HomeMy WebLinkAboutResolution 4432 Change order 1 alteration of Contract with Lutey Construction tea.�►4°'�
COMMISSION RESOLUTION NO. 4432
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF
BOZEMAN, MONTANA, APPROVING ALTERATIONIMODIFICATION OF
CONTRACT WITH LUTEY CONSTRUCTION, BOZEMAN, MONTANA.
WHEREAS, the City Commission did, on the 5th day of November 2012, authorize award of
the bid for the Renovation of the Water Department Building in the Laurel Glen Subdivision, Bozeman,
Montana; and
WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or
modifications of the specifications and/or plans of the contract be made by resolution; and
WHEREAS, it has become necessary in the prosecution of the work to make alterations or
modifications to the specifications and/or plans of the contract.
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman,
Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman,
a municipal corporation, and Lutcy Construction, Bozeman, .Montana, as contained in Change Order 01,
attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and
directed to execute the contract change order for and on behalf of the City; and the City Clerk is
authorized and directed to attest such signature.
PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a
regular session thereof held on the 18"' day of March, 2013.
Page 1 of 2
SEAN BECKER, Mayor
c ti
J"
STACY Y 'MC
City Cle,,Yk
APPROVED AS TO FORM:
k
G - LI,IVAN
City Attorney
Page 2 of 2
LUTEDY CONS'rRUCTION'
TEIE CRAFTSIVi[AN, INC.
420 S.13",Ave. Bozeman,MT 59715
Phone.(406)587-8892
Fax: (406)582-5727
February 26, 2013
CHAhIGE PROPOSAL
FOR: City Of Bozeman
Superintendent of Facility Services
Attn: James Goehrung
P.O. Box 1230 .
Bozeman, MT 69716
Lutey Construction—The Craftsman, Inc.would appreciate your consideration to the requested
change orders pertaining to the Laurel Glen Water Department Building Renovation project
located at 5519 Saxton, Bozeman MT.
Install conduit and 120Af 1-ir-lif for Owner provided nhone and data cablinct
Install 3/4"conduit for Owner provided cabling
Install duplex outlet for Owner Computer
Install 20 amp single pole breaker
Clean up
Labor, Materials and equipment $241.39
ht flx�ture ballasts per Submittal Comments
Upgrade ballasts
Labor, Materials and equipment
$140.00:
TOTAL CHANGE PROPOSAL
Total Material, Labor, Equipment $381.39
Overhead and Profit(15%) $57.21
State Tax(1%) $4,39
Total $442.99
tl
City Manager Approval