HomeMy WebLinkAbout13- Agreement between City and Knife river for Concrete work at Mainenance Building MEMORANDUM Andrew Kerr co Engineering Assistant 582-2286 To: Chris Kukulski, City Manager Date. April 24, 2013 Re; Agreement for Miscellaneous Concrete Installations - 2013 Facilities Maintenance and the 'Water Department requested the solicitation of quotes for some concrete work they desired to have done. Requests for quotes were sent to three local contractors. One contractor, Knife River, responded with a quote in the amount of $33,032.00. The proposed work entails installation of concrete building aprons at the Westside Maintenance Shop building on Saxon Way, installation of a sidewalk along Bozeman Avenue at the City Shops at 814 N. Bozeman, widening of a sidewalk at the Bozeman Public Library, and installation of a short sidewalk connection at the parking lot at the corner of Black and Mendenhall. The quoted amount and unit prices from Knife River appear to be reasonable and commensurate with the work, and I recommend that you sign the attached agreement so we may proceed with these improvements. Attachment ° THE CITY OF BOZEMAN 20 E. OLIVE -P.0. E30X 1230 E30ZEMAN MONTANA 59771.1230 ENGINEERING DEPARTMENT ?� GO 0 P QNE: (406)582.2280 . FAX: (406) 582-2263 Request for Quotes 2013. Miscellaneous Concrete Installations City of Bozeman The City of Bozeman is soliciting quotes from interested contractors for the installation of concrete sidewalks and building aprons at four separate locations in the City of Bozeman. Contractors interested in providing a quote for this work should sign and submit the attached Agreement with the bid form completed no later than 5:00 pm., April 22, 2013, to: City of Bozeman, Engineering Department, 20 E, Olive Street, P.O. Box 1230, Bozeman, MT 59771, Attn: Andrew Kerr. If you have any questions concerning this project, or would like to inspect the work sites, please contact me. Andrew Kerr Engineering Assistant 582-2280 HOME OF MONTANA STATE UNIVERSITY GATEWAY TO YELLOWSTONE PARK CONTRACT AGREEMENT THIS CONTRACT AGREEMENT is dated as of the day of in the year 2013 by and between CITY OF BOZEMAN hereinafter r ereinaf terr called OWNER and """ hereinafter called CONTRACTOR. —KA ����� OWNER AND CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows : Article 1 . WORK, CONTRACTOR shall complete all Work as specified or indicated in the Contract - The Project Work is generally described as follows : 1 . 1 Work Location 1 : Installation of approximately 1, 880 sF of 61, concrete building aprons at the Westside Maintenance Shop at 5521 Saxon Way, Work Location 2 : Installation of approximately 1 , 870 SF of 6" concrete sidewalk and one street corner pedestrian ramp along N. Bozeman Avenue adjacent to the City Shop Complex at 814 N. Bozeman Avenue . Work Location 3 : Installation of approximately 51 SF of 4" concrete sidewalk in the northwest corner of the public parking lot at the corner of N. Black Avenue and E. Mendenhall Street . Work Location 4 : Installation of approximately 1, 240 SF of 4" concrete sidewalk to widen an existing sidewalk in the parking lot of the Bozeman Public Library at 626 E . Main Street . 1 . 2 Plans sheets C-1, C-2 , and C-3 showing the details of the proposed work are attached. Article 2 -. CONTRACT TIME. 2 . 1 The Work will be completed within 30 calendar days after the date the written notice to proceed is issued. Final payment will be withheld until final completion and acceptance of the work as stipulated in this Agreement . 1 CORTRA=MRG Article 3 . CONTRACT PRICE.- 3 . 1 OWNER shall pay CONTRACTOR for performance of the Base Bid Work in accordance with the Contract Documents the sum (subject to adjustment as provided in the Contract Documents) of Vii S4V IYe Dollars z2oa*t-� 40 7hge-25- 7W�IO Article 4 . PAYMENT PROCEDURES. CONTRACTOR shall submit applications for payment in accordance with the Montana Public Works Standard Specification, sixth Edition General Conditions . Applications for payment will be processed as provided in the General Conditions . 4 . 1 Payment . Upon satisfactory final completion and acceptance of the Work in accordance with the General Conditions, OWNER ,shall pay the full contract price . 4 . 1 . 