HomeMy WebLinkAbout13- Agreement between City and Knife river for Concrete work at Mainenance Building MEMORANDUM
Andrew Kerr
co
Engineering Assistant
582-2286
To: Chris Kukulski, City Manager
Date. April 24, 2013
Re; Agreement for Miscellaneous Concrete Installations - 2013
Facilities Maintenance and the 'Water Department requested the solicitation of quotes for
some concrete work they desired to have done. Requests for quotes were sent to three
local contractors. One contractor, Knife River, responded with a quote in the amount of
$33,032.00.
The proposed work entails installation of concrete building aprons at the Westside
Maintenance Shop building on Saxon Way, installation of a sidewalk along Bozeman
Avenue at the City Shops at 814 N. Bozeman, widening of a sidewalk at the Bozeman
Public Library, and installation of a short sidewalk connection at the parking lot at the
corner of Black and Mendenhall.
The quoted amount and unit prices from Knife River appear to be reasonable and
commensurate with the work, and I recommend that you sign the attached agreement so
we may proceed with these improvements.
Attachment
° THE CITY OF BOZEMAN
20 E. OLIVE -P.0. E30X 1230
E30ZEMAN MONTANA 59771.1230
ENGINEERING DEPARTMENT
?� GO 0 P QNE: (406)582.2280 . FAX: (406) 582-2263
Request for Quotes
2013. Miscellaneous Concrete Installations
City of Bozeman
The City of Bozeman is soliciting quotes from interested contractors for the installation
of concrete sidewalks and building aprons at four separate locations in the City of
Bozeman.
Contractors interested in providing a quote for this work should sign and submit the
attached Agreement with the bid form completed no later than 5:00 pm., April 22, 2013,
to: City of Bozeman, Engineering Department, 20 E, Olive Street, P.O. Box 1230,
Bozeman, MT 59771, Attn: Andrew Kerr.
If you have any questions concerning this project, or would like to inspect the work sites,
please contact me.
Andrew Kerr
Engineering Assistant
582-2280
HOME OF MONTANA STATE UNIVERSITY
GATEWAY TO YELLOWSTONE PARK
CONTRACT AGREEMENT
THIS CONTRACT AGREEMENT is dated as of the
day of
in the year 2013 by and between CITY OF BOZEMAN hereinafter r
ereinaf terr
called OWNER and """
hereinafter
called CONTRACTOR.
—KA �����
OWNER AND CONTRACTOR, in consideration of the mutual covenants
hereinafter set forth, agree as follows :
Article 1 . WORK,
CONTRACTOR shall complete all Work as specified or indicated in
the Contract - The Project Work is generally described as
follows :
1 . 1 Work Location 1 : Installation of approximately 1, 880 sF of
61, concrete building aprons at the Westside Maintenance Shop at
5521 Saxon Way,
Work Location 2 : Installation of approximately 1 , 870 SF of 6"
concrete sidewalk and one street corner pedestrian ramp along N.
Bozeman Avenue adjacent to the City Shop Complex at 814 N.
Bozeman Avenue .
Work Location 3 : Installation of approximately 51 SF of 4"
concrete sidewalk in the northwest corner of the public parking
lot at the corner of N. Black Avenue and E. Mendenhall Street .
Work Location 4 : Installation of approximately 1, 240 SF of 4"
concrete sidewalk to widen an existing sidewalk in the parking
lot of the Bozeman Public Library at 626 E . Main Street .
1 . 2 Plans sheets C-1, C-2 , and C-3 showing the details of the
proposed work are attached.
Article 2 -. CONTRACT TIME.
2 . 1 The Work will be completed within 30 calendar days after the
date the written notice to proceed is issued. Final payment will
be withheld until final completion and acceptance of the work as
stipulated in this Agreement .
1
CORTRA=MRG
Article 3 . CONTRACT PRICE.-
3 . 1 OWNER shall pay CONTRACTOR for performance of the Base Bid
Work in accordance with the Contract Documents the sum (subject
to adjustment as provided in the Contract Documents) of
Vii S4V IYe Dollars
z2oa*t-� 40
7hge-25- 7W�IO
Article 4 . PAYMENT PROCEDURES.
CONTRACTOR shall submit applications for payment in accordance
with the Montana Public Works Standard Specification, sixth
Edition General Conditions . Applications for payment will be
processed as provided in the General Conditions .
