Loading...
HomeMy WebLinkAboutResolution 4467 change order 1, alteration of Contract with Omdahl Excavation.gym COMMISSION RESOLUTION NO, 4467 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMA , MONTANA, APPROVING ALTERATIONIMODIFICATION OF CONTRACT WITH OMDAHL EXCAVATION AND UTILITIES, INC., MANHATTAN, MONTANA. WHEREAS, the City Commission did, on the 22 d day of April 2013, authorize award of the bid for the City of Bozeman 2013 Water Renovations project, to Omdahl Excavation and Utilities, Inc., Manhattan., Montana; and WHEREAS, Section 7 -5 -4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution, and WHEREAS", it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and /or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Omdahl Excavation and Utilities, Inc., as contained in Change Order No. 1, attached hereto, be and the same are hereby approved, and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City, and the City Clerk is authorized and directed to attest such signature. 1 of 2 Resolution No. 4467. (lunge Orderfi)), 2013 Water Renovations PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 26'h day of August, 2013, 13 0 ATTEST: �' �17 L STACY I r] City Cle*pl��" C(-) /KEAN BECKER Mayor APPROVED AS TO FORM: 2of2 tiA.NGE t1,N:DER DATE OF ISSUANCE EFFECTIVE DATE OWNER Contract: I'Max CONTRACTOR Omdahl Excavation & Utilities Project: Same OWNEWs Contract No. N/A ENGINEER City ofBozemn ENGINEER`s Contract No. N/A You are directed to make the following changes in the Contract Documents:.. Description: Install a fiber optic conduit from Fire Station I to the northeast corner of Rouse and Mendenhall. Reason for Change Order: Owner Requested. Attachments: (List documents supporting change) CHANGE IN CONTRACT PRICE: Original Contract Price $ 995,236.00 Net Increase (Decrease) from previous Change Orders No. 0 to 0 $ 0.00 Contract Price prior to this Change Order: $ 995 236.00 Net increase (decrease) of this Change Order: $ 1.0 500.00 Contract Price with all approved Change Orders: $ 1,0.05,736.,00 CHANGE IN CONTRACT TIMES: Original Contract Times: Substantial Completion: 90 Ready for final payment:90 (days or dates Net change from previous Change Orders No. 0 to No. 0 : Substantial Completion: 0 Ready for final payment:0 Aq s Contract Times prior to this Change Order: Substantial Completion: 90 Ready for final payment:90 da s or dates Net increase (decrease) this Change Order: Substantial Completion: 5 Ready for final payment: 5 (days) Contract Times with all approved Change Orders: Substantial Completion: 95 Ready for final payment :95 (days or dates) Contractor certifies and agrees that there are no additional costs or claims for extra work, additional time, delays or omitted items, of any nature whatsoever associated with the subject change order items, except as identified and set forth herein and unless expressly stated otherwise in the Change Order. And further, that the price agreed -upon herein represents the full cost and value for the subject work performed and the materials supplied under the terms of the contract andthat the work qu iti sand value were properly determined and are correct COtf7RACTOR (Authorized ignature) Da RECOMMENDED BY: APPROVED BY (E DINE - Signature) D e OWNER ut iorized Signature) Date EJCDC 1910 -8 -B (1996 Edition Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated Genera[ Contractors of America and the Construction Specifications Institute. Page 1 of 2 C:1Backup2013 Water Renovations\COB Change Order Form 1.doc Date: 18 July 2013 Estimate No. 375-624 Revised TO: City of Bozeman FR: Omdahl Excavation & Utilities, Inc. Bob Murray 659 Morning Mist Road Manhattan, MT 59741 Phone: 406-388-0196 RE: 2013 Water Rehab / Extra: Inter-duct Conduit We hereby submit the following estimates for the work referenced above. This is an estimate and not intended to form a contract. If the terms contained in this estimate are acceptable to the customer, a contract must be signed prior to the performance of any work. Omdahl Excavation & Utilities, Inc, to provide all equipment, labor and materials necessary for the following: Install 2" inter-duct conduit to a depth of 42" from the Fire Station to the NW corner of Rouse and Mendenhall. To include sidewalk and asphalt replacement', saving curb by boring under curb. TOTAL AMOUNT $10,600.00 Terms: Balance due upon completion and receipt of invoice. Any unpaid balance after 30 days from the invoice date will incur a late fee at the highest rate allowed by Law, Omdahl Excavation & Utilities, Inc, also reserves the tight to lie a notice of Right to Claim a Lien against the property owner(s). In case legal collection procedures are necessary, Orridahl Excavation & Utilities, Inc. is entitled to compensation for any and all attorney's fees and/or court costs involved with collection. NOTE: THIS ESTIMATE MAY BE WITHDRAWN IF NOT ACCEPTED WITHIN 10 DAYS. Authorized Signature: drkahl Excavation & Utilities, Inc. Dat6 ACCEPTANCE OF ESTIMATE - The above prices, specifications and conditions are satisfactory and are hereby accepted. Omdahl Excavation & Utilities, Inc. will submit contract for signature(s) upon acceptance and receipt of this estimate. Authorized Signature: Bob Murray for City of Bozeman Date 659 Moming Mist Road - Manhattan, Montana 59741 • Phone (406) 388-0196 - Fax (406) 388-0844