Loading...
HomeMy WebLinkAboutChange order 1 Resolution 4467.pdf Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer SUBJECT: 2013 Water Renovations Project – Change Order No. 1. MEETING DATE: August 26, 2013 AGENDA ITEM TYPE: Consent RECOMMENDATION: Motion and vote to authorize the City Manager’s signature on the 2013 Water Renovations Project – Change Order No. 1. BACKGROUND: Attached is a copy of change order number 1 for the above referenced project. The City’s Information Technology (IT) Department wants to get a fiber optic connection between Fire Station 1 and City Hall. It will establish hard connectivity between the two facilities. It will further strengthen our disaster recovery opportunities and will become part of a larger site plan to connect the new police station, EOC, and city shop complex if that comes to fruition. Since the intersection of Rouse and Mendenhall will be torn up with the installation of the water main, we will have that same contractor install a conduit from the station to the northwest corner of the intersection at the same time to save costs. The IT Department will then hire a separate contractor to install the line from that point to City Hall. Overall this change will increase the contract price by $10,500.00 and the contract time by 5 days. The final recommended change in cost and time for these items is reasonable and commensurate with the work involved. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: Overall this change order increases the contract amount by $10,500.00 from $995,236.00 to $1,005,736.00. The conduit installation will be paid for out of the IT Construction FY 14 fund. Attachments: Change Order No 1, Resolution No 4467 Report compiled on: 8/12/13 52 1 of 2 COMMISSION RESOLUTION NO. 4467 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH OMDAHL EXCAVATION AND UTILITIES, INC., MANHATTAN, MONTANA. WHEREAS, the City Commission did, on the 22nd WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and day of April 2013, authorize award of the bid for the City of Bozeman 2013 Water Renovations project, to Omdahl Excavation and Utilities, Inc., Manhattan, Montana; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Omdahl Excavation and Utilities, Inc., as contained in Change Order No. 1, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 53 Resolution No. 4467, Change Order for 2013 Water Renovations 2 of 2 PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 26th day of August, 2013. __________________________________________ SEAN BECKER Mayor ATTEST: ________________________________________ STACY ULMEN, CMC City Clerk APPROVED AS TO FORM: _____________________________________________ GREG SULLIVAN City Attorney 54 55 56