4 . 1 Payment . Upon satisfactory final completion and acceptance
of the Work in accordance with the General Conditions, OWNER
,shall pay the full contract price .
4 . 1 . 1 Measurement and Payment. Payment for the work
satisfactorily completed in accordance with this contract shall
be made pursuant to the applicable measurement and payment
sections in Exhibit B, based on the unit prices established in
Exhibit A (Bid Form) , of this agreement .
No item that is required by Contract for the proper and
successful completion of the Work will be paid for outside of or
in addition to the prices submitted in the contract. All work
not specifically set forth as a pay item herein shall be
considered a subsidiary obligation of the CONTRACTOR and all
costs in connection therewith shall be included in the contract
price .
Article 5 . CONTRACTOR' S REPRESENTATIONS .
In order to induce OWNER to enter into this Agreement, CONTRACTOR
makes the following representations :
5 . 1 CONTRACTOR has familiarized himself with the nature and
extent of the Contract Documents, Work, locality, and with all
local conditions and federal, state and local laws, ordinances,
rules and regulations that in any manner may affect cost,
progress or performance of the Work.
5 . 2 CONTRACTOR has studied carefully all reports of
2
investigations and tests of subsurface and latent physical
conditions at the site or otherwise affecting cost, progress or
performance of the Work .
5 . 3 CONTRACTOR has made or caused to be made examinations, and
investigations as -he deems necessary for the performance of the
Work at the contract price, within the contract time and in
accordance with the other terms and conditions of the Contract
Documents , and no additional examinations, investigations, tests,
reports or similar data are or will be required by CONTRACTOR for
such purposes .
5 , 4 CONTRACTOR has correlated the results of all such observa-
tions, examinations, investigations, tests, reports and data with
the terms and conditions of the Contract Documents .
Article G . CONTRACT DOCUMENTS .
The Contract Documents which comprise the entire agreement
between OWNER and CONTRACTOR as attached to or referenced in this
Agreement, are made a part hereof and consist of the following:
6 . 1 This Agreement .
6 . 2 certificates of Insurance and Performance and Payment Bonds .
6 . 3 Montana Public Works Standard Specifications (MPWSS) , Sixth
Edition, and as further amended by the City of Bozeman
Modifications to mpwsS (by reference) .
6 . 4 Notice to Proceed.
There are no Contract Documents other than those listed above in
this Article 6 .
The Contract Documents may only be altered, amended or repealed
by a modification (as defined in the Montana Public Works
Standard Specifications , Sixth Edition, General Conditions) .
Article 7 . GENERAL REQUIREMENTS .
7 . 1 Contractor Use of Premises . The CONTRACTOR shall confine
his operations at site of the proposed work to within the right-
of-way or construction easements provided.
Tt shall be understood that the responsibility for protection and
safekeeping of equipment and materials on or near the site will
be entirely that of the CONTRACTOR and that no claim shall be
3
made against the OWNER by reason of any act of an employee or
trespasser. It shall be further understood that should any
occasion arise necessitating access by the OWNER to the sites
occupied by these stored materials and equipment, the CONTRACTOR
owning or responsible for the stored materials or equipment shall
immediately remove same. No materials or equipment may be placed
upon any private property until the property OWNER has agreed in
writing to the location contemplated by the CONTRACTOR to be used
for storage.
7 . 2 Protection of Existing Structures . The CONTRACTOR shall be
solely responsible for locating all existing underground
installations , including service connections, in advance of
excavating or trenching, by contacting the OWNERS thereof and
prospecting. The CONTRACTOR shall use his own information and
shall not rely solely upon information shown on the drawings
concerning existing underground installations . The CONTRACTOR
shall repair all damage to existing utilities or property at his
own expense . The CONTRACTOR shall, at a minimum, call the "One-
Call" utility locate system (Phone: 1-800-424-5555 ) at least 72
hours in advance of starting construction.
Where excavation will be required adjacent to existing struc-
tures, the CONTRACTOR shall be solely responsible to maintain the
structural integrity of the existing structures . The CONTRACTOR
shall take whatever means necessary to insure that the existing
structure is not damaged and if necessary shall install sheet
piling. The CONTRACTOR shall repair all damage to the existing
structures at his own expense . Any fences destroyed during
construction shall be repaired to the satisfaction of the
property owner. Any delay, additional work, or extra cost to the
CONTRACTOR caused by existing underground installations shall not
constitute a claim for extra work, additional payment or damages .
