HomeMy WebLinkAboutEnterprise Funds FY14 budget work session_2 Commission Memorandum
REPORT TO: Honorable Mayor and City Commission FROM: Anna Rosenberry, Administrative Services Director
Chris Kukulski, City Manager
SUBJECT: Fiscal Year 2014 (FY14) Budget Work Session – Enterprise Funds
MEETING DATE: June 24, 2013
AGENDA ITEM TYPE: Work Session
RECOMMENDATION: Listen to staff presentations, ask questions, give direction, as you
see fit.
BACKGROUND: This budget work session is intended for discussion and questions. The
budget will be adopted during the Final Budget Hearing, scheduled for Monday, July 1, 2013.
Tonight we will be going over the details of the budgets for our Enterprise Funds: 1. Water Fund (including Water Impact Fees) 2. Wastewater Fund (including Wastewater Impact Fees)
3. Storm Water Fund
4. Solid Waste Fund
5. Parking Fund
All five funds are self-supporting operations, paid for with user fees.
• We are recommending rate increases for Water (3% each year) and Wastewater (3% each
year) Funds, and will be asking the Commission to adopt two-year rate resolutions in at
the July 22nd meeting. (The public notice requirements for these rate hearings will need to begin on June 26th.)
• Last year, a two-year rate resolution was adopted for the Storm Water Fund that included
a ~4.5% rate increase for FY14.
• The Solid Waste Fund budget was prepared with a “status quo” operation model and no rate increases included. Based on the operations report that was received from our
consultant, the Commission may decide to change rates and make other significant
changes to the FY14 budgets for Garbage Collection & Curb-side Recycling. This will
be discussed later on the Commission agenda tonight.
FISCAL EFFECTS: Although the Final Budget adoption has far-reaching fiscal effects,
there are no immediate fiscal effects as a result of this work session.
Attachments: Budget Discussion Worksheets Water Rate Study FY14-FY18
7
Wastewater Rate Study FY14-FY18
Revised CM Recommended Budget page 167 “Solid Waste Collection”
Revised CM Recommended Budget page 170 “Solid Waste Recycling”
Report compiled on: June 13, 2013
8
June 24, 2013 - Budget Discussion Sheets
1
Water & Sewer Rates
In 2006, HDR Engineering completed Comprehensive 5-Year Water and Wastewater rate studies that included Cost-of-
Service studies for all of our rate classes, as well as financial requirements for funding the systems. Since that time, we
have been updating the 5-year finanical requirements models and adopting two-year rate resolutions. This year we
updated the models for the next 5 year period (FY14-FY18.) This process helps us smooth rate increases that might
fluctuate due to weather, changing consumption, and other factors.
The Full Water Rate Study and Wastewater Rate Study for FY14-FY18 are attached at the back of this memo.
We will be talking with the Commision about hiring a consultant to complete new Comprehensive Rate Studies for both
systems in the coming year (FY15). With both of the systems having completed substantial plant expansion projects,
and our increased amount of pipe replacements, a new analysis of how costs are assigned to customer classes would be
helpful. Until that work is completed, we recommend making across-the-board increases to our existing rates for each
cusomter class (Residential, Commercial, etc.)
Water Rates: We are recommending a 3% increase in Water Rates for FY14 and FY15. These increses will help
continue to fund the operations and capital improvements that are necessary for the system, and bring reserve levels
very close to our target amount by FY18.
The Rate Study includes plans to fund the FY14 personnel request for a Water Conservation Specialist, and adds one
Water Operations crew member in FY15.
Excerpt from Exhibit 9:
Water Fund Rate Requirements
Budgeted
FY13 FY14 FY15 FY16 FY17 FY18
REQUIRED RATE ADJUSTMENT CUMULATIVE - 3.0%6.1%9.3%12.6%15.9%
Proposed Rate Adjustment - ANNUALLY 4.5%3.0%3.0%3.0%3.0%3.0%
Additional Revenue beyond Current Levels 193,707.10$ 397,123.99$ 610,619.92$ 834,577.57$ 1,069,391.93$
Average Residential Customer (10 CF, 3/4" Meter)38.43$ 40.16$ 41.36$ 42.61$ 43.88$ 45.20$
With Rate Increase 1.73 1.20$ 1.24$ 1.28$ 1.32$ 1.36$
40.16$ 41.36$ 42.61$ 43.88$ 45.20$ 46.56$
Projected
9
June 24, 2013 - Budget Discussion Sheets
2
Excerpt from Exhibit 8:
Wastewater Rates: We are recommending a 3% increase in Wastewater Rates for FY14 and FY15. Similar to the
Water Rates, these increses will help continue to fund the operations and capital improvements that are necessary for
the system, and bring reserve levels closer to our target amount by FY18.
The Rate Study includes plans to fund the FY14 personnel requests (Share of Public Works Technician, and the full-time
Wastewater Operations position).
Excerpt from Exhibit 9
Reserves Recap
Budgeted
FY13 FY14 FY15 FY16 FY17 FY18
Water Fund
Operating & Capital Reserve
Beginning Balance 5,041,229.00 5,487,549.92 5,002,963.17 5,412,913.99 6,172,558.96 6,936,244.53
Add: Operating Revenues 6,739,692.00 6,962,938.41 7,108,789.07 7,205,193.73 7,309,498.20 7,456,528.17
Add: Additional Rate Revenue - 193,707.10 397,123.99 610,619.92 834,577.57 1,069,391.93
Less: Operating Expenditures (4,390,941.00) (4,196,713.00) (4,387,620.62) (4,536,112.06) (4,692,623.58) (4,832,599.40)
Less: Capital Expenditures (1,741,514.00) (1,356,665.00) (1,380,220.00) (1,191,935.00) (1,359,645.00) (1,174,950.00)
Less: Debt Service Payment (160,916.08) (689,530.27) (1,328,121.62) (1,328,121.62) (1,328,121.62) (1,328,121.62)
Less: Funding of Debt Service Reserve (1,398,324.00) - - -
Ending Balance - Water Fund 5,487,549.92 5,002,963.17 5,412,913.99 6,172,558.96 6,936,244.53 8,126,493.60
Ending Balance - Debt Service Reserve 1,398,324.00 1,398,324.00 1,398,324.00 1,398,324.00 1,398,324.00
Operating & Capital Reserve Target 8,145,637.89 8,121,691.97 8,145,228.53 8,163,535.69 8,182,831.63 8,200,088.93
45 O&M 541,348.89 517,402.97 540,939.53 559,246.69 578,542.63 595,799.93
Annual Deprec 7,604,289.00 7,604,289.00 7,604,289.00 7,604,289.00 7,604,289.00 7,604,289.00
Projected
Wastewater Fund Rate Requirements
Budgeted
FY13 FY14 FY15 FY16 FY17 FY18
Proposed Rate Adjustment 6.0%3.0%3.0%3.0%3.0%3.0%
Additional Revenue beyond Current Revenues 201,779.85$ 413,815.73$ 636,346.29$ 869,776.09$ 1,114,516.58$
Bond Coverage Ratio
Average Residential Customer (10 CF, 3/4" Meter)41.55$ 44.04$ 45.36$ 46.73$ 48.13$ 49.57$
With Rate Increase 2.49$ 1.32$ 1.36$ 1.40$ 1.44$ 1.49$
44.04$ 45.36$ 46.73$ 48.13$ 49.57$ 51.06$
Projected
10
June 24, 2013 - Budget Discussion Sheets
3
Excerpt from Exhibit 8
Reserves Recap
Budgeted
FY13 FY14 FY15 FY16 FY17 FY18
Wastewater Fund
Operating & Capital Reserve
Beginning Balance 1,496,429.00 2,365,020.00 2,789,557.26 3,105,752.47 2,281,470.43 3,933,781.64
Add: Operating Revenues 6,800,607.00 6,892,866.41 7,033,672.72 7,173,135.66 7,316,338.87 7,462,396.55
Add: Additional Rate Revenue - 201,779.85 413,815.73 636,346.29 869,776.09 1,114,516.58
Add: Grant Revenues - - - - - -
Less: Operating Expenditures (4,482,736.00) (5,000,979.00) (5,022,313.25) (4,981,083.98) (5,230,623.75) (5,426,244.89)
Less: Capital Expenditures (1,040,000.00) (1,251,650.00) (1,691,500.00) (3,235,200.00) (885,700.00) (1,045,850.00)
Less: Debt Service Payment (1,237,480.00) (1,237,480.00) (1,237,480.00) (1,237,480.00) (1,237,480.00) (1,237,480.00)
Plus: Impact Fee Debt Payment 828,200.00 820,000.00 820,000.00 820,000.00 820,000.00 820,000.00
Ending Balance - Wastewater Fund 2,365,020.00 2,789,557.26 3,105,752.47 2,281,470.43 3,933,781.64 5,621,119.88
Ending Balance - Debt Service Reserve 1,237,480.00 1,237,480.00 1,237,480.00 1,237,480.00 1,237,480.00 1,237,480.00
Operating & Capital Reserve Target 6,113,570.08 6,177,463.05 6,180,093.30 6,175,010.24 6,205,775.42 6,229,893.10
45 O&M 552,666.08 616,559.05 619,189.30 614,106.24 644,871.42 668,989.10
Annual Deprec 5,560,904.00 5,560,904.00 5,560,904.00 5,560,904.00 5,560,904.00 5,560,904.00
Projected
11
June 24, 2013 - Budget Discussion Sheets
4
Water Fund - FY14 Budget Worksheet
Both the Water Plant and the Water Operations Divisions are paid for by the Water Fund. Water Plant
information begins on page 149 of the City Manager’s (CM) Recommended Budget document. Water Operations information begins on page 153 of the CM Recommended Budget document.
