Loading...
HomeMy WebLinkAboutNotice of Award 2013 Street Improvements Project NOTICE OF AWARD Dated: ll TO: Big 'sky Asphalt,Inc. ADDRESS: P.O.Box 835,Bozeman,MT 59771 PROJECT: Ciq of Bozeman 2013 Street Improvements CONTRACT FOR: Cold milling and hot mix overlays, and seal coat improvements You are notified that your Bid dated May 21,2012,for the above Contract has been considered. You are the apparent Successful Bidder and have been awarded a Contract for Cold milling and hot mix overlays,and seal coat improvements The Contract Price of your Contract is;three hundred sevenly four thousand four hundred silly four and 401100 Dollars ($374,164.40). Three copies of the proposed Contract Documents accompany this Notice of Award. You must comply with the following conditions precedent within fifteen(15)days of the date of this Notice of Award,that is, by 1. You must deliver to the OWNER 3 fully executed counterparts of the Agreement including all the Contract Documents and Drawings. 2. You must deliver with the executed Agreement the Contract Security(Bonds) as specified in the Instruction to Bidders(page 7),General Conditions(paragraph 5.01)and Supplementary Conditions (paragraph SC-5.02). 3. list other conditions precedent: You must deliver with the executed Agreement the Certificates of Insurance as specified in the General Conditions(paragraph 5.03)and Supplementary Conditions (paragraph SC5.04). Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned, to annul this Notice of Award, and to declare your Bid Security forfeited. Within ten (I 0) days after you comply with these conditions,OWNER will return to you one fully signed counterpart of the Agreement with the Contract Documents attached. 13 oz CITY OF BOZEMAN, ONTANA ATTEST: -'(01fFV MANAGER) n nom'" RIB) DATE: ' �`, Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Andrew Derr, Engineering Assistant Rick Hixson, City Engineer Craig Woolard, Director of Public Works SUBJECT: Authorize the City Manager to sign the Notice of Award to award the contract for the 2013 Street Improvements to Big Sky Asphalt, Inc. in the amount of $374,464.40. MEETING DATE: dune 10, 2013 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to sign the Notice of Award to award the contract for the 2013 Street Improvements to Big Sky Asphalt, Inc. in the amount of $374,464.40. BACKGROUND: Bids were opened May 21, 2013, for the 2013 Street Improvements project. The project consists of cold milling and asphalt overlays of Ferguson Ave. from Huffine Lane to Babcock Street, S. 121', S. 13", and S. 14`h, from College Street to Dickerson Street, Dickerson Street from S. 1 I`' to S. 15'x', Technology Blvd and Research Drive, and a portion of Professional Drive, and chip sealing of streets in Brentwood Subdivision.., Stoneridge Subdivision, and portions of Annie Subdivision. Two bids were received for the project, with the low bid being submitted by Big Sky Asphalt, Inc. of Bozeman in the amount of $374,464.40. The bids appear to be competitive with the low bid being approximately 6% below the construction estimate ($398,652). A copy of the Certified Bid Tabulation is attached. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission, FISCAL EFFECTS: Funding for this work has been planned for from the Fuel Tax fund. Attachments Bad Tabulation Notice ofAward(3) Report compiled on May 29, 2013 D m W Q m 0 c+) N N s to It co 5 'W Wt 0 d m E 4) CD L IR 0 CN CL L. �♦ ♦+ � bi Can M uj m t , IM .`� 0 `p C co •. CL' QQ CC) LO 0 C R1 W o CL Gl� E 0 r� C 0 (0 0 uj I.tJ r LO in a an x m x as U z , aCO � am ¢ w