Loading...
HomeMy WebLinkAboutCIP materials combined Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Chris Kukulski, City Manager Anna Rosenberry, Finance Director SUBJECT: Adoption of the General Fund Capital Improvement Plan (CIP) for FY14-18 AGENDA ITEM TYPE: Action MEETING DATE: December 3, 2012 RECOMMENDATION: Adoption of the General Fund Capital Improvement Plan (CIP) for FY14-18. BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital Improvements Plan and submit it to the Commission by December 15th. In October and November, staff meetings and requests for General Fund capital items were discussed. The attached schedule contains the recommended Capital Improvement Plan. Project Descriptions and Information: We have made an effort to indicate how a capital project supports an identified Performance Measure or Workload Indicator for a department. These use the specific reference number (ie, WL01 for “workload indicator” or PM01 for “performance measure”) from the budget document. We can continue to refine and improve how this information is linked from the Annual Budget to the Capital Improvement Plan. Because there are so many different items in the General Fund CIP, we have prepared two different summary schedules: One listing the projects “Sorted by Funding Year and Rating” and, another listing the projects “Sorted by Department and Rating.” Revenues and Money Available: Last year’s CIP for the General Fund contained cash reserved for capital from the prior year’s budget savings. For FY12, FY13, and FY14, cash from budget savings has been assigned to help fund the MMIA Litigation/Settlement – and is therefore not available for capital investment. Until this dispute is resolved, we will not include any budget savings amount estimates for capital projects on these schedules. We have continued to develop the CIP working off a basic “% of general fund revenues dedicated to capital,” found towards the bottom of the Financial Summary sheet. As you know, during budget development, we will load all of the FY14 approved CIP items and then work to balance the budget, with capital, personnel, and operating costs in total. In planning for our two largest scheduled projects the following Revenues are added on the Financial Summary Sheet, critical to the projects moving forward: Plus: Bond Issue: Police & Municipal Court Facility Bond, FY15 $17,992,000 Plus: Mandeville Farm Developer/Land Contribution, FY15 $4.6 Million, FY16 $550,000 UNRESOLVED ISSUES: Recreation & Aquatics Feasibility Study: The City is currently underway with a Recreation and Aquatics Feasibility Study. The Study will inform how we move forward with the following listed CIP Items: GF055 – Bogert Gutter & Shell - $382,000 GF117 – Bogert Pool Heater - $100,000 GF183 – Bogert Pool Bath House Renovation/Reconstruction - $1.5 Million GF142 – Swim Center Pool Gutter & Edge Tiles, etc. - $400,000 GF182 – Swim Center Expansion - $1.2 Million GF137 - Swim Center Filtration System - $135,000 GF181 – Swim Center Deck Tile Replacement - $198,000 GF192 – Swim Center Ceiling Tile Replacement - $40,000 GF56 – Design & Construct a Community Recreation/Aquatics Center - $21 Million Because the results of the study are not complete, we have done our best to leave items in the same years as proposed in the past, and/or scheduled the most critical projects earlier in the plan years. We anticipate that the results of the study will be presented to the public and the Commission in January 2013, and could potentially change the timing and contents of these projects. Sale of Story Mansion: We have prepared the CIP assuming that the sale of the Mansion is completed in February 2013. In previous CIP’s, before the sale agreement was entered into, there were also projects related to rehabilitation and repair of the Mansion and Carriage House themselves. The Mansion Sidewalk Replacement – GF144 - $69,200 remains in the plan as an improvement to that Park property surrounding the Mansion and Carriage House. ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for FY14. Report compiled on: November 28, 2012 Attached: General Fund CIP General Fund CIP Criteria General Fund Criteria Criteria Rating Notes Project Score 1. Level of Service Up to 20 pts 20 - Corrects a health or safety hazard or prevents a critical breakdown of an existing city facility or equipment. 15 - Repairs, rehabilitates, or replaces physically deteriorated or functionally obsolete existing city facility or equipment. 10 - Brings an area up to the basic level of service as identified in an adopted city wide plan. 5 – Expands an approved City service. 0 – Other. 2. Operating Budget Impact Up to 10 pts 10 - Provides a significant decrease in city operating and/or maintenance expenses. 5 – Has a neutral or small impact on operating and/or maintenance expenses. 0 – Provides a significant increase in city operating requirements. 3. Service Area Up to 10 pts 10 – Direct Benefit to entire city. 5 – Direct benefit to roughly half city or indirect benefit to entire city. 2 – Direct benefit to small area of the city or indirect benefit to several areas. 4. Departmental Priority Up to 10 pts 10 – Critical to Department’s Mission 7 – High 3 – Moderate 0 – Questionable/Very Difficult to Complete 5. Commission Work Plan Up to 10 pts 10 – Identified project in Adopted Commission Work Plan 5 – Contributes to an indentified project in the Adopted Commission Work Plan. 0 – Not identified in Adopted Commission Work Plan. 6. Municipal Climate Protection (Municipal Climate Action Plan – MCAP) Up to 5 pts 5 – Is recommended by MCAP and will accomplish a stated MCAP goal. 3 – Will assist in meeting MCAP goal. 0 – No relation to MCAP. 7. Seasonal Use Up to 5 pts 5 – Year Round. 3 – Six to Eleven months per year. 1 – Five or fewer months per year. TOTAL Up to 70 pts. General Fund Capital Improvement PlanFinancial Summary Current YearFY13 FY14 FY15 FY16 FY17 FY18 UnscheduledProjected Beginning Balance Dedicated to CIP 473,320$             ‐$                         17,835$              136,635$            (14,327)$             190,488$               Plus:  General Fund Revenues Dedicated to CIP 1,380,000$         1,380,000$             1,393,800$        1,407,738$         1,421,815$         1,436,034$           ‐$                 Plus:  Bond Issue:  Police & Municipal Court Facility Bond 17,992,000$      Plus:  Mandeville Farm Developer/Land Contribution 4,600,000$        550,000$            Plus:  FY13 Assigned to Bogert Pool Repairs/Design 177,000$                Less:  Scheduled CIP Project Costs (1,853,320)$        (1,539,165)$            (23,867,000)$     (2,108,700)$        (1,217,000)$       (692,500)$            (25,361,800)$        Projected Year‐End Cash Dedicated to CIP‐$                     17,835$                   136,635$            (14,327)$             190,488$            934,022$               *  FY12 Budget Amendment AnticipatedAssumptions Made for Revenue Estimates:FY14 FY15 FY16 FY17 FY18Estimated Annual General Fund Revenues 23,000,000$          23,000,000$     23,230,000$      23,462,300$      23,696,923$         Estimated Growth in General Fund Revenues 0% 1% 1% 1% 1%Total Estimated General Fund Revenues 23,000,000$          23,230,000$     23,462,300$      23,696,923$      23,933,892$       Current Revenues Dedicated to CIP % 5.0% 6.0% 6.0% 6.0% 6.0%  Plus:  Increase Dedicated to Capital Improvements % 1.0% 0.0% 0.0% 0.0% 0.0%  Total % Dedicated to CIP 6.0% 6.0% 6.0% 6.0% 6.0%ProjectedProjectedTotal Estimated Revenues Dedicated to CIP 1,380,000$            1,393,800$       1,407,738$        1,421,815$        1,436,034$         30,000,00025,000,00020,000,00015,000,00010,000,0005,000,0000FY14 FY15 FY16 FY17 FY18 UnscheduledGeneral Fund  Projects & Equipment PROJ.DEPARTMENTPROJECT NAMEFY14FY16UnscheduledFY15RATINGFY17FY18CIP PROJECT FUND:General FundSorted by Funding Year and RatingGF053POLICEPOLICE CARS & VEHICLE EQUIPMENT REPLACEMENT$156,000$208,000$156,00063$208,000$156,000GF080I.T.REMOTE CLOSET SWITCHES, ROUTER AND WIRELESS AP REPLACEMENT$40,000$40,000$40,00050$40,000$40,000GF104FAC. MTC.ENERGY UPGRADES$30,000$30,000$30,00047$30,000$30,000GF062I.T.SERVER & PERSONAL COMPUTER (PC) REPLACEMENT$100,000$100,000$100,00045$100,000$100,000GF162FIRELIVE‐FIRE TRAINING PROP$10,000$10,000$10,00045$10,000$10,000GF103FAC. MTC.AMERICAN'S WITH DISABILTIES ACT (ADA) COMPLIANCE IMPROVEMENTS$15,000$15,000$15,00042$15,000$15,000GF031PARKSPARK IMPROVEMENT GRANTS$75,000$75,000$75,00037$75,000$75,000GF052POLICEUNMARKED VEHICLE REPLACEMENT PROGRAM$35,500$60,000$30,00063$33,000GF185ECONOMIC DEMANDEVILLE FARM PROJECT ‐ PHASE 1$150,000$4,600,000$550,00045GF170FAC. MTC.BOILER REPLACEMENT AT FIRE STATION #1$255,66562GF055RECREATIONBOGERT POOL GUTTER AND POOL SHELL REPAIRS$382,00057GF117RECREATIONBOGERT POOL HEATER$100,00055GF180RECREATIONLINDLEY CENTER RESTROOMS ADA UPGRADES$40,00052GF184I.T.WEB MAPPING$25,00046GF197I.T.SQL CLUSTER UPGRADE$10,00045GF197RECREATIONLINDLEY CENTER CLEAN AND SEAL BASEMENT$25,00039GF048PLANNINGCOPY MACHINE REPLACEMENT$25,00037GF176ATTORNEYELECTRONIC DISCOVERY SOFTWARE$65,00036GF115PARKSPARK VEHICLE REPLACEMENTS$28,000$30,000$60,00063$30,000$30,000GF194PARKSPARK ENTRANCE SIGNS$10,000$10,000$10,00037$10,000$10,000GF166POLICEPORTABLE RADIO REPLACEMENTS$48,000$49,50057$51,000$52,500GF010CEMETERYCEMETERY MOWER REPLACEMENTS$14,000$16,00025$16,000$16,000GF165POLICEPATROL MOTORCYCLE REPLACEMENTS$70,000$70,00066GF092PARKSPLAYGROUND EQUIPMENT$55,00037$60,000GF050POLICE/COURTPOLICE & MUNICIPAL COURT FACILITY$17,992,00065GF079I.T.NETWORK CORE SWITCHES$50,00050 PROJ.DEPARTMENTPROJECT NAMEFY14FY16UnscheduledFY15RATINGFY17FY18GF164FAC. MTC.REPLACEMENT OF IT AIR CONDITION UNIT AT PROFESSIONAL BUILDING$22,50049GF137RECREATIONSWIM CENTER POOL FILTRATION SYSTEM$135,00045GF139FAC. MTC.CITY HALL PHASE 3 SITE IMPROVEMENTS$45,00045GF188FAC. MTC.REPLACE BOILER AT BOZEMAN SENIOR CENTER$18,50042GF163ADMINCOPIER/PRINTER/SCANNER REPLACEMENT$18,00040GF187FAC. MTC.REPLACE WORN SIDING ON THE BOZEMAN SENIOR SOCIAL CENTER$25,00039GF030PARKSARTICULATING TRACTOR$110,00035GF189FAC. MTC.REFINISH THE ROOF ON THE GREEN STORAGE BUILDING AT THE SHOP COMPLEX$38,00030GF192RECREATIONBOZEMAN SWIM CENTER CEILING TILE REPLACEMENT$40,00030PW01PARKS/FAC. MTSHOPS FACILITY EXPANSION PLAN$10,000GF084PARKSPARKS RESTROOM UPGRADES$175,00037$175,000$40,000GF051POLICEANIMAL CONTROL VEHICLE$27,70060GF142RECREATIONSWIM CENTER POOL GUTTER & EDGE TILES, POOL RESURFACING, AND UNDERWATER LIGHTING REPLACEMENT$400,00047GF034PARKSLARGE DECK MOWER$50,00043$60,000GF083CEMETERYBACKHOE$110,00042GF157FAC. MTC.SENIOR CENTER ELEVATOR$65,00037GF116CEMETERYCEMETERY VEHICLE REPLACEMENTS$42,50034GF100PARKSTRACTOR WITH BUCKET$45,00033GF186FAC. MTC.REPLACE ENTRANCE LOCKS AT THE PROFESSIONAL BUILDING WITH FOB UNITS.$12,00027GF140RECREATIONLINDLEY CENTER PARKING LOT RENOVATION47$47,000GF171FAC. MTC.CITY HALL SITE DRAINAGE ON WEST SIDE OF BUILDING43$11,000GF181RECREATIONSWIM CENTER DECK TILE REPLACEMENT43$198,000GF065I.T.AERIAL PHOTOGRAPHY39$65,000GF130FAC. MTC.CITY HALL SITE IMPROVEMENTS ‐ PHASE 238$40,000GF190PARKS4‐WHEELER ATV REPLACEMENT37$13,000GF126RECREATIONTRUCK WITH PLOW36$23,000 PROJ.DEPARTMENTPROJECT NAMEFY14FY16UnscheduledFY15RATINGFY17FY18GF182RECREATIONSWIM CENTER EXPANSION$1,200,00046GF056RECREATIONDESIGN & CONSTRUCT COMMUNITY RECREATION/AQUATICS CENTER$21,000,00044GF144PARKSSTORY MANSION SIDEWALKS$69,20038GF183RECREATIONBOGERT POOL BATH HOUSE RENOVATION/RECONSTRUCTION$1,500,00037GF001FAC. MTC.PROFESSIONAL BUILDING ELEVATOR REPLACEMENT$65,60033GF111PARKSEAST GALLATIN REC AREA IRRIGATION REPAIRS$25,00028GF146PARKSLINDLEY PARK IRRIGATION SYSTEM$100,00028GF147PARKSSOFTBALL COMPLEX IRRIAGATION SYSTEM$110,00028GF108PARKSPARK SIDEWALK REPLACEMENTS$182,00027GF148PARKSBMX PARKING LOT$85,00025GF149PARKSEAST GALLATIN REC AREA PARKING LOT$60,00025GF151PARKSBEALL PARK BASKETBALL COURTS$18,00023GF191PARKSUPGRADE OF SOFTBALL COMPLEX LIGHTING$825,00022GF195PARKSAERATOR$17,00019GF196PARKSSKATE PARK REFURBISHMENT$35,00018GF168FAC. MTC.NEW CITY HALL BRICK FAÇADE REPAIR53GF064PLANNINGVEHICLE REPLACEMENT35$25,000Summary for  General Fund (69 items)Totals by year:$1,539,165 $23,867,000 $2,108,700$1,217,000$25,361,800FY14FY15FY16FY17UnscheduledFY18$692,500 PROJ.DEPARTMENTPROJECT NAMEFY14FY16UnscheduledFY15RATINGFY17FY18CIP PROJECT FUND:General FundSorted by Department and RatingGF163ADMINCOPIER/PRINTER/SCANNER REPLACEMENT$18,00040GF176ATTORNEYELECTRONIC DISCOVERY SOFTWARE$65,00036GF083CEMETERYBACKHOE$110,00042GF116CEMETERYCEMETERY VEHICLE REPLACEMENTS$42,50034GF010CEMETERYCEMETERY MOWER REPLACEMENTS$14,000$16,00025$16,000$16,000GF185ECONOMIC DEMANDEVILLE FARM PROJECT ‐ PHASE 1$150,000$4,600,000$550,00045GF170FAC. MTC.BOILER REPLACEMENT AT FIRE STATION #1$255,66562GF168FAC. MTC.NEW CITY HALL BRICK FAÇADE REPAIR53GF164FAC. MTC.REPLACEMENT OF IT AIR CONDITION UNIT AT PROFESSIONAL BUILDING$22,50049GF104FAC. MTC.ENERGY UPGRADES$30,000$30,000$30,00047$30,000$30,000GF139FAC. MTC.CITY HALL PHASE 3 SITE IMPROVEMENTS$45,00045GF171FAC. MTC.CITY HALL SITE DRAINAGE ON WEST SIDE OF BUILDING43$11,000GF103FAC. MTC.AMERICAN'S WITH DISABILTIES ACT (ADA) COMPLIANCE IMPROVEMENTS$15,000$15,000$15,00042$15,000$15,000GF188FAC. MTC.REPLACE BOILER AT BOZEMAN SENIOR CENTER$18,50042GF187FAC. MTC.REPLACE WORN SIDING ON THE BOZEMAN SENIOR SOCIAL CENTER$25,00039GF130FAC. MTC.CITY HALL SITE IMPROVEMENTS ‐ PHASE 238$40,000GF157FAC. MTC.SENIOR CENTER ELEVATOR$65,00037GF001FAC. MTC.PROFESSIONAL BUILDING ELEVATOR REPLACEMENT$65,60033GF189FAC. MTC.REFINISH THE ROOF ON THE GREEN STORAGE BUILDING AT THE SHOP COMPLEX$38,00030GF186FAC. MTC.REPLACE ENTRANCE LOCKS AT THE PROFESSIONAL BUILDING WITH FOB UNITS.