Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
13- Preliminary Plat Review of Knoll at Baxter West Subdivision Findings of Fact and ORder
Record Series: Property Agreements Record Title: Findings of Fact & Order Return To. City of Bozeman Department of Coniniunity Developunent RO, Box 1230 Bozeman, MT 59771-1230 2451255 Page: 1 of 20 06/03/2013 04:44I56 PM Fee: $140.00 Charlotte Mills - Gallatin County, MT 1111111111111111111111 IN 11111111111 IN 1111111111111111111111111111111111111111 .... BEFORE THE BOZEMAN CITY COMMISSION IN THE MATTER OF THE APPLICATION OF FINDINGS OF FACT BMW, LLC FOR PRELIMINARY PLAT REVIEW AND ORDER OF THE KNOLL AT BAXTER WEST SUBDIVISION CITY OF BOZEMAN, GALLATIN COUNTY, MONTANA PURSUANT to the Montana Subdivision and Platting Act, Section 76-3-101 through 76- 3-625, Montana Codes Annotated, City of Bozeman Growth Policy, and the Bozeman Unified Code, public hearings were scheduled, after notice given, before the Bozeman Planning Board on March 5, 2013, and before the Bozeman City Commission on March 25, 2013, on the above- entitled application. The applicant presented to the City Commission a proposed preliminary plat to subdivide 26.314± acres together with the required supplementary plans and information to create sixty-five (65) single-household residential lots and the remaining area as common open space, trails and public streets. The application for preliminary plat review includes a request for variances from the City of Bozeman Uniform Development Code to: 1) Section 38.23.040.B "Block Length" to exceed the maximum block length of 400 feet for Blocks 9, 10, 11, 14, 18, and 2) Section 38,23.040.0 "Block Width"to allow block widths to be less than 200 feet in width for Blocks 9, 14, and 18. The purpose of the public hearings was to consider all relevant evidence relating to public health, safety, and welfare, including the required supplemental information, environmental assessment and recommendation of the Planning Board, to determine whether the plat should be approved, conditionally approved, or disapproved. It appeared to the City Commission that all parties and the public wishing to appear and comment were given the opportunity to do so, and therefore, being fully advised of all matters The Knoll at Baxter West Subdivision— Findings of Fact and Order I having come before it regarding this application, the City Commission makes the following Findings of Fact, as required: FINDINGS OF FACT 1. The complete application for the subdivision preliminary plat review of The Knoll at Baxter West Subdivision, a residential major subdivision, was submitted to the City of Bozeman Department of Planning and Community Development on January 17, 2013. The preliminary subdivision plat, as proposed, will subdivide 26.31,4± acres and create a major subdivision containing sixty-five (65) single-household residential lots and the remaining area as common open space, trails and public streets. The subject property is legally described as being a portion of Tract 1A of the Amended Plat of Baxter Meadows Subdivision PUD Phasel, Tract 1 (J- 353A). located in the Southwest One-Quarter of Section 34, 'Township 1 South, Range 5 East, PMM, City of Bozeman, Gallatin Country, Montana. 11. Notice of a public hearing before the City of Bozeman Planning Board and public hearing before the Bozeman City Commission was published in the Bozeman Daily Chronicle on February 14 and February 24, 2013, and the notice was posted at the site and mailed by certified mail, return receipt requested,to all adjoining property owners. III. The City of Bozeman Planning Board heard the matter of preliminary subdivision plat review of The Knoll of Baxter West Subdivision, on March 5, 2013. The Planning Board found that the application was properly submitted and reviewed under the procedures of the City of Bozeman Unified Development Code, Chapter 38, Bozeman Municipal Code. The Planning Staff reviewed the project and the evidence which justified the imposition of conditions, recommendations of the Development Review Committee and local review agencies, recommended modifications to proposed conditions, requested variances to the City of Bozeman Unified Development Code, history of Baxter Meadows Subdivision and design of the major subdivision, phasing, zoning, existing infrastructure, physical features, and provisions for parkland and open space. The Knoll at Baxter West Subdivision —FiMings of Fact aiid Order 2 The Planning Staff reported that one member of the general public has provided written comment on the matter of this preliminary plat application expressing concern with the requested variances to the Unified Development Code. Trina Wolf, representing BMW, LLC, discussed the history of the subdivision, subdivision design, improvements completed for the 10-acre park, and proposed enhancement improvements to the Baxter-Border ditch and open space/trail corridor. David Crawford of TD&H Engineering, consultant for the applicant, discussed the requested variances to the Unified Development Code, improvements to Harper Puckett Road, subdivision topography, street and block design, mid-block crossings and open space corridors. IV. The Planning Board then opened the public hearing portion for public comment on the matter of the preliminary subdivision plat application. Two members of the general public commented on the matter of the preliminary subdivision plat application regarding improvements to Baxter Lane, Davis Lane and Harper Puckett Road, concerns with the requested variances, timeline to complete street improvements and access to Chief Joseph Middle School. V. After reviewing the staff recommendation, hearing the applicant's presentation, public testimony on the matter, and finding that the Preliminary Plat was properly submitted and reviewed under the procedures of the City of Bozeman Unified Development Code and the adopted growth policy, the Planning Board reviewed and considered the facts against the criteria related in Title 76-3-608, MCA, 2011. The Planning Board considered the recommended conditions prepared by the Planning Department, Development Review Committee and local review agencies, and discussed street light illumination standards, justification of the requested variances, street improvements, and creation of special improvement districts to complete street network. V1. The City of Bozeman Planning Board then discussed the applicant's requested variances to the Unified Development Code, and justification of supporting the requested variances as outlined in the staff report. The Knell at Baxter West Subdivisioji —Findings of Fact and Order 3 The Planning Board, having heard and considered public comment and the findings presented in the staff report, found that the requested variances to the Uniform Development Code would comply with the primary review criteria, and therefore voted 5-0 to recommend approval to the Bozeman City Commission in Planning Resolution No. P-12014. The Planning Board then discussed the applicant's preliminary subdivision plat application, improvements to the area's transportation network, and considered the recommended modifications by the