Loading...
HomeMy WebLinkAbout13- Change Order No. 1 Lutey Construction change order for Laurel Glen Water Department Building LUTEDY CONS'rRUCTION' TEIE CRAFTSIVi[AN, INC. 420 S.13",Ave. Bozeman,MT 59715 Phone.(406)587-8892 Fax: (406)582-5727 February 26, 2013 CHAhIGE PROPOSAL FOR: City Of Bozeman Superintendent of Facility Services Attn: James Goehrung P.O. Box 1230 . Bozeman, MT 69716 Lutey Construction—The Craftsman, Inc.would appreciate your consideration to the requested change orders pertaining to the Laurel Glen Water Department Building Renovation project located at 5519 Saxton, Bozeman MT. Install conduit and 120Af 1-ir-lif for Owner provided nhone and data cablinct Install 3/4"conduit for Owner provided cabling Install duplex outlet for Owner Computer Install 20 amp single pole breaker Clean up Labor, Materials and equipment $241.39 ht flx�ture ballasts per Submittal Comments Upgrade ballasts Labor, Materials and equipment $140.00: TOTAL CHANGE PROPOSAL Total Material, Labor, Equipment $381.39 Overhead and Profit(15%) $57.21 State Tax(1%) $4,39 Total $442.99 tl City Manager Approval