1 Measurement and Payment. Payment for the work satisfactorily completed in accordance with this contract shall be made pursuant to the applicable measurement and payment sections in Exhibit B, based on the unit prices established in Exhibit A (Bid Form) , of this agreement . No item that is required by Contract for the proper and successful completion of the Work will be paid for outside of or in addition to the prices submitted in the contract. All work not specifically set forth as a pay item herein shall be considered a subsidiary obligation of the CONTRACTOR and all costs in connection therewith shall be included in the contract price . Article 5 . CONTRACTOR' S REPRESENTATIONS . In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following representations : 5 . 1 CONTRACTOR has familiarized himself with the nature and extent of the Contract Documents, Work, locality, and with all local conditions and federal, state and local laws, ordinances, rules and regulations that in any manner may affect cost, progress or performance of the Work. 5 . 2 CONTRACTOR has studied carefully all reports of 2 investigations and tests of subsurface and latent physical conditions at the site or otherwise affecting cost, progress or performance of the Work . 5 . 3 CONTRACTOR has made or caused to be made examinations, and investigations as -he deems necessary for the performance of the Work at the contract price, within the contract time and in accordance with the other terms and conditions of the Contract Documents , and no additional examinations, investigations, tests, reports or similar data are or will be required by CONTRACTOR for such purposes . 5 , 4 CONTRACTOR has correlated the results of all such observa- tions, examinations, investigations, tests, reports and data with the terms and conditions of the Contract Documents . Article G . CONTRACT DOCUMENTS . The Contract Documents which comprise the entire agreement between OWNER and CONTRACTOR as attached to or referenced in this Agreement, are made a part hereof and consist of the following: 6 . 1 This Agreement . 6 . 2 certificates of Insurance and Performance and Payment Bonds . 6 . 3 Montana Public Works Standard Specifications (MPWSS) , Sixth Edition, and as further amended by the City of Bozeman Modifications to mpwsS (by reference) . 6 . 4 Notice to Proceed. There are no Contract Documents other than those listed above in this Article 6 . The Contract Documents may only be altered, amended or repealed by a modification (as defined in the Montana Public Works Standard Specifications , Sixth Edition, General Conditions) . Article 7 . GENERAL REQUIREMENTS . 7 . 1 Contractor Use of Premises . The CONTRACTOR shall confine his operations at site of the proposed work to within the right- of-way or construction easements provided. Tt shall be understood that the responsibility for protection and safekeeping of equipment and materials on or near the site will be entirely that of the CONTRACTOR and that no claim shall be 3 made against the OWNER by reason of any act of an employee or trespasser. It shall be further understood that should any occasion arise necessitating access by the OWNER to the sites occupied by these stored materials and equipment, the CONTRACTOR owning or responsible for the stored materials or equipment shall immediately remove same. No materials or equipment may be placed upon any private property until the property OWNER has agreed in writing to the location contemplated by the CONTRACTOR to be used for storage. 7 . 2 Protection of Existing Structures . The CONTRACTOR shall be solely responsible for locating all existing underground installations , including service connections, in advance of excavating or trenching, by contacting the OWNERS thereof and prospecting. The CONTRACTOR shall use his own information and shall not rely solely upon information shown on the drawings concerning existing underground installations . The CONTRACTOR shall repair all damage to existing utilities or property at his own expense . The CONTRACTOR shall, at a minimum, call the "One- Call" utility locate system (Phone: 1-800-424-5555 ) at least 72 hours in advance of starting construction. Where excavation will be required adjacent to existing struc- tures, the CONTRACTOR shall be solely responsible to maintain the structural integrity of the existing structures . The CONTRACTOR shall take whatever means necessary to insure that the existing structure is not damaged and if necessary shall install sheet piling. The CONTRACTOR shall repair all damage to the existing structures at his own expense . Any fences destroyed during construction shall be repaired to the satisfaction of the property owner. Any delay, additional work, or extra cost to the CONTRACTOR caused by existing underground installations shall not constitute a claim for extra work, additional payment or damages . 