedule B which will be attached to the Bond, which reflects the amortization of all advances made or to be made on the date hereof of proceeds of the Bond (i.e., $9,573,000) (the sum of the amounts of the Bond applied to pay costs of the Project or costs of issuance of the Bond or deposited in the Reserve Account as described in paragraph 4 hereof) as required under Section I I(g) of the Indenture, which is attached hereto as Schedule B. The City hereby acknowledges and agrees that said Schedule B has been calculated in accordance with the provisions of the Resolution and the Indenture, and that the Bond, with said Schedule B attached thereto, has been duly issued pursuant to the Resolution and is a valid and binding obligation of the City accordance with its terms and the terms of the Resolution. The City commenced the semiannual payment on the Bond on January 1, 2011 in accordance with the Schedule B, as originally attached to the Bond at closing on December 14, 2010, and payments thereon will continue on each January 1, and July 1,thereafter until paid in accordance with the Schedule B attached hereto. The City hereby waives its right to any remaining Committed Amount, as defined in the Commitment Agreement, not advanced or to be advanced upon delivery hereof and specifically confirms and agrees that no additional funds are needed for the Project and that any unadvanced Committed Amount is released. 6. Pursuant to the Resolution, the City has established a Reserve Account in the Fund (the"Reserve Account"),to secure its parity water system revenue bonds and which currently secures the Bond. Under the terms of the Resolution,the amount required to be on hand in the Reserve Account is equal to the maximum amount of principal and interest payable on the Bonds in any future fiscal year(the"Reserve Requirement"). The Reserve Requirement on the Bonds, based on the amortization of the Bond in accordance with Schedule B thereto, is $682,625. The amount on deposit therein on the date hereof, $682,625 is not less than the Reserve Requirement. 7. The representations of the City contained in Section 3 of the Commitment Agreement, dated as of September 15, 2008, between the City and the DNRC, and in Sections 2.1, 3.1 and 3.3 of the Resolution are true and complete as of the date hereof as if made on this date, except to the extent that the City has specifically advised the DEQ and the DNRC otherwise in writing. 8. No default in any covenant or agreement on the part of the City contained in the Resolution has occurred and is continuing. WITNESS our hands and the seal of the City as of this day of L2013. CITY OF BOZEMAN,MONTANA By ayor 0-P (SEAL) And City Manager G:\CARD\SRF-WRF Loans\8RF-Certfficates\CERT Bozeman$9,573,000.docx full 2 A , Certificate of Substantial ompletion n-- y prvt�.x aox,manMRF Ptrose 1 1mprn,re7erak4 rrt>er COY ormmarmm rs coertraa No. Cmtradar s Ppcife ct.No,: 00.,,5074s-P0123 1+ct'I.LZ-1 This jtentative][definiftve).t;ertitacate of Subst tia'i Completion Applies to; All Work under the Contact Documents, C7 The following specified portions: The Work to which this Cartiftcate applies has been inspeoieti by authot¢cct.representatives at Owner,Contractor^and t riglneer, and found to be substantlally complete, The Date of 5ubstantidl Completion of the project or portion thereof desWnaled atrova Is hereby declared and is also.the:date of�commericaernant of applicable entarrabties required by the Gontract Doctrrnents;except as stated iaelow. A flentatiVel list of items to be completed or corrected,is attached hereto. This list rrtay not be all- inclusive;aDd the failure to lnelWe 4hy items on such list does not al.tdr the responsibility of the