Loading...
HomeMy WebLinkAbout12- Change Order No. 3 McAlvain Civil Constructors, Inc. CIIANGE ORDER No. 3 DATE OF ISSUANCE EFFECTIVE DATE-- OWNER Ci1y of Bozeman CONTRACTOR McAlvain Civil Constructors, Inc. Contract: Bozeman WRF Digester No. 3 an 1 Solids Dewaterinp, Building Project Project: Digester No. 3 and Solids Dewatering Building Project OWNER's Contract No. S RF C3 01229 ENGINEER HDR/MMI ENGINEER's Contract No. 00-60746 You are directed to make the following changes in the Contract Documents: Description: Make changes identified in the Change Proposal Requests listed in the attached summary. Reason for Change Order: Miscellaneous additional work and cost savings. Attachments: Change Order No. 3 Summary with referenced attachments. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times: Substantial Completion: Ma y 10 2011 5,298,965.00 Ready for final payment: July 9, 2011 (das or dates) Net Increase(Decrease) from previous Change Net change from previous Change Orders No, 0 to Orders No. 0 to 2 No. 2 : Substantial Completion: 118 173,01339 Ready for final payment: 68 (days) Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial Completion: September5, 2011 $ 5,471,978.79 Ready for final payment: Septembei- 15 2011 (days or dates Net increase(decrease) of this Change Order: Net increase(decrease)this Change Order: Substantial Completion: 19 $ 104,96,6J'9 Ready for final payment: 19 (days) Contract Price with all approved Change Orders: Contract Times with all approved Change Orders: Substantial Completion: September 24, 2011 S 5 576 944.98 Ready for final payment: October 4,2011 �1 (days or dates) Contractor certifies and agrees that there are no additional costs or claims for extra work, additional time, delays or omitted items, of any nature whatsoever, associated with the Subject change order items, except as identified and set forth herein and unless expressly stated otherwise in the Change Order, And further,that the price agreed-upon herein represents the full cost and value for the subject work performed and the materials supplied under the terms of the contract and that the work quantities and value were properly deten-nined and are correct. �14 J CONTRACTOR (Authorized Signature) Date ff RECOMMENDED BY: Y -z (ENGINEER- Signature) Date OWNER (Authorized Signature) Date EJCDC 1910-8-B (1996 Edition Prepared by the E'rigincers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America and the Construction Specifications Institute. Change Order No. 3 Summary Bozeman Water Reclamation Facility Digester No. 3 and Solids Dewatering Building Project agm—m—a-Ey This change order consists of twenty-four Change Proposal Requests (CPR) and includes both cost saving items and additional work. The following is a list of the CPRs included in the change order: CPR Description Price Time 20 DFM Change $2,350.00 0 24 Digester Roof Modification $8,800.00 0 25 Stair Modification $4,063.69 0 33 Drain Vents $3,032.30 0 38 Roof Drains $4,659.31 0 40 Reroute FC, HWS/HWR Lines $3,812.06 0 46 Heat Loop Pumps $615.89 0 47 Bituminous Drain Pipe Credit ($2,977.67) 0 53 Gas Building Fans $2,992.67 1 58 Dewatering Building Hatches $4,608,00 2 59 West Man Door Modification $1,474A9 0 60 Glycol and Feeder $28,432,48 4 64 Waste Gas Burner Valve $1,337.81 1 65 Sump Pump Change $13,996,13 4 66 Boiler Shutoff Switches $2,276.10 1 67 Gas Drip Probe Change $1,178.22 0 68 Foam Suppressor Modifications $2,638.13 2 69 Gas Building Valve $876.16 1 73 Foam Suppression Power $1,253.19 1 74 Additional Glycol $12,786,00 0 75 Thermostat Change $1,605,59 0 77 Gas Building Heat Pump $5,302.00 2 79 Sludge Loadout Soffits $3,219.03 0 80 Electrical Credit ($3,365.39) 0 Total $104,966-19 19 Description CPR 20 DFIM Change This change modified the location of a 2" drain pipe. Documentation for this change includes CPR 20 with a cost breakdown and recommendation. N:\21051054.031Construction Docs\Change OrdersNChange Order 31Change Order 3 Summary.docx CPR 24 Digester Roof Modifications The digester roof required modifications as the bid alternate for the designed roof was not awarded. Documentation for this change includes CPR 24 with additional information. CPR 25 Stair Modifications This change modifies the stair embed and