Planning Staff for condition#4. Having heard and considered public comment, the findings presented in the staff report, and recommended amendments to condition 44, the Planning Board found that with the recommended conditions, that the subdivision preliminary plat application would comply with the primary review criteria, and therefore voted 5-0 to forward a recommendation of conditional approval to the Bozeman City Commission as set forth in Planning Resolution No. P-12014. VII. The matter of the preliminary plat application for The Knoll at Baxter West Subdivision was considered by the City Commission at a public hearing on March 25, 2013 at which time the Planning Staff reviewed the project and forwarded the Planning Board's recommendation of conditional approval in Planning Resolution No. P-12014. Trina Wolf, representing BMW, LLC, discussed involvement with Baxter West property owner's association, history of Baxter Meadows Subdivision, Phase 3, subdivision design, improvements to parkland and trails, parkland requirements, garage orientation, elimination of alley loaded lots, and schedule of Harper Puckett Road improvements. David Crawford of TD&H Engineering, consultant for the applicant, discussed proposed north/south trail corridor, pedestrian transportation network, engineering deviations, alleys, existing topography and grade, street names, and agency comments by Fish, Wildlife and Parks. VIII. The public hearing portion was then opened to hear public testimony on the matter of the preliminary plat application with two members of the general public expressing concerns with the requested variances to the Unified Development Ordinance, traffic impacts, street improvements, design of open space and trails, completion of infrastructure, and potential conflict of the applicant as a member of the homeowner's association. Seeing no further public The Knoll at Baxter West Subdivision—Findings of Fact and Order 4 testimony the City Commission then closed the public comment portion of the matter of the preliminary plat application. ix. Trina Wolf, representing BMW, LLC then responded to comments and questions discussed during the public comment portion of the hearing. As the developer and also a member of the homeowner's association, Ms Wolf stated she recognized the public concerns and proposed to bond the construction of Harper Puckett Road as a condition if that would be acceptable. She also noted that four of five members of the association live in the subdivision and noted two of the five members of the board have provided letters in support of the proposed subdivision. In response to a question of the subdivision's title, she noted she was unaware of having a similar name as that of an existing subdivision in the community and further noted as being part of Baxter Meadows Subdivision and in proximity to Baxter Lane that it should eliminate some of the confusion . X. The City Commission then considered the minutes of the Planning Board hearing, Resolution of the Planning Board, Planning Office staff report, public record, the developer's testimony, and weighed the proposed subdivision against the primary criteria for consideration of subdivisions established in 76-3-608, MCA and found as follows: A. Primary Review Criteria 1. Effects on Agriculture Historically, the subject property has been used for agricultural purposes. The limited area of the subject property would not be of a substantial size to accommodate a viable farmstead. The adopted growth policy for this area is identified for development as "Residential" on the Future Land Use Map of the Bozeman Community Plan, With approval of the original preliminary plat for Baxter Meadows Subdivision PUD in 2005 and filing of the final plat for Phase 3A in 2006, this preliminary plat application is considered appropriate for urban growth at urban density. 2. Effects on Agricultural Water User Facilities No effects on agricultural water user facilities have been identified for this project. Although the subdivider does not anticipate any impacts to downstream water users with this subdivision, the applicant is reminded that they are subject Title 85, MCA protecting water rights, conveyance and agricultural water user facilities, and are therefore advised that they may be subject to those restrictions. The Knoll at Baxter West Subdivision—Findings of Fact and Order 5 3. Effects on Local Services Water/Sewer-Access to municipal infrastructure and public services is available with water and sanitary sewer mains already installed with Phase 3A of Baxter Meadows Subdivision that will service the site from the south and the east. However, standard code requirements still apply, including the requirements for final as-built plans and specifications, detailed design reports, engineering services for construction inspection, and preparation of mylar record drawings. The City Engineer's Office recommends condition #23 that the water main in Kimberwicke Street is extended to the center median in Harper Puckett Road for future looping purposes. This also provides provisions for the median of the principal arterial road to be completed with turf and irrigation. Cash in lieu of water rights or the equivalent water rights must be transferred to City of Bozeman in accordance with Section 18.74.020.A.1, BMC. Streets -The City Engineer's Office is recommending condition #20 for the east half of a 5-lane principal arterial standard to be constructed with Harper Puckett Road, a principal arterial. 'The condition also recommends that the applicant shall provide payment of the estimated cost of topsoil, seed, and irrigation of one half of the future median of Harper Puckett Road along the frontage of the subdivision. All interior local streets will be constructed to City standards within in 60' rights-of-way with curb, gutter and sidewalks on both sides. A one-foot wide "No Access" strip along the Harper Puckett Road street frontage is also recommended in condition #22. Police/Fire- The property is located within the City's Police and Fire emergency response area. The subdivider must obtain addresses for the new lots from the City Engineer's Office prior to filing the final plat to facilitate fire and police response to the site. In November of 2006, the City Commission adopted the Bozeman Fire Protection Master Plan- The Fire Master Plan identified current and future service delivery deficiencies and outlined timetables for future facilities and staffing to address the growing community. Construction of fire station#3 southeast of the site will provide fire and emergency services to the future residents of this subdivision. Stormwater- The standard requirement for a detailed review of the final grading and drainage plan, and approval by the City Engineer, will be required as part of the infrastructure plan and specification review process. Provisions for routing of major storm events (100 year) either through Pipe, surface flow, or a combination thereof shall be provided for any major drainage courses that are being cut off. This also includes proper design, placement and construction of stormwater facilities that may encroach into any watercourse