7 . 3 Protection of Existing Mailboxes, Curbs and Gutters and
Driveways, etc - The CONTRACTOR shall take whatever means
necessary to insure that the existing mailboxes, curbs and
gutters and driveways, and other public or private improvements
are not damaged during construction. If it is necessary to
remove or disturb mailboxes during construction, the CONTRACTOR
shall repair and restore the mailboxes at his own expense to the
satisfaction of the Property owner. Any curb, gutter, or
driveways damaged during construction, not noted to be replaced
on the drawings, shall be replaced by the CONTRACTOR at his own
expense .
7 . 4 Surface Drainage . Water from such sources as surface
runoff, dewatering and flushing of water lines during project
4
Construction shall not be allowed to enter into drainage ways or
open areas that will cause flooding of existing structures,
street intersections, or lawn areas .
7 . 5 Work Sequence . The CONTRACTOR shall schedule the work to
minimize inconvenience to the OWNER and to adjacent property
owners and to minimize interruptions to utility service . This
shall include minimizing obstruction to local traffic especially
on dead end streets . Work shall be scheduled so as to minimize
disruptions to local mail delivery. Close coordination will be
required between the CONTRACTOR, OWNER, and COUNTY. The utility
service companies such as power, gas, telephone, and video shall
be contacted at least 72 hours in advance of when locating of
services will be required.
Article 8 . Warrant V and Guarantee .
8 . 1 CONTRACTOR warrants and guarantees to OWNER that all Work
will be in accordance with the Contract Documents and will not be
defective- Prompt notice of all defects shall he given to
CONTRACTOR. All defective Work, whether or not in place, may be
rejected, corrected or accepted as provided in the Montana Public
Works Standard Specification, Sixth Edition (MPWSS) .
Article 9 . Traffic Control ,
9 . 1 The CONTRACTOR shall conduct his work so as to interfere as
little as possible with public travel, whether vehicular or
pedestrian. Whenever it is necessary to cross, obstruct, or
close roads and walks, the CONTRACTOR shall obtain approval of
such actions from the appropriate road agency and shall provide
and maintain suitable and safe lighted detours or other temporary
expedients for the accommodation of public and private travel in
accordance with the current edition of the Manual on Uniform
Control Devices for Streets and Highways (MUTCD) . The CONTRACTOR
shall not occupy the work site or initiate construction-until all
traffic control pro-visions are in place and the OWNER has been so
notified.
9 . 2 Safety Provisions . Safety provisions must he entirely
adequate and meet with City, County, State and Federal
regulations to protect the public on these streets and roads .
9 . 3 Barricades and Lights . Prior to the start of construction
across roads or walks, all construction permits shall be
obtained, utility companies notified, and traffic patterns,
signing, location of flagmen, barricades and other safety
5
measures arranged. Providing and maintaining safety barricades,
and other work site safety measures shall be the responsibility
of the CONTRACTOR and shall be included in the contract price .
The CONTRACTOR shall cooperate and coordinate his methods with
the OWNER'S traffic control plans prior to the disruption of the
normal flow of any traffic,
All open trenches and other excavations shall be provided with
suitable barriers, signs, and lights to the extent that adequate
protection is provided to the public . Obstructions, such as
material piles and equipment, shall be provided with similar
warning signs and lights .
All barricades and obstructions shall be illuminated by means of
warning lights from sunset to sunrise . Materials stored upon or
alongside public streets and highways shall be provided with
similar warning signs and lights .
All barricades, signs, lights and other protective devices shall
be installed and maintained in conformity with applicable
statutory requirements and, where within railroad and highway
right-of-way, as required by the authority having jurisdiction
thereover.
Work performed within property under the OWNER'S jurisdiction
shall have all barricades, signs, lights and protective devices
installed and maintained.
Article 10 STATE LAWS AND REGULATIONS .
10 . 1 All applicable laws, ordinances and the rules and regula-
tions of all authorities having jurisdiction over construction of
the project shall apply to the contract throughout .
