HomeMy WebLinkAbout09-18-13 Wetland Review Board Additional Materials
Page 1 Appropriate Review Fee Submitted
CITY OF BOZEMAN FEE APPLIES- $
DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT
Alfred M. Stiff Professional Building
20 East Olive Street
P.O. Box 1230
Bozeman, Montana 59771-1230
phone 406-582-2260
fax 406-582-2263
planning@bozeman.net
www.bozeman.net
DEVELOPMENT REVIEW APPLICATION
1. Name of Project/Development: Catron Crossing Subdivision
2. Property Owner Information:
Name: VC Development, LLC. E-mail Address:
Mailing Address: 1184 North 15th, Suite 4, Bozeman, MT 59715
Phone: (406) 624-0382 FAX: (406) 582-1116
3. Applicant Information:
Name: VC Development, LLC. E-mail Address: dcape@jwtcompanies.com
Mailing Address: 1184 North 15th, Suite 4, Bozeman, MT 59715
Phone: (406) 624-0382 FAX: (406) 582-1116
4. Representative Information:
Name: Morrison Maierle, Inc. E-mail Address: mekstrom@m-m.net
Mailing Address: P.O. Box 1113, Bozeman, MT 59771
Phone: 406-587-0721 FAX: 406-922-6702
5. Legal Description: Tract A-1 of C.O.S. 1827A
6. Street Address: 5900 Valley Center Rd.
7. Project Description: Commercial Subdivision
8. Zoning Designation(s): B-2 9. Current Land Use(s): Vacant
10. Bozeman Community Plan Designation: Community Commercial Mixed Use
11. Gross Area: Acres: 23.35 Square Feet: 12. Net Area: Acres: 22.75 Square Feet:
N:\2605\025\Design Docs\Platting\Pre-App\WaiverRequest.docx
Catron Crossing
Proposed Variances
Two variances to the Unified Development Code are anticipated as part of this application.
Details regarding the requested variances will be provided in the Preliminary Plat Application
and will address the required review criteria per MCA 76-3-506. At this time, the variances are
as follows:
38.23.100 Watercourse Setback
38.23.040.C Block Length
A cursory discussion on the variance to 38.23.100 is provided as part of this Pre-Application
submittal and includes details regarding the hardship. Comments specific to this consideration
are requested as part of those that will be received as part of the Pre-Application process.
Waiver Request
A request to waive the requirement to provide the following supplemental information from
Section 38.41.060 is being included with this Pre-Application submittal. The items included in
this waiver were identified during a pre-application meeting held with members of the City of
Bozeman staff on November 11, 2012.
A summary response as to the reasoning for each requested waiver is provided, where
appropriate, on the following list in bold italics.
1. Floodplains. A floodplain analysis report shall be submitted with the preliminary plat in
compliance with article 31 of this chapter.
A detailed floodplain analysis will not be necessary for this subdivision proposal. A brief
narrative along with an exhibit illustrating the location of the subdivision in relation to
any FEMA mapped floodplains will be provided as part of the environmental assessment.
2. Groundwater.
a. Depth. Establish the seasonal minimum and maximum depth to the water table, dates on
which these depths were determined, and the location and depth of all known aquifers which
may be affected by the proposed subdivision. The high water table shall be determined from
tests taken during the period of major concern as specified in writing by the county
environmental health department. Specific locations for test holes may also be determined by
the county environmental health department.
b. Steps to avoid degradation. Describe any steps necessary to avoid the degradation of
groundwater and groundwater recharge areas.
Groundwater considerations will not be necessary as part of this subdivision application.
As a commercial subdivision, basements will not be included in any site improvements
and all lots will utilize City of Bozeman water supply and wastewater treatment facilities.
N:\2605\025\Design Docs\Platting\Pre-App\WaiverRequest.docx
3. Water and sewer. Provide an engineering design report and/or other documentation
demonstrating that adequate water distribution systems and capacity, and sewage collection
and disposal systems and capacity, exists to serve the proposed subdivision.
A conceptual layout illustrating the proposed locations of those service lines will be
included as part of the environmental assessment. An evaluation of the current capacity
will not be necessary as part of this application request as that has been established
through past projects on the subject property.