Water Fund – FY14 Expenditure Total $6.1 Million
The Water Fund is an enterprise fund that supports the operations of water treatment and distribution. It is a self-funded utility; the primary source of revenue is from water customer payments.
The proposed budget for FY14 is as follows:
Personnel: The FY14 budget proposes adding a full time (1.0 FTE) Water Conservation Specialist. This position would be responsible for expanding the City’s water conservation programs, as outlined by the Integrated Water Resource Plan.
Personnel &
Benefits
29%
Operating
41%
Capital
17%
Debt Service
13%
Water Fund - FY14
12
June 24, 2013 - Budget Discussion Sheets
5
Capital Projects: With the construction of the new Water Plant (expected to be completed in December)
entirely budget in previous years, Capital Projects are lower than prior years and account for 12% of the
Water Fund budget this year. Water Fund Capital Projects Include: CIP W04 Water Pipe Annual Projects $ 974,165
CIP W03 Engineering Design for Rehab $ 22,500
CIP W24 Fixed Base Meter Read System $ 60,000
Total $ 1,056,665
Water Fund – FY14 Revenues Total $7.1 Million
Rates: The CM Recommended Budget is based on a 3% increase in water rates. In addition to rate increases, Water Sales and Impact Fee collections affect the Funds finances.
a. Water sales had declined in FY09 & FY10, due weather changes (drought ending,) conservation
efforts, and the local economy. With May and June still unaccounted for, we are trending ahead of our estimate for FY13, thanks to strong water sales in the summer of 2012.
Annually, the months of July through October reflect the weather-related water sales changes. In
wet years, we will see flat or declining sales; in dry years (e.g. FY08) we will see expanded sales.
The chart below shows water sales for those months during the past 5 years.
b. Water Impact Fees are accounted for in a separate fund for budgeting purposes. However, because
of the tie between the current Plant construction project and water customer rates, the amount of
Water Impact Fee collections is an important factor. Our rate models for FY12-16 assumed higher
estimates of Impact Fee Revenues than we had seen in previous years. That estimate played-out and continues to surge, with FY13 Year to Date collections at $1.6 Million.
13
June 24, 2013 - Budget Discussion Sheets
6
c. Purchase of Water Rights have been included in our rate models, with $200,000 per year in utility money to purchase water rights. This recent policy change is meant to be in addition to the current
“Cash in Lieu of Water Rights” program related to annexations and development projects.
14
Date: 6/11/2013
FY14 Water Fund
FY14 CM RECOMMENDED BUDGET
DESCRIPTION FY14 CM RECOMMENDED BUDGET
ADDITIONAL EARNINGS $31,720.00
ADMINISTRATIVE OVERHEAD $646,481.00
ADVERTISING $6,000.00
BOOKS & REFERENCE MTRLS $1,900.00
CHEMICALS $240,000.00
CLOTHING & UNIFORMS $7,600.00
COMPUTER SUPPLIES $3,700.00
COMPUTERS & SERVERS < $5K $11,500.00
CONSULTANTS & PROF SERV $95,400.00
DUES & CERTIFICATIONS $9,434.00
ELECTRICITY $120,000.00
F.I.C.A.$85,217.00
GASOLINE AND OIL $42,500.00
GENERAL $618,880.00
GOODS PURCHSD FOR RESALE $112,052.00
HEALTH/DENTAL INSURANCE $215,306.00
IMP:INFRASTRUCTURE+IMPROV $996,665.00
IN-STATE $14,200.00
INSURANCE $208,222.00
INTEREST $408,991.00
INTERNET $12,000.00
LIFE INSURANCE $809.00
LONGEVITY $12,843.00
M&E:COMPUTER HARDWARE $60,000.00
MAINTENANCE CONTRACTS $24,354.00
MEDICAL SERVICES $2,600.00
NATURAL GAS $78,000.00
OFFICE SUPPLIES $8,850.00
OUT-OF-STATE $16,250.00
OVERTIME $50,456.00
PERS $97,668.00
POSTAGE $25,300.00
PRINCIPAL $377,708.00
PROPANE GAS FOR BUILDINGS $5,000.00
REFUSE DISPOSAL $2,500.00
REGULAR EARNINGS $1,190,885.00
RENTS & LEASES $4,500.00
REPAIR & MAINT - OTHER $24,000.00
REPAIR & MAINT- BUILDINGS $4,000.00
REPAIR & MAINT- EQUIPMENT $51,700.00
ROAD SUPPLIES $9,000.00
Water Fund Budget Summary with Chart.imr
15
Date: 6/11/2013
FY14 Water Fund
FY14 CM RECOMMENDED BUDGET
DESCRIPTION FY14 CM RECOMMENDED BUDGET
SHIPPING & HANDLING $500.00
SMALL EQUIPMENT AND TOOLS $4,500.00
SUBSCRIPTIONS $550.00
TAXES & ASSESSMENTS $7,900.00
TELEPHONE $11,380.00
UNEMPLOYMENT TAX $3,257.00
VEH MAINT FUND ALLOCATION $24,936.00
VEHICLE SUPPLIES $7,000.00
WATER SERVICE $20,000.00
WORKERS' COMP $42,486.00
TOTAL $6,056,700.00
Water Fund Budget Summary with Chart.imr
16
June 24, 2013 - Budget Discussion Sheets
7
Wastewater Fund – FY14 Budget Worksheet
Both the Water Reclamation Facility (WRF) and the Wastewater Operations Divisions are paid for by the
Wastewater Fund. Water Reclamation Facility information begins on page 161 of the City Manager’s Recommended Budget document. Wastewater Operations information begins on page 157 of the City
Manager’s Recommended Budget document.
Wastewater Fund - FY14 Expenditure Total $7.6 Million
The Wastewater Fund is an enterprise fund that supports the operations of water treatment and distribution.
It is a self-funded utility; the primary source of revenue is from wastewater customer payments.
The proposed expenditure budget for FY14 is as follows:
Personnel: The FY14 budget for the Water Reclamation Facility (WRF) proposes adding a seasonal staff
position for grounds keeping (0.5 FTE) and a seasonal staff position for dredge operations (0.6 FTE). The
FY14 Wastewater Operations budget includes the addition of 1.0 FTE Wastewater Operations Service
Worker, and the funding of 1/3 of the Public Works Technician position.
Contracted Services: The Solvent Site Remediation Project is paid for by sewer customers. We have
incorporated the new estimates for the clean-up and monitoring, as prepared by our consultants. The FY14
budget includes $565,365 for unreimbursed expenses related to the active bio-remediation and monitoring
of the site. We have included this amount budgeted for contracted services, as it will be delivered by a
number of vendors currently working under contract.
17
June 24, 2013 - Budget Discussion Sheets
8
Capital Projects: The Wastewater fund’s capital projects include:
Wastewater Fund Capital Projects Include: CIP WW08 - Wastewater Pipe Annual Projects $ 1,003,150
CIP WW07 -Wastewater Pipe Engineering/Design $ 22,500
CIP WW02 - 1 Ton Truck with Hoist $ 45,000
CIP WW32 - Replace Lift #1 Pump (WRF) $ 19,000 CIP WW32 - Fishing Access Latrine (WRF) $ 10,000 Cityworks Site License Share (WRF) $ 12,000
CIP WW30- New Digestor Draft Tube Mixer (WRF) $ 42,000
Total $ 1,153,650
Wastewater Fund - FY14 Revenues Total $7.1 Million
The CM Recommended Budget includes the 3% rate increase for all customer classes. Unlike water rates, wastewater rates do NOT see the fluctuation related to summer weather watering. Wastewater rates are based on a customer’s “winter-quarter average” water consumption.
Wastewater Impact Fees are accounted for in a separate fund for accounting purposes. And, because of the tie between the WRF Plant construction project and wastewater customer rates, the amount of Wastewater Impact Fee collections is an important factor. Like with Water rates, we increased our
estimates of Wastewater Impact Fee revenues for FY12 and FY13. And, like with Water Impact Fees, that
estimate has been significantly exceeded for actual revenues in FY13 year-to-date.
