HomeMy WebLinkAbout00- Ferguson Meadows Subdivision
BEFORE THE BOZEMAN CITY COMMISSION
GALLATIN COUNTY, MONTANA
IN THE MATTER OF THE APPLICATION OF FLUIDYNE FINDINGS OF FACT
FOR FERGUSON MEADOWS SUBDIVISION, ON BEHALF AND ORDER
THE VECTOR GROUP LLC.
PURSUANT to the Montana Subdivision and Platting Act, Section 76-3-101 through 76-3-
625, Montana Codes Annotated, and the Bozeman Area Subdivision Regulations, Bozeman Area
Master Plan, and Bozeman Zoning Ordinance, the Bozeman City Commission reviewed the proposed
Preliminary Subdivision Plat for a 107 lot major subdivision as submitted in its original form by the
applicant on February 1, 2000, with the required supplementary plans and information provided on
February 1, 2000; February 25, 2000; March 8, 2000; and March 15, 2000, File #P-0004, to
determine if the information submitted meets the requirements of the Bozeman Area Subdivision
Regulations and the Montana Subdivision and Platting Act, and in addition, to listen to public
testimony concerning the application.
It appeared to the Bozeman City Commission that all parties wishing to appear and comment
were given the opportunity to do so, and as the City Commission was fully advised of all matters
having come before it regarding this application, makes the following Findings of Fact, as required:
FINDINGS OF FACT
1.
The application submitted by Fluidyne for approval to create Ferguson Meadows, a major
subdivision dividing 37.796 acres, owned by The Vector Group LLC, into 106 lots for single family
residential development and 1 lot for condominium development on property being a tract of land
shown on C.O.S. #1610, located in the NEY4 of Section 10, T.2S, R.5E, PMM, City of Bozeman,
Gallatin County, Montana, was made on February 1, 2000. The subject property has been annexed
into the corporate city limits, with the northern 34.466 acres zoned "R-2" (Residential Single Family,
Medium Density) and the southern 3.33 acres zoned "R-3" (Residential Medium Density). A1llots
in the subdivision are for residential purposes and other uses as allowed by the applicable zoning
regulations. The applicant did not request waivers trom the Environmental Assessment and
Community Impact Statement requirements or variances trom regulations.
1
II.
The comments of the Development Review Committee and various reviewing agencies, along
with those of Planning & Community Development Staff, were incorporated into a Staff Report,
including suggested conditions ofapproval, which was provided to the Bozeman Planning Board for
consideration at its March 7, 2000, regular meeting.
III.
The Bozeman Planning Board considered the application at its regular meeting on March 7,
2000. The Planning Board found that the application was properly submitted and reviewed under the
procedures ofthe Bozeman Area Subdivision Regulations and the Bozeman Area Zoning Ordinance.
Staff reviewed written public comment expressing concern regarding traffic impacts, wildlife habitat,
and loss of open space. Staff reviewed the Staff Report and reviewed the findings which justified the
conditions, noting especially conditions # 1, #2 and # 16 through #23 which address the State Historic
Preservation Offices' recommendation for a cultural resource survey of the site as there has been
none, and parkland and street improvements. During the review by the City Engineering Department
it was determined that due to poor Levels of Service on the intersection of North 19th Avenue/
Durston Road, traffic signal improvements for that intersection must be fully operational prior to
issuance of any building permits in the subdivision.
The applicants made a presentation in favor of the requested subdivision, and agreed to all
recommended conditions of approval. The applicants discussed the findings of its wildlife consultant
which concluded that what was thought to be the presence of black-tailed prairie dogs by a member
ofthe public was likely the Richardson's ground squirrel, a species found in high numbers in the area.
The applicants also indicated that they had retained an archeologist to conduct a survey ofthe site
to evaluate any historic and cultural features.
The Planning Board then opened the public hearing. One member of the public voiced
concern regarding the number of housing units approved for development in the northwest quadrant
of the City, heavy traffic in the area, and infrastructure not keeping up with development. Another
asked that the lot sizes be increased to match the adjacent Valley Unit Subdivision lots to the east.
Another sought clarification on access to the subdivision. Following a call for additional public input
and receiving no response, the Planning Board closed the public hearing.
Two members of the Planning Board expressed concerns regarding traffic impacts on West
Babcock Street. One member of the Planning Board expressed concern regarding the proposed street
2
. -. -----.