4. Stormwater management. A stormwater management plan shall be submitted with the
preliminary plat. A system shall be designed to remove solids, silt, oils, grease and other
pollutants from the runoff from the private and public streets and all lots, including:
a. The plan shall depict the retention/detention basin locations, and locate and provide
easements for adequate drainageways within the subdivision to transport runoff to the
stormwater receiving channel. Stormwater receiving channels shall be clearly identified for all
ponds.
b. The plan shall include sufficient site grading and elevation information (particularly for the
basin sites, drainageways and lot finished grades), typical stormwater retention/detention basin
and discharge structure details, basin sizing calculations, and a stormwater maintenance plan.
c. Any necessary stormwater easements.
A general Grading and Drainage plan will be provided as part of the preliminary plat
application submittal illustrating a conceptual method of treatment. Detailed stormwater
management plans will be addressed at the site development stage.
5. Streets, roads and alleys.
a. Description. Describe any proposed new public or private streets, roads or alley, or
substantial improvements of existing public or private streets, roads or alleys. The developer
shall demonstrate that the land to be subdivided has access onto a legal street.
c. Modification of existing streets, roads or alleys. Explain any proposed closure or modification
of existing streets, roads or alleys.
d. Dust. Describe provisions considered for dust control on alleys.
e. Pollution and erosion. Explain how street, road and alley maintenance will be provided to
meet the department of environmental quality guidelines for prevention of water pollution and
erosion.
f. Traffic generation. Discuss how much daily traffic will be generated on existing local and
neighborhood streets, roads and alleys, when the subdivision is fully developed, and provide the
following information:
(1) The report format shall be as follows:
(a) Trip generation, using the Institute of Transportation Engineers Trip Generation Manual;
(b) Trip distribution;
(c) Traffic assignment;
(d) Capacity analysis;
N:\2605\025\Design Docs\Platting\Pre-App\WaiverRequest.docx
(e) Evaluation; and
(f) Recommended access plan, including access points, modifications and any mitigation
techniques.
(2) The report shall include the following information:
(a) Land use and trip generation in the form of a table of each type of land use, the number
of units or square footage, as appropriate, the trip rates used (daily and peak) and
resulting trip generation.
(b) Traffic graphics, which show:
(i) A.M. peak hour site traffic;
(ii) P.M. peak hour site traffic;
(iii) A.M. peak hour total traffic;
(iv) P.M. peak hour total traffic;
(v) Total daily traffic (with site-generated traffic shown separately).
(c) A.M. and P.M. capacity analysis with an A.M. and P.M. peak-hour capacity analysis
provided for:
(i) All major drive accesses that intersect collector or arterial streets or roads; and
(ii) All arterial-arterial, collector-collector and arterial-collector intersections within one-
half mile of the site, or as required by the city engineer during the preapplication
review, concept plan review, or informal project review.
(d) For two-way stop controlled intersections, analysis of whether the intersection would
satisfy signalization warrants if the two-way stop control was removed.
g. Capacity. Indicate the levels of service (before and after development) of existing and
proposed streets and roads, including appropriate intersections, to safely handle any increased
traffic. Describe any anticipated increased maintenance that will be necessary due to increased
traffic and who will pay the cost of maintenance.
h. Bicycle and pedestrian pathways, lanes and routes. Describe bicycle and pedestrian
pathways, lanes or routes to be developed with the development.
i. Traffic calming. Detailed drawings of any proposed traffic calming installations, including
locations and turning radius templates.
A Traffic Impact Study will not be necessary for the review of this subdivision. Site
development, within the individual lots to be created, will be consistent with the uses
anticipated with the underlying zoning designation.