18
Date: 6/16/2013
FY14 Wastewater Fund
FY14 CM RECOMMENDED BUDGET
DESCRIPTION FY14 CMRECOMMENDED BUDGET
ADDITIONAL EARNINGS $29,564.00
ADMINISTRATIVE OVERHEAD $533,226.00
ADVERTISING $1,300.00
BONDS $1,200,000.00
BOOKS & REFERENCE MTRLS $700.00
CHEMICALS $157,000.00
CLOTHING & UNIFORMS $5,600.00
COMPUTER SUPPLIES $3,650.00
COMPUTERS & SERVERS < $5K $2,000.00
CONSULTANTS & PROF SERV $585,365.00
DUES & CERTIFICATIONS $2,342.00
DUES & SUBSCRIPTIONS $2,642.00
ELECTRICITY $390,500.00
ENGINEERS $110,000.00
F.I.C.A. $122,051.00
GASOLINE AND OIL $65,000.00
GENERAL $246,680.00
HEALTH/DENTAL INSURANCE $338,876.00
IMP:INFRASTRUCTURE+IMPROV $1,025,650.00
IN-STATE $12,450.00
INSURANCE $160,918.00
INTERNET $7,500.00
JANITORIAL CONTRACTS $11,500.00
LIFE INSURANCE $1,161.00
LONGEVITY $22,202.00
M&E:COMPUTER SOFTWARE $12,000.00
M&E:MACH+EQUIP/HEAVY TRUK $71,000.00
MAINTENANCE CONTRACTS $40,200.00
MEDICAL SERVICES $3,000.00
NATURAL GAS $49,750.00
OFFICE SUPPLIES $6,900.00
OUT-OF-STATE $15,750.00
OVERTIME $57,168.00
PERS $139,412.00
PERSONAL COMPUTERS $8,000.00
POSTAGE $19,300.00
REFUSE DISPOSAL $26,500.00
REGULAR EARNINGS $1,629,931.00
RENTS & LEASES $18,500.00
REPAIR & MAINT - OTHER $31,000.00
0 400,000 800,000 1,200,000 1,600,000
ADDITIONAL EARNINGS
ADMINISTRATIVE OVERHEAD
ADVERTISING
BONDS
BOOKS & REFERENCE MTRLS
CHEMICALS
CLOTHING & UNIFORMS
COMPUTER SUPPLIES
COMPUTERS & SERVERS < $5K
CONSULTANTS & PROF SERV
DUES & CERTIFICATIONS
DUES & SUBSCRIPTIONS
ELECTRICITY
ENGINEERS
F.I.C.A.
GASOLINE AND OIL
GENERAL
HEALTH/DENTAL INSURANCE
IMP:INFRASTRUCTURE+IMPROV
IN-STATE
INSURANCE
INTERNET
JANITORIAL CONTRACTS
LIFE INSURANCE
LONGEVITY
M&E:COMPUTER SOFTWARE
M&E:MACH+EQUIP/HEAVY TRUK
MAINTENANCE CONTRACTS
MEDICAL SERVICES
NATURAL GAS
OFFICE SUPPLIES
OUT-OF-STATE
OVERTIME
PERS
PERSONAL COMPUTERS
POSTAGE
REFUSE DISPOSAL
REGULAR EARNINGS
RENTS & LEASES
REPAIR & MAINT - OTHER
REPAIR & MAINT- BUILDINGS
REPAIR & MAINT- EQUIPMENT
ROAD SUPPLIES
SEWER SERVICE
SHIPPING & HANDLING
SMALL EQUIPMENT AND TOOLS
SUBSCRIPTIONS
TAXES & ASSESSMENTS
TELEPHONE
UNEMPLOYMENT TAX
VEH MAINT FUND ALLOCATION
VEH:AUTOS + LIGHT TRUCKS
VEHICLE SUPPLIES
WATER SERVICE
WORKERS' COMP
Wastewater Fund - Operations &
Plant
FY14 Budget Request
19
Date: 6/16/2013
FY14 Wastewater Fund
FY14 CM RECOMMENDED BUDGET
DESCRIPTION FY14 CMRECOMMENDED BUDGET
REPAIR & MAINT- EQUIPMENT $70,500.00
ROAD SUPPLIES $12,500.00
SEWER SERVICE $800.00
SHIPPING & HANDLING $900.00
SMALL EQUIPMENT AND TOOLS $13,400.00
SUBSCRIPTIONS $700.00
TAXES & ASSESSMENTS $29,000.00
TELEPHONE $8,380.00
UNEMPLOYMENT TAX $4,628.00
VEH MAINT FUND ALLOCATION $12,685.00
VEH:AUTOS + LIGHT TRUCKS $45,000.00
VEHICLE SUPPLIES $5,400.00
WATER SERVICE $3,800.00
WORKERS' COMP $68,969.00
TOTAL $7,562,950.00
20
June 24, 2013 - Budget Discussion Sheets
9
Storm Water Fund
This is the City’s newest enterprise fund/utility. It was created in FY13, with rates adopted for the FY13 and FY14 Years.
Storm Water program information begins on page 146 of the CM Recommended Budget document.
We are proceeding according to the plan established last year. Mapping efforts continue. This summer, the new TV Van
is being used to assess the condition of the storm water underground system. The van retro-fit was funded and
completed in FY13, and will prove critical to expanding our understanding and planning for future utility projects.
Because of our need to fund the TV Van retro-fit in FY13 ($130,000), there was a budget deficit in the first year of the
utility. That amount will be recovered in the rates collected in FY14.
Personnel: As anticipated last year, we have included the costs of 1/3 Public Works Technician position to assist with
the sampling and permit compliance related to the Storm Water system.
Capital: There is no capital budgeted in FY14.
Customer Charges will increase by ~4.5% in FY14, as already adopted. The majority of customers will pay $1.75 per
month for the Storm Water utility in FY14
Storm Water Fund FY13 Budget
FY14 CM
Recommended
Revenues: 225,000$ 236,250$
Expenditures:(247,140)$ (125,586)$
Surplus/Deficit:(22,140)$ 110,664$
METHOD B
Per Meter Per Month, by Meter Size (similar to current Water Base Charge)
Size:Factor Count Charge/Month
5/8"1.00 9,875 1.67$ 1.75$ 1.86$ 1.97$ 2.09$
1"1.32 449 2.21$ 2.32$ 2.46$ 2.61$ 2.76$
1 1/2"2.08 176 3.48$ 3.65$ 3.87$ 4.10$ 4.35$
2"3.03 64 5.06$ 5.31$ 5.63$ 5.97$ 6.32$
3"5.24 8 8.74$ 9.18$ 9.73$ 10.31$ 10.93$
4"8.40 10 14.02$ 14.72$ 15.60$ 16.54$ 17.53$
6"15.66 2 26.12$ 27.43$ 29.07$ 30.82$ 32.67$
8"24.75 2 41.30$ 43.37$ 45.97$ 48.73$ 51.65$
10,586
21
Date: 6/16/2013
FY14 Storm Water Fund
FY14 CM RECOMMENDED BUDGET
DESCRIPTION FY14 CMRECOMMENDED BUDGET
REGULAR EARNINGS $72,688.00
COMPUTER SUPPLIES $15,556.00
HEALTH/DENTAL INSURANCE $6,684.00
GENERAL $5,400.00
MAINTENANCE CONTRACTS $5,287.00
F.I.C.A. $4,054.00
IN-STATE $3,620.00
PERS $3,424.00
GASOLINE AND OIL $3,000.00
SMALL EQUIPMENT AND TOOLS $2,000.00
OUT-OF-STATE $1,500.00
WORKERS' COMP $1,211.00
TELEPHONE $960.00
UNEMPLOYMENT TAX $167.00
LIFE INSURANCE $35.00
TOTAL $125,586.00
0 20,000 40,000 60,000 80,000
REGULAR EARNINGS
COMPUTER SUPPLIES
HEALTH/DENTALINSURANCE
GENERAL
MAINTENANCECONTRACTS
F.I.C.A.
IN-STATE
PERS
GASOLINE AND OIL
SMALL EQUIPMENTAND TOOLS
OUT-OF-STATE
WORKERS' COMP
TELEPHONE
UNEMPLOYMENT TAX
LIFE INSURANCE
Storm Water Fund
FY14 Budget Request
22
June 24, 2013 - Budget Discussion Sheets
10
Solid Waste Fund – FY14 Budget Worksheet
The Solid Waste Fund accounts for our garbage collection and recycling divisions. Solid Waste Collection
information begins on page 165 of the CM Recommended Budget Document, and Recycling begins on page
168. Due to an error in the Financial Information (which was incorrectly combined in the Budget Document), we are attaching Corrected Page 167 and Corrected Page 170.
The Commission will be hearing recommendations for future garbage collection and recycling program
operations. For CM Recommended Budget development, we kept the status quo for both charges and
services provided. This can be changed prior to Final Budget adoption, or mid-year with administrative budget amendments, in order to affect any of the consultants recommendations.