.-----.. --" -"
widths, traffic safety and emergency vehicle response times and discussed the need for: 1) shielded
interior street lighting and for the intersection lighting recommended in condition #22 to be shielded,
2) boulevard trees to be installed along Ferguson Avenue and maintained by the developer; and 3)
bicycle lanes to be incorporated into the designs for Ferguson Avenue, Durston Road, and West
Babcock Street improvements. The Planning Board formulated changes to conditions listed in the
Staff Report which addressed these concerns, and forwarded recommendations to the Bozeman City
Commission that bicycle lanes be incorporated into the eventual design improvements proposed for
Ferguson Avenue, West Babcock Street, and Durston Road, and that the Commission move with
haste to improve traffic conditions along West Babcock Street.
The Planning Board then voted on a motion regarding the subdivision. The motion, to
recommend approval of the subdivision with changes as discussed to conditions #2, #3, and #22,
passed on a vote of 4 for and 3 in opposition.
IV.
The application was considered by the Bozeman City Commission at its regular meeting on
March 20, 2000, at which time the recommendation of the Planning Board was reviewed by the
Planning & Community Development Department Staff. as well as recent findings provided by the
applicants' consulted archeologist which conclude there are no cultural resources on the subject
property that would be adversely affected by the development. The Bozeman City Commission
considered changes recommended by the City Attorney to condition #23 which requires the traffic
signal improvements for North 19th A venue/Durston Road to be fully operational prior to the issuance
of building permits in the subdivision. The Bozeman City Commission considered testimony trom
two members of the public, a real estate agent and a loan officer, in relation to the a need for
affordable housing within the city limits.
V.
The application was considered by the Bozeman City Commission and weighed against the
review criteria established by Statute, and found as follows:
A) PRIMARY REVIEW CRITERIA
1. Effects on Agriculture.
The development of this subdivision will remove land that has been used for hay rrom use.
There are no structures on the site. The community adopted master plan determined that the
most appropriate use for the property, once inrrastructure is available, is for residential uses
at urban densities.
2. Effects on Agricultural Water User Facilities.
3
..
The stream/ditch along Ferguson Road is not used to convey irrigation water, and its
relocation outside ofthe right-of-way for Ferguson Road should not impact flows. However,
the stream/ditch is used as a blow-off for the Fanner's Canal and, therefore, should be sized
accordingly. The irrigation ditch at the northeast comer of the property emerges from a
concrete pipe and flows north to a culvert and passes under Durston Road. The applicant has
worked with the one water right owner and has agreed to place the ditch within a
continuation of the piping across Durston Road north to the place of use. Appropriate
manholes for cleaning and maintenance are proposed. These changes will require the
applicant to obtain any necessary permits as well as written permission from the ditch
owner(s). Conditions which address the ditches are #10, #11, #12, #18, #25 and #26.
3. Effects on Local Services.
Water/Sewer: Water and sewer services can be provided by extensions of and connections
to existing main lines, and general capacity limitations for water and sewer facilities are not
anticipated by the Engineering Department staff as a result of the project. The design and
approval of water and sewer facilities is addressed in recommended conditions #13 through
#15. The Valley West Subdivision developers who installed the 12" water main in Durston
Road are attempting to create a payback district or SID to finance the improvements. Should
they succeed in creating a district, this development will be required to contribute to it on a
fair share proportionate basis as provided in condition # 15. Water mains are required to be
looped with each phase of the development. No building permits will be approved prior to
substantial completion and City acceptance of said improvements.
PoliceIFire: The development of the property will increase the likelihood of emergency
services being required, and response times may vary. The Assistant Chief of Police has
expressed concern over the Police Department's ability to provide adequate patrol coverage
in light limitations of manpower and the ongoing development. Intersection and interior
street lighting and provisions for sidewalks as recommended necessary public safety features
are addressed in conditions #3, #17, and #22.
