Loading...
HomeMy WebLinkAbout06-13-2013 Trails, Open Space and Parks (TOP) Committee Minutes MINUTES OF THE TRAILS, OPEN SPACE& PARKS MEETING,JUNE 13, 2013 COMMITTEE MEMBERS PRESENT: Bob Hawks Sandy Dodge Doug Chandler Tom Starner Cyndy Andrus, Commission Liaison COMMITTEE MEMBERS ABSENT: Don Beeman CITY STAFF PRESENT: Mitch Overton, Director of Parks & Recreation Doreen Olean, Recording Secretary A. Call meeting to order Bob Hawks, Chairperson, called the meeting to order at 8:07 a.m. B. Approval of Minutes of May 14, 2013 meeting ➢ Committee member Dodge made a motion to approve the minutes as submitted. Committee member Chandler seconded. Motion passed unanimously. C. Changes to the Agenda ➢ None D. Public Comment ➢ None E. Disclosures ➢ Mitch Overton announced that there are two projects that he is working with that he expects to come to the Trails, Open Space & Parks Committee. The two projects are the Trail to the M (a grant through the Federal Land Access Program) and the Bozeman Creek Enhancement Project. ➢ A discussion of submission of e-mailed materials ensued as to how it should be properly done. Information can be sent to the committee and then the committee would discuss the information at a scheduled Committee meeting which are open to the public. ➢ Tom Starner disclosed that he had a conversation with Thom White, Parks & Cemetery Superintendent, about how Parks would maintain projects. F. Special Presentation None 1 MINUTES OF THE TRAILS, OPEN SPACE& PARKS MEETING,JUNE 13, 2013 G. Action Items None H. Discussion ➢ Discussion Regarding Creation of Evaluation Criteria for Project Proposals ➢ Trails, Open Space & Parks Protect Selection Process ➢ The following changes were suggested to the first draft of the Trails, Open Space and Parks Project Selection Process 1. Paragraph 1: Opening sentence should state that this is an initial screening process that leads to a recommendation that may not include funding the project. 2. Step 1: insert "measured" for "evaluated" in second sentence 3. Step 2: change "consistently hear feedback"to "receive on call reports" in second sentence 4. Step 3: remove "First" from second sentence 5. Step 4: change "Next the proposed project is"to "All proposals accepted in step 3 will be" in first sentence. Add N" behind 120 in last sentence. 6. Step 5: While some projects may score high enough,the TOP Committee may still recommend to the City Commission that some projects do not receive funding. Change title of Step 5 to "Final Discussion and Consideration of Qualifying Projects". In second sentence change from "A quorum is required"to "A full TOP Committee quorum is required". ➢ TOP Rough Cut Matrix: The following changes were suggested to the Top Rough Cut Matrix: 1. Under Guiding Documents: The first question should have a mandatory yes to proceed. 2. Under Maintenance: Change "possible" to "feasible". 2 MINUTES OF THE TRAILS, OPEN SPACE& PARKS MEETING,JUNE 13, 2013 3. Under Opportunity: First question change "good economic value and a positive" to "prudent" ➢ Contributions Matrix: The following changes were suggested to the Contributions Matrix 1. Under Balance: Change "balance of the" to" diversification and need for" 2. Under Connections: Change "and" to "or" 3. Under Enhancement: Take out "Contrasts with" ➢ Innate Characteristics Matrix: Parks The following changes were suggested to the Parks Matrix: I. Under Directions: change a score of"41"to "43" 2. On the Sth criterion: change the word "good"to "fair" ➢ Innate Characteristics Matrix: Natural Areas/Open Space The following changes were suggested: 1. The third and fifth Primary Characteristics: Natural Values weights be changed to "4" rather than "5" & 113" ➢ Innate Characteristics Matrix: Stream Enhancement/Water Quality The following changes were suggested: 1.The last Criterion change from a weight of"4" to "5" ➢ Innate Characteristics Matrix: Multi-Use Recreational Fields& Facilities The following changes were suggested: 1.0n the second Criterion change "evaluated" to "considered" 2. The last Criterion be changed from "The proposed property/design is in an appropriate area of Bozeman"to "The proposed property/design and use is appropriate in scale for the area of Bozeman and mitigates impacts on surrounding land uses". 3 MINUTES OF THE TRAILS, OPEN SPACE& PARKS MEETING,JUNE 13, 2013 3. Change weights on Criterion 3 & 5 from "4" and "4" to "5" and „5„ ➢ Innate characteristics Matrix: Trails The following changes were suggested: 1. On the first Criterion from "yes" or "no" to weight of"5" 2.On third Criterion add "and/or transportation" after the word "recreational'. Delete "Main Street to the Mountains" ➢ Next meeting time and date ➢ The next meeting will be held on Thursday,June 27th beginning at 9:30 a.m. Facility availability will be checked and the information relayed to Committee members. I. FYI ➢ None J. Adjournment ➢ Committee member Dodge moved to adjourn the meeting at 1035 a.m. Committee member Chandler seconded. Motion-passed unanimou ly. 114,111, Bob Hawks, Committee Chairperson ATTEST Doreen Olean, Recording Secretary PREPARED BY: Doreen Olean, Recording Secretary Approved on 6/27/13. 4