7 . 3 Protection of Existing Mailboxes, Curbs and Gutters and Driveways, etc - The CONTRACTOR shall take whatever means necessary to insure that the existing mailboxes, curbs and gutters and driveways, and other public or private improvements are not damaged during construction. If it is necessary to remove or disturb mailboxes during construction, the CONTRACTOR shall repair and restore the mailboxes at his own expense to the satisfaction of the Property owner. Any curb, gutter, or driveways damaged during construction, not noted to be replaced on the drawings, shall be replaced by the CONTRACTOR at his own expense . 7 . 4 Surface Drainage . Water from such sources as surface runoff, dewatering and flushing of water lines during project 4 Construction shall not be allowed to enter into drainage ways or open areas that will cause flooding of existing structures, street intersections, or lawn areas . 7 . 5 Work Sequence . The CONTRACTOR shall schedule the work to minimize inconvenience to the OWNER and to adjacent property owners and to minimize interruptions to utility service . This shall include minimizing obstruction to local traffic especially on dead end streets . Work shall be scheduled so as to minimize disruptions to local mail delivery. Close coordination will be required between the CONTRACTOR, OWNER, and COUNTY. The utility service companies such as power, gas, telephone, and video shall be contacted at least 72 hours in advance of when locating of services will be required. Article 8 . Warrant V and Guarantee . 8 . 1 CONTRACTOR warrants and guarantees to OWNER that all Work will be in accordance with the Contract Documents and will not be defective- Prompt notice of all defects shall he given to CONTRACTOR. All defective Work, whether or not in place, may be rejected, corrected or accepted as provided in the Montana Public Works Standard Specification, Sixth Edition (MPWSS) . Article 9 . Traffic Control , 9 . 1 The CONTRACTOR shall conduct his work so as to interfere as little as possible with public travel, whether vehicular or pedestrian. Whenever it is necessary to cross, obstruct, or close roads and walks, the CONTRACTOR shall obtain approval of such actions from the appropriate road agency and shall provide and maintain suitable and safe lighted detours or other temporary expedients for the accommodation of public and private travel in accordance with the current edition of the Manual on Uniform Control Devices for Streets and Highways (MUTCD) . The CONTRACTOR shall not occupy the work site or initiate construction-until all traffic control pro-visions are in place and the OWNER has been so notified. 9 . 2 Safety Provisions . Safety provisions must he entirely adequate and meet with City, County, State and Federal regulations to protect the public on these streets and roads . 9 . 3 Barricades and Lights . Prior to the start of construction across roads or walks, all construction permits shall be obtained, utility companies notified, and traffic patterns, signing, location of flagmen, barricades and other safety 5 measures arranged. Providing and maintaining safety barricades, and other work site safety measures shall be the responsibility of the CONTRACTOR and shall be included in the contract price . The CONTRACTOR shall cooperate and coordinate his methods with the OWNER'S traffic control plans prior to the disruption of the normal flow of any traffic, All open trenches and other excavations shall be provided with suitable barriers, signs, and lights to the extent that adequate protection is provided to the public . Obstructions, such as material piles and equipment, shall be provided with similar warning signs and lights . All barricades and obstructions shall be illuminated by means of warning lights from sunset to sunrise . Materials stored upon or alongside public streets and highways shall be provided with similar warning signs and lights . All barricades, signs, lights and other protective devices shall be installed and maintained in conformity with applicable statutory requirements and, where within railroad and highway right-of-way, as required by the authority having jurisdiction thereover. Work performed within property under the OWNER'S jurisdiction shall have all barricades, signs, lights and protective devices installed and maintained. Article 10 STATE LAWS AND REGULATIONS . 