Streets: The traffic analysis has been reviewed by Engineering Department staff and a need
for supplemental traffic data was indicated during the DRC review. Having reviewed the
supplemental traffic data, engineering staffhas not identified improvements beyond conditions
# 16 through #23. The supplemental analysis indicates that Durston Road (west ofN orth 19th)
and Babcock Street (west of Main Street) operate at Level of Service (LOS) "D" during the
peak hour. Chapter 16.18.050.D. 7 ofthe Bozeman Subdivision Regulations establishes LOS
"C" as the design objective, and that under no circumstances will less than a LOS "D" be
accepted. The need for improvements on both Durston and Babcock have long been
recognized, and developments have been approved with similar LOS. The City Commission
has recently directed engineering staff to retain a firm to appraise the value of right-of-way
necessary for Babcock as the first step in the condemnation process. Adequate right-of-way
for Durston Road will be provided with the subject proposal, as well as SID waivers for
improvements to Durston Road, Babcock Street, and Ferguson Avenue. Sidewalks will be
required along Durston Road and along Ferguson Avenue with each phase of the
development. The applicant has been advised of the possibility that a payback district may
be created for improvements to Ferguson Road.
Utilities: Appropriate easements will be obtained. Montana Power Company (MPC) and US
West requested no additional specific conditions be imposed upon the project at this time.
However, due to the recent deregulation of power services, there may be changes from
standard MPC policies which could delay the availability of utilities equipment for the
development.
4. Effects on the Natural Environment.
Natural Resource Conservation Service (NRCS) data suggests the presence ofTumer Loam,
a soil type that is neither hydric nor contains hydric inclusions. It is characterized as being
well- to moderately well-drained and having moderate infiltration. Field studies have
indicated a seasonal high groundwater depth ranging from 3 to 6 feet, and the applicant has
indicated there will be plat notes which indicate adequate construction precautions should be
taken. Applications have been submitted to the Natural Resource Conservation Service for
a 310 permit to relocate the stream/ditch and to the Army Corps of Engineers for a 404
4
--...-....-.-....---
~
pennit to address the disturbance of the stream. Conditions #25 and #26 will ensure review
by other agencies having jurisdiction. Covenants will address maintenance of storm water
facilities and noxious weeds as provided for in condition #3. Weeds will be controlled in
accordance with an approved Weed Control Plan (condition #4).
5. Effects on Wildlife and Wildlife Habitat.
Comments provided rrom Fish, Wildlife and Parks express general displeasure regarding the
relocation of streams to accommodate street layouts; however, acknowledge that the
proposed stream! ditch relocation, which includes specific measures to enhance the stream and
aquatic community, should preserve the health of the watercourse by avoiding runoff
containing sedimentation and pollution rrom the Ferguson A venue right-of-way. The 310 and
404 pennit will require the watercourse to meander, specific species ofplantings, and a small
channel incised in the bottom to provide enough water depth to sustain aquatic species.
Concerns expressed regarding the potential presence of black-tailed prairie dogs on the
property were addressed by the applicants' wildlife consultant which found no reliable
observations of prairie dogs or any evidence of prairie dog activity on the site.
6. Effects on Public Health and Safety.
Because the development will be serviced by municipal sewer, the threat of groundwater
degradation rrom onsite sewage disposal will be eliminated. Traffic safety concerns should
be ameliorated through mitigating conditions placed on the subdivision, and through ongoing
efforts to improve the vicinity transportation system. As per conditions, no building pennits
will be issued until inrrastructure (water, sewer, streets, sidewalks) improvements have been
completed and accepted for each phase or prior to the signal at the intersection of Durst on
RoadINorth 19th Avenue being operational.
ID COMPLIANCE WITH SURVEY REQUIREMENTS PROVIDED FOR IN PART 4 OF
THE MONTANA SUBDIVISION AND PLATTING ACT. The subdivision complies or will
comply with survey requirements ofthe Act.
0 COMPLIANCE WITH THE BOZEMAN SUBDIVISION REGULATIONS.
With conditions, the final plat will comply with the regulations.
ill COMPLIANCE WITH THE REQUIRED SUBDIVISION REVIEW PROCESS.
The meeting before the Planning Board and hearing before the City Commission have been
properly noticed, as required in the Subdivision Regulations. The notice was mailed to all
adjoining. property owners by certified mail on February 17, 2000, and the notice was
published in the Bozeman Daily Chronicle on February 20, 2000.
ill PROVISION OF EASEMENTS FOR THE LOCATION AND INST ALLA TION OF ANY
PLANNED UTILITIES. All utilities and necessary utility easements will be provided and
depicted on the plat per condition #24.
fl PROVISION OF LEGAL AND PHYSICAL ACCESS TO EACH PARCEL.