6. Parks and recreation facilities. The following information shall be provided for all land used
to meet park land dedication requirements:
a. Park plan. A park plan, including:
(1) Site plan for the entire property; showing developer installed improvements on the initial park
plan and proposed future improvements on the future park plan;
(2) Drainage areas;
(3) Utilities in and adjacent to the property;
(4) The zoning and ownership for adjacent properties;
(5) The location of any critical lands (wetlands, riparian areas, streams, etc.) and location of
watercourse setbacks;
N:\2605\025\Design Docs\Platting\Pre-App\WaiverRequest.docx
(6) Park landscaping plan, prepared by a qualified landscape professional in accordance with
section 38.41.100, showing the location and specific types and species of plants, shrubs, trees
as well as grass seed mixes;
(7) General description of land, including size, terrain, details of location and history, and
proposed activities;
(8) Trail design and construction showing compliance with adopted city standards and trail
classifications;
(9) The requirement for approval of the final park plan by the city commission with a
recommendation from the city recreation and parks advisory board prior to any site work;
(10) The requirement for a preconstruction meeting prior to any site work;
(11) Appropriate sections from the design guidelines for city parks;
(12) Cost estimate and installation responsibility for all improvements;
(13) If playground equipment will be provided, information including the manufacturer,
installation data and specifications, installer, type of fall zone surfacing and age group intended
for use shall be provided; and
(14) Soils information and analysis.
b. Park maintenance.
(1) Maintenance information, including levels of maintenance, a maintenance schedule, and
responsible parties;
(2) Weed control plan, including responsible parties; and
(3) Plan for garbage collection, snow removal and leaf removal including responsible parties.
c. Irrigation information.
(1) An irrigation system map generally showing the locations and types of lines, including depth,
water source, heads, electric valves, quick couplers, drains and control box; and
(2) If a well will be used for irrigation, a certified well log shall be submitted showing depth of
well, gpm, pump type and size, voltage, water rights, etc.
d. Phasing. If improvements will be phased, a phasing plan shall be provided including
proposed financing methods and responsibilities.
Parkland considerations will not be necessary for this subdivision as it is intended to
create commercial lots in accordance with the underlying zoning.
7. Neighborhood center plan. A neighborhood center plan shall be prepared and submitted for
all subdivisions containing a neighborhood center.
A neighborhood center plan will not be necessary for this subdivision as it is intended to
create commercial lots in accordance with the underlying zoning.
8. Miscellaneous.
a. Public lands. Describe how the subdivision will affect access to any public lands. Where
public lands are adjacent to or within 200 feet of the proposed development, describe present
and anticipated uses for those lands (e.g., open space, recreation, etc.), and how public access
will be preserved/enhanced.
b. Hazards. Describe any health or safety hazards on or near the subdivision, such as mining
activity or potential subsidence, high pressure gas lines, dilapidated structures or high voltage
power lines. Any such conditions should be accurately described and their origin and location
identified. List any provisions that will be made to mitigate these hazards. Also describe any on-
site or off-site land uses creating a nuisance.
N:\2605\025\Design Docs\Platting\Pre-App\WaiverRequest.docx
Access to public lands will be unaffected by this subdivision proposal as none are
adjacent to the subject property. Hazards, beyond those which would have been
considered as part of the Community Plan are not anticipated. The Community Plan
identified this area as suitable for the uses proposed with this application.
9. Affordable housing. Describe how the subdivision will satisfy the requirements of chapter
10, article 8. The description shall be of adequate detail to clearly identify those lots designated
as subject to chapter 10, article 8 compliance requirements and to make the obligations placed
on the affected lots readily understandable.
a. On all lots intended to be used to satisfy the requirements of chapter 10, article 8, the
allowable building envelope shall be depicted.
This provision is not required at this time.
Request for Variance – Catron Crossing/VC Development March 29, 2013
Page 1 of 4
Narrative
for a Request for Variance
Catron Crossing Master Site Plan
VC Development, LLC
March 5, 2013
The applicant is respectfully requesting the feedback of the Bozeman City Commission for this variance
request during the subdivision pre-application process. The formal variance request will be submitted
during the Preliminary Plat process through the Bozeman City Planning Department. The applicant’s
interest in doing so is to seek initial support for the variance prior to investing in the associated
preliminary plat design documents. The rationale of the applicant for requesting the variance is
presented below with its associated background information.
UDO Sec. 38.23.100. - Watercourse Setback
Variance Request – A minimum 30-foot setback from the west side of the Catron Ditch watercourse,
which is a variance of 20 feet.
A. 2. c. (3) Other watercourses. A minimum 50-foot setback shall be provided along both sides of all
other watercourses.