setback. Parks/Trails -Based on the subdivision consisting of 65 single family households and using the factor of providing 0.03 acres per dwelling unit approximately 1.95 acres of dedicated parkland is required. To fulfill the parkland requirements, the applicant has requested use of dedicated parkland credits available for the Baxter Meadows Subdivision PUD. The Recreation and Parks. Advisory Board (R.PAB) and Gallatin Valley Land Trust (GVLT) considered the applicant's request on February 8, 2013 and is generally supportive of the applicant's proposal and recommended that the applicant be granted parts of the available dedicated parkland credits, but agreed that the HOA should participate in the maintenance and upkeep of the parkland and open space areas in Baxter Meadows Subdivision Planned Unit Development (PUD). The The Knoll at Baxter West Subdivision-Findings of Fact and Order 6 preliminary plat proposes a network of public trails within 30-foot wide public access easements with development of the subdivision. The network of Type 11 class trails will link with the existing pedestrian system to the south and east in Baxter Meadows Subdivision, Phase 3; as well as, future trails to the north. 4. Effects on the Natural Environment With exception to the Border-Baxter Ditch water course and associated wetlands, no significant physical or topographical features have been identified (i.e., outcroppings, geological formations, steep slopes). The applicant's proposal to enhance the streambed of Any mitigation and enhancement of wetlands will occur only with the approval of 310 and/or 404 Permits from the Gallatin County Conservation District and Army Corp of Engineers. Groundwater quality will be protected by the installation of municipal sanitary sewer services and appropriate measures are proposed by the developer with residential construction. Provisions have been discussed in the applicant's submittal to address the control of noxious weeds and maintenance of common open space areas, and will be further addressed with the protective covenants and compliance with the recommended conditions of approval. 5. Effects on Wildlife and Wildlife Habitat The historical use of the property for agricultural purposes has limited the potential for development of significant areas of mature vegetation. No known endangered species or critical game ranges have been identified on the proposed subdivision. The Department of Fish, Wildlife & Parks has not identified any impacts on wildlife and wildlife game range habitat with this development proposal. The Department is recommending that disturbance of the watercourse riparian and wetland vegetation be limited and that storm water runoff be properly treated before discharge. 6. Effects on Public Health and Safety The intent of the regulations in Chapter 38 of the Bozeman Municipal Code is to protect the public health, safety and general welfare. The subdivision has been reviewed by the Bozeman Development Review Committee (DRC)which has determined that it is in general compliance with the title. Any other conditions deemed necessary to ensure compliance have been noted throughout this staff report. All subdivisions must be reviewed against the criteria listed in 76-3-608.3.b-d, M.C.A., 1,995 regardless of compliance with master plan status. As a result, the Planning Office has reviewed this application against the listed criteria and further provides the following summary review: B. Compliance with survey requirements provided in Part 4 of the Montana Subdivision and Platting Act. The property in question has been surveyed and platted in conformance with the Montana Subdivision and Platting Act and prepared as a preliminary plat in accordance with the state statute and the Bozeman Municipal Code. Prior to filing of any plat(s) for this subdivision, said plat(s) must comply with the survey requirements in Part 4 of the Montana Subdivision and Platting Act and will be filed in the Gallatin County Clerk & Recorder's Office upon review and approval by City staff. The Knoll at Baxter West Subdivision—Findings of Fact and Order 7 C. Compliance with the local subdivision regulations provided for in Part 5 of the Montana Subdivision and Platting Act. The final plat shall comply with the standards identified and referenced in the Unified Development Code (UDC). The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as a condition of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. The following requirements are standards of the Bozeman Unified Development Code and shall be addressed with the final plat application: a. 38.03.040.A of the BMC, conditional approval of the preliminary plat shall be in force for not more than one calendar year for minor subdivisions,two years for single-phased major subdivisions and three years for multi-phased major subdivisions. Prior to that expiration date, the developer may submit a letter of request for the extension of the period to the Planning Director with each subsequent request considered on its individual merits and consideration on criteria provided in 38.03.040.A, BMC. As a multi-phased subdivision, conditional approval of the preliminary plat for The Knoll at Baxter West Subdivision shall be in force for three years. b. 38.02.050 - Water rights or cash-in-lieu thereof, as calculated by the City Engineer's Office, is due with each final plat(s) of the major subdivision. c. 38.21.06O.C.1 "Comer Lots"—The homeowner's association documents shall provide language stating that all comer lots shall have the same orientation as dwellings on lots on the interior of the block. The final plat shall indicate the orientation of all comer lots. d. 38.23.030.D, comer lots shall have sufficient width to permit appropriate building setbacks from both streets and provide acceptable visibility for traffic safety. Further, homes on comer lots shall have the same orientation as homes on lots on the interior of the block, unless otherwise approved through an overall development plan. Covenants shall contain information regarding the orientation for all comer lots. The preliminary plat shall indicate the orientation of all comer lots. e. 38.23,050 "Utilities" - Utilities shall be placed underground,wherever technically and economically feasible. If overhead utility lines are used, they shall be placed along the rear property line. f. 38.23.060.13 "Private Utilities"—The final plat and homeowner's association documents shall contain a note stating that if a utility easement is greater than the building setback required by Chapter 38, B.M.C. said easement shall apply. All utility easements to be noted on the Final Plat for each typical subdivision lot/block, exclusive of notations on the final plat. g. 38.23.060.D.4 — States that storm water runoff from a development shall not be discharged directly to an irrigation facility, This will further require all storm water facilities to be designed in a manner that addresses the criteria set forth by the Planning Office h. 38.23.080 "Grading and Drainage" - Proposed storm water facilities must be constructed and contained on an individual lot as a common area(s) owned and maintained