Loading...
HomeMy WebLinkAboutOption 2 - Swim Center RenovationCity of Bozeman Recreation / Aquatics Facility Feasibility Study / 12.27.2012 | Page 98 OPTION 2 - SWIM CENTER RENOVATION Opon 2: Swim Center Renovaon - Building Updates + Pool Extension Bozeman High School New Mul-purpose Removable Spectator Bleachers Building and 50 Meter Pool extended 10 feet to accommodate two (2) movable bulkheads New Entry, Lounge, Control Desk, Staff Office and New General and Bleacher Storage New Meet Management Room/ Moveable bulkheads shown posioned for 25 yard lap configuraon Renovated Life Guard Room 173 City of Bozeman Recreation / Aquatics Facility Feasibility Study / 12.27.2012 | Page 99 OPTION 2 - SWIM CENTER RENOVATION 174 City of Bozeman Recreation / Aquatics Facility Feasibility Study / 12.27.2012 | Page 100 OPTION 2 - SWIM CENTER RENOVATION 175 City of Bozeman Recreation / Aquatics Facility Feasibility Study / 12.27.2012 | Page 101 OPTION 2 - SWIM CENTER RENOVATION 176 City of Bozeman Recreation / Aquatics Facility Feasibility Study / 12.27.2012 | Page 102 OPTION 2A - SWIM CENTER RENOVATION Opon 2A: Swim Center Renovaon - Building Updates with No Change to the Pool Bozeman High School New Mul-purpose Removable Spectator Bleachers Building and 50 Meter Pool extended 10 feet to accommodate two (2) movable bulkheads New Entry, Lounge, Control Desk, Staff Office and New General and Bleacher Storage New Meet Management Room/ Moveable bulkheads shown posioned for 25 yard lap configuraon Renovated Life Guard Room 177 City of Bozeman Recreation / Aquatics Facility Feasibility Study / 12.27.2012 | Page 103 OPTION 2A - SWIM CENTER RENOVATION Opon 2A: Swim Center Renovaon - Building Updates with No Change to the Pool 178 City of Bozeman Recreation / Aquatics Facility Feasibility Study / 12.27.2012 | Page 104 OPTION 2A - SWIM CENTER RENOVATION Opon 2A: Swim Center Renovaon - Building Updates with No Change to the Pool 179 City of Bozeman Recreation / Aquatics Facility Feasibility Study / 12.27.2012 | Page 105 OPTION 2A - SWIM CENTER RENOVATION Opon 2A: Swim Center Renovaon - Building Updates with No Change to the Pool 180