Legal and physical access to each parcel will be provided, and limited by appropriate no
access strips (condition # 19), rrom existing streets, and rrom a dedicated City standard streets
proposed through the subdivision.
VI.
Following the public hearing held on March 20, 2000, the Bozeman City Commission
concluded that the proposed subdivision complies with the Bozeman Area Master Plan, Bozeman
Area Subdivision Regulations, and the Bozeman Zoning Ordinance, if certain conditions were
imposed.
ORDER
5
....... ........... ". ................... .. ... . . ........"....~............... '. ... w.....................w..""..... ".'. ""..........,.,.,'.,'.,."...............""..,,..........
. ...... .... ". '. ...'.' ................................." ~.
IT IS HEREBY ORDERED that the Preliminary Subdivision Plat of Ferguson Meadows
Subdivision for The Vector Group LLC be therefore approved, subject to the following conditions:
GENERAL:
1. As recommended by the State Historical Preservation Office (SHPO), a professional
reconnaissance survey ofthe site shall be conducted by a qualified archeologist. The results
of said survey must be provided to both the Planning Department and SHPO, and the
subdivider shall provide a written statement outlining any recommendations ofSHPO and any
plans for inventory, study, and/or preservation and any mitigation planned to overcome any
adverse impacts, prior to the submittal of any infrastructure plans and specifications for
Engineering Department review.
2. The applicant shall sign and record with the County Clerk and Recorder's office an executed
Waiver of Right to Protest Creation of Special Improvements Districts (SID) for a city-wide
Park Maintenance District. The document recorded shall specifY that in the event an SID is
not utilized for parks maintenance, the developer agrees to participate in an alternate fmancing
method for the maintenance on a fair share, proportionate basis as determined by square
footage of property, taxable valuation of the property, traffic contribution from the
development or a combination thereof.
A detailed master plan for the public park, street frontage trees along Ferguson Avenue
(minimum 1 per 50 linear feet), and trail corridors, which indicates the proposed uses,
landscaping, irrigation, maintenance plan, phasing and type of improvements must be
provided to and approved by the Parks Division, and submitted to the Planning Department
as part of the final plat application. All improvements and maintenance must be to City
standards. The covenants must reflect that the homeowners association shall maintain the tot
lot, park corridor, street ftontage trees along Ferguson Avenue, and sidewalks within and
adjoining the park areas.
3. A property owners association shall be established and covenants recorded with the Final Plat
which specifically include the provisions ftom Section 16.34.030, as well as provisions for
owners association maintenance of the of all applicable open space, interior street lighting,
street ftontage trees along Ferguson Avenue, parks areas, park area landscaping, park area
pedestrian facilities, perimeter fencing, and storm water facilities.
4. Prior to final plat approval, a Memorandum of Understanding shall be entered into by the
Weed Control District and the subdivider for the control of county declared noxious weeds
and a copy provided to the Planning Department.
5. The Final Plat shall conform to all requirements of the Bozeman Area Subdivision Regulations
and the Uniform Standards for Final Subdivision Plats and shall be accompanied by all
required documents, including certification ftom the City Engineer that as-built drawings for
public improvements were received, a platting certificate, and all required and corrected
certificates. The Final Plat application shall include two (2) signed clothback (or equivalent)
copies; two (2) signed reproducible copies on a stable base polyester film (or equivalent); two
(2) digital copies on a double-sided, high density 3-1/2" floppy disk; and five (5) paper prints.
6. Conditional approval of the Preliminary Plat shall be in force for not more than three calendar
years, as provided by State statute. Prior to that expiration date, the developer may submittal
letter of request for the extension of the period to the Planning Director for the City
Commission's's consideration.
7. If it is the developer's intent to file the plat prior to the completion of all required
improvements (with the exception of water and sewer inftastructure), an Improvements
Agreement shall be entered into with the City of Bozeman guaranteeing the completion of all
improvements in accordance with the Preliminary Plat submittal information and conditions
of approval. If the Final Plat is filed prior to the installation of all improvements, the
developer shall supply the City of Bozeman with an acceptable method of security equal to
150% of the cost of the remaining improvements.