1. Historical Perspective
2. Current Conditions
3. Negative Impact to Design
Historical Perspective
In 2001, Cape France Enterprises, a related party to VC Development, LLC, completed the
relocation of the Catron Stream Ditch from what was effectively the east/west centerline of
the property to the eastern edge of the property. Catron originally served as an irrigation
ditch and as such flowed in effectively a straight line from south to north. The underlying
intent of the realignment was to make the ditch an amenity for the overall parcel and the
surrounding area much like Catron Stream is in front of what is currently the Holiday Inn
Express. The total cost of this realignment was approximately $300,000 as the bed of the
ditch was enhanced to meander along the entire eastern boundary of the property. The
bends in the bed of the ditch were constructed to enhance the habitat provided to fish and
birds, increasing the overall length of the ditch by 1,272 linear feet. The realignment
effectively took an unattractive, non-habitat irrigation ditch and created a substantial public
and wildlife amenity that enhances the Valley Center corridor as well as the property. The
new design of the realignment was completed with the cooperation of Montana Fish
Wildlife and Parks to insure the new alignment would create beneficial habitat. The
realignment was chosen over routing the ditch underground through pipes, an option that
existed at the time due to its classification as a ditch as opposed to a stream ditch. At the
time the ditch was realigned, the watercourse setback was not the current 50’.
At the time that the Catron Ditch was realigned, the City of Bozeman planning and zoning
regulation was the Bozeman 2020 Plan as adopted on October 22, 2001, the applicable
section of which is attached. As referenced, the Bozeman Zoning Ordinance required
watercourse setbacks to be 35’ from the Mean High Water Mark (MHWM) of a watercourse,
Request for Variance – Catron Crossing/VC Development March 29, 2013
Page 2 of 4
which is the point at which the water leaves the main channel and spills into the floodplain.
This point is effectively the top of the channel bank. This same section further states a
watercourse is any natural stream, river, creek, drainage, waterway, gully, ravine, or wash in
which water flows either continuously or intermittently and has a definite channel, bed and
banks. The term watercourse does not apply to any facility created solely for the
conveyance of irrigation water. The original alignment of Catron Ditch was constructed
solely for the purpose of conveying irrigation water. The new alignment, as stated above,
was constructed to make what was an irrigation channel into a public amenity.
Current Conditions
The subject property is located within the North 19th Entryway Corridor Overlay District and
as such is subject to a 50’ setback from the property line. The new alignment of the Catron
Ditch is located within that 50’ setback. Extending the effective setback an additional 50’
will place all improvements to the site at nearly 150’ from the property line. The combined
setback creates two situations that a variance will help overcome. The first situation is a
negative impact to the overall design of the project, specifically its visual connectivity to
Valley Center Drive and the pedestrian path constructed along Valley Center Drive. The
second is the inefficiency created in site planning due to the unusually large consumption of
land and density.
Negative Impact to Design
The existing buildings along Valley Center Drive have been constructed adhering to the 50’
setback requirement of the North 19th Entryway Corridor. If the Catron Crossing parcel
constructs its buildings with a 150’ setback, continuity in design along the corridor will be
compromised. The connection between people using Valley Center Drive and the
pedestrians using the path along Valley Center Drive will be lost as well. There are varying
opinions in the Bozeman design community regarding the spatial impacts of the baseline 50’
setback requirement currently in place. Many professionals, both in the private and public
domains, believe that the North 19th Corridor lacks an intimacy due to the current 50’
setback. Extending the setback an additional 100’ feet will substantially exaggerate that
effect.
The people who visit Catron Crossing will experience no connection to the Catron Ditch if
the 50’ setback is not relaxed. Currently, restaurant parcels are designed for the eastern
boundary of the property and it is envisioned that these restaurants will be designed with
the intent of connecting their outdoor space and dining experience with the Catron Ditch.
This connection cannot be achieved if the 50’ setback is not relaxed.