Solid Waste Fund - FY14 Revenues Total $2.55 Million
Solid Waste Fund - FY14 Expenditures Total $3 Million
23
June 24, 2013 - Budget Discussion Sheets
11
Capital Items: Total $659,984
• CIP SW27 – Replacement of Front Load Truck $250,000
• CIP SW28 – Replacement of Side Load Truck $275,000
• CIP SW26 – Side Load Packer Replacement (postponed in FY13) $134,984
24
June 24, 2013 - Budget Discussion Sheets
12
Parking Fund – FY14 Budget Worksheet
The Parking Enterprise Fund is managed by the city’s Parking Commission. Their budget is developed
with the help of the Parking Manger and approved by the City Commission. The Parking budget discussion begins on page 135 of the CM Recommended Budget Document.
The Budget Highlights should read: “In FY14: Parking enforcement gained 1 FTE from the Police
Department” (It will be corrected for inclusion in the final document.) This change will consolidate city-
wide parking enforcement officers (those that are now sworn police officers) under the Parking Manager’s supervision. The Parking Fund will receive ticket revenue from the tickets this position writes.
Parking Fund - FY14 Revenues Total $558,500
The Parking Fund’s largest source of revenue is also the most unpredictable source: Fines & Forfeitures. These are the revenues derived from parking tickets issued to those that violate parking regulations.
Parking Fund - FY14 Expenditures Total $487,111
25
June 24, 2013 - Budget Discussion Sheets
13
26
Date: 6/11/2013
FY14 Parking Fund
FY14 CM RECOMMENDED BUDGET
DESCRIPTION FY14 CM RECOMMENDED BUDGET
ADMINISTRATIVE OVERHEAD $60,000.00
ADVERTISING $500.00
CLOTHING & UNIFORMS $1,200.00
COMPUTER SUPPLIES $250.00
CONSULTANTS & PROF SERV $3,000.00
ELECTRICITY $22,000.00
F.I.C.A.$12,236.00
GASOLINE AND OIL $4,900.00
GENERAL $50,700.00
HEALTH/DENTAL INSURANCE $51,390.00
IN-STATE $500.00
INSURANCE $13,000.00
JANITORIAL CONTRACTS $12,000.00
LIFE INSURANCE $174.00
MAINTENANCE CONTRACTS $5,500.00
NATURAL GAS $1,000.00
OFFICE SUPPLIES $4,100.00
OUT-OF-STATE $3,000.00
PERS $17,165.00
POSTAGE $9,000.00
REFUSE DISPOSAL $100.00
REGULAR EARNINGS $176,834.00
REPAIR & MAINT - OTHER $3,500.00
REPAIR & MAINT- BUILDINGS $1,500.00
REPAIR & MAINT- EQUIPMENT $3,000.00
ROAD SUPPLIES $125.00
SEWER SERVICE $1,000.00
STORM WATER $100.00
TAXES & ASSESSMENTS $4,500.00
TELEPHONE $4,450.00
UNEMPLOYMENT TAX $533.00
UTILITIES / INTERNET $1,500.00
VEH MAINT FUND ALLOCATION $750.00
VEHICLE SUPPLIES $750.00
WATER SERVICE $1,550.00
WORKER'S COMP $6,304.00
TOTAL $478,111.00
Parking Fund Budget Summary with Chart.imr
27
DRAFTWater Rate Revenue Requirements FY14‐FY18FactorsCity of BozemanWater Rate StudyExhibit 1Escalation FactorsBudgetedFY13 FY14 FY15 FY16 FY17 FY18RevenuesRates ‐ Acct Growth1.0% 2.0% 2.0% 2.0% 2.0% 2.0%Other Revenues1.0% 1.0% 1.0% 1.0% 2.0% 2.0%Interest Income0.75% 1.0% 1.0% 1.5% 1.5% 2.0%ExpensesUtilities3.0% 3.0% 3.0% 3.0% 3.0% 3.0%Labor3.9% 2.0% 2.5% 2.5% 2.5% 2.5%Benefits ‐ Medical10.0% 8.0% 8.0% 8.0% 8.0% 8.0%Materials & Supplies3.0% 3.0% 3.0% 3.0% 3.0% 3.0%Chemicals10.0% 10.0% 10.0% 10.0% 10.0% 10.0%Electricity8.0% 8.0% 8.0% 8.0% 8.0% 8.0%Natural Gas5.0% 5.0% 5.0% 5.0% 5.0% 5.0%Gas & Oil8.0% 8.0% 8.0% 8.0% 8.0% 8.0%Equipment3.0% 5.0% 5.0% 5.0% 5.0% 5.0%Miscellaneous2.0% 3.0% 3.0% 3.0% 3.0% 3.0%Debt ServiceRevenue Bond (Outstanding)Term in Years202020202020Rate5.50%New SRF LoanTerm in Years202020202020Rate3.75% 3.00% 3.00% 3.00% 3.00% 3.00%Projected6/16/201328
DRAFTWater Rate Revenue Requirements FY14‐FY18RevenuesCity of BozemanWater Rate StudyExhibit 2RevenuesActuals BudgetedFY12 FY13 FY14 FY15 FY16 FY17 FY18Rate RevenuesRate Revenues6,426,858.00 6,368,949.00 6,496,327.98 6,626,254.54 6,758,779.63 6,893,955.22 7,031,834.33 Unmetered Sales2,505.00 2,550.00 2,575.50 2,601.26 2,627.27 2,679.81 2,733.41 Low Income Discount(13,075.00) (12,000.00) (12,000.00) (12,000.00) (12,000.00) (12,000.00) (12,000.00) ACH Discount(30,851.00) (30,000.00) (30,000.00) (30,000.00) (30,000.00) (30,000.00) (30,000.00) Total Rate Revenue6,385,437.00 6,329,499.00 6,456,903.48 6,586,855.79 6,719,406.90 6,854,635.04 6,992,567.74 Other RevenuesSales of Water Materials74,679.00 55,000.00 100,000.00 101,000.00 102,010.00 104,050.20 106,131.20 Hydrant Fees159,338.00 137,713.00 139,090.13 140,481.03 141,885.84 144,723.56 147,618.03 Interest Income142,875.00 105,000.00 94,000.00 105,778.00 65,470.00 26,140.00 26,662.80 Refunds & Reimb2,528.00 1,030.00 1,040.30 1,050.70 1,061.21 1,082.43 1,104.08 Hookup Charges28,824.00 20,000.00 30,000.00 30,300.00 30,603.00 31,215.06 31,839.36 Other/Grants 87,830.00 45,450.00 95,904.50 96,863.55 97,832.18 99,788.82 101,784.60 Late Charges26,937.00 24,000.00 24,000.00 24,240.00 24,482.40 24,972.05 25,471.49 Hang Tag Charges26,100.00 22,000.00 22,000.00 22,220.00 22,442.20 22,891.04 23,348.86 Total Other Revenue549,111.00 410,193.00 506,034.93 521,933.28 485,786.83 454,863.17 463,960.43 Operating Revenues6,934,548.00 6,739,692.00 6,962,938.41 7,108,789.07 7,205,193.73 7,309,498.20 7,456,528.17 Other: Contributed Capital564,404.00 ‐ Cash in Lieu of Water Rights113,676.00 ‐ Grand Total7,612,628.00 6,739,692.00 6,962,938.41 7,108,789.07 7,205,193.73 7,309,498.20 7,456,528.17 Projected6/16/201329
DRAFTWater Rate Revenue Requirements FY14‐FY18Operating ExpendituresCity of BozemanWater Rate StudyExhibit 3Operating ExpendituresActuals BudgetedFY12 FY13 FY14 FY15 FY16 FY17 FY18Water PlantWater Treatment Plant OpsPersonnel574,485.00 576,055.00 687,012.00 704,187.30 721,791.98 719,836.78 737,832.70 FY14 ‐ 2FTE's, 2 Months StartupBenefits ‐ Medical87,740.00 96,681.00 105,681.00 114,135.48 123,266.32 133,127.62 143,777.83 FY14 ‐ 1 FTE Water Consv Spec.Overtime34,224.00 26,583.00 26,583.00 26,583.00 26,583.00 26,583.00 26,583.00 Total Personnel696,449.00 699,319.00 819,276.00 655,730.00 655,730.00 655,730.00 655,730.00 Operations725,551.00 949,118.00 920,532.00 948,147.96 976,592.40 1,005,890.17 1,036,066.88 Chemicals165,111.00 160,000.00 240,000.00 264,000.00 290,400.00 319,440.00 351,384.00 Gas & Oil8,147.00 10,500.00 10,500.00 11,340.00 12,247.20 13,226.98 14,285.13 Electricity49,041.00 60,000.00 80,000.00 86,400.00 93,312.00 100,776.96 108,839.12 Natural Gas32,186.00 50,000.00 