by the property The Knoll at Baxter West Subdivision—Findings of Fact and Order owner's association and noted accordingly in the protective covenants. Said facilities may be included in the common open space area containing the Baxter Spring Ditch watercourse. i, 38.23.120 - If mail will not be to each individual lot within the development,the developer shall provide an off-street area for mail delivery within the development in cooperation with the United States Postal Service, All cluster mail boxes must be ADA accessible and placed accordingly. It shall not be the responsibility of the City to maintain or plan any mail delivery area constructed within a City right-of-way. j, 38.23.150—The Lighting Plan shall reflect the standards outlined in the UDC. A lighting plan shall be submitted for review and approval prior to the contracting, creation of an SLID and installation of the lights. The plan shall include a pole light detail with spacing based on high pedestrian conflict, a local street pole light at one per local street intersection, and a bollard light detail for placement at pathway/street intersections. All lights including the bollard light shall conform to the City's requirement for cut-off shields. k. 38.25.020.A "Parking Dimensions"—The homeowners' association documents shall include language stating the minimum provisions for one-stall and two-stall car garages as outlined by Section 38.25.020A BMC, L 38.26.050.E "Street Frontage' —The homeowner's association documents shall contain language stating that all street rights-of-way contiguous to or within the proposed development site not used for street pavement, curbs, gutters, sidewalks or driveways (i.e., street boulevards) shall be landscaped, as defined in the Bozeman Municipal Code, and shall include one (1) large canopy tree for each 50 feet of total street frontage rounded to the nearest whole number. For street trees, a City of Bozeman planting permit for street trees and obtaining utility locates before any excavation begins in the City of Bozeman right-of-way. The covenants shall include a planting note stating that the planting hole shall be at least twice the diameter of the root ball, that the root flare of the newly planted tree is visible and above ground, and there should be a mulch ring 3'- 4' in diameter around each newly planted boulevard tree, in. 38.26.070 "Landscaping of Public Lands" - Requires the subdivider to install irrigation,turf grass and street trees on all external streets (i.e., Harper Puckett Road) and adjacent to public parks or other open spaces. Trees may not be located within 10 feet of sewer and water services. Sewer and water services shall be shown on the landscaping plan of the park and open space plan, and approved by the Water/Sewer Superintendent. A landscape plan prepared by a certified nurseryperson shall be submitted, identifying the location and tree species to be installed by the developer, prior to installation of the trees or prior to final plat approval, whichever comes first n. 38.26.050.L "Maximum Allowable Slope or Grade"— All areas identified in the subdivision for the purposes of retention/detention storm water facilities shall be noted on the subdivision plat as "Common Open Space"owned and maintained by the property owner's association, and noted accordingly in the property owner's association documents, for review and approval by the Planning Office. All storm water facilities must be designed in a fashion that is landscaped as effective landscape features (i.e., not rectangular or box-like), with slopes not more than 1:4 , or 25%, with an average depth of not more than two feet. All collection and outlet facilities must also be properly landscape and screened from the general public. All storm water facility outlet The Knoll at Baxter West Subdivision—Findings of Fact and Order 9 structures will be properly landscape and a minimum distance of not less than thirty (3 0) from any watercourse high water mark will be required.. Placement and design of the facilities will be approved by both the City Engineer's Office and Planning Office. o, 38.27.090 "Waiver of Park Maintenance District—Prior to final plat approval executed waivers of right to protest the creation of special improvement districts (SIDS) for a park maintenance district will be required to be filed and of record with the Gallatin County Clerk and Recorder, unless already filed with annexation. p. 38.31.090.13 "Flood Hazard Evaluation- The developer's professional engineer, licensed in the state, shall provide written certification to the city that the mapped flood locations and proposed mitigation shall protect against damage by the 100-year flood,which will require a 100-year flood plain boundary to be delineated on the final plat. q. 3 8.27.110 —Pathways must be maintained by the developer in conformance with the approved maintenance plan until 50% of the lots are sold and the property owner's association is created. Thereafter, the property owner's association is responsible for pathway maintenance. Plans and specifications for the trail will need to be reviewed by the Parks Department prior to construction. A 6-foot wide Type 11 class trail is recommended along the watercourse corridor with the placement appropriate pedestrian crossings at all intersections with interior subdivision streets. A typical cross section of the public trail shall be included in the landscape guidelines and will include trail specifications,typical landscape guidelines, and site grading plans for review and approval prior to final plat approval. r. 18.72.030 "Covenants" - Covenants, restrictions, and articles of incorporation for the creation of a homeowners' association shall be submitted with the final plat application for review and approval by the Planning Office and shall contain, but not be limited to the following items: 1) the orientation and setback for comer lots, 2) additional setbacks required when adjacent to pathway corridors (i.e., P.A.C. corridors) and minor arterial roads, 3) provisions for fences, 4) provisions for snow removal, maintenance and upkeep of all common areas, public and private parks, trails, storm water runoff facilities, 5) guidelines that outlines architectural and landscape guidelines for each individual lot and/or phase of the subdivision, including placement of boulevard trees at a regular spacing for each residential lot, 6) a 25-foot yard setback from Davis Lane, 7) provisions that outline the renewal of an annual contract with a certified landscape nursery person for the upkeep and maintenance of all parklands, common open space, trails, etc., 8) landscape details for detention ponds, outlet structures,boulevard trees, parkland, irrigation, etc., 9) mitigation of groundwater with established floor elevations and no basement restriction, 10) architectural guidelines for residential character, porches, fenestration treatment, placement of garages, boulevard trees, 11) noxious weed control, 12)parking within residential structures, 13) assessment of existing and future Special Improvement Districts, and 14) protection of downstream water users. These documents shall be