10 . 1 . 1 MONTANA CONTRACTOR REGISTRATION REQUIREMENTS No bids
will be considered that do not carry the Bidder' s Certificate of
Contractor' s Registration number on the envelope containing the
Bid and on the Bid. Information pertaining to the Montana
Contractor Registration requirements may be obtained from the
Montana State Department of Revenue, Helena, Montana. (1-800-556-
6694)
10 . 1 . 2 ADDITIONAL CONTRACTOR LICENSE FEE (MONTANA CONTRACTORS
GROSS RECEIPTS TAX) In accordance with Title 15, Chapter 50 ,
MCA, the Owner shall withhold, in addition to other amounts
withheld as provided by law or specified herein, I percent (1%)
of all payments due the Contractor and shall transmit such moneys
6
to the Montana Department of Revenue .
10 . 1 . 3 The CONTRACTOR' S attention is called to the Industrial
Accident Insurance laws in force in Montana and to the
responsibility of the OWNER for the collection of premiums
thereunder. The CONTRACTOR' S compliance with said laws is
required and shall relieve the OWNER of any responsibility for
payment of premiums thereunder and shall furnish the OWNER with
satisfactory evidence showing that all premiums arising from this
contract have been paid before payment is made on the final
estimate .
10 . 1 . 4 LOCAL LABOR Contractor shall give preference to the
employment of Montana residents in accordance with applicable
portions of Title 13 , Chapter 2 , Part 4 , MCA,
10 - 1 . 5 PREVAILING WAGE RATES On all projects and contracts with
the Owner in excess of $25, 000 . 00, Contractor and all
subcontractors shall pay for all labor employed the standard
prevailing rate of wages - The standard prevailing rate of wages
as used herein means that standard prevailing rate of wages in
the locality where the work is to be performed as determined by
the Montana Commissioner of Labor pursuant to MCA 18-2-402 and as
bound herein. The Contractor and subcontractors are directed to
the Montana Commissioner of Labor for information on the standard
prevailing rate of wages applicable to this contract within this
area.
Article 11 . PERFORMANCE AND PAYMENT BONDS. The CONTRACTOR shall
furnish a Performance Bond and a Payment Bond in favor of the
OWNER each in an amount equal to one-hundred Percent (10o,5) of
the Agreement amount ,
Article 12 . INSURANCE. Without limiting any of the other
obligations or liabilities of the CONTRACTOR, CONTRACTOR shall
,secure and maintain such insurance from an insurance company (or
companies) authorized to write insurance in the State of Montana,
with minimum "A.M. Best Rating" of B+, VI, as will protect
himself, his subcontractors, the Owner and their respective
agents and employees from claims for bodily injury, death or
property damage which may arise from operations and completed
operations under this Agreement . Such coverage shall be written
fax claims arising out of all premises/ operations, sub-
contracted operations , products/completed operations, and all
liability assumed by the CONTRACTOR under any contract or
agreement . CONTRACTOR shall not commence work under this
Agreement until such certified copies of the insurance policy
shall have been filed with the OWNER. The City of Bozeman shall
7
be named as additional insured on any insurance certificates .
All insurance coverages shall remain in effect throughout the
life of the Agreement.
Each insurance policy shall contain a clause providing that it
will not be cancelled by the insurance company without 30 days
written notice to the OWNER and Engineer of intention to cancel .
The minimum amounts of such insurance coverages being as per
Section SC-5 . 04 , Supplementary Conditions to the General
Conditions, Montana Public Works Standard Specifications , Sixth
Edition, and included herein:
SC - 5 . 04 CONTRACTOR' S LIABILITY INSURANCE
Add the following new paragraphs immediately after Paragraph
5 . 04 .B :
C. The limits of liability for the insurance required by
Paragraph 5 . 04 of the General Conditions shall provide coverage
for not less than the following amounts or greater
where required by Law or Regulations :
1 . Workers, Compensation, etc . under Paragraphs 5 . 04 . 1 and 5 . 04 . 2
of the General Conditions .
a. State Statutory
b. Applicable Federal (e .g. Longshoremans) Statutory
c- Employer' s Liability $ 500, 000 . 00
2 . Contractor' s Liability Insurance under Paragraphs 5 . 04 .A.3
through 5 . 04 . A- 6 of the General Conditions which shall also
include completed operations and product liability coverage.
a. GENERAL AGGREGATE $ 3 , 000 , 000 . 00
b. Products-Completed
Operations Aggregate $ 3 , 000 , 000 . 00
c . Personal and Advertising
d. Each occurrence
(Bodily Injury and
Property Damage) $ 1, 000 , 000 . 00
e. Coverage will include :
1 . Premises - Operations
2 . Operations of Independent Contractor
3 . Contractual Liability
4 . Personal Injury
5 Products and Completed Operations
8
6 . Broad Form Property Damage will include explosion,
collapse, blasting and underground where applicable .