70,000.00 73,500.00 77,175.00 81,033.75 85,085.44 Total Operations980,036.00 1,229,618.00 1,321,032.00 1,383,387.96 1,449,726.60 1,520,367.86 1,595,660.56 Water OperationsWater OperationsPersonnel1,027,255.00 1,051,558.00 769,843.00 829,089.08 849,816.30 871,061.71 892,838.25 +1 FTE in FY15Benefits ‐ Medical172,211.00 187,374.00 88,805.00 107,909.40 116,542.15 125,865.52 135,934.77 +1 FTE in FY15Overtime11,673.00 23,873.00 23,873.00 23,873.00 23,873.00 23,873.00 23,873.00 Total Personnel1,211,139.00 1,262,805.00 761,973.00 960,871.48 990,231.45 1,020,800.23 1,052,646.02 Operations682,349.00 690,246.00 766,357.00 789,347.71 813,028.14 837,418.99 837,418.99 Chemicals‐ ‐ ‐ ‐ ‐ ‐ ‐ Gas & Oil31,298.00 30,000.00 32,000.00 34,560.00 37,324.80 40,310.78 43,535.65 Electricity45,008.00 40,000.00 40,000.00 43,200.00 46,656.00 50,388.48 54,419.56 Natural Gas7,049.00 8,000.00 8,000.00 8,400.00 8,820.00 9,261.00 9,724.05 Total Operations765,704.00 768,246.00 786,357.00 875,507.71 905,828.94 937,379.25 945,098.24 Utility LocatesPersonnel‐ ‐ ‐ ‐ ‐ ‐ ‐ Benefits ‐ Medical‐ ‐ ‐ ‐ ‐ ‐ ‐ Overtime‐ ‐ ‐ ‐ ‐ ‐ ‐ Total Personnel‐ ‐ ‐ ‐ ‐ ‐ ‐ Operations7,443.00 7,250.00 7,450.00 7,673.50 7,903.71 8,140.82 8,385.04 Total Operations7,443.00 7,250.00 7,450.00 7,673.50 7,903.71 8,140.82 8,385.04 Water ServicesOperations27,433.00 35,000.00 35,000.00 37,800.00 40,824.00 44,089.92 47,617.11 Total Operations27,433.00 35,000.00 35,000.00 37,800.00 40,824.00 44,089.92 47,617.11 Projected6/16/201330
DRAFTWater Rate Revenue Requirements FY14‐FY18Operating ExpendituresMeter ReadingPersonnel112,007.00 60,549.00 106,955.00 109,628.88 112,369.60 115,178.84 118,058.31 Benefits ‐ Medical23,388.00 14,304.00 20,820.00 22,485.60 24,284.45 26,227.20 28,325.38 Overtime 2,775.00 ‐ ‐ 2,775.00 2,775.00 2,775.00 2,775.00 Total Personnel138,170.00 74,853.00 127,775.00 134,889.48 139,429.04 144,181.04 149,158.69 Operations162,833.00 228,850.00 230,350.00 237,260.50 244,378.32 251,709.66 259,260.95 Chemicals‐ ‐ Gas & Oil‐ ‐ Electricity‐ ‐ Natural Gas‐ ‐ Total Operations162,833.00 228,850.00 230,350.00 237,260.50 244,378.32 251,709.66 259,260.95 HydrantsOperations11,051.00 50,000.00 50,000.00 54,000.00 58,320.00 62,985.60 68,024.45 Total Operations11,051.00 50,000.00 50,000.00 54,000.00 58,320.00 62,985.60 68,024.45 ValvesOperations17,760.00 15,000.00 17,500.00 18,900.00 20,412.00 22,044.96 23,808.56 Total Operations17,760.00 15,000.00 17,500.00 18,900.00 20,412.00 22,044.96 23,808.56 Main RepairsOperations7,279.00 20,000.00 20,000.00 21,600.00 23,328.00 25,194.24 27,209.78 Total Operations7,279.00 20,000.00 20,000.00 21,600.00 23,328.00 25,194.24 27,209.78 Grand Total Operating Expenses 4,025,297.00 4,390,941.00 4,176,713.00 4,387,620.62 4,536,112.06 4,692,623.58 4,832,599.40 ck figreport11470790 67191545933687capital & debt7451297 23282131843364diff(5,804.00) ‐ (86,390.00) Past Rate Study Amounts4,164,685.00 4,310,839.00 4,452,120.00 4,600,743.00 4,733,825.00 diff139,388.00 (80,102.00) 275,407.00 213,122.38 197,712.94 6/16/201331
DRAFTWater Rate Revenue Requirements FY14‐FY18Capital Expenditures ‐ Wat FundCity of BozemanWater Rate StudyExhibit 4Capital Expenditures ‐ Water FundActuals BudgetedFY12FY13FY14FY15FY16FY17FY18Totals ‐ ‐ ‐ ‐ ‐ Water OperationsW03 ‐ Bi Annual Eng‐ 22,500.00 22,500.00 22,500.00 22,500.00 22,500.00 W04 ‐ BiAnnual Upgrades968,400.00 1,205,720.00 974,165.00 1,147,720 969,435 1,097,145 952,450 W12 ‐ 1 Ton Truck with Hoist46,794.00 WW23 ‐ Mini Excavator & Trailer (Share)25,000.00 PW02 ‐ Laurel Glen Shop (Carryover)72,432.00 78,000.00 W16 ‐ Backhoe (Carryover)96,000.00 GF99 ‐ IBM i5 Replacement2,040.00 W15 ‐ Meter Van17,432.00 W24 ‐ Fixed Base Meter Read System90,000.00 60,000.00 W26 ‐ Internal Pipeline Assmt of Sourdough50,000.00 W25 ‐ Replacement Vehicle (Plant)40,000.00 W27 ‐ ReEngineering the Lyman Tank Liner50,000.00 PW01 ‐ Shops Facilty Expansion Plan‐ 10,000.00 ***Water Right Purchase***200,000.00 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00 Grand Total ‐ Capital Expenditures for Water Fund1,260,304.00 1,741,514.00 1,356,665.00 1,380,220.00 1,191,935.00 1,359,645.00 1,174,950.00 Less: Funding Sources other than RatesGrants‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Cash on Hand‐ ‐ ‐ ‐ ‐ SRF Loan‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Total Funding Sources other than Rates‐ ‐ ‐ ‐ ‐ ‐ ‐ Rate Revenues Required for CIP1,260,304.00 1,741,514.00 1,356,665.00 1,380,220.00 1,191,935.00 1,359,645.00 1,174,950.00 Projected6/16/201332
DRAFTWater Rate Revenue Requirements FY14‐FY18Capital Expenditures ‐ ImpactCity of BozemanWater Rate StudyExhibit 5Capital Expenditures ‐ Water Impact Fee FundActuals BudgetedFY12FY13FY14FY15FY16FY17FY18TotalsWater PlantW07 ‐ WTP Construction‐ WIF‐04 Lyman Improvements (FY08 CIP Carryover)WIF‐01 Sourdough Creek damWIF‐09 Water Supply/Storage Expansion StudyWIF‐08 WTP Debt Service2,750,295.00 884,427.00 902,115.00 920,158.00 Grand Total ‐ Water Impact Fee Fund‐ ‐ ‐ ‐ ‐ ‐ ‐ Projected6/16/201333
DRAFTWater Rate Revenue Requirements FY14‐FY18WTP ConstructionCity of BozemanWater Rate StudyExhibit 6Water Treatment Plant Construction ProjectActuals BudgetedFY12FY13FY14FY15FY16FY17FY18WTP Water Fund‐ ‐ ‐ Impact Fees‐ ‐ ‐ Grand Total ‐ Project Costs‐ ‐ ‐ ‐ ‐ ‐ ‐ Projected34
DRAFTWater Rate Revenue Requirements FY14‐FY18Debt ServiceCity of BozemanWater Rate StudyExhibit 7Water Fund Debt ServiceActuals BudgetedFY12 FY13 FY14 FY15 FY16 FY17 FY18WTP SRF LoanDebt Service Estimated Payments160,916.08$ $689,530.27 $1,328,121.62 $1,328,121.62 $1,328,121.62 $1,328,121.62Grand Total Debt Service‐ 160,916.08 $689,530.27$1,328,121.62 $1,328,121.62 $1,328,121.62 $1,328,121.62Projected35