$12,00027GF162FIRELIVE‐FIRE TRAINING PROP$10,000$10,000$10,00045$10,000$10,000 PROJ.DEPARTMENTPROJECT NAMEFY14FY16UnscheduledFY15RATINGFY17FY18GF079I.T.NETWORK CORE SWITCHES$50,00050GF080I.T.REMOTE CLOSET SWITCHES, ROUTER AND WIRELESS AP REPLACEMENT$40,000$40,000$40,00050$40,000$40,000GF184I.T.WEB MAPPING$25,00046GF062I.T.SERVER & PERSONAL COMPUTER (PC) REPLACEMENT$100,000$100,000$100,00045$100,000$100,000GF198I.T.SQL CLUSTER UPGRADE$10,00045GF065I.T.AERIAL PHOTOGRAPHY39$65,000GF115PARKSPARK VEHICLE REPLACEMENTS$28,000$30,000$60,00063$30,000$30,000GF034PARKSLARGE DECK MOWER$50,00043$60,000GF144PARKSSTORY MANSION SIDEWALKS$69,20038GF031PARKSPARK IMPROVEMENT GRANTS$75,000$75,000$75,00037$75,000$75,000GF084PARKSPARKS RESTROOM UPGRADES$175,00037$175,000$40,000GF092PARKSPLAYGROUND EQUIPMENT$55,00037$60,000GF190PARKS4‐WHEELER ATV REPLACEMENT37$13,000GF194PARKSPARK ENTRANCE SIGNS$10,000$10,000$10,00037$10,000$10,000GF030PARKSARTICULATING TRACTOR$110,00035GF100PARKSTRACTOR WITH BUCKET$45,00033GF111PARKSEAST GALLATIN REC AREA IRRIGATION REPAIRS$25,00028GF146PARKSLINDLEY PARK IRRIGATION SYSTEM$100,00028GF147PARKSSOFTBALL COMPLEX IRRIAGATION SYSTEM$110,00028GF108PARKSPARK SIDEWALK REPLACEMENTS$182,00027GF148PARKSBMX PARKING LOT$85,00025GF149PARKSEAST GALLATIN REC AREA PARKING LOT$60,00025GF151PARKSBEALL PARK BASKETBALL COURTS$18,00023GF191PARKSUPGRADE OF SOFTBALL COMPLEX LIGHTING$825,00022GF195PARKSAERATOR$17,00019GF196PARKSSKATE PARK REFURBISHMENT$35,00018 PROJ.DEPARTMENTPROJECT NAMEFY14FY16UnscheduledFY15RATINGFY17FY18PW01PARKS/FAC. MTSHOPS FACILITY EXPANSION PLAN$10,000GF048PLANNINGCOPY MACHINE REPLACEMENT$25,00037GF064PLANNINGVEHICLE REPLACEMENT35$25,000GF165POLICEPATROL MOTORCYCLE REPLACEMENTS$70,000$70,00066GF052POLICEUNMARKED VEHICLE REPLACEMENT PROGRAM$35,500$60,000$30,00063$33,000GF053POLICEPOLICE CARS & VEHICLE EQUIPMENT REPLACEMENT$156,000$208,000$156,00063$208,000$156,000GF051POLICEANIMAL CONTROL VEHICLE$27,70060GF166POLICEPORTABLE RADIO REPLACEMENTS$48,000$49,50057$51,000$52,500GF050POLICE/COURTPOLICE & MUNICIPAL COURT FACILITY$17,992,00065GF055RECREATIONBOGERT POOL GUTTER AND POOL SHELL REPAIRS$382,00057GF117RECREATIONBOGERT POOL HEATER$100,00055GF180RECREATIONLINDLEY CENTER RESTROOMS ADA UPGRADES$40,00052GF140RECREATIONLINDLEY CENTER PARKING LOT RENOVATION47$47,000GF142RECREATIONSWIM CENTER POOL GUTTER & EDGE TILES, POOL RESURFACING, AND UNDERWATER LIGHTING REPLACEMENT$400,00047GF182RECREATIONSWIM CENTER EXPANSION$1,200,00046GF137RECREATIONSWIM CENTER POOL FILTRATION SYSTEM$135,00045GF056RECREATIONDESIGN & CONSTRUCT COMMUNITY RECREATION/AQUATICS CENTER$21,000,00044GF181RECREATIONSWIM CENTER DECK TILE REPLACEMENT43$198,000GF197RECREATIONLINDLEY CENTER CLEAN AND SEAL BASEMENT$25,00039GF183RECREATIONBOGERT POOL BATH HOUSE RENOVATION/RECONSTRUCTION$1,500,00037GF126RECREATIONTRUCK WITH PLOW36$23,000GF192RECREATIONBOZEMAN SWIM CENTER CEILING TILE REPLACEMENT$40,00030 PROJ.DEPARTMENTPROJECT NAMEFY14FY16UnscheduledFY15RATINGFY17FY18Summary for  General Fund (69 items)Totals by year:$1,539,165 $23,867,000 $2,108,700$1,217,000$25,361,800FY14FY15FY16FY17UnscheduledFY18$692,500 CIP Project Fund General Fund PROJECT NUMBER GF001 DEPARTMENT FAC. MTC. PROJECT NAME PROFESSIONAL BUILDING ELEVATOR REPLACEMENT FY14 FY15 FY16 Unscheduled $65,600 DESCRIPTION OF PROJECT The elevator in the Professional Building is a three stop Otis elevator. The elevator was installed when the second floor was added in 1972. Since the City purchased the building re-modeling has occurred on both the main floor and second floor. The elevator is to the point where many technological improvements have been made in elevator technology and a change out would yield both improved service and some reductions in energy savings. While the elevator is still a safe system, there are some inherent problems with the operation of the elevator. Of the four elevators owned by the City, this system experiences the most downtime. One big problem is the leveling systems and the way the rails and tracks are mounted in the building. If someone loads the elevator heavy to one side or another the balance alarm will engage and the elevator has to be reset. A new car and track system would solve the nuisance trips associated with this elevator. ALTERNATIVES CONSIDERED Continue to maintain and adjust the elevator operating systems throughout the year. The current electronics for the building are also a source of increased vigilance on the system and the electrical components on the system had to be traced back this year on two occasions to determine the problems of uneven voltages associated with the system. ADVANTAGES OF APPROVAL A new car, rail system and control package would add to the reliability of the elevator operation and the address the accessibility requirements for a municipal building. Building energy demands would also benefit as the newer elevator systems have more energy saving features built into them. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: A new system would reduce some of the maintenance costs currently associated with this elevator. A new system would also include a number of technological improvements such as a solid state slow start motor yielding reduced energy costs associated with the high demand motors used in elevator systems. FUNDING SOURCES General Fund and Building Inspection Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:33 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF010 DEPARTMENT CEMETERY PROJECT NAME CEMETERY MOWER REPLACEMENTS FY14 FY15 $14,000 FY16 $16,000 Unscheduled DESCRIPTION OF PROJECT Ongoing mower replacement program developed to keep the cemetery mowers operating as needed. These mowers are the equipment used to complete the mowing of 53 Formal Turf Acres (Workload Measure WL04), and support the Cemetery Divisions's performance measures PM03 and PM04 - Mowing the cemetery and adjacent trails. ALTERNATIVES CONSIDERED Keep older mowers for extended periods of time. ADVANTAGES OF APPROVAL Less down time, Decreased repair /maintenance costs, High trade –in value, Increased productivity, Less emissions. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Routine maintenance, oil changes, fuel. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:25 LEVEL OF SERVICE (Up to 20):5 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):3 FY17 $16,000 FY18 $16,000 CIP Project Fund General Fund PROJECT NUMBER GF030 DEPARTMENT PARKS PROJECT NAME ARTICULATING TRACTOR FY14 FY15 $110,000 FY16 Unscheduled DESCRIPTION OF PROJECT The replacement of the 1992 MT articulating tractor, which does the bulk of the sidewalk snow removal for the Parks Division (WL08), encompassing over 10 miles of sidewalks and two routes to plow. ALTERNATIVES CONSIDERED Repair and maintain the 1992 MT as needed or explore the potential of sharing the costs of new Wacker/Neuson wheel loader machines with the Street Division. The Wacker/Neuson machines are a fairly new development in regards to sidewalk snow removal and can handle numerous implements as well. Waiting on costs from the Street Division. Rough estimate is around $52,000.00 ADVANTAGES OF APPROVAL Less down time and maintenance/repair costs, A new MT tractor will be able to support more implements, Less emissions and better fuel economy, Faster more efficient use of time. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Better fuel economy and less emissions= less maintenance costs and operating costs. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:35 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):3 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF031 DEPARTMENT PARKS PROJECT NAME PARK IMPROVEMENT GRANTS FY14 $75,000 FY15 $75,000 FY16 $75,000 Unscheduled DESCRIPTION OF PROJECT Contribute each year from the General Fund towards improving park infrastructure through implementation of park master plans. This grant program is a matching funds program in which the City receives a 1 to 1 match from the recipient. The Commission has established a formal grant policy by resolution. The number of Park Improvement Grants is tracked in department Workload Measure WL05, with 20 various grant projects underway in FY12. ALTERNATIVES CONSIDERED Handle park equipment and improvement requests on an adhoc basis, as various donors or service groups bring them forward. Allocate more or fewer dollars to the program. ADVANTAGES OF APPROVAL This matching funds program provides critical infrastructure to the park system by utilizing the talents of our community members through matching funds, donations, labor in lieu of and numerous specialized services. All of the above can be used as a match in this program ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: New infrastructure and facilities bring on increased maintenance and labor costs. The nature of each project funded will determine the continued costs. Some projects have very low ongoing costs, others have relatively higer costs. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:37 LEVEL OF SERVICE (Up to 20):10 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):7 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):3 FY17 $75,000 FY18 $75,000 CIP Project Fund General Fund PROJECT NUMBER GF034 DEPARTMENT PARKS PROJECT NAME LARGE DECK MOWER FY14 FY15 FY16 $50,000 Unscheduled DESCRIPTION OF PROJECT Replacement of the 1999 (in FY16) Toro 455 series mower, which is difficult to repair due to lack of parts (these mowers are not manufactured anymore). This mower is used in department weekly mowing (PM01-PM03). Mower in FY18 would be the addition of a large-deck sports turf mower, anticipated to be needed for additional land purchases from Park and Trail Bond and future annexations. The city currently maintains 125 acres of Formal Turf in the parks system (WL02). ALTERNATIVES CONSIDERED Continue to repair as break downs occur, Replace mowers as they breakdown, Lease mowers on a 3 - year program. ADVANTAGES OF APPROVAL Proper mowing of sports fields is imperative to safety. Regular replacement will reduce maintenance costs and decrease the number of breakdowns we have been experiencing. Well mowed parks are an important reflection on our City and how it is perceived by visitors and citizens. Having the right mower to do the job will ensure well mowed parks. New mowers will be more reliable, safer, productive, and will reduce the workload on the vehicle maintenance shop personnel. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Improve scheduling of mowing and increase crew efficiency because of reliable equipment. FUNDING SOURCES 100% General Fund. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:43 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):10 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):3 FY17 FY18 $60,000 CIP Project Fund General Fund PROJECT NUMBER GF048 DEPARTMENT PLANNING PROJECT NAME COPY MACHINE REPLACEMENT FY14 $25,000 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT The existing copy machine is expected to have a life of around 5 years given its intensive use, and was purchased in May 2008. The machine produces in excess of 250,000 copies per year. Repair and maintenance costs show a steady increase as wear continues. This request is for a replacement copier to meet the ongoing operational needs of the department, supporting all department workload measures for (WL01-WL32.) Incorporation of advanced scanning capability facilitates records management and customer service. ALTERNATIVES CONSIDERED Continue using current copier with an increasing frequency of down time and cost of repairs. ADVANTAGES OF APPROVAL The new copier will help contain operational costs due to maintenance. The copier is also utilized as a high capacity network printer and scanner for the department which brings some additional efficiencies in utilization of staff time in the preparation of reports, commission packets, and other materials. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: None, operating costs are already incurred with the current copier. Anticipated costs are expected to remain in line with current charges. Maintenance costs will increase annually without replacement. FUNDING SOURCES General Fund and/or Planning Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:37 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF050 DEPARTMENT POLICE/COURTS PROJECT NAME POLICE & MUNICIPAL COURT FACILITY FY14 FY15 $17,992,000 FY16 Unscheduled DESCRIPTION OF PROJECT The City recently participated in the 2011 Campus Master Plan for the Gallatin County Law and Justice Center site. This study reviewed and validated the prior estimated space needs for the City and County’s criminal justice functions and specifically the facility needs of the Bozeman Police Department and Municipal Courts to 2020 and 2025. The master plan determined that there is adequate space for the City and County’s law enforcement and courts functions on the site and recommends the construction of two new buildings; a combined courts building housing the District, Justice and Municipal Courts and a separate combined law enforcement building for the Sheriff and Bozeman Police. The plan did not address sequencing or recommend timing of the construction, but did determine that the law enforcement building could be built in phases (police or sheriff) as the needs of the City and County dictated. Presently we are negotiating a memorandum of understanding with the County that would identify a construction site, agree to a mutually beneficial ownership model, and allow us to proceed with the design of a municipal courts and police facility, either with or without the county. ALTERNATIVES CONSIDERED The existing building does not meet current building and life-safety codes for critical public safety facilities and is not adequate for remodel or additions. Previous studies discuss the operational needs of the departments and the lack of the existing space. They analyzed alternative site locations for this facility including 5 dedicated acres at the current L&J site and approximately 6 acres at the current BMX Park located at 5th and Tamarack. These other sites would provide for projected expansion capabilities, adequate parking and public space needs but would separate the City’s criminal justice functions from the County. ADVANTAGES OF APPROVAL The Police Department would have adequate room for existing staff – and projected staff for 15-20 years. Sufficient Municipal Court space would also be available. This facility would be programmed and built with the PD, Court, and Prosecution needs in mind from the beginning. The new site and building would provide secure parking for the City’s police vehicle inventory. Public areas, secured areas, office locations, and space adjacencies could be maximized for the best and safest utilization (as opposed to a retro-fit of an existing building). ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Not estimated at this time. Currently, the City pays facility costs to the County for our square footage at the L& J. We anticipate asking voters to approve an operating levy, if necessary, when approving the construction levy. FUNDING SOURCES General Fund: Land and Construction would be funded by a voter-approved levy. 20 year General Obligation Bonds would be issued. FY12 & 13: $500,000 each year for Design. FY15: $17,992,000 Land Purchase and Construction. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:65 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):10 ADOPTED CLIMATE PLAN (Up to 5):5 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF051 DEPARTMENT POLICE PROJECT NAME ANIMAL CONTROL VEHICLE FY14 FY15 FY16 $27,700 Unscheduled DESCRIPTION OF PROJECT FY16 - $27,700 to replace vehicle Asset 3230, 2004 Dodge 4-wheel drive with an expected mileage of 109,000. This vehicle will be replaced with a new extended cab, 4wd truck. The department responds to nearly 2,000 Animal Complaints each year (WL07). During the winter months, it is very difficult to navigate the city streets and transport animals to the Heart of the Valley Animal Shelter with a 2 wheel drive pickup and need to continue use of a 4wd vehicle. It is anticipated that this vehicle will begin accumulating repairs and increasing maintenance costs. Purchase of a new truck would ensure many years of service without incurring high maintenance costs. The current truck could be used by another city department, be sold at auction, or used as a trade in. Hybrid fuel vehicles will be examined for suitability to assignment. ALTERNATIVES CONSIDERED The purchase of a newer lease return vehicle is a viable option and one that should be looked at before a final decision to purchase is made. ADVANTAGES OF APPROVAL 4-wheel drive is important for 12-month access in difficult weather. 4-wheel drive vehicles are often used for evidence retrieval and transport. A flex-fuel vehicle would provide better gas mileage. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Reduction in costs expected. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:60 LEVEL OF SERVICE (Up to 20):17 OPERATING BUDGET IMPACT (Up to10):10 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):10 ADOPTED CLIMATE PLAN (Up to 5):1 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF052 DEPARTMENT POLICE PROJECT NAME UNMARKED VEHICLE REPLACEMENT PROGRAM FY14 $35,500 FY15 $60,000 FY16 $30,000 Unscheduled DESCRIPTION OF PROJECT FOR POLICE INVESTIGATION AND ADMINISTRATION VEHICLES. FY14 - New vehicle for support service administrative position. FY15 - Replace vehicle Asset #2617 and 2618 1998 Chevrolet Luminas used by our School Resource Officers which will have become maintenance intensive. FY16 - Replace vehicle Asset #3138 Chevy Impala which will have over 120,000. Purchase mid-size passenger vehicles, plus equipment, to replace high mileage cars currently driven by detectives and to provide safe and reliable emergency response vehicles. An additional Support Service Supervisory Position requires a vehicle with similar emergency response needs. This amount includes all the necessary vehicle equipment, with some current equipment being reused. Hybrid fuel vehicles will be examined for suitability to assignment. As feasible and appropriate, old cars are either rotated for use as travel cars for employees attending training, traded in, sold at auction or transferred to other divisions in the city. Unmarked vehicles are an essential item in the operation of the Bozeman Police Department, being the primary tool used by Detectives, School Officers, and department administration to assist and manage the 41,000 Response to Calls (workload measures WL02-WL34) each year. ALTERNATIVES CONSIDERED No safe and reliable alternatives have been identified. ADVANTAGES OF APPROVAL Would drastically reduce maintenance costs, mechanical concerns and provide many years of reliable service. Increased public safety and officer safety in providing mechanically sound emergency response vehicles, reduced risk and liability related to use of unreliable cars. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Reduction in maintenance costs and possible reduction in fuel costs. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:63 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):10 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):5 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 FY18 $33,000 CIP Project Fund General Fund PROJECT NUMBER GF053 DEPARTMENT POLICE PROJECT NAME POLICE CARS & VEHICLE EQUIPMENT REPLACEMENT FY14 $156,000 FY15 $208,000 FY16 $156,000 Unscheduled DESCRIPTION OF PROJECT This plan allows for a number of patrol cars to be replaced each year, including all of the necessary vehicle equipment (top lights, sirens, mobile data terminals, video cameras, electronic reporting / ticketing systems, etc.) Patrol vehicles are an essential item in the operation of the Bozeman Police Department, being the primary tool used for over 41,000 Response to Calls (workload measures WL02-WL34) each year. Police vehicles must be available for police patrol use 24 hours a day, 365 days a year. These vehicles are used to respond to both emergency and non-emergency calls for service, investigate accidents, conduct traffic enforcement and for general patrol duties. These patrol vehicles average approximately 20,000 miles annually. The table on the following page is an outline of the replacement schedule. ALTERNATIVES CONSIDERED None. ADVANTAGES OF APPROVAL This helps us plan for safe and reliable emergency response vehicles for patrol use, as well as projected lower annual maintenance costs due to lower annual miles driven per vehicle per year. This program would allow for the replacement of older, higher mileage patrol cars that become less reliable and more costly to repair. Equipment components mounted inside the car can sometimes be transferred from the old car to the new car, depending on the condition. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: These are replacements; recurring costs frequently decline as newer cars replace older ones. Maintenance costs have stabilized due to regularly scheduled service even though calls for service have increased and additional officers have been hired. Also, fewer miles are accumulating on the vehicles because the number of patrol vehicles has increased. Our projection is the useful life of each patrol car is being extended. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:63 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):10 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):5 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 $208,000 FY18 $156,000 Police Vehicle DetailsProject NumberCurrent MileageAsset #MakeFY14FY15FY16UnscheduledNotesFY17FY18GF053113,617335106 IMPALA$52,000Mileage Oct 2012112,370335006 IMPALA$52,000Mileage Oct 2012122,243328005 IMPALA$52,000Mileage Oct 2012107,124331105 EXPLORER$52,000Mileage Oct 2012115,841335206 IMPALA$52,000Mileage Oct 201278,185344008 IMPALA$52,000Mileage Oct 201277,345336907 IMPALA$52,000Mileage Oct 201229,728349909 IMPALA$52,000Mileage Oct 201233,6363498CHEVY LUMINA$52,000Mileage Oct 201260,016337007 IMPALA$52,000Mileage Oct 201225,801358911 IMPALAMileage Oct 2012$52,00022,463359011 IMPALAMileage Oct 2012$52,0008,667359511 IMPALAMileage Oct 2012$52,0004,363363012 IMPALAMileage Oct 2012$52,00050363112 TAHOEMileage Oct 2012$52,000.003,904362712 IMPALAMileage Oct 2012$52,000.0064362812 IMPALAMileage Oct 2012$52,000.00$156,000$208,000$156,000$208,000Totals$156,000 CIP Project Fund General Fund PROJECT NUMBER GF055 DEPARTMENT RECREATION PROJECT NAME BOGERT POOL GUTTER AND POOL SHELL REPAIRS FY14 $382,000 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT General Fund Budget $177,000 for this Item in FY13. The pool gutter system around the edge of the Bogert Pool is in disrepair. The gutter system is vital to the filtration system as it skims water from the pool and sends it to filtration. The pool shell is in need of replacement also. It is most efficient and economical to complete the gutter and shell projects together since they are connected and one project affects the other. This will replace the current concrete gutter system with a stainless steel gutter system and install a new plaster pool shell with a ceramic tiled whale logo to replace the 30 year old shell. This project would assist in making sure Aquatics classes aren't cancelled (PM08), reduce some of the current maintenance burdens (PM01), and mitigate some of the items contained in Risk Management reports - Aquatics Facilities (PM06). ALTERNATIVES CONSIDERED Build new outdoor leisure pool ADVANTAGES OF APPROVAL The USAquatics report stated that the above renovations will increase the life of the facility by an additional 30 plus years. This will benefit the community by keeping a historical icon in service, allowing community swim lessons and recreational swimming in an outdoor environment. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Reduced water use, Reduce Chemicals use, Reduce annual painting costs. FUNDING SOURCES 100% General Fund * General Fund Reserve $382,000 for this Item in FY12. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:57 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):9 SERVICE AREA (Up to 10):9 DEPARTMENT PRIORITY (Up to 10):9 COMMISSION WORKPLAN (Up to 10):10 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):1 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF056 DEPARTMENT RECREATION PROJECT NAME DESIGN & CONSTRUCT COMMUNITY RECREATION/AQUATICS CENTER FY14 FY15 FY16 Unscheduled $21,000,000 DESCRIPTION OF PROJECT Build a community center designed to create a visual connection between spaces and an openness that promotes community for all users. Aquatic Elements: Therapy pool, water slides, zero entry teaching area, river run, deep diving well, 25 yd lap pool. Fitness Elements: Indoor track, strength and cardio equipment, free weights, climbing wall. Gym Elements: Two multipurpose gym facilities and an indoor tennis court Multipurpose/Play Elements: Indoor playground and multipurpose rooms (one with a kitchen). This item was identified as a “Top Ten Capital Facility Recommendation” in the PROST plan, adopted October 2007. ALTERNATIVES CONSIDERED Implement plan in phases ADVANTAGES OF APPROVAL Community Benefits of a Community Center: Safe and healthy place for families to play; Connected families; Strong, vital, involved community; Support for youth at risk; and, Increased community programs. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual operating and maintenance costs to include additional Recreation Department staff: Cost undetermined at this time. We would recommend asking voters to approve a levy increase of operations, at the time we funded the capital improvements. FUNDING SOURCES General Fund, Bond Issue, Grants, etc. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:44 LEVEL OF SERVICE (Up to 20):10 OPERATING BUDGET IMPACT (Up to10):0 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):8 COMMISSION WORKPLAN (Up to 10):8 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF062 DEPARTMENT I.T. PROJECT NAME SERVER & PERSONAL COMPUTER (PC) REPLACEMENT FY14 $100,000 FY15 $100,000 FY16 $100,000 Unscheduled DESCRIPTION OF PROJECT This is a general item for replacement of personal computers and Servers for General Fund related jobs and services. (Enterprise and Special Revenue fund services pay for their own pc’s and servers.) As of FY10, Personal Computers’s moved to a 4 year rotation and servers continued to be minimal of a 5 year asset before replacement. PC Replacements are one of the primary drivers of Help Desk Calls (PM01 & WL01) - aging computers can have more software and technical conflicts, and replaced PC's often require user support for newer versions of software, etc. ALTERNATIVES CONSIDERED Not replace computer/server hardware as frequently. ADVANTAGES OF APPROVAL City technology needs will be better met and the IT department will be able to more efficiently support employees and citizens. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:45 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):7 SERVICE AREA (Up to 10):8 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 $100,000 FY18 $100,000 CIP Project Fund General Fund PROJECT NUMBER GF064 DEPARTMENT PLANNING PROJECT NAME VEHICLE REPLACEMENT FY14 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT Replacement of the current vehicle, a 1998 Nissan Sentra with 55,000 miles. This is a small car which works well for single or two person activities but does not have much cargo or personnel capacity. The vehicle is used by Planning Staff for site visits to projects, posting notices on-site, in-town meetings and other department activities (WL01-WL32) . Replacement would be with a fuel efficient small vehicle, possibly a hybrid. ALTERNATIVES CONSIDERED Continue to operate the existing vehicles with increasing maintenance costs. ADVANTAGES OF APPROVAL Provide functional transportation with reduced maintenance costs. Because of the age of the existing vehicle, maintenance costs are likely to increase to keep it functional. Recent repairs include power windows and routine maintenance. The vehicle needs numerous minor repairs, including dashboard lights, that continue to be deferred. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: No new costs are expected as maintenance is already performed on the existing vehicle. However, maintenance and repair costs are anticipated to increase due to the age of the vehicle. FUNDING SOURCES General Fund and/or Planning Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:35 LEVEL OF SERVICE (Up to 20):10 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 FY18 $25,000 CIP Project Fund General Fund PROJECT NUMBER GF065 DEPARTMENT I.T. PROJECT NAME AERIAL PHOTOGRAPHY FY14 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT Acquire aerial photography for the Bozeman planning area. Aerial photography benefits both the organization and the community by supplying a clear and accurate representation of current conditions. This information is used on a daily basis in all levels of our operations. We continue to experience unprecedented demand for digital imagery (i.e., staff reports, Commission presentations, water/sewer utilities, public requests, etc.). ALTERNATIVES CONSIDERED Use of lower resolution satellite imagery. Partnerships with other agencies. ADVANTAGES OF APPROVAL Contributes to on-going acquisition of photos at regular intervals for historical archives. Since 1987 we have not gone more than five years without an update. Measurements and land use determinations are made on a local or regional basis without requiring extensive field time. Aerial photographs are used extensively in several on-line and in-house mapping applications. Background information for existing and future GIS & CAD datasets and Facility Plans. Meets public demand for current and accurate aerial photography. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED There are no annual operating or maintenance costs associated with this project. FUNDING SOURCES General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:39 LEVEL OF SERVICE (Up to 20):13 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):7 DEPARTMENT PRIORITY (Up to 10):8 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):1 FREQUENCY OF USE (Up to 5):5 FY17 $65,000 FY18 CIP Project Fund General Fund PROJECT NUMBER GF079 DEPARTMENT I.T. PROJECT NAME NETWORK CORE SWITCHES FY14 FY15 $50,000 FY16 Unscheduled DESCRIPTION OF PROJECT This is a scheduled replacement of switches that provide the backbone of the entire network. These provide the technology platform for the entire organization. The switches at the Professional Building will be replaced in FY15. This equipment is critical to the City's technology network, suporting all of the department's performance measures related to system "uptime" (PM02- PM06) and workload measures related to number of hours the network and various software is "in service" (WL02-W06). ALTERNATIVES CONSIDERED Maintain current switches without critical support or maintenance. ADVANTAGES OF APPROVAL Continued maintaining network stability and ensure phone services and data without interruption. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: FUNDING SOURCES General Fund – with costs shared with Enterprise, as location warrants. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:50 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):10 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF080 DEPARTMENT I.T. PROJECT NAME REMOTE CLOSET SWITCHES, ROUTER AND WIRELESS AP REPLACEMENT FY14 $40,000 FY15 $40,000 FY16 $40,000 Unscheduled DESCRIPTION OF PROJECT Wan Site end of life replacements for switches and router throughout City to include City Hall, Professional Building, City Shops, Landfill, L&J, Library, WWTP, WTP, Swim Center, Beall Park, Cemetery. Smaller sites will be consolidated in one year. FY 14 – Swim Center, PD, FS 1,2,&3 Cemetery. FY 15 - Prof-Building, Vehicle Maint. This equipment is critical to the City's technology network, suporting all of the department's performance measures related to system "uptime" (PM02-PM06) and workload measures related to number of hours the network and various software is "in service" (WL02-W06). ALTERNATIVES CONSIDERED Maintain current switches without critical support or maintenance. ADVANTAGES OF APPROVAL Maintain uptime for all WAN locations throughout the City to include phone services as well as data. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES General Fund – with costs shared with Enterprise, as location warrants. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:50 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):10 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 $40,000 FY18 $40,000 CIP Project Fund General Fund PROJECT NUMBER GF083 DEPARTMENT CEMETERY PROJECT NAME BACKHOE FY14 FY15 FY16 $110,000 Unscheduled DESCRIPTION OF PROJECT This vehicle replaces the current cemetery backhoe that is used for burials an average of 2 times per week (WL01). This is the main piece of equipment utilized for cemetery burials. ALTERNATIVES CONSIDERED Continue to use older vehicle which is becoming unreliable and costly to maintain. Borrow from another department. ADVANTAGES OF APPROVAL Increased reliability and safety for staff and the families relying on cemetery services. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Operating and repair costs are expected to be lower than the existing vehicle. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:42 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF084 DEPARTMENT PARKS PROJECT NAME PARKS RESTROOM UPGRADES FY14 FY15 FY16 $175,000 Unscheduled DESCRIPTION OF PROJECT This project is the general replacement and upgrading of the City Park’s public restroom facilities. In order of priority: 1. Rose Park (new - FY16) – $175,000 2. BMX Park (new - FY17) - $175,000 3. Beall Park Restroom Refurb - $40,000. The replacement of the Lindley Park Restroom Facility was scheduled and funded in FY13, as the top replacement priority. The Project was put on hold, pending the outcome of the MMIA litigation settlement. At this point, we are assuming that that "hold" will be lifted and the Lindley Park Restroom will be replaced in Late FY13, early FY14. Doing a good job maintaining the 13 existing restrooms (PM21 & WL19) is critical to the enjoyment of park users. ALTERNATIVES CONSIDERED Continue to try to maintain existing facilities. The Rose and BMX Park projects will provide restroom facilities in areas where currently none exist. ADVANTAGES OF APPROVAL Ease of maintaining new restrooms, increased cleanliness of public facilities. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Operating and repair costs are expected to be lower than the existing facilities. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:37 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 $175,000 FY18 $40,000 CIP Project Fund General Fund PROJECT NUMBER GF092 DEPARTMENT PARKS PROJECT NAME PLAYGROUND EQUIPMENT FY14 FY15 $55,000 FY16 Unscheduled DESCRIPTION OF PROJECT The following playground equipment needs to be replaced due to its age and condition: Replacement will bring fully compliant ADA equipment and reduce safety and liability concerns. FY15– Christie Park, FY17– Beall Park. In general, safety recommendations for playgrounds address: playground site elements, sight lines, equipment features and materials, surfacing materials, hardware, paints and finishes, and any other hazards that might be present. Playground repairs require "same-day" response (PM11) given their critical safety implication. We currently maintain 24 playgrounds city-wide (WL10). ALTERNATIVES CONSIDERED Keep existing equipment in place. ADVANTAGES OF APPROVAL Increased safety for community members. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Minimal. FUNDING SOURCES 100% General Fund. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:37 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):5 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):3 FY17 $60,000 FY18 CIP Project Fund General Fund PROJECT NUMBER GF100 DEPARTMENT PARKS PROJECT NAME TRACTOR WITH BUCKET FY14 FY15 FY16 $45,000 Unscheduled DESCRIPTION OF PROJECT Replace the aging 1986 Ford tractor with a new tractor. This tractor will be used to broom the 4 ice rinks (WL12), move material, assist in fertilization (PM04-PM06) and will be used extensively with all three city-owned aerators. New price information is much less expensive than previously quoted. ALTERNATIVES CONSIDERED Continue to repair and patch up the Ford tractor as breakdowns occur. ADVANTAGES OF APPROVAL Less down time and maintenance/repair costs, A new tractor will be able to support more implements, Less emissions and better fuel economy, Faster more efficient use of time. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Better fuel economy and less emissions= less maintenance costs and operating costs. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:33 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF103 DEPARTMENT FAC. MTC. PROJECT NAME American's with Disabilties Act (ADA) COMPLIANCE IMPROVEMENTS FY14 $15,000 FY15 $15,000 FY16 $15,000 Unscheduled DESCRIPTION OF PROJECT Replace or install ADA upgrades in various city-owned buildings. Work examples include: door hardware, handrails, parking signage and stalls, building access, etc. Plans are in place to reestablish an ADA advisory committee in 2013 to provide recommendations to the city on priority order for any upgrades or improvements that we might make in order to make our facilities or programs more accessible. Having this money available to begin improvements will show our priorities have already been in place to address special needs concerns for the City of Bozeman. ALTERNATIVES CONSIDERED When remodels are initiated on buildings they are brought up to current ADA requirements as per regulations. There are changes to the ADA that took effect in March 2011. We will continue to make upgrades as changes are made to buildings but this budget item would accelerate the compliance for city buildings. ADVANTAGES OF APPROVAL It has been the policy of the city to meet the full spirit of the law as outlined in the ADA regulations. By taking the initiative to bring all our buildings up to current standards we can provide a positive example to the community in meeting the needs of people with restricted or limited mobility. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: No real costs foreseen with these improvements. Future costs could be reduced if the upgrades are made prior to any remodeling of the building FUNDING SOURCES 100% General Fund. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:42 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 $15,000 FY18 $15,000 CIP Project Fund General Fund PROJECT NUMBER GF104 DEPARTMENT FAC. MTC. PROJECT NAME ENERGY UPGRADES FY14 $30,000 FY15 $30,000 FY16 $30,000 Unscheduled DESCRIPTION OF PROJECT Install occupancy sensors in areas that are occupied at irregular times; install programmable thermostats; replace plumbing fixtures with low-water fixtures; replace single glaze windows with double glazed units. Work would occur on all city owned buildings after an analysis of the work that would have the best payback and energy savings. Some consultation with an electrical engineer would be needed to develop some energy modeling to determine which improvements would have the best payback. This funding is expected to become available just as our federal Energy Efficiency & Conservation Block Grant money has been fully utilized. ALTERNATIVES CONSIDERED Currently upgrades are made as equipment reaches its useful life. This approach would be more proactive, replacing Items that have a reasonable pay-back on energy savings. ADVANTAGES OF APPROVAL This work would be in line with the Mayor’s energy initiative. Some rebates are currently available through NorthWestern Energy which would help offset the cost of the change-outs. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Improvements that would result in the shortest payback would receive priority. Changes that would improve the work environment for employees and the public would also be given a priority. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:47 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):10 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):5 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 $30,000 FY18 $30,000 CIP Project Fund General Fund PROJECT NUMBER GF108 DEPARTMENT PARKS PROJECT NAME PARK SIDEWALK REPLACEMENTS FY14 FY15 FY16 Unscheduled $182,000 DESCRIPTION OF PROJECT Identified for replacement due to deteriorating cement, missing sections and heaving from weather and roots from trees. Approx $7/ square foot for rip and replace. New sidewalks must meet or exceed city code. Replacing the old sidewalk will result in a safer sidewalk year round and enable the sidewalks plows to better meet the snow removal municipal code in 12.24.020 (PM23). Project 1: $100,000 - Southside Park - replace 730' of sidewalk along South 5th Avenue and along West Alderson Street with new 6' (six foot) wide concrete sidewalk, and the related retaining wall. Project 2: $82,000 - Cooper Park - replace the sidewalk around the entire block. This sidewalk serves as a main route to and from the University. Approximately 1875' total. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Increased safety for community members. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: no estimate at this time FUNDING SOURCES General Fund. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:27 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):0 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF111 DEPARTMENT PARKS PROJECT NAME EAST GALLATIN REC AREA IRRIGATION REPAIRS FY14 FY15 FY16 Unscheduled $25,000 DESCRIPTION OF PROJECT Update and repair the irrigation and pump system that has been repeatedly damaged by construction of the restrooms and park expansion. A damaged system requires more repairs (PM07.) Wait until the Sunrise Rotary park development is completed. ALTERNATIVES CONSIDERED Not irrigate until construction and master plan implementation is complete. Patch together what we can of the existing system and irrigate some of the park. ADVANTAGES OF APPROVAL Efficiently irrigate the entire park Minimize labor due to potentially hauling hoses around. Shorten the time it takes to irrigate the park Irrigate at night-minimize evaporation, transpiration and vandalism to irrigation heads. Healthier turf ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Annual operating and maintenance costs would rise slightly, due to the upgrades of valves, rotor heads and electrical wire in the ground. These identified costs potentially could be offset by fuel, vehicle and manpower savings attributed to continual manual watering. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:28 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):3 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF115 DEPARTMENT PARKS PROJECT NAME PARK VEHICLE REPLACEMENTS FY14 FY15 $28,000 FY16 $30,000 Unscheduled $60,000 DESCRIPTION OF PROJECT Parks Department utilizes trucks for mowing, fertilization, irrigation, inspections, and repairs of the city parks (PM01 -PM23), comprising over 125 acres of formal turf and 220 acreas of natural parkland. Because these are not emergency response vehicles, they are replaced as funding becomes available. All trucks are utilized well beyond 150,000 miles, and until service related down- time for equipment and staff become problematic or safety is compromised. A detailed listing of the replacement plan is shown on the following page, with vehicle mileage updated October 2012. ALTERNATIVES CONSIDERED None. ADVANTAGES OF APPROVAL This insures safe and reliable vehicles for park use. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: These are replacements; recurring costs frequently decline as newer cars replace older ones. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:63 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):10 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):5 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 $30,000 FY18 $30,000 Parks Vehicle Replacements - DetailsProject NumberAsset #MakeModel YrCurrent MileageFY14FY15FY16UnscheduledNotesFY17FY18GF1151495GMC1988207,240$28,00010/2012 MILEAGE2691FORD1990188,83010/2012 MILEAGE$30,0005561FORD1997181,109$010/2012 MILEAGE$30,000.003251DODGE2001171,488$30,00010/2012 MILEAGE1266CHEVY1985145,088$30,00010/2012 MILEAGE– 3023DODGE (1 TON)200129,132$30,00010/2012 MILEAGE –$0$28,000 $30,000 $30,000 $30,000 $60,000Totals CIP Project Fund General Fund PROJECT NUMBER GF116 DEPARTMENT CEMETERY PROJECT NAME CEMETERY VEHICLE REPLACEMENTS FY14 FY15 FY16 $42,500 Unscheduled DESCRIPTION OF PROJECT Cemetery Vehicle Replacement Plan. The Cemetery Department utilizes 1-Ton trucks for operations and maintenance of the Sunset Hills Cemetery. Asset# 1213, 1989 1Ton 4x4, Estimated 45,000 miles, replace in FY16. This 1-Ton is critical to providing prompt burial services (loading and unloading dirt) roughly twice a week (WL01), and sanding/plowing cemetery roads (PM16). While it has relatively low mileage, the cost of repairs and its extremely low fuel economy (460 engine) drive our recommendation to replace this 27 year old vehicle. *Mileage as of 10/2012 ALTERNATIVES CONSIDERED None. ADVANTAGES OF APPROVAL This insures safe and reliable vehicles for cemetery use. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: These are replacements; recurring costs frequently decline as newer cars replace older ones FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:34 LEVEL OF SERVICE (Up to 20):10 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):5 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF117 DEPARTMENT RECREATION PROJECT NAME BOGERT POOL HEATER FY14 $100,000 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT The current boiler for Bogert pool is a 1946 380 million BTU heater. The boiler is unreliable half way through the season, locking out at night time. The replacement system will consist of four 200 thousand BTU heat exchangers, with a total of 800 thousand BTUs. They would be configured to run independently from each other, to increase the total efficiency. During the startup of the 2011 summer season the water maker was replaced and the asbestos was removed. This project would assist in making sure Aquatics classes aren't cancelled (PM08), reduce some of the current maintenance burdens (PM01), and mitigate some of the items contained in Risk Management reports - Aquatics Facilities (PM06). ALTERNATIVES CONSIDERED Continue using current boiler ADVANTAGES OF APPROVAL The new heat exchangers will decrease the amount of natural gas consumed by Bogert during the summer season. It will also increase the reliability of having the pool heated throughout the night, providing warm water for morning swim lessons. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Annual startup and winterization: $1000 FUNDING SOURCES 100% general fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:55 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):8 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):8 COMMISSION WORKPLAN (Up to 10):10 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):1 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF126 DEPARTMENT RECREATION PROJECT NAME TRUCK WITH PLOW FY14 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT New ¾ ton 4X4 gas or diesel double cab truck with a V-plow mounted on the front. This truck would assist with Swim Center parking lot snow plowing (PM04), which needs to be completed by 5:00am for early morning swimmers. ALTERNATIVES CONSIDERED Contract our plowing for the Swim Center: $1000/yr ADVANTAGES OF APPROVAL Be able to plow Swim Center lot, Asist in plowing of Story, Move 5 staff members at a time for Bogert start-up and shut-down, Pull kayak trailer to classes at East Gallatin pond, Replace 2 wheel drive truck with 151,000 miles. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:36 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 $23,000 FY18 CIP Project Fund General Fund PROJECT NUMBER GF130 DEPARTMENT FAC. MTC. PROJECT NAME CITY HALL SITE IMPROVEMENTS - PHASE 2 FY14 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT A general landscape plan was prepared for the building remodel. It included planting beds, irrigation upgrades for a dated system and modifications to provide water coverage for the revised site and better use of treated city water. Improvement items include: Irrigation upgrade and new irrigation lines to all parts of the site, Reclamation of the abandoned alley to the south of the City Commission meeting room, Trees to provide screening and shading on the south facing elevation, A storm water detention area on the north east end of the alley to protect the creek from site run-off and any added siltation, Planting beds and screening from the parking lot to the south of City Hall, Benches and or picnic tables for staff and citizen use, Better amenities for bike racks will also be included. If approved the landscaping plan will be presented to the Commission for final review and approval. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL The site improvements will add to the overall character of the building as an important municipal facility. Commitments were made in the LEED application for future site development that will address lower maintenance needs, less water use, and other green practices. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: The replacement of the irrigation system with a properly zoned system will make better use of treated city water. The landscape plan that has been initially developed for the site includes both native plantings and other vegetation requiring less water. FUNDING SOURCES 100% General Fund. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:38 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):3 FY17 $40,000 FY18 CIP Project Fund General Fund PROJECT NUMBER GF137 DEPARTMENT RECREATION PROJECT NAME SWIM CENTER POOL FILTRATION SYSTEM FY14 FY15 $135,000 FY16 Unscheduled DESCRIPTION OF PROJECT The current filtration at the Swim Center is a hazard to work in. Staff must climb into the filtration pit onto slick wood rails to scrub the filter grids on weekly bases. Once per month staff must climb to the bottom of the pit to clean out all old filter media, there is not a ladder the bottom of the pit so staff must swing from pipes to get to the bottom. The filter pit holds approximately 60,000 gallons of water, which gets flushed down the drain. A regenerative media system is a new media system that uses the same media that the Swim Center currently uses, which provides the cleanest water. The system is contained in a pressurized tank that will hold 400 gallons of water. To clean the staff will only be required to press a button, reducing the potential hazard. This project would assist in making sure Aquatics classes aren't cancelled (PM08), reduce some of the current maintenance burdens (PM01), and mitigate some of the items contained in Risk Management reports - Aquatics Facilities (PM06). ALTERNATIVES CONSIDERED Continue to use current system ADVANTAGES OF APPROVAL This project will decrease the work place hazards for staff, reduce staff time needed to clean filters, and replace media. The regenerative media system will also save approximately 700,000 gallons of water per year in cleaning. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Maintenance and Operating cost will be equal or less then current system. FUNDING SOURCES 100% General fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:45 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):7 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):7 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF139 DEPARTMENT FAC. MTC. PROJECT NAME CITY HALL PHASE 3 SITE IMPROVEMENTS FY14 FY15 $45,000 FY16 Unscheduled DESCRIPTION OF PROJECT Phase III will address some of the longer term site needs. Work proposed in this phase of improvements includes: an established path of travel through the parking lot from the parking area along Rouse to the entry sidewalk, resurfacing the parking lot and restriping will reduce annual maintenance costs, sections of sidewalk along Lamme are starting to deteriorate. Work on these sidewalk sections will be combined with the establishment of tree pits and drip irrigation. Current code calls for street trees approximately every 50 feet. The curb area around the creek crossing bridge on Lamme is an odd configuration that leads to water retention and freezing during the winter. Site security and pedestrian lighting will also be evaluated once a site plan and project costs are further refined. ALTERNATIVES CONSIDERED Certain components of Phase III will require coordination so that improvements do not get damaged with future work on the site. ADVANTAGES OF APPROVAL The site improvements will add to the overall character of the building as an important municipal focal point. The work proposed in Phase III will improve general pedestrian safety by getting people across the parking lot and address some of the deterioration sidewalk on the East Lamme side of the building. This area gets a good deal of pedestrian traffic for both City Hall and Hawthorn school. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Some additional costs will be incurred during the first few years as the plantings are starting to establish themselves on-site. The upgraded sidewalk areas will still need to be maintained, but a new walk will require less work to clear because the surface will be uniform and have the proper drainage slopes. Improvements to the parking lot will also reduce some of the overall annual maintenance costs. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:45 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF140 DEPARTMENT RECREATION PROJECT NAME LINDLEY CENTER PARKING LOT RENOVATION FY14 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT Seal and stripe the parking lot at the Lindley Center and include ADA parking stalls. Install parking lot lights and bases, a dumpster pad and dumpster enclosure fence. This project aligns with section 10.10.1 of the PROST plan (adopted October 2007) that recommends that City parks, recreation facilities and trails are accessible to the greatest extent possible. It would reduce some of the current maintenance burdens (PM07), and mitigate some of the items contained in Risk Management reports - Recreation Facilities (PM06). Includes permit fees. ALTERNATIVES CONSIDERED Sealing and striping lot and not installing lights ADVANTAGES OF APPROVAL Comply with city codes, allow for more cars to be parked in the lot at a time, more organized parking which will make the lot safer and reduced liability, lights will help with public safety and parking lot/facility security, ADA spots will be designated which will make the lot accessible, the dumpster would be enclosed. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual operating and maintenance costs to include stripping and periodic overlays. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:47 LEVEL OF SERVICE (Up to 20):13 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):9 COMMISSION WORKPLAN (Up to 10):5 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 $47,000 FY18 CIP Project Fund General Fund PROJECT NUMBER GF142 DEPARTMENT RECREATION PROJECT NAME SWIM CENTER POOL GUTTER & EDGE TILES, POOL RESURFACING, AND UNDERWATER LIGH FY14 FY15 FY16 $400,000 Unscheduled DESCRIPTION OF PROJECT The current Pool gutter tiles are from the original build in 1974. They are made of concrete and over the years have been eroded away and are becoming dangerously thin. The tiles are no longer made; the gutter will be replaced with a high impact plastic gutter system. The edge tiles around the pool will be damaged during the process, and they are also no longer available. A modern tile that will fit into the color scheme of the pool will replace them. $210,000 The pools current shell surface will be 10 years old in 2017. The average life span of pool surfaces is 10 years. Resurfacing of the pool is the best time to replace light fixtures. In the last resurfacing the crew was not monitored and the fixtures were installed incorrectly, therefore we have disconnected the lights from the electricity source for safety. Resurfacing of the pool will be with Diamond-brite, and the lights will be LED fixtures producing better light at higher efficiency then the 500W fixtures currently in place. Light and shell resurfacing combined price: $190,000 This project would assist in making sure Aquatics classes aren't cancelled (PM08), reduce some of the current maintenance burdens (PM01), and mitigate some of the items contained in Risk Management reports - Aquatics Facilities (PM06). ALTERNATIVES CONSIDERED Replace with stainless steel gutters ADVANTAGES OF APPROVAL Replace with stainless steel gutters ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:47 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):10 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF144 DEPARTMENT PARKS PROJECT NAME STORY MANSION SIDEWALKS FY14 FY15 FY16 Unscheduled $69,200 DESCRIPTION OF PROJECT Replace the damaged areas of sidewalk around the perimeter lot of the Story Mansion. Replacing the old sidewalk will result in a safer sidewalk year round and enable the sidewalks plows to better meet the snow removal municipal code in 12.24.020 (PM23). ALTERNATIVES CONSIDERED The current sidewalks are the standard 5 foot walkways. Areas of the sidewalk are showing signs of wear making it difficult to maintain in the winter. The turf areas on either side of the sidewalk are higher that the sidewalk which leads to snow and snow melt-off accumulation on the walk. The Parks Department has moved to 6 foot wide sidewalks so it can be cleared properly with the equipment we currently use for winter snow removal. ADVANTAGES OF APPROVAL Annual Operating and Maintenance Costs: Replacement of the walks will facilitate more efficient snow removal on the block. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:38 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF146 DEPARTMENT PARKS PROJECT NAME LINDLEY PARK IRRIGATION SYSTEM FY14 FY15 FY16 Unscheduled $100,000 DESCRIPTION OF PROJECT Completely replace the irrigation system at Lindley Park. The system is one of the oldest in the city. It is becoming common that the pipe and electrical wire are starting to fail on a regular basis. A damaged system requires more repairs (PM07.) It is important to keep this system working because Lindley is one of our most used parks, keeping the grass green before and after the Sweet Pea Festival, and it also a part of the cemetery irrigation system. ALTERNATIVES CONSIDERED Repair existing system as needed ADVANTAGES OF APPROVAL Healthier turf, grass will be green, not dormant in the summer Efficient use of the water (water conservation) Irrigate at night-minimize evaporation and transpiration Public safety, un-irrigated ground is hard and attracts gophers. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Annual operating and maintenance costs would rise slightly, due to the nature of valves, rotor heads and electrical wire in the ground. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:28 LEVEL OF SERVICE (Up to 20):10 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):5 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):3 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF147 DEPARTMENT PARKS PROJECT NAME SOFTBALL COMPLEX IRRIAGATION SYSTEM FY14 FY15 FY16 Unscheduled $110,000 DESCRIPTION OF PROJECT Replace the existing irrigation system at the softball complex. The system is 35 years old and starting to fail regularly. This is not only due to its age but because many of the lines were cut through and patched when the lighting system was installed. Work has been done to fix the curb stops from leaking by. A damaged system requires more repairs (PM07.) ALTERNATIVES CONSIDERED Continue to repair existing system ADVANTAGES OF APPROVAL Healthier turf, grass will be green, not dormant in the summer Efficient use of the water (water conservation) Irrigate at night-minimize evaporation and transpiration Public safety, un-irrigated ground is hard. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Annual operating and maintenance costs would rise slightly, due to the nature of valves, rotor heads and electrical wire in the ground. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:28 LEVEL OF SERVICE (Up to 20):10 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):5 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):3 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF148 DEPARTMENT PARKS PROJECT NAME BMX PARKING LOT FY14 FY15 FY16 Unscheduled $85,000 DESCRIPTION OF PROJECT Installation of parking lot at Westlake BMX park. ALTERNATIVES CONSIDERED Do not install a parking lot ADVANTAGES OF APPROVAL Also access for Childrens Memorial Park Accessible area to park Christmas tree dumping ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Minimal. Clean-up, possible snow plowing, painting lines every few years FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:25 LEVEL OF SERVICE (Up to 20):10 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF149 DEPARTMENT PARKS PROJECT NAME EAST GALLATIN REC AREA PARKING LOT FY14 FY15 FY16 Unscheduled $60,000 DESCRIPTION OF PROJECT Paving parking lot at the East Gallatin Recreation Area. ALTERNATIVES CONSIDERED Keep the parking lot gravel ADVANTAGES OF APPROVAL Reduced maintenance on the road. We would be able to plow the parking lot after all snow events. We now have to make sure the ground is frozen before we plow so the parking lot does not come up with the snow. No washboards and holes to trap water. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Minimal. Clean-up, possible snow plowing, painting lines every few years FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:25 LEVEL OF SERVICE (Up to 20):10 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF151 DEPARTMENT PARKS PROJECT NAME BEALL PARK BASKETBALL COURTS FY14 FY15 FY16 Unscheduled $18,000 DESCRIPTION OF PROJECT Resurface or tile the existing court. ALTERNATIVES CONSIDERED Leave it the way it is. ADVANTAGES OF APPROVAL Improved basketball courts that are level, safe and are an asset to the park. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:23 LEVEL OF SERVICE (Up to 20):10 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):3 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF157 DEPARTMENT FAC. MTC. PROJECT NAME SENIOR CENTER ELEVATOR FY14 FY15 FY16 $65,000 Unscheduled DESCRIPTION OF PROJECT The elevator at the Bozeman Senior Social Center is a three stop Otis elevator. The elevator was installed in early 1980. The elevator is to the point where many technological improvements have been made in elevator technology and a change out would yield both improved service and some reductions in energy savings. While the elevator is still a safe system, the elevator is used often due to the special needs of the members of the Senior Center. Planning ahead for the replacement of the elevator will be more cost effective and avoid unnecessary down time during the replacement process. ALTERNATIVES CONSIDERED Continue to maintain and adjust the elevator operating systems throughout the year. Wait to replace the elevator until it physically breaks down or continue to monitor the operation and hold off on the replacement until the routine repair and maintenance costs exceed acceptable limits ADVANTAGES OF APPROVAL A new car, rail system and control package would add to the reliability of the elevator operation and the address the accessibility requirements for a municipal building. Building energy demands would also benefit as the newer elevator systems have more energy saving features built into them. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: A new system would reduce some of the maintenance costs currently associated with this elevator. A new system would also include a number of technological improvements. FUNDING SOURCES General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:37 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):7 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):5 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF162 DEPARTMENT FIRE PROJECT NAME LIVE-FIRE TRAINING PROP FY14 $10,000 FY15 $10,000 FY16 $10,000 Unscheduled DESCRIPTION OF PROJECT This will complete the Fire training facility at the lower yards. It would be constructed of modular container units that will be configured and replaced when needed. This facility will be used year round. The following types of training would occur: Live Fire, Flashover, Ventilation, Forcible Entry, Confined Space, Hazardous Materials Response, and Trench Rescue. The facility would be available to the City Police Department for their training needs (Special Response Team, etc.) and to the Water and Sewer Department for continued Trench Rescue training. In recent budgets we have purchased the containers and have them stacked at the training site. The ongoing request is to begin and complete the passage doorways, roof props, burn rooms and eventually a standalone flash over prop. This project trains firefighters to respond to Fires (WL01), Reputure/Explosion (WL02), and Hazardous Conditions (WL04) and various other call types. It supports two department training performance measures (PM10 & PM11.) ALTERNATIVES CONSIDERED Continue with utilizing the existing site and Central Valley Fire training center out of the city and limited trips to Missoula to use their prop. ADVANTAGES OF APPROVAL Firefighters can train when on-duty, reducing overtime costs. Required for ISO compliance. This is one item that were recently marked down on in our latest ISO review. Located within the City Limits, firefighters would be close for call-outs. Available when needed (unlike Central Valley Fire site.) Shared facility with City Police and Water/Sewer Operations. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Operating costs are minimal and are within our existing operational budgets. FUNDING SOURCES 100% General Fund. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:45 LEVEL OF SERVICE (Up to 20):10 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):5 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 $10,000 FY18 $10,000 CIP Project Fund General Fund PROJECT NUMBER GF163 DEPARTMENT ADMIN PROJECT NAME COPIER/PRINTER/SCANNER REPLACEMENT FY14 FY15 $18,000 FY16 Unscheduled DESCRIPTION OF PROJECT Purchase of an ENERGY STAR rated Copier/Printer/Scanner to replace the oldest copier at City Hall, currently located in the City Clerk's office. This machine is used to print, scan and make copies for: Commission packets, general public requests and administrative/clerk staff, supporting all City Commission workload measures (WL1-WL9) and City Manager workload measures WL01, and WL04-WL08. At replacement time, this Konica Bizhub C550 machine will be approx 8 years old. The current machine is under a repair contract, but has recently required a lot of site-visits from the vendor. (This item was previously listed as "Finance Copier Replacement;" however, in FY13, the Finance Department copier was replaced with the Clerk's previous copier, when the Clerk's office moved upstairs. We've changed this item to simply replace the oldest copier in City Hall, where- ever it may be located at the time.) ALTERNATIVES CONSIDERED Utilize other machines throughout City Hall. ADVANTAGES OF APPROVAL The Clerk's Office will have a critical piece of office equipment available in our office for customer service. Energy star devices are more energy efficient than other non-rated machines ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: The replacement will be more energy efficient than the existing machine. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:40 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF164 DEPARTMENT FAC. MTC. PROJECT NAME REPLACEMENT OF IT AIR CONDITION UNIT AT PROFESSIONAL BUILDING FY14 FY15 $22,500 FY16 Unscheduled DESCRIPTION OF PROJECT Upgrade the aging air conditioner in the professional building's server room. Due to the migration to virtual servers, this piece of equipment is over-sized for today's uses. It is also out of warranty, so future repairs could be troublesome or difficult to accomplish. When in need of repair, this equipment is an "emergency" (PM01), due to its temperature control of critical IT equipment. ALTERNATIVES CONSIDERED Don't replace. ADVANTAGES OF APPROVAL The replacement will be significantly smaller and have reduced energy costs. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Assists in reducing the professional building's reoccurring energy costs. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:49 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):8 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):4 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF165 DEPARTMENT POLICE PROJECT NAME PATROL MOTORCYCLE REPLACEMENTS FY14 FY15 $70,000 FY16 $70,000 Unscheduled DESCRIPTION OF PROJECT FY15 - $70,000 will replace asset # 3112 and asset # 3154. This plan allows for our 2 primary patrol motorcycles to be replaced, including all of the necessary vehicle equipment (emergency lights, sirens, electronic reporting / ticketing systems, etc.) This program would replace older, higher mileage patrol motorcycles that become less reliable and more costly to repair. Equipment from the motorcycle can sometimes be transferred from the old motorcycle to the new motorcycle depending on the equipment’s condition. Patrol motorcycles are an essential item in the traffic enforcement division, used for a portion of the over 13,000 traffic stops, crashes, and citations each year (WL32-34.) These vehicles are used to respond to both emergency and non- emergency calls for service, investigate accidents, conduct traffic enforcement and for general patrol duties. ALTERNATIVES CONSIDERED None. ADVANTAGES OF APPROVAL This ensures safe and reliable emergency response vehicles for patrol use, as well as lower annual maintenance costs. For the traffic division to be effective, this equipment must be kept in top operating condition. Police motorcycles must be available for police patrol use during the day and when the city streets are clear enough to ride. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Maintenance costs are stable due to regularly scheduled service. Officers assigned to the motorcycle division are also assigned to their own motorcycle. This seems to reduce the wear on this equipment. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:66 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):10 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):10 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):3 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF166 DEPARTMENT POLICE PROJECT NAME PORTABLE RADIO REPLACEMENTS FY14 FY15 $48,000 FY16 $49,500 Unscheduled DESCRIPTION OF PROJECT This plan allows for 9 police portable radios to be replaced each year, including all of the software, programming and peripheral accessories. This is planned replacement of radios at the end of their predicted usable life, estimated between six and ten years. This will provide forseamless communication and response capabilities as the radios become less reliable and repair is no longer a financially prudent option. Portable (or hand-held) radios are an essential item in the operation of the Bozeman Police Department, being a critical communication tool used for over 41,000 Response to Calls (workload measures WL02-WL34) each year. Police radios must be available for police use 24 hours a day, 365 days a year. These radios are individually assigned, allowing for greater longevity, and department-wide communication in the event of a need for major response. ALTERNATIVES CONSIDERED None. ADVANTAGES OF APPROVAL This insures safe and reliable emergency communication and response. Program allows for a planned and predictable need for equipment replacement. Clear and dependable communication allows for quick and efficient deployment and the required level of officer safety. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:57 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):10 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):5 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 $51,000 FY18 $52,500 CIP Project Fund General Fund PROJECT NUMBER GF168 DEPARTMENT FAC. MTC. PROJECT NAME New City Hall Brick Façade Repair FY14 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT At least 6 areas of brick around windows at the new City Hall are showing signs of weather deterioration. Water has become trapped behind areas of the brick causing the brick to crack. Most of the window areas are close to the ground but on the west side of the building the windows are on the second floor and falling brick pieces have the potential to fall on people or parked vehicles in the staff lot. ALTERNATIVES CONSIDERED The problem is caused by water getting behind the brick and during the freeze thaw cycle, the brick gets cracked which allows even more water to penetrate. There is a spray on binder that will seal the brick and bind some of the cracks. It is a temporary fix because of some of the deterioration that has already occurred. The repair options include cutting away the front surface of the brick and binding a new brick face to the wall and re-grouting. The better solution is to remove the entire section of brick and replace it with a brick of similar appearance and providing for weep holes behind the brick to allow the water to not ADVANTAGES OF APPROVAL Securing the building envelope and preventing further deterioration of adjoining brick; preventing damage to vehicles or injuries to people from falling pieces of brick; improving the exterior appearance of the building. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Address other areas of the building if other surfaces of the building start showing similar problems. FUNDING SOURCES 100% general fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:53 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):6 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):5 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF170 DEPARTMENT FAC. MTC. PROJECT NAME BOILER REPLACEMENT AT FIRE STATION #1 FY14 $255,665 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT The old steam boiler at Fire Station #1 has reached the end of its useful cycle. The fact that the unit is no longer serving the old City Hall means that is working even less efficient because it is now oversized. The current plan was to replace the existing boiler with another steam boiler. When the steam lines were disconnected from old City Hall the condition of the pipes could be assessed. The pipes were found to be severely corroded and in poor condition. An engineer was hired to size the boiler for servicing only Fire Station #1 and to assess other features of the 1964 vintage system. Three options were proposed to upgrade the system for both building comfort and energy efficiency. The third option proposed in the study is the most efficient and has the best payback. This project significantly effects building occupant comfort/quality (PM05) and potentially generates emergency and non-emergency repairs (PM01-3). ALTERNATIVES CONSIDERED Replacement of the current boiler with another steam boiler is no longer an option after assessing the condition of the steam distribution lines and other components of the older system. Three options were reviewed and a summary report for each option was included in the analysis done by the engineer. The least expensive solution is to stay with a stem system. The project will now include boiler replacement, distribution line replacement, and changing out the old pneumatic controls with a digital control system. ADVANTAGES OF APPROVAL The proposed option will better address the variable heating needs of the building – work areas, living areas, and fire bays. The proposed system is designed for the current configuration of the building and could be supplemented to handle the additional square footage proposed when the dorm area of the station is increased. The proposed system is in line with the Municipal Climate Action Plan. Planning for the replacement of the current boiler prior to failure of the unit will be most cost effective. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED The recommended system would result in an approximate $9,000 per year in energy savings at current utility rates. The payback would be about 28 years. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:62 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):10 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):9 COMMISSION WORKPLAN (Up to 10):5 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF171 DEPARTMENT FAC. MTC. PROJECT NAME CITY HALL SITE DRAINAGE ON WEST SIDE OF BUILDING FY14 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT The drainage on the west side of the building at City Hall needs some re-grading to properly drain the lot. The roof drain and melting snow is ponding in the lot and accumulates in the ADA parking spot. Water needs to be diverted from the area from the public building entrance to the south. The work will involve removal of pavement, regrading, and repaving in order to drain properly. So concrete aprons may need to be added along the edge of the building to aid drainage. ALTERNATIVES CONSIDERED Phase II and Phase III improvements for City Hall are already listed in the Capital Improvements Budget. This work could be added into one of those phases. ADVANTAGES OF APPROVAL Proper drainage of the lot will reduce water ponding and during the winter icing in the lot. It will make the building access safer and improve the layout of the ADA parking space on the west side of the building. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Proper drainage will reduce the amount of time needed to make sure there is safe building access from the staff parking lot and reduce the risk of slip and falls. Proper drainage will also mean less hand shoveling and less sand and salting of the lot. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:43 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):8 SERVICE AREA (Up to 10):8 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 $11,000 FY18 CIP Project Fund General Fund PROJECT NUMBER GF176 DEPARTMENT ATTORNEY PROJECT NAME ELECTRONIC DISCOVERY SOFTWARE FY14 $65,000 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT Currently we have software that enables electronic discovery of email communications. We are lacking the ability to enable electronic discovery of other records. This item would buy the software to more efficiently respond to discovery requests for litigation support, trials (WL03 & WL04), DUI and domestic violence case prosecution (WL11-WL14) and requests for Confidential Criminal Justice Information (WL08). ALTERNATIVES CONSIDERED CONTINUE TO MANUALLY DISCOVER RECORDS ADVANTAGES OF APPROVAL ENSURES CITY WILL DISCOVER ALL REQUESTED RECORDS ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED $3600/ANNUALY FUNDING SOURCES 100 % General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:36 LEVEL OF SERVICE (Up to 20):8 OPERATING BUDGET IMPACT (Up to10):8 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):5 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF180 DEPARTMENT RECREATION PROJECT NAME Lindley Center Restrooms ADA Upgrades FY14 $40,000 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT This project will upgrade existing restrooms in the Lindley Center to be compliant with federal ADA guidelines, and City of Bozeman Building codes. The project will also replace materials, such as flooring and backsplashes, with products that are easily cleaned and do not harbor pathogens. This estimate includes architectural fees, permitting, and construction. This project would assist in making sure Recreation Programs aren't cancelled (PM08), reduce some of the current maintenance burdens (PM07), and mitigate some of the items contained in Risk Management reports - Recreation Facilities (PM06). ALTERNATIVES CONSIDERED As suggested by the commission ADVANTAGES OF APPROVAL *Brings restrooms up to current ADA requirements * Brings restrooms up to current City of Bozeman codes *Improves restrooms sanitary environment *Improves esthetics ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:52 LEVEL OF SERVICE (Up to 20):18 OPERATING BUDGET IMPACT (Up to10):8 SERVICE AREA (Up to 10):4 DEPARTMENT PRIORITY (Up to 10):8 COMMISSION WORKPLAN (Up to 10):8 ADOPTED CLIMATE PLAN (Up to 5):1 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF181 DEPARTMENT RECREATION PROJECT NAME Swim Center deck tile replacement FY14 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT The tile on the Bozeman Swim Center’s deck is the original tile. The grout has worn away in many places and the tile is cracked in many places. The tile pattern was a special order tile when the pool was constructed and we have none left. Replacement with a current, non-skid tile will not only increase the visual appeal of the facility, but will help reduce the number of slips that occur at the facility. This project would reduce some of the current maintenance burdens (PM01) and mitigate some of the items contained in Risk Management reports - Aquatics Facilities (PM06). ALTERNATIVES CONSIDERED Replace the deck in four sections, north($23,500), south($23,500), east($81,000) and west($70,000) deck. With the first deck being the east deck. ADVANTAGES OF APPROVAL Increase safety by installing non-skid tile ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:43 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):10 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 $198,000 FY18 CIP Project Fund General Fund PROJECT NUMBER GF182 DEPARTMENT RECREATION PROJECT NAME Swim Center Expansion FY14 FY15 FY16 Unscheduled $1,200,000 DESCRIPTION OF PROJECT The Swim Center expansion will increase the size of the lobby, create a secure front desk space, provide for private(Family) ADA changing rooms, bring all entrances up to current federal ADA codes, add a teaching/birthday party room, and provide office space for staff. This project would reduce some of the current maintenance burdens (PM01) and mitigate some of the items contained in Risk Management reports - Aquatics Facilities (PM06). ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL This project will provide space to meet the current needs and use of the Swim Center ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:46 LEVEL OF SERVICE (Up to 20):13 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):5 COMMISSION WORKPLAN (Up to 10):10 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF183 DEPARTMENT RECREATION PROJECT NAME Bogert Pool Bath House Renovation/Reconstruction FY14 FY15 FY16 Unscheduled $1,500,000 DESCRIPTION OF PROJECT This project will be for the renovation/reconstruciton of the bathhouse at Bogert Pool. The will bring the bathhouse up to current codes for plumbing, electrical, and structural. This will also bring the bathhouse up to current ADA standards. This project would reduce some of the current maintenance burdens (PM01) and mitigate some of the items contained in Risk Management reports - Aquatics Facilities (PM06). ALTERNATIVES CONSIDERED Full Remodel of Existing House ADVANTAGES OF APPROVAL Providing a safe, and up to code facility for the public ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:37 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):5 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):1 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF184 DEPARTMENT I.T. PROJECT NAME WEB MAPPING FY14 $25,000 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT Migrate existing web mapping applications to support future software releases. The City maintains several mapping sites, both internal & public. We have provided access to valuable information since 2002, with increased demand in recent years as the internet becomes more functional. The software program we use to create and manage these sites is being discontinued. An opportunity also exists to provide additional functionality through easy-to-use tools (e.g., basic analysis, reporting, etc.). ALTERNATIVES CONSIDERED Contracted professional services for custom application development. ADVANTAGES OF APPROVAL The City will continue to provide vital information to its employees & citizens. We will maintain substantial investments that have been made over many years. Additional functionality will be available to end-users, thus increasing the value of our information. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Maintenance (first year included) = $4,000.00 FUNDING SOURCES General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:46 LEVEL OF SERVICE (Up to 20):17 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):7 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):2 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF185 DEPARTMENT ECONOMIC DEVELOPMENT PROJECT NAME Mandeville Farm Project - Phase 1 FY14 $150,000 FY15 $4,600,000 FY16 $550,000 Unscheduled DESCRIPTION OF PROJECT Phase 1 Infrastructure Improvements for the Mandeville Farm Project, according to the Mandeville Property Land Use Plan. FY14 - Preliminary Engineering Report ($50,000) and SiteWork, with beginning of geo-tech and platting work. FY15 - Complete Geo- tech, Platting, Water, Sewer, Electrical, Fiber-Optic, Street, Curb, Gutter, Sidewalk, Stormwater infrastructure. FY16 - Signage, Landscaping, Trail & Bridge Work. Costs of infrastructure could be off-set by the sale of land in the development. This project is critical to the City's development of the Mandeville Farm Industrial Tax Increment District (Community Development workload indicator WL01) ALTERNATIVES CONSIDERED any ADVANTAGES OF APPROVAL Phase 1 development of the Mandeville Property – Commission Policy Initiative 2e on the adopted 2011-2012 Work plan. Development of the Mandeville property for job creation and industry diversification has been adopted as a commission priority. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED unknown FUNDING SOURCES The City is very actively pursing a Montana Department of Commerce Economic Development Grant, which would provide $450,000 (to be matched with $450,000 local dollars) for infrastructure improvements, most likely the FY15 tasks. Total potential sources of funding: General Fund, grant funding, private investment (leverage the land for infrastructure), bonding, TIF New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:45 LEVEL OF SERVICE (Up to 20):10 OPERATING BUDGET IMPACT (Up to10):0 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):10 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF186 DEPARTMENT FAC. MTC. PROJECT NAME Replace Entrance Locks at the Professional Building with Fob Units. FY14 FY15 FY16 $12,000 Unscheduled DESCRIPTION OF PROJECT There are 6 main entrance doors at the Professional Building on the south, north, and west sides of the building. The current door locks would be replaced with the radio frequency fob locks that are being used for other city buildings. ALTERNATIVES CONSIDERED Stay with the existing key locks. ADVANTAGES OF APPROVAL Replacement of the key locks with fobs would be consistent with the other locks that have been installed on all new city projects. This is one of the last primary city buildings that is not equipped with the fob units. These locks would allow for easier access for the various employees and multiple departments that occupy the building. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% general fund unless the building department fund would be charged separately for a portion of the cost. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:27 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):0 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF187 DEPARTMENT FAC. MTC. PROJECT NAME Replace Worn Siding on the Bozeman Senior Social Center FY14 FY15 $25,000 FY16 Unscheduled DESCRIPTION OF PROJECT The original siding on the Senior Center is wide flat boards installed in a clap board pattern. The board are showing signs of wear and many are split and exposing the underlayment. Areas of the building that were damaged in the 2010 hail storm were resided with a cement based siding that is more durable. While the current siding does add character to the building it will be difficult to replace or refinish and the proposed material will be more durable. ALTERNATIVES CONSIDERED Repair, replace, and repaint the existing wide board siding. ADVANTAGES OF APPROVAL Install a more durable type of siding that will seal the building envelope and provide for a material that will have a longer life. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Long term maintenance costs will be reduced. FUNDING SOURCES General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:39 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF188 DEPARTMENT FAC. MTC. PROJECT NAME Replace Boiler at Bozeman Senior Center FY14 FY15 $18,500 FY16 Unscheduled DESCRIPTION OF PROJECT There are two hot water boilers at the Bozeman Senior Social Center. One boiler was replaced about 3 years ago. The other boiler from about 1989 is now assigned as a back-up boiler. The older unit is having problems firing and will often not come on. The boiler would be replaced with a high efficiency combustion boiler and the other unit would then be used as the back-up unit. ALTERNATIVES CONSIDERED Work is being done right now on the old unit to get the venting and firing to function property so that we can continue to use the unit for awhile. ADVANTAGES OF APPROVAL Replacing the older unit will give us a reliable more cost effective boiler which will help with both comfort levels (PM04) and efficiency. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Reduced maintenance and operating costs from less energy use. FUNDING SOURCES 100% general fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:42 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):5 FREQUENCY OF USE (Up to 5):3 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF189 DEPARTMENT FAC. MTC. PROJECT NAME Refinish the Roof on the Green Storage Building at the Shop Complex FY14 FY15 $38,000 FY16 Unscheduled DESCRIPTION OF PROJECT The Green Building used for vehicle and equipment storage has a metal roof that is has been leaking at the seams of the metal panels. The interior ceiling shows lots of areas where leaks are occurring. There is a new technique where a plasticized material is sprayed on the roof which will seal all the seams and cover the existing metal roof material. The roof is power washed, seams are sealed and the spray material is applied. ALTERNATIVES CONSIDERED Remove and replace all the existing metal roof panels. There is also an option of spraying on a layer of insulation and then spraying on the roof finish. Rather than applying the insulation on the roof, once the roof is sealed the insulation on the ceiling and some ventilation for condensation will need to be installed. ADVANTAGES OF APPROVAL The spray on material will cost less than removing all the panels which are showing no signs of rusting. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED As mentioned after the roof is sealed, he ceiling of the building will need to be removed and new insulation and sheet rock will need to be installed. FUNDING SOURCES General Fund and other departments that occupy the shop complex and store equipment in the building could be charged for the cost of the repairs. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:30 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF190 DEPARTMENT PARKS PROJECT NAME 4-Wheeler ATV Replacement FY14 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT Replace the ATV (2000 Yamaha Grizzley) used for sidewalk snow removal (WL08 - approx 10 miles) and is the main piece of equipment that is used to spray approx 300 acres with herbicides and biostimulants for the Parks Division (WL13-14.) ALTERNATIVES CONSIDERED Continue to use the 2000 Yamaha Grizzley and repair as needed. ADVANTAGES OF APPROVAL Maximize efficiency, minimize down time, proactive replacement of aging equipment. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Routine maintenance FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:37 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 $13,000 FY18 CIP Project Fund General Fund PROJECT NUMBER GF191 DEPARTMENT PARKS PROJECT NAME Upgrade of Softball Complex Lighting FY14 FY15 FY16 Unscheduled $825,000 DESCRIPTION OF PROJECT Replace the current lights at the Softball Complex with appropriate stadium lights. Estimate provided by MUSCO, would be bid at the time of construction. Existing lights have light spillage and this is the only way to make the lights Dark Skies Compliant. ALTERNATIVES CONSIDERED Keep existing lights ADVANTAGES OF APPROVAL The new lights can offer 50% less light spillage and glare and reduce energy costs by up to 50%. Additionally, upgraded lights could help to reduce or eliminate complaints regarding light pollution. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Reduction in electrical use. FUNDING SOURCES 100% General Fund, or fundraising by user groups - Cost estimates range from $750,000 to $825,000 in August 2012. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:22 LEVEL OF SERVICE (Up to 20):10 OPERATING BUDGET IMPACT (Up to10):6 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):0 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):1 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF192 DEPARTMENT RECREATION PROJECT NAME Bozeman Swim Center Ceiling Tile Replacement FY14 FY15 $40,000 FY16 Unscheduled DESCRIPTION OF PROJECT This Project will replace all of the ceiling tiles above the pool at the Bozeman swim Center. Most of the tiles are from the original construction. They have lost their reflective ability, limiting the amount of light reflected down into the pool. Replacement of the tiles will increase the visibility on the bottom of the pool and increase public safety thereby mitigating an element of Risk Management reports - Aquatics Facilities (PM06). ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Increase safety of swimmers by reflecting more light off the ceiling tiles. This will also increase the aesthetics of the facility. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:30 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF194 DEPARTMENT PARKS PROJECT NAME Park Entrance Signs FY14 FY15 $10,000 FY16 $10,000 Unscheduled $10,000 DESCRIPTION OF PROJECT A five year project to replace existing park signs and add park entrance signs where none currently exist with an updated, identifiable, uniform, maintenance-free park sign. This project would provide for approximately 5 double-sided signs per year. ALTERNATIVES CONSIDERED Continue to make our own wooden routered park signs. ADVANTAGES OF APPROVAL A uniform signing system creating easily identifiable park properties, continuity, and reduction in labor costs due to constant upkeep of our wooden signs. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED None FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:37 LEVEL OF SERVICE (Up to 20):10 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 $10,000 FY18 $10,000 CIP Project Fund General Fund PROJECT NUMBER GF195 DEPARTMENT PARKS PROJECT NAME Aerator FY14 FY15 FY16 Unscheduled $17,000 DESCRIPTION OF PROJECT An additional aerator into Parks and Recreation inventory of turf equipment. This would be used to maintain the 125 acres of turf in the park inventory (WL02). ALTERNATIVES CONSIDERED Continue to operate with one aerator. ADVANTAGES OF APPROVAL Proactively and aggressively aerate parks and sports fields within the City to create a finer and healthier product. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:19 LEVEL OF SERVICE (Up to 20):5 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):1 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF196 DEPARTMENT PARKS PROJECT NAME Skate Park Refurbishment FY14 FY15 FY16 Unscheduled $35,000 DESCRIPTION OF PROJECT Tear out and replace the East end of the Skate Park to make it more functional and create a space appropriate for beginners to learn. This project is in coordination with Gallatin Valley Skate Park Association. This could potentially be a Park Improvement Grant Project (WL05) or Volunteer project (WL07). ALTERNATIVES CONSIDERED Leave the East end as it is to be underutilized by participants. ADVANTAGES OF APPROVAL A non-functioning section of the Skate Park can be transformed into a learning and teaching area. This plan can nurture younger participants and increase family activity at the Skate Park, ultimately creating a healthier environment. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED none FUNDING SOURCES 100% General Fund, possibly local fundraising and donations. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:18 LEVEL OF SERVICE (Up to 20):5 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):3 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF197 DEPARTMENT RECREATION PROJECT NAME Lindley Center Clean and Seal Basement FY14 $25,000 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT Put in FY14 Due to public safety concerns - The Lindley Center basement has become a health and safety hazard. It is infested with rodents, is dilapidated and is to the point of being non-functional. The basement has previously been used for storage of Parks and Recreation Department program supplies (used in youth programs) as well as storage for other community groups such as Bridger Ski Foundation and Gallatin Valley Bike Club. The proposed project will include the following: Cleaning/disinfecting and packing out all salvageable supplies to an on-site storage container, patching all holes where rodents are entering the structure, cleaning and disinfecting the structure. It would reduce some of the current maintenance burdens (PM07), and mitigate some of the items contained in Risk Management reports - Recreation Facilities (PM06). ALTERNATIVES CONSIDERED None. At this point the basement needs to be addressed due to the fact that our heating and ventilation system is in the basement and the upstairs is a rentable public space. ADVANTAGES OF APPROVAL Reduced liability for the City, a healthier/safer environment for the staff, a healthier/safer environment for the public, reduced rodent population, increased storage which is very much needed by the Department, reduction of staff time for maintenance and upkeep. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Renovation fees as determined by the recently completed facility condition index. Annual operating and maintenance costs, which would include an exterminator. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:39 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER GF198 DEPARTMENT I.T. PROJECT NAME SQL CLUSTER UPGRADE FY14 $10,000 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT This project complets an upgrade to our existing database backbone, that was begun in FY13. This upgrade will support data network uptime (PM03) and the number of hours the data network is available (WL03). ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Critical databases are available when needed, without work-stoppage for departments and customers. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:45 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 CIP Project Fund General Fund PROJECT NUMBER PW01 DEPARTMENT PARKS/FAC. MTC. PROJECT NAME SHOPS FACILITY EXPANSION PLAN FY14 FY15 $10,000 FY16 Unscheduled DESCRIPTION OF PROJECT The construction of the new Vehicle Maintenance Shop at the Lower Yards on Rouse Avenue in FY10/FY11 was Phase I in expanding and improving our ability to service equipment, store vehicles, and provide work space for Public Works, Parks, and Facilitiy services. Questions remain about the long-term plan for construction, location, and expansion for: Streets, Sign & Signal, Forestry, Water/Sewer Operations, Solid Waste Collection & Recycling, Facilities, and Parks & Cemetery departments. This project would develop a master plan. In scheduling this project, we are recommending waiting until after the Vehicle Maintenance Division is relocated to its new shop and the interior improvements are made to the Shop at Rouse and Tamarack Street for the remaining divisions. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES From related divisions: General Fund 20% ($10,000), Water Fund 20% ($10,000), Wastewater Fund 20% ($10,000), Street Maintenance Fund 20% ($10,000), Solid Waste Fund 20% ($10,000). New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING: LEVEL OF SERVICE (Up to 20): OPERATING BUDGET IMPACT (Up to10): SERVICE AREA (Up to 10): DEPARTMENT PRIORITY (Up to 10): COMMISSION WORKPLAN (Up to 10): ADOPTED CLIMATE PLAN (Up to 5): FREQUENCY OF USE (Up to 5): FY17 FY18