'7 . Per Project Aggregate Endorsement
3 . Automobile Liability under Paragraph 5 . 04 .A. 6 of the General
Conditions :
a . Bodily Injury:
Each Person $ 500, 000 . 00
Each Accident $ 1, 000, 000 . 00
Property Damage :
Each Accident $1, 000, 000 . 00
(or)
b- Combined Single Limit $ 1 , 000, 000 . 00
Coverage to Include
1 , All Owned
2 . Hired
3 . Non-Owned
4 . Contractor' s Liability Insurance under 5 . 04 .A. 3 through 5 . 04 ,A- 6
may be satisfied by primary insurance or a combination of primary and
excess or umbrella insurance . Primary occurrence limit cannot be less
than $1, 000 , 000 . 00 . Deductible not to exceed $5, 000 . 00 per occurrence
on property damage.
5 . Add a new paragraph at the end of Paragraph 5 . 04 -B. 1 of the
General Conditions as follows :
The Contractor' s insurance coverage shall name the Owner, and Engineer
and Engineer' s Consultants as an additional insured under Commercial
General Liability, Automobile Liability, Excess or Umbrella polices .
G . The Contractual Liability coverage required by Paragraph 5 . 04 .B.4 .
of the General Conditions shall provide coverage for not less than the
following amounts :
Each Occurrence $ 1, 000, 000 . 00
Aggregate $ 3 , 000 , 000 . 00
Article 13 . MISCELLANEOUS ,
13 . 1 Terms used in this Agreement which are defined in the
General Conditions shall have the meanings indicated in the
General Conditions of the Montana Public Works Standard
Specifications, Sixth Edition.
13 . 2 This Agreement and all of the covenants hereof shall inure
to the benefit of and be binding upon the OWNER and the
CONTRACTOR respectively and his partners, successors, assigns,
and legal representatives . Neither the OWNER nor the CONTRACTOR
shall have the right to assign, transfer or sublet his interest
or obligations hereunder without written consent of the other
party. The Owner reserves the right to withdraw at any time from
any subcontractor whose work has proven unsatisfactory the right
to be engaged in or employed upon any part of the Work.
13 . 3 In the event it becomes necessary for either party to this
Agreement to retain an attorney to enforce any of the terms or
conditions of this Agreement or to give any notice required
herein, then the prevailing party or the party given notice shall
be entitled to reasonable attorney' s fees and costs, including
fees, salary, and costs of in-house counsel.
13 . 4 Any amendment of modifications of this Agreement or any
provisions herein shall be made in writing and executed in the
same manner as this original document and shall after execution
become a part of the Agreement .
13 . 5 The CONTRACTOR hereby agrees to indemnify, defend, and hold
the OWNER harmless from all claims and liability due to the
activities of CONTRACTOR, their agents, employees, or both, in
performing the work required.
The CONTRACTOR is and shall perform this agreement as an
independent contractor, and as such, is responsible to the OWNER
only as to the results to be obtained in the work herein
specified, and to the extent that the work shall be done in
accordance with the terms, plans and specifications . The
CONTRACTOR shall have and maintain complete control over all of
its employees, subcontractors, agents and operations, being
responsible for any required payroll deductions and providing
required benefits , such as, but not limited to, workman' s
compensation and unemployment insurance .
10
13 . 6 The Contractor agrees not to discriminate in the
fulfillment of this Agreement on the basis of race, color,
religion, creed, sex, age, marital status, national origin, or
actual or perceived sexual orientation, gender identity or
disability. The Contractor agrees this requirement shall apply
to the hiring and treatment of the Contractor' s employees and to
all subcontracts .
13 . 7 CITY OF BOZEMAN BUSINESS LICENSE All Contractors conducting
work within the City of Bozeman are required to have a current
Business License. Applications for Business Licenses may be
obtained at City Hall, 121 N. Rouse Avenue, Bozeman, Montana.