DRAFTWater Rate Revenue Requirements FY14‐FY18Reserve RecapCity of BozemanWater Rate StudyExhibit 8Reserves RecapBudgetedFY13 FY14 FY15 FY16 FY17 FY18Water FundOperating & Capital ReserveBeginning Balance5,041,229.00 5,487,549.92 5,022,963.17 5,432,913.99 6,192,558.96 6,956,244.53 Add: Operating Revenues6,739,692.00 6,962,938.41 7,108,789.07 7,205,193.73 7,309,498.20 7,456,528.17 Add: Additional Rate Revenue‐ 193,707.10 397,123.99 610,619.92 834,577.57 1,069,391.93 Less: Operating Expenditures(4,390,941.00) (4,176,713.00) (4,387,620.62) (4,536,112.06) (4,692,623.58) (4,832,599.40) Less: Capital Expenditures(1,741,514.00) (1,356,665.00) (1,380,220.00) (1,191,935.00) (1,359,645.00) (1,174,950.00) Less: Debt Service Payment(160,916.08) (689,530.27) (1,328,121.62) (1,328,121.62) (1,328,121.62) (1,328,121.62) Less: Funding of Debt Service Reserve(1,398,324.00) ‐ ‐ ‐ Ending Balance ‐ Water Fund5,487,549.92 5,022,963.17 5,432,913.99 6,192,558.96 6,956,244.53 8,146,493.60 Ending Balance ‐ Debt Service Reserve1,398,324.00 1,398,324.00 1,398,324.00 1,398,324.00 1,398,324.00 Operating & Capital Reserve Target8,145,637.89 8,119,226.22 8,145,228.53 8,163,535.69 8,182,831.63 8,200,088.93 45 O&M541,348.89 514,937.22 540,939.53 559,246.69 578,542.63 595,799.93 Annual Deprec7,604,289.00 7,604,289.00 7,604,289.00 7,604,289.00 7,604,289.00 7,604,289.00 Water Impact Fee FundBeginning Balance5,000,000.00 2,774,710.00 874,415.00 839,988.00 787,873.00 717,715.00 Add: Impact Fee Revenues850,000.00 850,000.00 850,000.00 850,000.00 850,000.00 850,000.00 Add: SRF Loan Proceeds‐ ‐ ‐ ‐ ‐ ‐ Less: Capital Expenditures‐ ‐ ‐ ‐ ‐ ‐ Less: Debt Service(3,075,290.00) (2,750,295.00) (884,427.00) (902,115.00) (920,158.00) ‐ Ending Balance ‐ Water Impact Fees2,774,710.00 874,415.00 839,988.00 787,873.00 717,715.00 1,567,715.00 Projected36
DRAFTWater Rate Revenue Requirements FY14‐FY18Rate RequirementsCity of BozemanWater Rate StudyExhibit 9Water Fund Rate RequirementsActuals BudgetedFY12 FY13 FY14 FY15 FY16 FY17 FY18RevenuesWater Sales6,385,437.00 6,329,499.00 6,456,903.48 6,586,855.79 6,719,406.90 6,854,635.04 6,992,567.74 Other Revenues549,111.00 410,193.00 506,034.93 521,933.28 485,786.83 454,863.17 463,960.43 Total Revenues6,934,548.00 6,739,692.00 6,962,938.41 7,108,789.07 7,205,193.73 7,309,498.20 7,456,528.17 ExpensesO&M ExpensesWater Treatment Plant Ops1,676,485.00 1,928,937.00 2,140,308.00 2,039,117.96 2,105,456.60 2,176,097.86 2,251,390.56 Water Operations1,976,843.00 2,031,051.00 1,548,330.00 1,836,379.19 1,896,060.40 1,958,179.48 1,997,744.26 Utility Locates7,443.00 7,250.00 7,450.00 7,673.50 7,903.71 8,140.82 8,385.04 Water Services27,433.00 35,000.00 35,000.00 37,800.00 40,824.00 44,089.92 47,617.11 Meter Reading301,003.00 303,703.00 358,125.00 372,149.98 383,807.36 395,890.71 408,419.64 Hydrants 11,051.00 50,000.00 50,000.00 54,000.00 58,320.00 62,985.60 68,024.45 Valves 17,760.00 15,000.00 17,500.00 18,900.00 20,412.00 22,044.96 23,808.56 Main Repairs7,279.00 20,000.00 20,000.00 21,600.00 23,328.00 25,194.24 27,209.78 Debt Service New Plant Debt Service160,916.08 689,530.27 1,328,121.62 1,328,121.62 1,328,121.62 1,328,121.62 Rates Dedicated to CIP1,260,304.00 1,741,514.00 1,356,665.00 1,380,220.00 1,191,935.00 1,359,645.00 1,174,950.00 Total Expenses5,285,601.00 6,293,371.08 6,222,908.27 7,095,962.24 7,056,168.68 7,380,390.20 7,335,671.03 Balance or (Deficiency) of Funds1,648,947.00 446,320.92 740,030.14 12,826.83 149,025.05 (70,892.00) 120,857.14 Proposed Rate Adjustment ‐ ANNUALLY4.5%3.0% 3.0% 3.0% 3.0% 3.0%Additional Revenue beyond Current Levels 193,707.10$ 397,123.99$ 610,619.92$ 834,577.57$ 1,069,391.93$ Debt Service Coverage RatioMinimum: 1.25n/a2.35 2.47 2.60 2.78 Average Residential Customer (10 CF, 3/4" Meter)38.43$ 40.16$ 41.36$ 42.61$ 43.88$ 45.20$ With Rate Increase1.73 1.20$ 1.24$ 1.28$ 1.32$ 1.36$ 40.16$ 41.36$ 42.61$ 43.88$ 45.20$ 46.56$ Projected37
DRAFT FactorsCity of BozemanWastewater Rate Study ‐ FY14 thru FY18Exhibit 1Escalation FactorsBudgetedFY13 FY14 FY15 FY16 FY17 FY18RevenuesRates ‐ Acct Growth1.0% 2.0% 2.0% 2.0% 2.0% 2.0%Other Revenues1.0% 1.0% 1.0% 1.0% 2.0% 2.0%Interest Income1.0% 1.0% 1.0% 1.0% 1.0% 1.0%ExpensesUtilities3.0% 3.0% 3.0% 3.0% 3.0% 3.0%Labor1.0% 2.0% 2.5% 2.5% 3.0% 3.5%Benefits ‐ Medical5.0% 10.0% 10.0% 10.0% 10.0% 10.0%Materials & Supplies3.0% 3.0% 3.0% 3.0% 3.0% 3.0%Chemicals10.0% 10.0% 10.0% 10.0% 10.0% 10.0%Electricity8.0% 8.0% 8.0% 8.0% 8.0% 8.0%Natural Gas5.0% 5.0% 5.0% 5.0% 5.0% 5.0%Gas & Oil8.0% 8.0% 8.0% 8.0% 8.0% 8.0%Equipment3.0% 5.0% 5.0% 5.0% 5.0% 5.0%Miscellaneous3.0% 3.0% 3.0% 3.0% 3.0% 3.0%Debt ServiceRevenue Bond (Outstanding)Term in Years202020202020Rate5.50%New SRF LoanTerm in Years202020202020Rate3.75% 3.75% 3.75% 3.75% 3.75% 3.75%Projected6/16/201338
DRAFTUpdated Rate Study FY14‐FY18RevenuesCity of BozemanWastewater Rate StudyExhibit 2RevenuesActuals BudgetedFY12 FY13 FY14 FY15 FY16 FY17 FY18Rate RevenuesRate Revenues6,345,773.00 6,610,554.00 6,742,765.08 6,877,620.38 7,015,172.79 7,155,476.25 7,298,585.77 Unmetered Sales25,148.00 23,000.00 23,230.00 23,462.30 23,696.92 24,170.86 24,654.28 Low Income Discount(14,543.00) (13,000.00) (15,000.00) (10,000.00) (10,000.00) (10,000.00) (10,000.00) ACH Discount‐ ‐ (25,000.00) (25,000.00) (25,000.00) (25,000.00) (25,000.00) Total Rate Revenue6,356,378.00 6,620,554.00 6,725,995.08 6,866,082.68 7,003,869.71 7,144,647.11 7,288,240.05 Other RevenuesSewer Hookup Charges370.00 2,020.00 500.00 505.00 510.05 520.25 530.66 Sale of Sewer Materials770.00 3,030.00 3,060.30 3,090.90 3,121.81 3,184.25 3,247.93 Interest Income125,437.00 102,000.00 95,000.00 95,000.00 95,950.00 96,909.50 97,878.60 Refunds & Reimb79,966.00 30,603.00 30,909.03 31,218.12 31,530.30 32,160.91 32,804.13 Lift Stations15,456.00 17,000.00 17,000.00 17,170.00 17,341.70 17,688.53 18,042.30 Extra Strength Surcharge12,428.00 20,200.00 20,402.00 20,606.02 20,812.08 21,228.32 21,652.89 Other 12,942.00 5,200.00 ‐ ‐ ‐ ‐ ‐ Sales 129.00 ‐ ‐ ‐ ‐ ‐ ‐ Total Other Revenue247,498.00 180,053.00 166,871.33 167,590.04 169,265.94 171,691.76 174,156.50 Operating Revenues6,603,876.00 6,800,607.00 6,892,866.41 7,033,672.72 7,173,135.66 7,316,338.87 7,462,396.55 Other: Contributed Capital‐ ‐ Grants‐ ‐ Loan Proceeds719,347.00 ‐ Grand Total7,323,223.00 6,800,607.00 6,892,866.41 7,033,672.72 7,173,135.66 7,316,338.87 7,462,396.55 Previous Study Numbers:6,387,504.00 6,822,414.17 7,283,935.00 7,838,177.00 8,428,068.00 Projected6/16/201339