6
---------..----...-- ....--....---.-- ...-----.- -.-..,. ,..... -- ...-....... -----------
8. The plans and specifications for the project infrastructure must be adequately dimensioned
and clearly indicate the extent of all improvements proposed for each phase. The plans must
clearly show the location of and distinction between existing and proposed sewer/water mains
and easements, as well as nearby and proposed fire hydrants. All infrastructure improvements
required for each phase of the development including water and sewer main extensions, public
streets, curb and gutter, sidewalks and related storm drainage infrastructure improvements
shall be constructed or fmancially guaranteed prior to final plat approval for each phase. .
No building permits within any phase of development will be issued prior to completion
and City of Bozeman acceptance of said infrastructure improvements for that phase.
STORMWATER:
9. The Stormwater Drainage, Treatment and Grading Plan submitted must be approved by the
City Engineer. Detailed review of the stormwater plan will be part ofthe infrastructure plan
and specification review process.
All stormwater improvements needed for each phase ofthe development must be constructed
or financially guaranteed prior to filing the final plat for that phase. No building permits in a
given phase will be issued until the stormwater improvements are constructed and approved.
10. Stormwater generated by the proposed subdivision which discharges to a privately owned
ditch must have the written permission of the ditch owner.
11. The applicant shall provide evidence of written permission from the existing ditch owners for
any ditch that is to be abandoned prior to approval of the infrastructure plans ands
specifications.
12. Ditch relocation:
a. The Montana Department of Fish, Wildlife and Parks shall be contacted by the
Applicant regarding the proposed ditch/stream relocation and any required permits
(i.e., 310,404, Turbidity exemption, etc.) shall be obtained prior to approval of plans
and specifications or construction of the intended work.
b. Easements for the ditch and certification of ditch capacity shall be provided per
Section 16.14.050 of the Bozeman Subdivision Regulations.
c. A 35' minimum building setback from either side ofthe water course high watermark
shall be delineated on the final plat. The setback must account for any channel
meandering.
WATER AND SEWER:
13. Plans, Specifications and a comprehensive utilities design report for water and sewer main
extensions, prepared and signed by a Professional Engineer (PE) registered in the State of
Montana shall be provided to and approved by the City Engineer. Water and sewer plans shall
also be approved by the Montana Department of Environmental Quality. The applicant shall
also provide Professional Engineering services for Construction Inspection, Post-Construction
Certification, and preparation of mylar Record Drawings. Construction shall not be
initiated on the public infrastructure improvements until the plans and specifications
have been approved and a preconstruction conference has been conducted.
No building permits shall be issued prior to substantial completion and City acceptance
of all required public infrastructure improvements.
14. An occupancy or encroachment permit may be required by Gallatin County for location of
water and sewer mains within the right-of-way.
15. Water mains shall be fully looped with each phase of development. The applicant is also
advised that at the time of this writing, the installers of the 12 inch water main in Durston
Road adjacent to this development are attempting to create a payback district or an SID to
finance that improvement. Should either of those two options come into being, this
development will be required to contribute to it on a fair share proportionate basis.
STREETS. CURB/GUTTER AND SIDEWALKS:
7
- .. ,...... ,.---.-..--
. .
16. The applicant shall provide and record with the County Clerk and Recorder's Office executed
Waivers of Right to Protest Creation of Special Improvements Districts (and Rural
Improvements Districts where appropriate) for the following improvements:
a. Street improvements to West Babcock Street including paving, curb and gutter,
sidewalk and storm drainage facilities.
b. Street improvements to Durston Road including paving, curb and gutter, sidewalk and
storm drainage facilities.
c. Ferguson Avenue City standard improvements including paving, curb and gutter,
sidewalk and storm drainage facilities.
The document filed shall specifY that in the event an SID/RID is not utilized for the
completion of these improvements, the developer agrees to participate in an alternate
financing method (such as a payback district) for the completion of said improvements on a
fair share, proportionate basis as determined by square footage of property, taxable valuation
of the property, traffic contribution from the development or a combination thereof.
17. Subdivision streets shall be constructed to a full City standard, i.e., 37 feet from back of curb
to back of curb as part ofthe subdivision improvements. Pursuant to Section 16.14.040 of
the Bozeman Subdivision Regulations, sidewalks along all subdivision streets shall be installed
at the time of the installation of the street improvements, unless a variance is granted by the
City Commission..