10 . 1 All applicable laws, ordinances and the rules and regula- tions of all authorities having jurisdiction over construction of the project shall apply to the contract throughout . 10 . 1 . 1 MONTANA CONTRACTOR REGISTRATION REQUIREMENTS No bids will be considered that do not carry the Bidder' s Certificate of Contractor' s Registration number on the envelope containing the Bid and on the Bid. Information pertaining to the Montana Contractor Registration requirements may be obtained from the Montana State Department of Revenue, Helena, Montana. (1-800-556- 6694) 10 . 1 . 2 ADDITIONAL CONTRACTOR LICENSE FEE (MONTANA CONTRACTORS GROSS RECEIPTS TAX) In accordance with Title 15, Chapter 50 , MCA, the Owner shall withhold, in addition to other amounts withheld as provided by law or specified herein, I percent (1%) of all payments due the Contractor and shall transmit such moneys 6 to the Montana Department of Revenue . 10 . 1 . 3 The CONTRACTOR' S attention is called to the Industrial Accident Insurance laws in force in Montana and to the responsibility of the OWNER for the collection of premiums thereunder. The CONTRACTOR' S compliance with said laws is required and shall relieve the OWNER of any responsibility for payment of premiums thereunder and shall furnish the OWNER with satisfactory evidence showing that all premiums arising from this contract have been paid before payment is made on the final estimate . 10 . 1 . 4 LOCAL LABOR Contractor shall give preference to the employment of Montana residents in accordance with applicable portions of Title 13 , Chapter 2 , Part 4 , MCA, 10 - 1 . 5 PREVAILING WAGE RATES On all projects and contracts with the Owner in excess of $25, 000 . 00, Contractor and all subcontractors shall pay for all labor employed the standard prevailing rate of wages - The standard prevailing rate of wages as used herein means that standard prevailing rate of wages in the locality where the work is to be performed as determined by the Montana Commissioner of Labor pursuant to MCA 18-2-402 and as bound herein. The Contractor and subcontractors are directed to the Montana Commissioner of Labor for information on the standard prevailing rate of wages applicable to this contract within this area. Article 11 . PERFORMANCE AND PAYMENT BONDS. The CONTRACTOR shall furnish a Performance Bond and a Payment Bond in favor of the OWNER each in an amount equal to one-hundred Percent (10o,5) of the Agreement amount , Article 12 . INSURANCE. Without limiting any of the other obligations or liabilities of the CONTRACTOR, CONTRACTOR shall ,secure and maintain such insurance from an insurance company (or companies) authorized to write insurance in the State of Montana, with minimum "A.M. Best Rating" of B+, VI, as will protect himself, his subcontractors, the Owner and their respective agents and employees from claims for bodily injury, death or property damage which may arise from operations and completed operations under this Agreement . Such coverage shall be written fax claims arising out of all premises/ operations, sub- contracted operations , products/completed operations, and all liability assumed by the CONTRACTOR under any contract or agreement . CONTRACTOR shall not commence work under this Agreement until such certified copies of the insurance policy shall have been filed with the OWNER. The City of Bozeman shall 7 be named as additional insured on any insurance certificates . All insurance coverages shall remain in effect throughout the life of the Agreement. Each insurance policy shall contain a clause providing that it will not be cancelled by the insurance company without 30 days written notice to the OWNER and Engineer of intention to cancel . The minimum amounts of such insurance coverages being as per Section SC-5 . 04 , Supplementary Conditions to the General Conditions, Montana Public Works Standard Specifications , Sixth Edition, and included herein: SC - 5 . 04 CONTRACTOR' S LIABILITY INSURANCE Add the following new paragraphs immediately after Paragraph 5 . 04 .B : C. The limits of liability for the insurance required by Paragraph 5 . 04 of the General Conditions shall provide coverage for not less than the following amounts or greater where required by Law or Regulations : 1 . Workers, Compensation, etc . under Paragraphs 5 . 