submitted to the city attorney and shall not be accepted by the City until approved as to legal form and effect. A draft of these documents must be submitted for review and approval by the Planning Department at least 30 working days prior to submitting a final plat application. These documents shall be executed and submitted with the initial final plat to be filed with the Gallatin County Clerk and Recorder at the time of final plat recordation. The Knoll at Baxter West Subdivision—Findings of Fact and Order 10 s. 38.39.030 "Completion of Improvements" - If it is the developer's intent to file the plat prior to the completion of all required improvements, an Improvements Agreement shall be entered into with the City of Bozeman guaranteeing the completion of all improvements in accordance with the preliminary plat submittal information and conditions of approval. If the final plat is filed prior to the installation of all improvements, the developer shall supply the City of Bozeman with an acceptable method of security equal to 150 percent of the cost of the remaining improvements. t. 38.39.030.8.2 "Sidewalks"—The final plat and homeowner's association documents shall include language stating that"upon the third anniversary of the plat recordation of any phase of the subdivision, any lot owner who has not constructed said sidewalk shall, without further notice, construct within 30 days, said sidewalk for their lot(s), regardless of whether other improvements have been made upon the lot." u. 38.41.050.A.8 —A Memorandum of Understanding shall be entered into by the Weed Control District and the subdivider for the control of county declared noxious weeds and a copy provided to the Planning Department prior to Final Plat approval. v. Irrigation System As-Builts - The developer shall provided irrigation system as-builts, for all irrigation installed in public rights-of-way and/or land used to meet parkland dedication requirements, or common open space areas once the irrigation system is installed. The as-builts shall include the exact locations and type of lines, including accurate depth, water source, heads, electric valves, quick couplers, drains and control box. w. That the applicant obtain Montana Department of Environmental Quality approval of the subdivision prior to Final Plat approval pursuant to Section 16.16.101 through 16.16.805 A.R.M. x. The subdivider shall ensure that all construction material and other debris are removed from the subdivision prior to final plat approval, or prior to release of said financial guarantee, if an Improvements Agreement is necessary with the final plat. y. The developer shall make arrangements with the City Engineer's office to provide addresses for all individual lots in the subdivision prior to filing of the final plat, The City Engineer's Office has identified the following code provisions and design standards. 1) Stormwater Master Plan: A Stormwater Master Plan for the subdivision for a system designed to remove solids, silt, oils, grease and other pollutants from the runoff from the private and public streets and all lots must be provided to and approved by the City Engineer. The master plan must depict the maximum sized retention basin location, show location of and provide easements for adequate drainage ways within the subdivision to transport runoff to the stormwater receiving channel. The plan shall include sufficient site grading and elevation information (particularly for the basin site, drainage ways and finished lot grades), typical stormwater detention/retention basin and discharge structure details, basin sizing calculations and a stormwater maintenance plan. Any stormwater ponds, located within a park or open space shall be designed and constructed to be conducive to the normal use and maintenance of the open space. Stormwater ponds for runoff generated by the subdivision(e.g., general lot runoff,public The Knoll at Baxter West Subdivision— Findings of Fact and Order 11 or private streets, common open space, parks, etc.) shall not be located on casements within privately owned lots. While the runoff from the individual lots will be dependent on the intensity of use on each lot, the maximum sizing of the storm retention facilities for each lot will be established based on maximum site development. Final facility sizing may be reviewed and reduced during design review of the FSP for each lot. 2) Plans and specifications and a detailed design report for water and sewer main extensions, storm sewer and the public street, prepared by a Professional Engineer, shall be provided to and approved by the City Engineer and the Montana Department, of Environmental Quality. The Applicant shall also provide Professional Engineering services for construction inspection, post- construction certification, and preparation of mylar record drawings. Construction shall not be initiated on the public infrastructure improvements until the plans and specifications have been approved and a pre-construction conference has been conducted. No building permits shall be issued prior to substantial completion and City acceptance of the required infrastructure improvements unless all of the requirements of section 38.39.030.1M are met to allow for concurrent construction. 3) All infrastructure improvements including 1) water and sewer main extensions, and 2) public streets, curb/gutter, sidewalks fronting parks, open space, rear yard frontages or other non-lot frontages, and related storm drainage infrastructure improvements shall be financially guaranteed or constructed prior to Final Plat approval. City standard residential sidewalks shall be constructed on all public street frontages of a property prior to occupancy of any structure on the property. Upon the third anniversary of the plat recordation of any phase of the subdivision, any lot owner who has not constructed said sidewalk shall, without further notice, construct within 30 days said sidewalk for their lot(s), regardless of whether other improvements have been made upon the lot. This condition shall be included on the plat and in the covenants for the subdivision. 4) The location.of existing water and sewer mains shall be properly depicted. Proposed main extensions shall be noted as proposed. 5) The Montana Fish, Wildlife and Parks, SCS, Montana Department of Environmental Quality and Army Corps of Engineer's shall be contacted regarding the proposed project and any required permits (i.e., 310,404, Turbidity exemption, etc.) shall be obtained prior to Final Plat approval. 6) Ditch relocation: a. The Montana Fish, Wildlife and Parks shall be contacted by the Applicant regarding the proposed relocation and any required permits (i.e., 310, 404, Turbidity exemption, etc.) shall be obtained prior to Final Plat approval. b. The Applicant shall comply with all parts of section 38.23.060.D for any ditch relocation. 