DRAFTUpdated Rate Study FY14‐FY18Operating ExpendituresCity of BozemanWastewater Rate StudyExhibit 3Operating ExpendituresActuals BudgetedFY12FY13FY14FY15FY16FY17FY18Wastewater OperationsWastewater OperationsPersonnel518,118.00 624,569.00 1,075,575.00 1,102,464.38 1,130,025.98 1,163,926.76 1,204,664.20 +1FTE FY14, 1/3 FTE TechBenefits ‐ Medical75,924.00 72,804.00 188,586.00 207,444.60 228,189.06 251,007.97 276,108.76 +1FTE FY14, 1/3 FTE TechOvertime4,015.00 17,398.00 17,398.00 17,398.00 17,398.00 17,398.00 17,398.00 Total Personnel598,057.00 714,771.00 1,213,689.00 1,327,306.98 1,375,613.04 1,432,332.73 1,498,170.96 Operations498,914.00 535,113.00 562,681.00 579,561.43 596,948.27 614,856.72 633,302.42 ***Solvent Site ACTIVE Remediation 357,308.00 663,819.00 565,365.00 294,145.39 68,330.57 111,991.88 78,737.89 Chemicals 2,085.00 1,000.00 2,000.00 2,200.00 2,420.00 2,662.00 2,928.20 Gas & Oil17,989.00 20,000.00 22,000.00 23,760.00 25,660.80 27,713.66 29,930.76 Electricity17,793.00 20,500.00 20,500.00 22,140.00 23,911.20 25,824.10 27,890.02 Natural Gas8,333.00 9,750.00 9,750.00 10,237.50 10,749.38 11,286.84 11,851.19 Total Operations902,422.00 1,250,182.00 1,182,296.00 932,044.32 728,020.22 794,335.20 784,640.48 Utility LocatesPersonnel‐ ‐ ‐ ‐ ‐ ‐ ‐ Benefits ‐ Medical‐ ‐ ‐ ‐ ‐ ‐ ‐ Overtime‐ ‐ ‐ ‐ ‐ ‐ ‐ Total Personnel‐ ‐ ‐ ‐ ‐ ‐ ‐ Operations2,238.00 3,900.00 4,400.00 4,532.00 4,667.96 4,808.00 4,952.24 Chemicals‐ ‐ ‐ ‐ ‐ ‐ ‐ Gas & Oil‐ ‐ ‐ ‐ ‐ ‐ ‐ Electricity‐ ‐ ‐ ‐ ‐ ‐ ‐ Natural Gas‐ ‐ ‐ ‐ ‐ ‐ ‐ Total Operations2,238.00 3,900.00 4,400.00 4,532.00 4,667.96 4,808.00 4,952.24 Wastewater ServicesOperations3,831.00 8,000.00 5,000.00 5,150.00 5,304.50 5,463.64 5,627.54 Total Operations3,831.00 8,000.00 5,000.00 5,150.00 5,304.50 5,463.64 5,627.54 ManholesOperations6,347.00 25,000.00 25,000.00 27,000.00 29,160.00 31,492.80 34,012.22 Total Operations6,347.00 25,000.00 25,000.00 27,000.00 29,160.00 31,492.80 34,012.22 TelevisingOperations716.00 8,100.00 9,100.00 9,373.00 9,654.19 9,943.82 10,242.13 Total Operations716.00 8,100.00 9,100.00 9,373.00 9,654.19 9,943.82 10,242.13 Main RepairsProjected6/16/201340
DRAFTUpdated Rate Study FY14‐FY18Operating ExpendituresOperations205.00 8,000.00 5,000.00 5,400.00 5,832.00 6,298.56 6,802.44 Total Operations205.00 8,000.00 5,000.00 5,400.00 5,832.00 6,298.56 6,802.44 Wastewater PlantWastewater Plant Operations+Standby Begin FY14Personnel726,527.00 728,900.00 864,708.00 886,325.70 908,483.84 935,738.36 968,489.20 FY14 ‐ 1 FTE 1/3 Public Works TecBenefits ‐ Medical128,191.00 140,036.00 130,463.00 143,509.30 157,860.23 173,646.25 191,010.88 Overtime 36,358.00 39,770.00 39,770.00 39,770.00 39,770.00 39,770.00 39,770.00 Total Personnel891,076.00 908,706.00 983,551.00 1,069,605.00 1,106,114.07 1,149,154.61 1,199,270.08 Operations622,727.00 679,401.00 701,342.00 722,382.26 744,053.73 766,375.34 789,366.60 Chemicals 49,628.00 60,000.00 60,000.00 66,000.00 72,600.00 79,860.00 87,846.00 Gas & Oil4,104.00 9,000.00 11,000.00 11,880.00 12,830.40 13,856.83 14,965.38 Electricity 354,254.00 360,000.00 370,000.00 399,600.00 431,568.00 466,093.44 503,380.92 Natural Gas71,794.00 24,000.00 40,000.00 42,000.00 44,100.00 46,305.00 48,620.25 Total Operations1,102,507.00 1,132,401.00 1,182,342.00 1,241,862.26 1,305,152.13 1,372,490.61 1,444,179.14 LaboratoryPersonnel106,857.00 108,934.00 111,112.68 113,890.50 116,737.76 120,239.89 124,448.29 Benefits ‐ Medical17,212.00 18,857.00 18,775.00 20,652.50 22,717.75 24,989.53 27,488.48 Overtime6,644.00 ‐ ‐ ‐ ‐ ‐ ‐ Total Personnel130,713.00 127,791.00 131,476.00 134,543.00 139,455.51 145,229.42 151,936.77 Operations54,785.00 47,800.00 55,200.00 56,856.00 58,561.68 60,318.53 62,128.09 Total Operations28,978.00 40,400.00 55,200.00 56,856.00 58,561.68 60,318.53 62,128.09 Slude InjectionPersonnel5,462.00 5,201.00 5,305.02 5,437.65 5,573.59 5,740.79 5,941.72 Benefits ‐ Medical967.00 1,058.00 1,052.00 1,157.20 1,272.92 1,400.21 1,540.23 Overtime431.00 376.00 435.00 435.00 435.00 435.00 435.00 Total Personnel6,860.00 6,635.00 6,925.00 7,029.85 7,281.51 7,576.01 7,916.96 Operations34,392.00 60,350.00 68,500.00 70,555.00 72,671.65 74,851.80 77,097.35 Chemicals‐ 152,000.00 95,000.00 95,000.00 95,000.00 95,000.00 95,000.00 Gas & Oil28,203.00 30,000.00 32,000.00 34,560.00 37,324.80 40,310.78 43,535.65 Electricity‐ ‐ ‐ ‐ ‐ ‐ ‐ Natural Gas‐ ‐ ‐ ‐ ‐ ‐ ‐ Total Operations62,595.00 242,350.00 195,500.00 200,115.00 204,996.45 210,162.58 215,633.00 PreTreatmentOperations1,276.00 6,500.00 6,695.00 6,895.85 7,102.73 7,315.81 7,535.28 Total Operations1,276.00 6,500.00 6,500.00 6,895.85 7,102.73 7,315.81 7,535.28 Grand Total Operating Expenses 3,737,616.00 4,482,736.00 5,000,979.00 5,022,313.25 4,981,083.98 5,230,623.75 5,426,244.89 6/16/201341
DRAFTUpdated Rate Study FY14‐FY18Capital Expend ‐ WWat FundCity of BozemanWastewater Rate StudyExhibit 4Capital Expenditures ‐ Wastewater FundActuals BudgetedFY12FY13FY14FY15FY16FY17FY18Wastewater PlantWW27 ‐ Watershed Study and Stream Modeling60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 WW29 ‐ Energy Recover (Methane Co‐Gen)50,000.00 350,000.00 2,200,000.00 WW30 ‐ Replace Digester Mixers42,000.00 WW31 ‐ Repalce Lift #1 Pump19,000.00 WW32 ‐ WRF Fishing Access Latrine10,000.00 Wastewater OperationsWW02 ‐ 1 ton truck with hoist45,000.00 WW03 ‐ 1/2 ton flex fuel truckWW07 ‐ Biannual Project Engineering22,500.00 22,500.00 22,500.00 22,500.00 22,500.00 WW08 ‐ Biannual Project Construction1,003,150.00 914,000.00 952,700.00 803,200.00 963,350.00 WW17 ‐ TV van replacementWW21 ‐ Flusher truck replacementPW02 ‐ Laurel Glen Shops AnnexPW01 ‐ Shops Facility Expansion Plan10,000.00 WW26 ‐ Vac truck replacement335,000.00 WW27 ‐ SKID STEER VEHICLEWW23 ‐ MINI EXCAVATOR & TRAILER ***Unidentified CIP***Grand Total ‐ Capital Expenditures for Wastewater Fun237,291.00 1,040,000.00 1,251,650.00 1,691,500.00 3,235,200.00 885,700.00 1,045,850.00 Less: Funding Sources other than RatesGrants‐ ‐ ‐ Cash on Hand‐ ‐ ‐ SRF Loan‐ ‐ ‐ net of SRF Loan to ReserveTotal Funding Sources other than Rates‐ ‐ ‐ ‐ ‐ ‐ ‐ Rate Revenues Dedicated to CIP237,291.00 1,040,000.00 1,251,650.00 1,691,500.00 3,235,200.00 885,700.00 1,045,850.00 Projected6/16/201342