Hardship
The additional 50’ foot setback as now required creates an unintended consequence to the
applicant. The realignment was constructed under Bozeman 2020 Plan when the setback
was either 35’ from the channel bank (MHWM) or not applicable due to the fact that Catron
Ditch was an irrigation channel. Current regulations will render approximately 2.04 acres of
land undevelopable through the application of the 50’ setback to the floodplain or wetland
fringe. At current market values, the cost of this undevelopable land is approximately
$890,000. Considering the original intent of the applicant was to make an amenity out of an
irrigation channel, these unintended consequences born out of regulatory evolution
Request for Variance – Catron Crossing/VC Development March 29, 2013
Page 3 of 4
Water Quality Preservation Considerations
A 30-foot setback is consistent with pre-established setbacks for Catron Creek south of the
property. As can be seen from aerial photography (Figure 1), the approximate 30-foot
setback was sufficient to support large wooded vegetation adjacent to the Wingate hotel
parking lot. A 30-foot setback will be sufficient for the Catron Crossing Subdivision for the
following reasons:
• Soils on-site are not classified as “highly erodible” by the Natural Resources
Conservation Service.
• The property to be developed is relatively flat, and the site will not be graded to
drain directly to the stream/ditch. Only controlled discharge via culverts at the pre-
development levels will be released to the stream/ditch.
• Catron ditch realignment was engineered with increased sinuosity and does not
have a history of meandering.
• The proposed development will be connected to city services and will have no
danger of sewage and septic field leakage into ground or surface waters.
• As part of the development, we will plant native woody species along the existing
riparian corridor. Benefits to native tree and shrub planting include:
o A canopy that will reduce the velocity of raindrops and decrease soil
erosion;
o Provide a complex root system which will increase the ability to curtail
erosion;
o Create an overhang that provides shade that reduces stream temperatures;
o Establish leaf litter that increases the infiltration and pollution-absorbing
ability of the soil.
Criteria for Consideration and Decision
UDO Sec. 38.35.060. – Zoning Variances
C. Criteria for consideration and decision. In acting on an application for a variance, the review
authority shall designate such lawful conditions as will secure substantial protection for the
public health, safety and general welfare, and shall issue written decisions setting forth
factual evidence that the variance meets the standards of MCA 76-2-323 in that the
variance:
1. Will not be contrary to and will serve the public interest;
A relaxation of the 50’ watercourse setback will serve the public interest by allowing the
linkage of the constructed buildings within Catron Crossing to the amenity that was
created through the realignment of the Catron Ditch. The wetlands that are associated
with the realignment sit at the base of a constructed 4:1 slope that is approximately
15.5 feet wide from the toe of the slope to the ridge. As such, direct human impact of
the wetlands will be minimized as few people will actually approach the edge of the
ditch and/or wetlands. The intent of future design is to visually and spatially connect
people to the ditch without inviting their direct interference with the ditch. In this
respect, the relaxation will actually serve the public interest by connecting people with
the ditch and not be contrary through a diminishment in its current natural, although
constructed, state by direct human interference.
Request for Variance – Catron Crossing/VC Development March 29, 2013
Page 4 of 4
2. Is necessary, owing to conditions unique to the property, to avoid an unnecessary
hardship which would unavoidably result from the enforcement of the literal meaning of
this chapter:
a. Hardship does not include difficulties arising from actions, or otherwise be self-
imposed, by the applicant or previous predecessors in interest, or potential for
greater financial returns; and
b. Conditions unique to the property may include, but are not limited to, slope,
presence of watercourses, after the fact imposition of additional regulations on
previously lawful lots, and governmental actions outside of the owners control;
It is clear that since the ditch realignment was constructed by the property owner, the
difficulties created by the 50’ setback can be construed as self imposed. In contrast to
this, the difficulties are actually created through evolutions in code that occurred post
realignment. As stated above in the historical perspective, the realignment was
completed during a period of time when the setback was less than 50’ and measured
from a different site parameter. The realignment was completed with the intent of
incorporating the ditch as an amenity to the final project as opposed to an underground
watercourse enclosed in a pipe around which construction would be completed.
Through the evolution of code, the connectivity of the ditch to project is now minimized
and the end effect is an approximate 150’ setback from the property line.
3. Will observe the spirit of this chapter, including the adopted growth policy, and do
substantial justice;
The requested relaxation falls within the spirit of this chapter as the primary underlying
paradigm of the Unified Development Ordinance is excellence in design. Cape France
made the conscious choice to realign the ditch in an effort to create an amenity for the
users and passerby’s of the site as opposed to allowing the ditch to flow through pipes
in its original alignment. These past efforts were line with the spirit of this chapter.
