HomeMy WebLinkAbout03-06-2013 Development Review Committee AgendaDEVELOPMENT REVIEW COMMITTEE
UPSTAIRS CONFERENCE ROOM,
ALFRED STIFF PROFESSIONAL BUILDING, 20 EAST OLIVE STREET
WEDNESDAY, MARCH 6, 2013
10:00 A.M.
ITEM 1. CALL TO ORDER
ITEM 2. PUBLIC COMMENT
• ithin the jurisdiction of the Development Review
Committee, not on this agenda. Three minute time limit per speaker.}
• Individual items will hav
{Limited to any public matter, w
e a public comment period at the end of Committee discussion.
EM 3. ONE WEEK REVIEW
/COA #Z-12316 (Krueger/Heaston)
ertificate of Appropriateness Application to allow the construction of
EM 4. SECOND WEEK REVIEW
Prel. Plat #P-13004 (Skelton/Murray)
tion to allow the subdivision of 2.4393
EM 5. INITIAL WEEK REVIEW
-13005 (Riley/Heaston)
n to allow the subdivision of 2.7172 acres into 5
M 6. INFORMAL REVIEW
Final Plat INF #I-13005 (Skelton/Johnson)
or advice and comment on the proposed layout of Baxter
m
EM 7. ADJOURNMENT
public. If you have a disability that requires assistance, please contact ADA
IT
1. Bozeman Gateway Building S SP
861 South 29th Avenue
* A Site Plan with a C
a restaurant/retail building with associated parking and related site improvements.
REVISED FLOOR PLAN TO ALLOW 10,000 SQ. FT. 2ND STORY.
IT
1. Meadow Creek Block 4, Lot 1 MaSub
Golden Sun Drive/Graf Street/South 27th Avenue
* A Major Subdivision Preliminary Plat Applica
acres into 11 single family residential lots with related site improvements.
IT
1. Panache Properties MiSub Pre-App #P
Kagy Boulevard near Sourdough Road
* A Minor Subdivision Pre-Applicatio
single-household residential lots. (First of a two week review.)
ITE
1. The Crossing @ Baxter Meadows
Lolo Way/Lemhi Trail Drive
* An Informal Application f
Meadows Major Subdivision Phase 4A including the removal of RSL designation fro
10 lots, the removal of two lots, and boundary line adjustments to 10 lots.
IT
T his meeting is open to all members of the
Coordinator, James Goehrung, at 582-3200 (voice) or 582-2301/582-2432 (TDD).
1