DRAFTUpdated Rate Study FY14‐FY18Capital Expenditures ‐ ImpactCity of BozemanWastewater Rate StudyExhibit 5Capital Expenditures ‐ Wastewater Impact Fee FundActuals BudgetedFY12FY13FY14FY15FY16FY17FY18TotalsWastewater PlantWWIF00 ‐ WRF Phase I Debt Service 828,200.00 836,482.00 853,212.00 870,276.00 887,681.00 89,655.00 4,365,506.00 Grand Total ‐ Water Impact Fee Fund‐ 828,200.00 836,482.00 853,212.00 870,276.00 887,681.00 89,655.00 Projected6/16/201343
DRAFTUpdated Rate Study FY14‐FY18Debt ServiceCity of BozemanWastewater Rate StudyExhibit 7Wastewater Fund Debt ServiceActuals BudgetedFY12 FY13 FY14 FY15 FY16 FY17 FY18WRF SRF LoanSummary of All Loans1,237,480.00$ 1,237,480.00$ 1,237,480.00$ 1,237,480.00$ 1,237,480.00$ $1,237,480.00 Grand Total Debt Service‐ 1,237,480.00 1,237,480.00 1,237,480.00 1,237,480.00 1,237,480.00 1,237,480.00 Projected44
DRAFTUpdated Rate Study FY14‐FY18Rate RequirementsCity of BozemanWastewater Rate StudyExhibit 9Wastewater Fund Rate RequirementsBudgetedFY13FY14FY15FY16FY17FY18RevenuesWastewater Services6,620,554.00 6,725,995.08 6,866,082.68 7,003,869.71 7,144,647.11 7,288,240.05 Other Revenues180,053.00 166,871.33 167,590.04 169,265.94 171,691.76 174,156.50 Total Revenues6,800,607.00 6,892,866.41 7,033,672.72 7,173,135.66 7,316,338.87 7,462,396.55 ExpensesO&M ExpensesWastewater Operations1,964,953.00 2,395,985.00 2,259,351.30 2,103,633.26 2,226,667.93 2,282,811.44 Utility Locates3,900.00 4,400.00 4,532.00 4,667.96 4,808.00 4,952.24 Wastewater Services8,000.00 5,000.00 5,150.00 5,304.50 5,463.64 5,627.54 Manholes25,000.00 25,000.00 27,000.00 29,160.00 31,492.80 34,012.22 Televising8,100.00 9,100.00 9,373.00 9,654.19 9,943.82 10,242.13 Main Repairs8,000.00 5,000.00 5,400.00 5,832.00 6,298.56 6,802.44 Wastewater Plant Operations2,041,107.00 2,165,893.00 2,311,467.26 2,411,266.20 2,521,645.22 2,643,449.22 Laboratory168,191.00 186,676.00 191,399.00 198,017.19 205,547.95 214,064.85 Slude Injection248,985.00 202,425.00 207,144.85 212,277.96 217,738.59 223,549.96 Debt Service1,237,480.00 1,237,480.00 1,237,480.00 1,237,480.00 1,237,480.00 1,237,480.00 Plus: Impact Fees Dedicated to Debt Svc(828,200.00) (820,000.00) (820,000.00) (820,000.00) (820,000.00) (820,000.00) Rates Dedicated to CIP1,040,000.00 1,251,650.00 1,691,500.00 3,235,200.00 885,700.00 1,045,850.00 Total Expenses5,925,516.00 6,668,609.00 7,129,797.40 8,632,493.26 6,532,786.50 6,888,842.05 Balance or (Deficiency) of Funds875,091.00 224,257.41 (96,124.67) (1,459,357.60) 783,552.37 573,554.50 Proposed Rate Adjustment6.0%3.0%3.0%3.0%3.0%3.0%Additional Revenue beyond Current Revenues201,779.85$ 413,815.73$ 636,346.29$ 869,776.09$ 1,114,516.58$ Bond Coverage RatioAverage Residential Customer (10 CF, 3/4" Meter)41.55$ 44.04$ 45.36$ 46.73$ 48.13$ 49.57$ With Rate Increase2.49$ 1.32$ 1.36$ 1.40$ 1.44$ 1.49$ 44.04$ 45.36$ 46.73$ 48.13$ 49.57$ 51.06$ Projected45
DRAFTUpdated Rate Study FY14‐FY18Reserve RecapCity of BozemanWastewater Rate StudyExhibit 8Reserves RecapBudgetedFY13 FY14 FY15 FY16 FY17 FY18Wastewater FundOperating & Capital ReserveBeginning Balance1,496,429.00 2,365,020.00 2,789,557.26 3,105,752.47 2,281,470.43 3,933,781.64 Add: Operating Revenues6,800,607.00 6,892,866.41 7,033,672.72 7,173,135.66 7,316,338.87 7,462,396.55 Add: Additional Rate Revenue‐ 201,779.85 413,815.73 636,346.29 869,776.09 1,114,516.58 Add: Grant Revenues‐ ‐ ‐ ‐ ‐ ‐ Less: Operating Expenditures(4,482,736.00) (5,000,979.00) (5,022,313.25) (4,981,083.98) (5,230,623.75) (5,426,244.89) Less: Capital Expenditures(1,040,000.00) (1,251,650.00) (1,691,500.00) (3,235,200.00) (885,700.00) (1,045,850.00) Less: Debt Service Payment(1,237,480.00) (1,237,480.00) (1,237,480.00) (1,237,480.00) (1,237,480.00) (1,237,480.00) Plus: Impact Fee Debt Payment828,200.00 820,000.00 820,000.00 820,000.00 820,000.00 820,000.00 Ending Balance ‐ Wastewater Fund2,365,020.00 2,789,557.26 3,105,752.47 2,281,470.43 3,933,781.64 5,621,119.88 Ending Balance ‐ Debt Service Reserve 1,237,480.00 1,237,480.00 1,237,480.00 1,237,480.00 1,237,480.00 1,237,480.00 Operating & Capital Reserve Target6,113,570.08 6,177,463.05 6,180,093.30 6,175,010.24 6,205,775.42 6,229,893.10 45 O&M552,666.08 616,559.05 619,189.30 614,106.24 644,871.42 668,989.10 Annual Deprec5,560,904.00 5,560,904.00 5,560,904.00 5,560,904.00 5,560,904.00 5,560,904.00 Wastewater Impact Fee FundBeginning Balance264,000.00 255,800.00 272,282.00 297,129.00 338,903.00 397,882.00 Add: Impact Fee Revenues820,000.00 836,482.00 844,847.00 861,774.00 878,979.00 896,558.00 Add: SRF Loan Proceeds‐ ‐ ‐ ‐ ‐ ‐ Less: Debt Service(828,200.00) (820,000.00) (820,000.00) (820,000.00) (820,000.00) (820,000.00) ‐ Ending Balance ‐ Wastewater Impact Fees255,800.00 272,282.00 297,129.00 338,903.00 397,882.00 474,440.00 Projected46
Department:SOLID WASTE COLLECTION
Activity:Public Service
Department Expenditures by Category
Department Expenditures by Division
Department Expenditures by Fund
FINANCIAL INFORMATION
Category FY12 Actual FY13 Budget FY14 CM Rec $ Change % Change
2.77%$1,005,220 $1,033,039Salaries & Benefits $943,466 $27,819
9.09%$1,114,678 $1,215,963Operating $1,472,463 $101,285
#Div/0!$0 $659,984Capital $62,103 $659,984
0.00%$0 $0Debt Service $0 $0
0.00%$0 $0Transfers $0 $0
Totals $2,478,032 $2,119,898 $2,908,986
$ Change % ChangeFY12 Actual FY13 Budget FY14 CM RecDivision
5810 Solid Waste Collection $789,088 37.22%$2,478,032 $2,119,898 $2,908,986
Totals $2,478,032 $2,119,898 $2,908,986
% Change$ ChangeFundFY13 Budget FY14 CM RecFY12 Actual
640 Solid Waste Fund $789,088 37.22%$2,478,032 $2,119,898 $2,908,986
Totals $2,478,032 $2,119,898 $2,908,986
47
Department:SOLID WASTE RECYCLING
Activity:Public Service
Department Expenditures by Category
Department Expenditures by Division
Department Expenditures by Fund
FINANCIAL INFORMATION
Category FY12 Actual FY13 Budget FY14 CM Rec $ Change % Change
‐7.29%$55,798 $51,730Salaries & Benefits $58,261 ($4,068)
‐2.53%$43,550 $42,450Operating $63,368 ($1,100)
‐100.00%$70,000 $0Capital $0 ($70,000)
0.00%$0 $0Debt Service $0 $0
0.00%$0 $0Transfers $0 $0
Totals $121,629 $169,348 $94,180
$ Change % ChangeFY12 Actual FY13 Budget FY14 CM RecDivision
5820 Recycling
($75,168)‐44.39%$121,629 $169,348 $94,180
Totals $121,629 $169,348 $94,180
% Change$ ChangeFundFY13 Budget FY14 CM RecFY12 Actual
640 Solid Waste Fund ($75,168)‐44.39%$121,629 $169,348 $94,180
Totals $121,629 $169,348 $94,180
48