7) Easements for the water and sewer main extensions shall be a minimum of 30 feet in width, with the utility located in the center of the easement. In no case shall the utility be less than 10 feet from the edge of easement. The Knoll at Baxter West Subdivision--Findings of Fact and Order 12 8) Project phasing shall be clearly defined including installation of infrastructure, 9) The developer shall make arrangements with the City Engineer's office to provide addresses for all individual lots in the subdivision prior to filing of the final plat, 10)Water rights or cash-in-lice thereof shall be provided in accordance with Sec. 38.23.180, BMC prior to final plat approval. 11)All proposed private utilities to serve the subdivision shall be shown on the public infrastructure plans and specifications. 12)The applicant shall submit a construction route map dictating how materials and heavy equipment will travel to and from the site in accordance with section 3 8.3 9.020,A.I of the Unified Development Ordinance, This shall be submitted as part of the final site plan for site developments, or with the infrastructure plans for subdivisions. It shall be the responsibility of the applicant to ensure that the construction traffic follows the approved routes. 13)All construction activities shall comply with section 38,39.020.A.2 of the Unified Development Code. This shall include routine cleaning/sweeping of material that is dragged to adjacent streets, The City may require a guarantee as allowed for under this section at any time during the construction to ensure any damages or cleaning that are required are complete. The developer shall be responsible to reimburse the City for all costs associated with the work if it becomes necessary for the City to correct any problems that are identified. D. Compliance with the local subdivision review procedures provided in Part 6 of the Montana Subdivision and Platting Act. The hearings before the Planning Board and City Commission have been properly noticed, as required by the Bozeman Unified Development Ordinance. The notice was mailed to all adjoining property owners by certified mail and noticed in the Bozeman Daily Chronicle. Based on the recommendation of the D.R.C. and other applicable review agencies, as well as any public testimony received on the matter,the Bozeman Planning Board shall forward a recommendation in a Resolution to the Bozeman City Commission who will make the final decision on the applicant's request. E. Provision for easements for the location and installation of any planned utilities. All utilities and necessary utility easements will be provided and depicted accordingly on the final plat for each phase. F. Provisions of legal and physical access to each parcel. The proposed lots will gain access from frontage on internal local streets or alleys, The final plat shall include a public access easement for all areas labeled as common open space and for all streets/alleys if they are not dedicated to the public XT. After considering all matters of record presented at the public hearing,the City Commission found that the requested variances to the City of Bozeman Unified Development The Knoll at Baxter West Subdivision—Findings of Fact and Order 13 Code would comply with the variance criteria in Section 38.35.070, BMC and 76-3-506, MCA as justified in the Planning Department's staff report. The City Commission then discussed the recommended conditions of approval and moved to approve the preliminary plat application subject to the conditions presented in Planning Board Resolution#P-20014. The City Commission then considered an amendment to the motion of conditional approval to add a condition that the applicant bonds the improvements to Harper Puckett Road with the -filing of the final plat for the first phase. The amendment passed on a vote of 4-0. After further considering all matters of record presented at the public hearing the City Commission found that preliminary subdivision plat for The Knoll at Baxter West Subdivision would comply with the primary review criteria, City of Bozeman Growth Policy, requirements the Bozeman Unified Development Code and the Montana Subdivision and Platting Act if certain conditions were imposed. The evidence, as stated or referenced in the Findings of Fact, justifies the imposition of the conditions ordered herein to ensure that the final plat complies with all applicable regulations and all required criteria. ORDER THEREFORE, IT IS HEREBY ORDERED, on a vote of 4-0,that the requested variances from the Uniform Development Code to: 1) Section 38.23.040.13 "Block Length" to exceed the maximum block length of 400 feet for Blocks 9, 10, 11, 14, 18, and 2) Section 38.23.040.0 "Block Width" to allow block widths to be less than 2010 feet in width for Blocks 9, 14, and 18 for The Knoll at Baxter West Subdivision be approved. THEREFORE, IT IS HEREBY FURTHER ORDERED, on a vote of 4-0, that the Preliminary Subdivision. Plat of The Knoll at Baxter West Subdivision be approved, subject to the following conditions: 1. The Final Plat shall conform to all requirements of the Bozeman Municipal Code and the Uniform Standards for Final Subdivision Plats and shall be accompanied by all required documents, including certification from the City Engineer that as-built drawings for public improvements were received, a platting certificate, and all required and corrected certificates. The Final Plat application shall include three (3) signed reproducible copies on a 3 mil or heavier stable base polyester film (or equivalent); two (2) digital copies; one (1) PDF copy; and five (5) paper prints. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in.any The Knoll at Baxter West Subdivision-Findings of Fact and Order 14 way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. 2. The applicant shall submit with the application for Final Plat review and approval, a written narrative stating how each of the conditions of preliminary plat approval and noted code provisions in the Findings of Fact and Order have been satisfactorily addressed, and shall include a digital copy(pdf) of the entire Final Plat submittal. This narrative shall be in sufficient detail to direct the reviewer to the appropriate plat, plan, sheet, note, covenant, etc. in the submittal. 3. The subdivider shall provide the necessary declaration and recitals creating the property owner's association bylaws and/or declaration of covenants, conditions and restrictions as being part of the existing Baxter Meadows West Homeowners Association for said major subdivision. 4. The final plat shall contain the following notation on its face or in a document to be recorded with the final plat: "Ownership of all common open space areas and trails, and responsibility of maintenance thereof and for city assessments levied on the common open space lands shall be that of the property owner's association. Maintenance responsibility shall include, in addition to the common open space and trails, all vegetative ground cover, boulevard trees and irrigation systems in the public right-of-way boulevard strips along all external perimeter development streets and adjacent to public parks or other common open space areas. All areas within the subdivision that are designated herein as common open space including trails are for the use and enjoyment by residents of the development and the general public. The property owner's association shall be responsible for levying annual assessments to provide for the maintenance, repair, and upkeep of all common open space areas and trails. At the same time of recording the final plat for each phase of the subdivision the subdivider shall transfer ownership of all common open space areas within each phase to the property owner's association created by the subdivider to maintain all common open space areas within The Knoll at Baxter West Subdivision". 