04 . 1 and 5 . 04 . 2 of the General Conditions . a. State Statutory b. Applicable Federal (e .g. Longshoremans) Statutory c- Employer' s Liability $ 500, 000 . 00 2 . Contractor' s Liability Insurance under Paragraphs 5 . 04 .A.3 through 5 . 04 . A- 6 of the General Conditions which shall also include completed operations and product liability coverage. a. GENERAL AGGREGATE $ 3 , 000 , 000 . 00 b. Products-Completed Operations Aggregate $ 3 , 000 , 000 . 00 c . Personal and Advertising d. Each occurrence (Bodily Injury and Property Damage) $ 1, 000 , 000 . 00 e. Coverage will include : 1 . Premises - Operations 2 . Operations of Independent Contractor 3 . Contractual Liability 4 . Personal Injury 5 Products and Completed Operations 8 6 . Broad Form Property Damage will include explosion, collapse, blasting and underground where applicable . '7 . Per Project Aggregate Endorsement 3 . Automobile Liability under Paragraph 5 . 04 .A. 6 of the General Conditions : a . Bodily Injury: Each Person $ 500, 000 . 00 Each Accident $ 1, 000, 000 . 00 Property Damage : Each Accident $1, 000, 000 . 00 (or) b- Combined Single Limit $ 1 , 000, 000 . 00 Coverage to Include 1 , All Owned 2 . Hired 3 . Non-Owned 4 . Contractor' s Liability Insurance under 5 . 04 .A. 3 through 5 . 04 ,A- 6 may be satisfied by primary insurance or a combination of primary and excess or umbrella insurance . Primary occurrence limit cannot be less than $1, 000 , 000 . 00 . Deductible not to exceed $5, 000 . 00 per occurrence on property damage. 5 . Add a new paragraph at the end of Paragraph 5 . 04 -B. 1 of the General Conditions as follows : The Contractor' s insurance coverage shall name the Owner, and Engineer and Engineer' s Consultants as an additional insured under Commercial General Liability, Automobile Liability, Excess or Umbrella polices . G . The Contractual Liability coverage required by Paragraph 5 . 04 .B.4 . of the General Conditions shall provide coverage for not less than the following amounts : Each Occurrence $ 1, 000, 000 . 00 Aggregate $ 3 , 000 , 000 . 00 Article 13 . MISCELLANEOUS , 13 . 1 Terms used in this Agreement which are defined in the General Conditions shall have the meanings indicated in the General Conditions of the Montana Public Works Standard Specifications, Sixth Edition. 13 . 2 This Agreement and all of the covenants hereof shall inure to the benefit of and be binding upon the OWNER and the CONTRACTOR respectively and his partners, successors, assigns, and legal representatives . Neither the OWNER nor the CONTRACTOR shall have the right to assign, transfer or sublet his interest or obligations hereunder without written consent of the other party. The Owner reserves the right to withdraw at any time from any subcontractor whose work has proven unsatisfactory the right to be engaged in or employed upon any part of the Work. 13 . 3 In the event it becomes necessary for either party to this Agreement to retain an attorney to enforce any of the terms or conditions of this Agreement or to give any notice required herein, then the prevailing party or the party given notice shall be entitled to reasonable attorney' s fees and costs, including fees, salary, and costs of in-house counsel. 13 . 4 Any amendment of modifications of this Agreement or any provisions herein shall be made in writing and executed in the same manner as this original document and shall after execution become a part of the Agreement . 13 . 5 The CONTRACTOR hereby agrees to indemnify, defend, and hold the OWNER harmless from all claims and liability due to the activities of CONTRACTOR, their agents, employees, or both, in performing the work required. The CONTRACTOR is and shall perform this agreement as an independent contractor, and as such, is responsible to the OWNER only as to the results to be obtained in the work herein specified, and to the extent that the work shall be done in accordance with the terms, plans and specifications . The CONTRACTOR shall have and maintain complete control over all of its employees, subcontractors, agents and operations, being responsible for any required payroll deductions and providing required benefits , such as, but not limited to, workman' s compensation and unemployment insurance . 10 13 . 