Article 14 . Special Provisions
14 . 1 Sidewalks shall be backfilled upon form removal with slopes
not to exceed 1 :4 . Material removed during excavation may be used
for backfill . If additional backfill is required the Contractor
shall provide clean topsoil . Seeding of disturbed areas will not be
required.
14 . 2 Contractor shall install 3" PVC sleeves under the sidewalks as
shown on the plans . The cost of this work shall be considered
incidental, no separate measurement and payment shall be made .
IN WITNESS WHEREOF, the parties hereto have executed this
Agreement the day and year first above written.
KNI)t;�2— oelvele —
(Co racto
By
Title -
Montana Contractor Registration Number
Special Fuel User Permit Number
SEAL AND ATTEST:
Citv of Bozeman
(Owner)
sy ... .
Title City Manager
SEAL AND %
>«
it
Title \ :
�
"\ ��/
%6
12
2013 Miscellaneous Concrete Installations
Exhibit B
MEASUREMENT AND PAYMENT
The quantities listed in the Bid Form are estimates for the purpose of bidding only. Payment to the
Contractor will be made based on the actual satisfactorily completed work quantities measured in the
field, Under the terms of this contract,the unit price as contained in this Bid Form shall be applicable to
quantity overruns.
The following measurement and payment sections do not necessarily name every incidental item
required by the Contract Documents to complete the work. Cost of all such incidental items shall be
included in the various related bid items.
No separate measurement and payment shall be made for traffic control.
Item 101: 6" Concrete anrons.
This item is measured and paid for by the square feet of concrete aprons in place at the contract unit
price bid for"6"concrete aprons". Price and payment is full compensation for all materials,excavations
and removal and disposal of all deleterious materials as required, compaction of the subgrade,
preparation of the gravel base, reinforcement installation, curing of concrete, all pre-molded mastic
material for expansion joints, all equipment, tools, labor, and for the performance of all work and
incidentals necessary to complete the item, and for the installation of compacted gravel backfill as
necessary adjacent to the aprons.
Item 201: 6"concrete sidewalk.
This item is measured and paid for by the square feet of concrete sidewalk in place at the contract unit
price bid for "6" concrete sidewalk". Price and payment is full compensation for all materials.
excavations and removal and disposal of all deleterious materials as required, compaction of the
,subgrade, preparation of the gravel base, "Fibermesh" or approved equal reinforcement, curing of
concrete, all pre-molded mastic material for expansion joints, all equipment, tools, labor. for the
performance of all work and incidentals necessary to complete the item,.and for the installation of topsoil
backfill as necessary adjacent to the sidewalk.
Item 202: Integral curb and gutter remove and re 1 �
This item is measured and paid for by the lineal feet of combined curb and gutter in removed and
replaced at the contract unit price bid for "Integral curb and gutter remove and replace". Price and
payment is full compensation for any sawcutfing and removal and disposal of existing concrete, for all
materials, preparation of gravel base, curing of concrete, all pre-molded mastic material for expansion
joints, all equipment, tools, labor, and for the performance of all work and incidentals necessary to
complete the item, and for the restoration of any asphalt pavement damaged during construction,
I MEASUREMENT AND PAYMENT
Item 203: Detectable warning
This item is measured and paid for by the square foot at the contract unit price bid for "Detectable
warning". Price and payment is full compensation for furnishing and installing detectable warning
panels in accordance with manufacturer's recommendation.
Item 301: 4"concrete sidewalk.
This Item is measured and paid for by the square feet of concrete sidewalk in place at the contract unit
price bid for "4" concrete sidewalk". Price and payment is full compensation for all materials,
excavations and removal and disposal of all deleterious materials as required, compaction of the
subgrade, preparation of the gravel base, curing of concrete, all pre-molded mastic material for
expansion joints, all equipment, tools, labor, and for the performance of all work and incidentals
necessary to complete the item, and for the installation of topsoil backfill as necessary adjacent to the
sidewalk.
Item 302: Curb removal.
This item shall be measured and paid for by the lineal foot(LF)at the unit price bid for"curb removal",
which price and payment shall constitute full compensation for furnishing all materials, tools,
equipment,labor, loading,hauling,disposal,and incidentals necessary to sawcut and remove and dispose
of existing straight curbing, and for the restoration of any asphalt pavement damaged during
construction.