5, The property owner's association documents shall comply with Section 38.21.060.C, BMC and include a provision requiring a 25-foot yard setback from Harper Puckett Road and that the setback is inclusive of the common open space area. 6. Lots located along Harper Puckett Road shall have a 20-foot rear yard setback measured from the property line of each lot. 7. Documentation of compliance with the parkland dedication requirements of Section 38.27.020, BMC shall be provided with the final plat. A table showing the parkland requirements for the subdivision and the method of meeting the parkland dedication shall be included on the final plat, or other recordable document acceptable to the City of Bozeman. This table shall include but not be limited to listing all dedicated parkland requirements,parkland or parkland credits and areas not credited towards parkland (i.e., detention/retention areas, watercourse setbacks, wetlands, common open space, parking facilities) and the total area of each. The Knoll at Baxter West Subdivision--Findings of Fact and Order 15 8. Each common open space area identified on the final plat(s) shall be identified according to a sequence of designated alphabetical values in-lieu of multiple common open space areas having the same designation(i.e., common open space "N' thru. "H" versus multiple areas with the same "A", "B", '4C ..... open space designations). 9. The applicant shall provide a minimum of 1.95 acres of dedicated parkland or equivalent thereof with the major subdivision. This amount is calculated based on 65 single household residential lots at 0.03 acres per dwelling of dedicated parkland. 10. The applicant recognizes it must meet the parkland requirements of Sect. 38.27.020, BMC. The applicant also recognizes it seeks to use available parkland credits associated with the dedicated parkland within Baxter Meadows Phase 3A including the dedicated city park known as the "10-acre Park" and should therefore participate in the maintenance of such parkland. Therefore, the applicant shall,prior to final plat approval, work with the Baxter Meadows Master Community Association, Inc. (BMMCA) to arrive at an agreed upon method to ensure the applicant and any future property owner's association created for this subdivision (including all its phases) succeeding in interest to the applicant contribute sufficient consideration to the BMMCA on an equitable basis for the maintenance and upkeep of existing publicly dedicated parks and publicly accessible open space lands and trails located within the area annexed to the City pursuant to the annexation agreement dated October 19, 2001 and on file with the Gallatin County Clerk and Recorder as document number 2053095 exclusive of. (i) lands included within the Gallatin County Regional Park and(ii) Tracts A-1,AIA and Al of Amended Plat J353D for the Chief Joseph middle school. Prior to final plat approval, the applicant shall provide evidence that an agreed upon method has been established. The agreement may contain a provision that should the City create a park maintenance district for maintenance of areas subject to the agreement the agreement may terminate. The property owner's association documents created for this subdivision shall include provisions describing the agreed upon method of contribution to the BMMCA and binding property owners to contribute to the maintenance and upkeep of dedicated parks and publicly accessible open space lands as required by the agreement between the applicant and the BMMCA. The provisions in the property owner's association documents fulfilling this condition shall be considered required by the City Commission pursuant to 3838.030.A.5, BMC, 11. Class II type trails located in a 30-foot wide public access easement will be constructed in the common open space areas for Block 9-12 and Blocks 14, 18 and 19. The final location, placement and installation schedule shall be approved by the Director of the City of Bozeman Department of Parks and Recreation with of the advice of the Recreation and Parks Advisory Board(RPAB). Prior to proceeding with construction of the public trail the applicant shall have a pre-construction meeting with the Department of Recreation and Parks. 12, The final plat shall provide all necessary utility casements which shall be described, dimensioned and shown on each subdivision block of the final plat in their true and correct location. If rear or side yard utility easements are not proposed the applicant shall provide The Knoll at Baxter West Subdivision—Findings of Fact and Order 16 written confirmation from all applicable utility companies that rear or side yard easements are not required. 13. Should the subdivider propose subdivision perimeter fencing, a fencing plan that includes plans and specifications shall be provided for review and approval prior to final plat approval. Fences located in the front, side or rear yard setback of properties adjacent to any park or common open space shall not exceed a maximum height of four feet, and shall be of an open construction designed in a manner to be consistent along all park land and open space areas. 14. The lots situated along the Harper Puckett Road shall have double-frontage architectural design features for dwellings facing onto the minor arterials similar to that found with the building orientation onto the local street frontages; including, but not limited to covered porches, varied roof lines, multiple fayade materials, varied facade plane, articulation and variation of materials. These architectural requirements shall be discussed and illustrated in the property owner's restrictive covenants and development guidelines. The property owner's association documents shall also specify that a maximum 4' tall fence, with a coordinated design detail of said fence type, is permitted along the back of these said lots. The provisions in the property owner's association documents fulfilling this condition shall be considered required by the City Commission pursuant to 38.38.030.A.5, BMC. 15. The 50-foot wide watercourse setback for the existing watercourse and associated wetlands shall be identified and dimensioned on the final plat. Typical sections, outlet details and landscape plans to confirm that storm water facilities can be successfully developed in Zone II of the watercourse setback without impacting the watercourse will be submitted to the Planning Department for review and approval prior to final plat approval. 16. The final plat shall clearly identify and reference the west half of Block 18 (i.e., Lots 1-8) as being a part of the major subdivision. 