6 The Contractor agrees not to discriminate in the fulfillment of this Agreement on the basis of race, color, religion, creed, sex, age, marital status, national origin, or actual or perceived sexual orientation, gender identity or disability. The Contractor agrees this requirement shall apply to the hiring and treatment of the Contractor' s employees and to all subcontracts . 13 . 7 CITY OF BOZEMAN BUSINESS LICENSE All Contractors conducting work within the City of Bozeman are required to have a current Business License. Applications for Business Licenses may be obtained at City Hall, 121 N. Rouse Avenue, Bozeman, Montana. Article 14 . Special Provisions 14 . 1 Sidewalks shall be backfilled upon form removal with slopes not to exceed 1 :4 . Material removed during excavation may be used for backfill . If additional backfill is required the Contractor shall provide clean topsoil . Seeding of disturbed areas will not be required. 14 . 2 Contractor shall install 3" PVC sleeves under the sidewalks as shown on the plans . The cost of this work shall be considered incidental, no separate measurement and payment shall be made . IN WITNESS WHEREOF, the parties hereto have executed this Agreement the day and year first above written. KNI)t;�2— oelvele — (Co racto By Title - Montana Contractor Registration Number Special Fuel User Permit Number SEAL AND ATTEST: Citv of Bozeman (Owner) sy ... . Title City Manager SEAL AND % >« it Title \ : � "\ ��/ %6 12 2013 Miscellaneous Concrete Installations Exhibit B MEASUREMENT AND PAYMENT The quantities listed in the Bid Form are estimates for the purpose of bidding only. Payment to the Contractor will be made based on the actual satisfactorily completed work quantities measured in the field, Under the terms of this contract,the unit price as contained in this Bid Form shall be applicable to quantity overruns. The following measurement and payment sections do not necessarily name every incidental item required by the Contract Documents to complete the work. Cost of all such incidental items shall be included in the various related bid items. No separate measurement and payment shall be made for traffic control. Item 101: 6" Concrete anrons. This item is measured and paid for by the square feet of concrete aprons in place at the contract unit price bid for"6"concrete aprons". Price and payment is full compensation for all materials,excavations and removal and disposal of all deleterious materials as required, compaction of the subgrade, preparation of the gravel base, reinforcement installation, curing of concrete, all pre-molded mastic material for expansion joints, all equipment, tools, labor, and for the performance of all work and incidentals necessary to complete the item, and for the installation of compacted gravel backfill as necessary adjacent to the aprons. Item 201: 6"concrete sidewalk. This item is measured and paid for by the square feet of concrete sidewalk in place at the contract unit price bid for "6" concrete sidewalk". Price and payment is full compensation for all materials. excavations and removal and disposal of all deleterious materials as required, compaction of the ,subgrade, preparation of the gravel base, "Fibermesh" or approved equal reinforcement, curing of concrete, all pre-molded mastic material for expansion joints, all equipment, tools, labor. for the performance of all work and incidentals necessary to complete the item,.and for the installation of topsoil backfill as necessary adjacent to the sidewalk. Item 202: Integral curb and gutter remove and re 1 � This item is measured and paid for by the lineal feet of combined curb and gutter in removed and replaced at the contract unit price bid for "Integral curb and gutter remove and replace". Price and payment is full compensation for any sawcutfing and removal and disposal of existing concrete, for all materials, preparation of gravel base, curing of concrete, all pre-molded mastic material for expansion joints, all equipment, tools, labor, and for the performance of all work and incidentals necessary to complete the item, and for the restoration of any asphalt pavement damaged during construction, I MEASUREMENT AND PAYMENT Item 203: Detectable warning This item is measured and paid for by the square foot at the contract unit price bid for "Detectable warning". Price and payment is full compensation for furnishing and installing detectable warning panels in accordance with manufacturer's recommendation. Item 301: 4"concrete sidewalk. This Item is measured and paid for by the square feet of concrete sidewalk in place at the contract unit price bid