Corrtraclor to complete all'Wdfk in o6ordanoo with tha Contract Documents, i The ressponsli,ill0n. batween OWNER and CONTRACTOR for secvrtty, operation, safety, rnalntanarice, heat: utUltles, lnsurance and wananties shall be as provided in the Contract Documents,9Xicep7t as amended as follows: `— p Amended Responsibilities Noi.Amghded Owner's Amended Responsibilities: Contractor's Amended Responsibilities: The follouving documents are attached to and made part of Wis Csartificate: This Cedifroa:W does not canstitute an acceptance of W-Ork ni t in aMwdent4with the Contract Documehts nor is it a retease of Contractors obligation to eompWa the Work in a0c'Qifdance vdth the Contract:Documents. Y Eineer Date .., h - cx' Ogle jD / Y mom 000...88486/Phase 1 Improvements Project June 11,2013 ` JUN ;. ,.. Mr. Bob Murray D City of Bozeman Engineering Department Dig a 20 East Olive Street Bozeman, Montana 59771 RE: City of Bozeman,Montana Bozeman WRF Phase 1 Improvements Project, MDEQ SRF No. 0303105-01 Facility Construction Certification Dear Bob: This letter is to certify that the above referenced project is complete,has been constructed in accordance with the approved plans and specifications,has been accepted by HDR/MMI and the City of Bozeman, and is operating satisfactorily as intended by the design. We have reviewed the final project deficiency (punch)list, and can now confirm that all identified items associated with the treatment process have been appropriately addressed by WBC and their subcontractors. Several site restoration items are remaining which should be completed in early summer. HDR/MMI has completed the project as-built drawings by incorporating all HDR/MMI, City and Contractor changes. We have sent the drawings and associated digital files to you under separate cover. HDR/MMI has also already completed and uploaded the digital O&M manual for this project, and received approval response from MDEQ.We plan to burn the project digital photos and other outstanding project files to DVD, and will deliver to your office at closeout of the Digester (Phiise 3)Piroject. In addition,we have conducted training on the digital O&M manual (e-O&M) and are in the process of organizing an additional training session with City staff at their convenience. The Montana DEQ requires that you, as the representative of the City of Bozeman for the project, also be a signatory to this Certification Letter. We suggest that, if you are in agreement with the above certification, sign at the location provided at the end of this letter and forward on to MDEQ for final project closeout. HQR ENOi666600.Ilnt. 1716 5auM Reserve Phone(4176)532-Zn soit6 C fax:(1116)SU-2241 Missoula,MT SWI-0708 www.hdiinc.com Mr.Bob Murray ;tune 11,2013 Please call if you have any questions with the above or require additional action,from FDDR'NM. Sincerely, HDR ENGINEERING, INC. Dan J.Harmon, P.E. Project Manager Letter and Certification Approved by the City of Bozeman,Montana By: Bob Murray, City ofBoz an Project Manager i 3'/Date C. Mike Abrahamson,MDEQ Herb Bartle/Craig Woolard, City of Bozeman James Nickelson (NMI) Coralynn Revis (HDR) HDR One Company I Many Solalions 2 of 2 AFFIRMATIVE CERTIFICATION of Project Performance Standards (for State Revolving Fund Loan Projects) As required by the Clean Water Act under Title VI, 33 U3,C. 1251 Section 602(b)(6), I certify as authorized representative of City of Bozeman (Name of Loanee) that the Bozeman WRF Phase 1 ImDrovements Project,(MDEQ SRF,No. C303105-01 (Name of Loan Project) wastewater treatment facility funded in part by the above-noted loan project, having initiated operation on May 25 , 2012 , has met its performance standards on the date one year