Loading...
HomeMy WebLinkAboutWater Pipeline and Access Easement with Marvin R. Cowdrey for Country Inn & Suitesproject Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Brian Heaston, Project Engineer Craig Woolard, Public Works Director SUBJECT: Authorize the City Manager to sign a Water Pipeline and Access Easement and Agreement with Marvin R. Cowdrey for the Country Inn & Suites project. MEETING DATE: September 30, 2013 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to sign a Water Pipeline and Access Easement and Agreement with Marvin R. Cowdrey for the Country Inn & Suites project. BACKGROUND: The platted water line easement on Tract 2 of Minor Subdivision 358B provided inadequate separation between the constructed water line location and the easement boundary. The lot is currently approved for construction of a new hotel, the Country Inn & Suites. The attached water pipeline easement provides the required 15’ of separation between the existing main and easement per city standards, and also includes additional easement area for construction of a new on-site fire hydrant. UNRESOLVED ISSUES: None. ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: None. Attachments: (1) Water Pipeline and Access Easement and Agreement Report compiled on: September 12, 2013 25 26 27 28 29