Item 401: 4"concrete sidewalk.
This item is measured and paid for by the square feet of concrete sidewalk in place at the contract unit
price bid for "4" concrete sidewalk". Price and payment is full compensation for all materials,
excavations and removal and disposal of all deleterious materials as required, compaction of the
subgrade,preparation of the gravel base,dowel installations, curing of concrete, all pre-molded mastic
material for expansion joints, all equipment, tools, labor, and for the performance of all work and
incidentals necessary to complete the item, and for the installation of topsoil backfill as necessary
adjacent to the sidewalk.
Item 402; Integral curb and gutier remove andTeplace.
This item is measured and paid for by the lineal feet of combined curb and gutter in removed and
replaced at the contract unit price bid for "Integral curb and gutter remove and replace". Price and i
payment s full compensation for any sawcutting and removal and disposal of existing concrete, for all
materials, preparation of gravel base., curing of concrete, all pre-molded mastic material for expansion
joints, all equipment, tools, labor, and for the performance of all work and incidentals necessary to
complete the item, and for the restoration of any asphalt pavement damaged during construction.
Item 4th:): Detectable Waming.
This item is measured and paid for by the square foot at the contract unit price bid for "Detectable
warning". Price and payment is full compensation for furnishing and installing detectable warning
panels in accordance with manufacturer's recommendation.
2 MEASUREMENT AND PAYMENT
Item 404: Reset sign.
Measurement of signs is per each sign reset. Payment will be made at the contract unit price bid per
each sign reset. Such price and payment will be full compensation for all work and materials
including dismantling and removal, resetting, furnishing and installing break away devices (if
required), breakdown of foundation material and backfill of removal sites, .and all incidentals
necessary to complete the work.
3 MEASUREMENT AND PAYMENT
EXHIBIT A–BID FORM
2013 Miscellaneous Concrete Installations
WORK LOCATION 1: 5519 Saxon Way
NO I"FEINT UNIT UNIT PRICE QUANTITY TOTAL PRICE
Fi ores Fi>t�res
101 6" Concrete S.F. $ `" 1,880 $ /0,
aprons
TOTAL BASE BID FORK LOCATION 1 $_
(TOTAL BASE BID WORK LOCATION I - WRITTEN WORDS)
WORK LOCATION 2: 814 N. Bozeman Ave
NO. ITEM UNIT UNIT PRICE QUANTITY TOTAL PRICE
F/i ores Fi ores
201 6" Concrete S.F. $ 1870 � ,1� (�
Sidewalk -
ram
202 Integral curb and L.F. $ 24 -
Gutter remove and
Replace
202 Detectable S.F. s 42 '— g;
Warning
TOTAL BASE BID WORK LOCATION 2 1 "c`
(TC?TAI, BASE Bll� WC1RK LOCATION 2 - WRITTEN WCJRI�S)
WORD LOCATION 3: Parking Lot, SE Corner of Black Ave and Mendenhall St
NO. ITEM UNIT UNIT PRICE QUANTITY TOTAL PRICE
Fi ores Fi ores
301 4" Concrete S.F. $ `� 51 00*
sidewalk
307 Curb removal L.F. 7 -
TOTAL BASE BID WORK LOCATION 3
- 1146 4 y=/� . aV - ' Yo Cam "
(TOTAL BASE BID WORK LOCATION 3 - WRITTEN 'WORDS)
WORK LOCATION 4: Bozeman Public Library 676 E. Fain Street
NO. ITEM UNIT UNIT PRICE QUANTITY TOTAL PRICE
Fi lire Fi ores
o
401 4" Concrete S.F. $ -'` 1,240 6 060 --
Sidewalk
402 Integral curb and L.F. $ 6 +'G? ,
Gutter remove and
Replace
403 Detectable S.F. S 10
Warning
404 Reset sign Each 2 $ ,/3C)
TOTAL BASE BID WORK LOCATION 4 $
{TOTTAL BASE I3ID WORK LOCATION 4 - RITTEi'1 WCDRIDSy
TOTAL BASE BTO WORK LOCATIONS 1, 2, 3, AND 4: S ��
(TOTAL BASE BID WORK; LOCATIONS 1, 13.. AND 4--- WRITTEN WORDS)