Loading...
HomeMy WebLinkAboutResolution 4432 Change order 1 alteration of Contract with Lutey Construction tea.�►4°'� COMMISSION RESOLUTION NO. 4432 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATIONIMODIFICATION OF CONTRACT WITH LUTEY CONSTRUCTION, BOZEMAN, MONTANA. WHEREAS, the City Commission did, on the 5th day of November 2012, authorize award of the bid for the Renovation of the Water Department Building in the Laurel Glen Subdivision, Bozeman, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Lutcy Construction, Bozeman, .Montana, as contained in Change Order 01, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 18"' day of March, 2013. Page 1 of 2 SEAN BECKER, Mayor c ti J" STACY Y 'MC City Cle,,Yk APPROVED AS TO FORM: k G - LI,IVAN City Attorney Page 2 of 2 LUTEDY CONS'rRUCTION' TEIE CRAFTSIVi[AN, INC. 420 S.13",Ave. Bozeman,MT 59715 Phone.(406)587-8892 Fax: (406)582-5727 February 26, 2013 CHAhIGE PROPOSAL FOR: City Of Bozeman Superintendent of Facility Services Attn: James Goehrung P.O. Box 1230 . Bozeman, MT 69716 Lutey Construction—The Craftsman, Inc.would appreciate your consideration to the requested change orders pertaining to the Laurel Glen Water Department Building Renovation project located at 5519 Saxton, Bozeman MT. Install conduit and 120Af 1-ir-lif for Owner provided nhone and data cablinct Install 3/4"conduit for Owner provided cabling Install duplex outlet for Owner Computer Install 20 amp single pole breaker Clean up Labor, Materials and equipment $241.39 ht flx�ture ballasts per Submittal Comments Upgrade ballasts Labor, Materials and equipment $140.00: TOTAL CHANGE PROPOSAL Total Material, Labor, Equipment $381.39 Overhead and Profit(15%) $57.21 State Tax(1%) $4,39 Total $442.99 tl City Manager Approval