Allowing for connectivity with the stream ditch and the built environment fulfills this
original intent. To the same end, allowing for an overall setback less than 150’ will
create continuity between the various projects located along Valley Center Road. As
stated above, the neighboring projects that have been completed along Valley Center
Road and along North 19th have adhered to the 50’ overall setback, but if Catron
Crossing is constructed with a 150’ setback, it will be spatially out of place in the greater
context of the entryway corridor.
We thank you for your consideration of the case we have made for a variance of UDO Sec. 38.23.100. -
Watercourse Setback. Please give consideration for both the historical context of this request as well as
the impact it will have toward enhancing the design of Catron Crossing.
///
///
///
///
///
////////////
///
///
///
///
///
///
///
///
///
///
//////
///
///
///
///
///
///
///
///
///
///
///
///
/////////
///
///WWWWWWWWWSSSS SS SS SS SS SS SS SSSSSSSSSSSSSSSS
WWWWWWWGGGGGGGGGGGGGG///
///
///
///
///
///
///
///
///
///
///
//////
///
///
///
///
///
///
//////STREAM SETBACK VARIANCE EXHIBITCATRON CROSSING SUBDIVISIONPROJECT NO.FIGURE NUMBERDRAWN BY:CHK'D. BY:APPR. BY:DATE:COPYRIGHT MORRISON-MAIERLE, INC., 20132880 Technology Blvd. W.Bozeman MT 59718Phone: (406) 587-0721Fax: (406) 922-6702N:\2605\025\ACAD\Exhibits\Aerial-Catron Stream Variance.dwg Plotted by matthew ekstrom on Jun/12/2013BOZEMAN05/2013MEE??????STATEFIG. 12605.025122' FROM THE PROPERTY LINETO THE 50' STREAM SETBACK(CURRENT CODE REQUIREMENT)102' FROM THE PROPERTY LINETO THE PROPOSED 30' STREAMSETBACK (REQUESTED VARIANCE).35' STREAM SETBACK - WHICH WASTHE CITY OF BOZEMAN CODE REQUIREMENTIN 2001 WHEN THE STREAM RELOCATIONPROJECT WAS COMPLETED.APPROXIMATELY 30' FROMOF STREAM TO PARKING LOT.APPROXIMATELY 50' FROMOF PROPERYT LINE TO THEEXISTING BUILDING.CONCEPTUALSITE PLAN
///////////////////////////////////////////////////////////////////////////////////////////////////////////////
///
//////
///
//////
///
//////
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/////////
///
///
///
///
///
//////
///
///
//////////////////////////////////////////////////////////////////////////////
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
////////////
///
///
///
///
/////////
///
///
/////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////FIREFIREWSWS UTILUTILUTILUTILUTILUTILE12WE12WE12WE12WE12WE12WE12WE12WE12WE12WE12WE12WE12WE12WE12WE12WE12WE12WE12WE12WE12WE12WE12WE12WE12WE12WE12WE12WSSE8S E8S E8S E8S E8S E8S E8S E8S E8S E8S
E8S
E8
SE8WE8WE8WE8WE8WE8WE8WE8WE8WE8WE8WE8WE8WE8WE8WE8W
ESSESS ESS ESS ESS ESS ESS ESS ESS ESS ESS ESS ESS ESS ESSESSESSESSESSESSESSE24SE24SE24SE24SE24SE24SE12WE12WE12WE12WE12WE12W E12W8W8W8W8W8W8W
8W
8W
8W
8W
8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8S8S8S8S8S8S8S8S8S8W//////
///
///
///
/////////
//////
///
//////
///
//////
///
//////
///
///
///
///
///
///
///
///
///
///
/////////
///
///8WESSE12WUTILITY PLAN CATRON CROSSING SUBDIVISIONPROJECT NO.FIGURE NUMBERDRAWN BY:CHK'D. BY:APPR. BY:DATE:COPYRIGHT MORRISON-MAIERLE, INC.,20132880 Technology Blvd. W.Bozeman MT 59718Phone: (406) 587-0721Fax: (406) 922-6702N:\2605\024\ACAD\Preapp\PREAPP-UTILITY PLAN.dwg Plotted by matthew ekstrom on Jun/12/2013BOZEMAN06/2013MEEMEEMEEMONTANAFIG.22605.025CATRON CROSSING SUBDIVISIONUTILITY PLAN FOR THE