for "4" concrete sidewalk". Price and payment is full compensation for all materials, excavations and removal and disposal of all deleterious materials as required, compaction of the subgrade, preparation of the gravel base, curing of concrete, all pre-molded mastic material for expansion joints, all equipment, tools, labor, and for the performance of all work and incidentals necessary to complete the item, and for the installation of topsoil backfill as necessary adjacent to the sidewalk. Item 302: Curb removal. This item shall be measured and paid for by the lineal foot(LF)at the unit price bid for"curb removal", which price and payment shall constitute full compensation for furnishing all materials, tools, equipment,labor, loading,hauling,disposal,and incidentals necessary to sawcut and remove and dispose of existing straight curbing, and for the restoration of any asphalt pavement damaged during construction. Item 401: 4"concrete sidewalk. This item is measured and paid for by the square feet of concrete sidewalk in place at the contract unit price bid for "4" concrete sidewalk". Price and payment is full compensation for all materials, excavations and removal and disposal of all deleterious materials as required, compaction of the subgrade,preparation of the gravel base,dowel installations, curing of concrete, all pre-molded mastic material for expansion joints, all equipment, tools, labor, and for the performance of all work and incidentals necessary to complete the item, and for the installation of topsoil backfill as necessary adjacent to the sidewalk. Item 402; Integral curb and gutier remove andTeplace. This item is measured and paid for by the lineal feet of combined curb and gutter in removed and replaced at the contract unit price bid for "Integral curb and gutter remove and replace". Price and i payment s full compensation for any sawcutting and removal and disposal of existing concrete, for all materials, preparation of gravel base., curing of concrete, all pre-molded mastic material for expansion joints, all equipment, tools, labor, and for the performance of all work and incidentals necessary to complete the item, and for the restoration of any asphalt pavement damaged during construction. Item 4th:): Detectable Waming. This item is measured and paid for by the square foot at the contract unit price bid for "Detectable warning". Price and payment is full compensation for furnishing and installing detectable warning panels in accordance with manufacturer's recommendation. 2 MEASUREMENT AND PAYMENT Item 404: Reset sign. Measurement of signs is per each sign reset. Payment will be made at the contract unit price bid per each sign reset. Such price and payment will be full compensation for all work and materials including dismantling and removal, resetting, furnishing and installing break away devices (if required), breakdown of foundation material and backfill of removal sites, .and all incidentals necessary to complete the work. 3 MEASUREMENT AND PAYMENT EXHIBIT A–BID FORM 2013 Miscellaneous Concrete Installations WORK LOCATION 1: 5519 Saxon Way NO I"FEINT UNIT UNIT PRICE QUANTITY TOTAL PRICE Fi ores Fi>t�res 101 6" Concrete S.F. $ `" 1,880 $ /0, aprons TOTAL BASE BID FORK LOCATION 1 $_ (TOTAL BASE BID WORK LOCATION I - WRITTEN WORDS) WORK LOCATION 2: 814 N. Bozeman Ave NO. ITEM UNIT UNIT PRICE QUANTITY TOTAL PRICE F/i ores Fi ores 201 6" Concrete S.F. $ 1870 � ,1� (� Sidewalk - ram 202 Integral curb and L.F. $ 24 - Gutter remove and Replace 202 Detectable S.F. s 42 '— g; Warning TOTAL BASE BID WORK LOCATION 2 1 "c` (TC?TAI, BASE Bll� WC1RK LOCATION 2 - WRITTEN WCJRI�S) WORD LOCATION 3: Parking Lot, SE Corner of Black Ave and Mendenhall St NO. ITEM UNIT UNIT PRICE QUANTITY TOTAL PRICE Fi ores Fi ores 301 4" Concrete S.F. $ `� 51 00* sidewalk 307 Curb removal L.F. 7 - TOTAL BASE BID WORK LOCATION 3 - 1146 4 y=/� . aV - ' Yo Cam " (TOTAL BASE BID WORK LOCATION 3 - WRITTEN 'WORDS) WORK LOCATION 4: Bozeman Public Library 676 E. Fain Street NO. ITEM UNIT UNIT PRICE QUANTITY TOTAL PRICE Fi lire Fi ores o 401 4" Concrete S.F. $ -'` 1,240 6 060 -- Sidewalk 402 Integral curb and L.F. $ 6 +'G? , Gutter remove and Replace 403 Detectable S.F. S 10 Warning 404 Reset sign Each 2 $ ,/3C) TOTAL BASE BID WORK LOCATION 4 $ {TOTTAL BASE I3ID WORK LOCATION 4 - RITTEi'1 WCDRIDSy TOTAL BASE BTO WORK LOCATIONS 1, 2, 3, AND 4: S �� (TOTAL BASE BID WORK; LOCATIONS 1, 13.. AND 4--- WRITTEN WORDS)