17. That the final plat(s) contain the following language that is readily visible on the plat placing future landowners of individual lots on notice of the presence of high groundwater in the area of the subdivision for review and approval by the Planning Office: "Due to the potential of high ground water tables in the areas of the subdivision, it is not recommended that residential dwellings or commercial structures with full or partial basements be constructed without first consulting a professional engineer licensed in the State of Montana and qualified in the certification of residential and commercial construction. 18. Should historical, cultural and/or archeological materials be inadvertently discovered during construction of this project, the State Historical Preservation Office (SHPO) and the Bozeman Historic Preservation Office shall be contacted immediately and construction activities shall cease. 19. All improvements needed to provide adequate level of service for the analyzed intersections must be installed or financially guaranteed prior to final plat approval, and must be installed and accepted prior to issuance of a building permit. The Kiwi] at Baxter West Subdivision—Findings of Fact and Order 17 20. The east half of Harper Puckett Road shall be improved to the 5-Lane Principal Arterial standard as shown in the Transportation Plan along the entire frontage of the subdivision. The required right-of-way dedication for Harper Puckett is 60 feet. The applicant shall provide payment of the estimated cost of topsoil, seed, and irrigation of one half of the future median of Harper Puckett Road along the frontage of the subdivision. 21. The sidewalks adjacent to Harper Puckett shall be 6'wide, and shall be installed at the time the street improvements are done. 21 A I' No Access Strip shall be shown on the plat along the entire frontage of Harper Puckett Road. 21 The water main in Kimberwicke shall be extended to the center median in Harper Puckett Road for future looping purposes. 24. The COB design standards require a minimum of 6" crushed base course. The local street sections in the geotechnical report only calls for 5". Revise accordingly. 25. That the applicant build or guarantee payment for the construction costs of the east one-half of Harbor Puckett Road prior to the filing of the final plat for the first phase of development. This City Commission order may be appealed by bringing an action in the Eighteenth District Court of Gallatin County, within 30 days after the adoption of this document by the City Commission, by following the procedures of Section 76-3-625, MCA. The preliminary approval of this subdivision shall be effective for three (3) years from the date of the signed Findings of Fact and Order approval. At the end of this period the City Commission may, at the request of the subdivider, grant individual extensions to its approval by the Planning Director for a period of not more than two years, or for more than two years by the City Commission. DATED this 6th day of May, 2013. BOZEMAN CITY COMMISSION 'SEAN BECKER, Mayor The Knoll at Baxter West Subdivision -Findings of Fact and Order 18 ATTEST: APPROVED AS TO FORM: ,�;�t111 ST _ N &d x ULLI t1Al , City Attomey a,. A The Knoll at Baxter West Subdivision—Findings of Fact and Order 19 SURVEY PURPOSE: TO CRF,',M1fk° 55 LOTS, : THIS PLAT IIS TO BE CONSIDERED FINAL ONLY IF SIGNER AND SEARED BY THIS THIS SUBDIVISION PROINRES LE6AI,AN:O PHYSICAL ACCESS TO ALL LOTS SURVEYOR. THE COMMISSIONER OF THIS SURVEY IS BMW, ILI.L. HEARING BASIS': NORTH LINE OF EQUESTRIAN LANE AS SHOWN ON THE FINAL PLAT OF BAXTER MEADOWS SUPS. P.U.D i PHASE t PER RECORD. AREAS IN SQUARE FELT Opel GENERAL N07ES. .Block. Lots Spate Total.. N, A 24.75'wide easement for the Maynard Border Ditch was Real in Book 30,Page 65 ire Pha$a 1 9 21594.9 5917.4 27512.3 after 9993,the ditch wog filled in one tha ditch water was piped iro the pilpelin:e shown a Phase 1 11 75529.9 : 3934.4 793643 ;place. The laaatioo of the obandoned pipeline is appre.ini and is From 1993 oonstlnuata: Phase 1 12 21662.4 a 21662.4 conveyed blowofd salves. A re Pp 1 a'r pl 119 the bad ri tin is routed along H p l -viiiiii-f-i7a 81 136110 94967.3 Qocurnerll,12231tl25 rel.-ed troy promos'ngh15 to the abandoned ppoh-and pravaus diI Phase 9 19... 12572.6 22173,7 34746,5 2 The watered.,so setback shown does rich take iI�ta oecoarl steep elope... These slopes by proposed stream a hancements. A Declaration of Protective Covenants 05 to Wetland nd A $ahtutxi 212910.4 45542,.4 258452.3 Racument.1120181906 identifies a prLAULted buffer Lad ithrii,35'from the edge of wi,LfL,d, Streets 88169.7 3 The common open space parcels within this plat are intended to be owned and mainly l Harlroowners Association. Ph.1 Total 346622,5 4. Utility easements are 10'wide,eMeept fcr a 6' w'ude easement along Ike ri line of I Phasm 2 9 36400.1_ 1$350 $4250,1 Alur'7' Phase 2 10 76532.2 391 60496 5. An easement tar electric and telephone systcrris °os no'w surveyed"within the SI/2'51,1 Phasa 2 - ---11 74855.1 ;751.5 736x6.6 is recorded n Book 92.,Page 179 The location of this easement is unknown, 'Ph 's.a 2�-T 12.. 398373 4050 43967.3 Subtotal 229624.7 27615.3 257240 Street$ 86209.2 I I I I Ph.2 Tlata 1 343449.2 I fl I V NI... 9 29421.5 16312.2 45733.7 II Fni 3 ----- 10 79753 5 3967,9 92701.4.. Pall of t k7 NroiroO 12 22562.2 a 21562.2 14 109333 51675 161009 0o.0G' Cu...C z9450, z39070.2 72935.1 ',311005.3 f 5F Ne9'S2 aB�E ' 145153.4 aa.ra s4ira 4 as a'ur rn[ASrxlrx.�r^I o 466156.7 � .a z 3 a PUBLIC STREET nuSEWP Ia xl' ° Nn sFt.-seao sr -sea$srN GCC:.#2.103143(c)�.. saoa' 1ST 1 I _ _ saa5z a9w � RR)G0,11ON RhSEI]FNR �� 188.6p' ,J (00c.#2231126] Tom' an NET AREAS IN SQUARE FEET I � i 5J' gurlumP� Fir. 1? PHASL PA80Lt5 STREETS....POTA.L.. I ? 396 SF ;I .e 1.53 , Y 121.84' Ip -e _. I 258453 96170 346623 n M o'namd"E N9a Da S 19 UT2 2 257240 99209 343449 I 2 3 311005 145153 436YS6 sr � 11469.. 9 l � rvsa4n"aa'"2 N9ao4'47 TOTAL 826598 319532 1146230. I � lasso" l 152 ss""-" 17 I I b � Iasx2 sr 0 � 111923 Nso 00.a4'Vf NEaaai- I 13221 4 16 „asa1A re w M9a?' 1 :- N9P4a'aa E. fl M]I_';1 LINE TABLE 0o.0. 134:7' un C.144 1 N EMMG am ,}W. dl&75�� 06459 Sf � 98437 L2 Ma0(0 aa'F 19.78'8 wwwMVVV "I NOO'D a"W W N9a04T� L1 SPW GqE i4NING A E 1 'fl '� 12 n5'12' I Ls sluoe39"E 30-W I Nsad4'o4'c 9 u aa9aa'a NQ 2557 m :as-'39' F� 133, e# 5?mi°6,•E "�©.22, 6 L7 I .-� 41' 6p791M n' 1w N 10,5e L9 v3'13'18.8 30.0x' I N90'4ob.-E Y °I Ngaoo-7 L9 sratl'la4 as a'1' z . t7 fl 154.3 J. ,O a LIU 'are'a,Y t4 39.x0' FT `y m 6a on. 1199x.. L11 sprorhori 7422' $O V bIItI7 S 1 L[3 50'aa da'E as.ao' p©qa �ivvaaa'aa'E _._mse ,,. Alt w 39.52 2 013 Maya aa'E 7S.ad' Ip " 11,a sr' �U eea4 7 914 rvrld'I5"w 3a a1' '> Lis wrarl9^w q.ea'.... 1 u N9aa0'a0"E. 016 5tl'$tl'1S'E 14.Jb' 112, E. a r3aos , a da, IJ' Li] Naea'W`E 10,&9` l a ° 111 y G I 110x2 SF tl1572 8 W155 LIB 814'18'21'9 &A9,..:.. Q NBa's,ba" t° I3s_7©' e m p rD I d m 1o9are SF h2 I N90'00 1}0.26'1' f g tl g 9 I g 14' I N90'fA'0i p`aL S4 I 110.02 G I I i 1 r I N �______.__( III) UAT C;30,dwg SHBET 1 OF 2 DRAWN BY: SA. DATE: 11,(2712 DUAIITY CHECK, _l I p � SNgVFYFDBY Sri JL}BNC. eIt-aGf FIEt.DBODK 1Ja IA,r3 D& THOMAS,DEAN t&HOSKINS,INC. ENGINEERING CONSULTANTS GREAT F LLS-BOZEMAN-KALiSPELL yyAy Or"" LEWISTON IDAHO