Sidewalks along Ferguson Avenue and Durston Road will be installed and accepted or
fmancially guaranteed prior to the filing of the final plat for the adjacent phase. No building
permits will be issued prior to completion and City of Bozeman acceptance of the
sidewalk adjacent to that phase.
Plans and specifications for the public streets required for each phase of the development,
including curb, gutter, sidewalk and related storm drainage infrastructure improvements,
prepared by a Professional Engineer (P.E.) registered in the state of Montana shall be
provided to and approved by the City Engineer prior to initiation of construction. Stop signs
and street names will be required and reviewed with the plans and specifications.
The applicant shall also provide Professional Engineering services for construction inspection,
post-construction certification and preparation of mylar record drawings. Construction shall
not be initiated on the public street until the plans and specifications have been approved by
the City Engineer and a pre-construction conference has been conducted.
While the plat may be filed ifthe required infrastructure improvements are financially
guaranteed, no building permits shall be issued prior to substantial completion and
City acceptance of the required street, curb and gutter, sidewalk and stormwater
infrastructure improvements for each phase.
18. The applicant shall dedicate to the City one-half of a 100 foot right-of-way (50 feet) located
on the subject property for Ferguson Avenue, one-half of a 90 foot right-of-way (45 feet)
located on the subject property for Durston Road and one-half of a 90 foot right-of-way (45
feet) located on the subject property for West Babcock Street. The existing ditch along
Ferguson Avenue must be relocated outside of the right-of-way.
19. No direct access from individual lots to either Ferguson Avenue, West Babcock Street or
Durston Road will be permitted. One foot wide no access strips shall be depicted on the final
plat.
20. A detailed Traffic Study Report prepared by a qualified Traffic Engineer registered in the
State of Montana shall be provided to and approved by the City Engineer. The Report shall
address existing and projected traffic volumes on all internal and perimeter streets and level
of service evaluations for Durston Road and West Babcock Street. The analysis must
demonstrate that the levels of service specified in 16.18.050.D.7 are met. The report shall
8
--..-----..-
. ..
include recommendations for any off-site roadway improvements necessary to raise the levels
of service to that required.
21. The intersections of Durston Road with Sanders and Mineral Avenues shall be constructed
with 45 foot radii per the County Road Department. Any encroachment permits required by
the County for streets or other infrastructure shall be obtained prior to initiation of
construction. Evidence of the necessary permits shall be provided at the pre-construction
meeting.
22. Shielded luminaries (street intersection lights) will be required at the intersections of Durst on
Road and Ferguson Avenue and West Babcock Street and Ferguson Avenue. Aninterior
street lighting system, utilizing cut-off shields, shall be installed which meet safety
requirements of the Police Chief and the Director of Public Service.
23. The traffic signal improvements for Durston RoadlNorth 19th Avenue must be fully
operational prior to issuance of any building permits in this subdivision.
UTILITY EASEMENTS:
24. Easements for the water and sewer main extensions shall be a minimum of30' in width, with
the utility located in the center of the easement. In no case shall the utility be less than 10'
from the edge of the easement. Utility easements must be provided on the plan in the proper
locations as provided in Section 16.14.050.B. All required easements shall be provided prior
to final plat approva1.
MISCELLANEOUS:
25. If construction activities related to the project result in the disturbance of more than 5 acres
of natural ground, an erosion/sediment control plan may be required. The Montana
Department of Environmental Quality shall be contacted by the applicant to determine if a
Stormwater Discharge Permit is necessary. If a permit is required by the State, the Developer
shall demonstrate to the City full permit compliance.
26. The Montana Department of Fish, Wildlife and Parks, SCS, Montana Department of
Environmental Quality and Army Corps of Engineer's shall be contacted regarding the
proposed project and any required pennits (i.e., 310,404, Turbidity exemption, etc.) shall be
obtained prior to final plat approval.
This City Commission order may be appealed by bringing an action in the Eighteenth District
Court of Gallatin County, within 30 days after the adoption ofthis document by the City Commission,
by following the procedures of Section 76-3-625, M.C.A.
DATED this 17th day of Apri 1 . 2000.
BOZEMAN CITY COMMISSION
By: ~t3~
Marcia B. Youngman, ayor
(;f~J~
Robin L. Sullivan
Clerk of the Commission
9
.------.. ... .------