following initiation of operation. This certification is substantiated by the attached Basis for Certification Report, 6/3113 )/i �lve Date Signature of Autho zed Represent ProLect Engineer, City of Bozeman Title S RF-11281 STATE OFMONTANA 50380394 GENERAL OBLIGATION BONDS 9989OTl/K88 WASTE WATER (REVOLVING FUND PROGRAM) BORROWER: Bozeman 2Q1UH FINAL LOAN PAYMENT: 1/112031 PROJECT NAME: VVstewtr Treatment Fac TOTAL#OF LOAN PAYMENTS: 40 LOAN COMMITMENT: $9.573.000 PROJECT NUMBER: LOAN AMOUNT: $8,573.000 DATE OF LOAN FUNDING: 12/14/10 INTEREST RATE: 3.75& PAYMENT ADM EXPENSE LOAN LOSS INTEREST PRINCIPAL 0/8 LOAN TOTALAMOUNT DUE SURCHARGE SURCHARGE PAYMENT PAYMENT BALANCE OFPAYMENT 07/01/11 23,298.26 31,064-35 62,128,69 145,000.00 9.428,000.00 261,491-30 01/01/12 35,355.00 47,140,00 94,280,00 145,000,00 9,283,000.00 $321,775.00 07/01/12 34.811.25 46.415.00 82.830.00 108.000,00 9.115.800.00 $342.058.25 01/01/13 34.181.25 45`570.00 81.150,00 189,000D0 8.048.000.00 $338,906.25 07/01/13 33.547.50 44.730.00 88.480.00 172.008.00 8,774.000.80 $330^73750 01/01/14 32.902.50 43.070.80 87'740,00 178.000.00 8.598.000.00 $348,512.50 07/01/14 32.242.50 42,990.00 85'980,00 179.000.00 8.419.000.00 $840,212.50 01/01/15 81.57125 42,095-00 84,190.00 182.000.00 8.237.000.00 $339.850.25 07701115 30,88876 41,185.00 82,370.08 180.800,00 8.051,000.0D *340.443-75 01101/16 30,191.26 40,255.00 80,510.00 189.008.00 7,062.000.00 $339.05625 07101/18 29.482.50 39,310.00 78,620.08 193.000,00 7,689.000.00 $340.412.50 01/81/17 28'758,75 88.345.00 76.600.00 197.000�00 7,472'000,00 $340.793.75 07/01/17 28.020.00 37.360.00 74`720-00 200,000.00 7.272,000.00 $340^100.00 01/01/18 27,270,00 36.300.00 72,720,00 204.000.00 7.068,000.00 $340.350.00 07/01118 26'505,00 35'340.00 70.600�08 205,000,00 6.883,000.00 $337,525.00 81/01/10 25.736.25 34.31E00 68.030,00 210.000,00 8.653.000,08 $338.681.25 07101/19 24.948.75 33.26&00 00.538.00 214,000�00 6.439.00000 $338.74375 01/07/20 24.146.25 32,195.00 64.390�00 219,000�00 0.220080.00 $339.731.25 87/01120 23,325.00 81,100.00 62.200.00 223.000O0 5.997.000,00 $339,525.00 01/01/21 22.488.75 29^985�00 58.970.00 227.000.00 5`770.800.00 $839.443.75 07/01t21 21,637.50 28,850.00 57.700.00 228.000�00 5.542.00I00 $336.187.50 01/01/22 28.782.80 27.710,00 55.420.00 235.000.00 5.307,000.00 $338.012-50 07/01/22 19.901.26 26.53&00 53.07000 239.000.00 5.008.000.00 $338.506.25 01/01123 18.005.00 25,340.00 50'680�00 247.000.80 4.821.000.00 $342,025.80 07/01/23 18,078.75 24.105,00 48.21000 250.000.00 4,571.000�00 $340.89075 01/01/24 17,141.25 22,855.00 46.710V0 255.080.00 4,310,000.00 $340,706.25 07/01/24 18,185.00 21,580D0 43,160.00 256.000.00 4.060,800.00 $338,925.00 01/01/25 15.225.00 28,380.00 40,600�80 262.000.00 3,798.000,00 $338,125.00 07/01/25 14,242.50 18.990.00 37,980-00 268,000.00 3.580.000,00 *339,212-50 01101/26 13.237,50 17,650.00 35,300,00 272.000D0 3,258.000�00 $338.187.50 07A01/26 12.217,50 10.280.00 32,58000 278.000.00 2.980.000.00 $389.087.50 01/01/27 11.175�00 14'900.00 28,800.00 285,000.00 2.895,008,00 $340.875.00 07/01/27 10,106.26 13.475,00 20.950,08 280^000.00 2.405.00000 $340.531.25 01/01/28 9,01815 12.025.00 24,050-00 207,000.00 2.100.000�00 $842.003.75 07/01/28 7.905.00 10'540.00 21.088-00 300.00O00 1.808.000.00 $339,535.00 01/01/29 6.780.80 9,040.00 18.080.08 307,800.80 1.501.000.00 $340,800.00 07/01/29 5.628J5 7,505,00 15.010-00 313,000.00 1.188.000.00 $341,143,75 01/01/30 4.456.00 5.940.00 11'880-00 354^000.88 834.000.00 $370.275,00 07/01/30 3.127-50 4`170.00 8.340.00 379.000.00 458.000.00 $394.837,50 01/01/31 1'70&25 2`275.00 4.550.00 455,000,00 0.00 $463,531.25 S858J68.75 $12.443.908.25 312,443'906.25 8ucemuo 8RF-ll2Al $9,573,000 s1an 9/26/20I3