provides for kickers on the stairs to meet code requirements. Documentation for this change includes CPR 25 with additional information. CPR 33 Drain Vents This change adds vents to the high strength waste tank and the main drain sump. Documentation for this change includes CPR 33 with additional information. CPR 38..Digester Roof Drains This change provides for roof drains for the digester turret. Documentation for this change includes CPR 38 with additional information. CPR 40 Reroute FC, HWS/HWR Lines This change relocates ferric feed lines and hot water supply and return lines around the framed in restroom. Documentation for this change includes CPR 40 with additional information. CPR 46 Heat Loop Pumps This change increases the size of some heat loop pumps and deletes one heat loop pump. Documentation for this change includes CPR 46 with additional information. CPR 47 Bituminous Drain Pipe This change removes the requirement to paint some of the drain pipes that were supplied with a bituminous coating. Documentation for this change includes CPR 47 with additional information. CPR 53 Gas Building.Fans This change modifies the fans in the gas building to meet code requirements. Documentation for this change includes CPR 53 with additional information. CPR 58 Dewatering Building Hatches This change modifies two hatches in the dewatering building to allow for the city to operate their bobcat loader on the hatches, Documentation for this change includes CPR 58 with additional information. CPR 59 West Door Modification This change modifies the hardware for the west man door to function as an exterior door. Documentation for this change includes CPR 59 with additional information. CPR 60 Glycol and Feeder This change adds a 30% glycol solution to the boiler/heat system and a feeder to inject the solution into the system. Documentation for this change includes CPR 60 with additional information, CPR 64 Waste Gas Burner Valve This change modifies the gas burner valve in the waste gas burner vault. Documentation for this change includes CPR 64 with additional information. W21051054 03\Construction Docs\Ghange Orders\Charige Order 31Change Order 3 SummaryAOU CPR 65 Sump Pump Change This change replaces the sump pumps for the dewater building to fit the needs of the project. Documentation for this change includes CPR 65 with additional information. CPR 66 Boiler Shutoff Switches This change adds shutoff switches at the exterior doors to meet code requirements. Documentation for this change includes CPR 66 with additional information. CPR 67 Gas Drip .Probe This change modifies the gas drip probe in the utliidor to work within the constraints of the project. Documentation for this change includes CPR 67 with additional information. CPR 68 Foam Suppressors Modifications This change modifies the foam suppressor units in Digester Control Building No. 1 to meet the existing constraints of the existing piping. Documentation for this change includes CPR 68 with additional information. CPR 69 Gas Building Valve This change replaces a valve in the gas building. Documentation for this change includes CPR 69 with additional information. CPR 73 Foam Suppressor Power This change provides power to the foam suppressors installed in Digester Control Building No. 1. Documentation for this change includes CPR 73 with additional information. CPR 74 Additiona.l.,Glycol This change provides for additional glycol to provide for a completed system as the quantity of glycol provided for in CPR 60 was not adequate for the existing piping system. Documentation for this change includes CPR 74 with additional information. CPR 75 Thermostat Change This change adds additional thermostat controls in the dewatering building. Documentation for this change includes CPR 75 with additional information. CPR 77 Gas Building Heat Pump System This change modifies the heat pump system for the gas building to meet required operating conditions. Documentation for this change includes CPR 77 with additional information. CPR 79 Sludge Loadout Soffits This change adds soffits to the sludge loadout facility to provide for a finished looking facility. Documentation for this change includes CPR 79 with additional information. CPR 80 Electrical Credit This change provides for a credit in lieu of modifying some electrical items that were not installed per the specifications but met the electrical code. Documentation for this change includes CPR 80 with additional information, End NA2105t054.031Construcfion Docs\Change Orders\Charge Order 31Change Order 3 Summary.docx ............. ........................................ ........... ............... .............. ........... RM .......... ............. ........... wr/ leadle A/m/4 ow ............../��,��m'�,,/�/-" ............ ........... Faq MORMS®N CHANGE PROPOSAL REQUEST .J A` WEB E,Nc (Not a Change Order) Project: Bozeman wRF Digester No.3 and Solids Dewatering Building CPR No.: 020 CPR Date: 9/2312010 Date Sent to Contractor: 9/2312010 Date Rec°d from Contractor: TO: MCAlvaln Civil Constructors Please furnish your proposal for executing the following changes: Modify rou€ing of 2"DFM from gas building to main drain sump,via the Dewatering Building. 1. Eliminate 2"DFM shown on sheet COGO00O2. 2. Grout 2"DFM Penetration in main drain sump 3, Install 2°"(Schad 80)PVC for new DFM from gas building through existing extra penetration in dewatering. building wall and connectto main level drain along cirid Line B on sheet 1000MO8 and increase this drain line to 4". HDR1MMl Date: 9/2312010 TO: HDR Engineering,lnc. /Morrison Maiede,Inc. Proposal: Cost Credit (A time extension is not required for this modification unless otherwise detailed and justified:) Contractor Date TO: AceeptedlNot Accepted HDR/MMI: Date Accepted/Not Accepted Owner:Date Recommend to accept at a total cast of$2,350 per discussions with Tammie Newman. James Nickelson 07-02-12 ij //��� nn1 i it� F I�I�A15ti Equal Opportunity Employer TITLE: Modify routing 2-DFM CHANGE ORDER REQUEST PROJECT: Bozeman WWTP Digester No.03 No. 28 TO: HDR Engineering DATE: 12/06/10 ATTN: Coralvnn Revis McALVAINIOWNER JOB NO. 210001. DESCRIPTION OF PROPOSAL Following is the detail for our proposal to complete the following changes in contract work. CPR 020 -Modify routing of 2-Dlw M The prices below are valid until 12I21/10. PCta Item Status Change in Days Quantity Um Unit Price Amount 1 :Modify routing 2-DFM Open 0 LS S2,419.60 2:Profit and Overlie-ad @ S % Open 0 L.4 S120.98 3:CRT ra 1% ©pen 0 LS $25A1 TOTAL $2565.99 SUBMITTED BY: APPROVAL: McAlvain Construction,Inc. HDR Engineering; By: .Approved: Gary Watson Coralynn Revis Rejected: Date: Date: [D RCE-14471 5559 West Cowen Road, Boise,Idaho 93709 (208)362-2125 FAX (208)362-4356 1 W 0 0 illiams t Plumbing * Heating Utilities ln.tera�� Cam>m.4tm,er>rt Ca�uml�iii December 1,2010 McA€vain Civil Constructors Attn: Gary Watson 5559 W. Gowen Rd. Boise, ID 83709 BW WTP Digester#9589 RFP#006--CPR#20 Dear Sir: RFP DESCRIPTION.- Change routing of 2" DFM from the gas building to the main drain sump via the Dewatering Building. Subcontractors: HVAC-100 - TEMP CONTROLS-101 - TEST&BALANCE-1 02 - INSUL-105 - CHEMICAL TREATMENT - Subtotal-Subs - Overhead Subs 10.00% - Subtotal-Subs-w OH - Profit Subs 5.00% -. Subtotal-Subs-w OH & Profit - Material 882 Labor Hours 18 990 Direct Job Costs 232 Subtotal 2,104 Overhead }; -?09° -I-0 Subtotal w OH Profile Subtotal w OH & Profit Subtotal Subs&Material, Labor, Direct.lob Costs --2-,30- BOND 0.00% - GROSS REC TAX 1,00% Total -2-,455- Sincerely, Project Manager Williams Plumbing,Healing Utikfiss,Inc. • BOX 10 - 2131 Induslriat drive Bozeman,MT 59715 406-587-0969 • FAX 4Q5-585-9458 ............... .......... ..................... ...................................................................................................................... ......................... ............. Items ........... .......... .......... ....... ........ ........ luq AMORTSON CHANGE PROPOSAL REQUEST l I MAMRLE,IT- (Not a Change order) Project- Bozeman WRF Digester No. 3 and Solids Dewatering Building CPR No.: 024B CPR Date: 10/1212010 Date Sent to Contractor; 1011212010 Date Reed from C-ontrac4or. TO: McAlvaln Civil Constructors Please furnish your proposal for executing the following changes. 1. RFI#1—Furnish[2)addftional course of CMU,add W suppoft an le extend.roofing to parapet and nailer on CMU. RE\ASED 10/20/2010., Modt CMU,cap and flashing per the attached detail,rather than.the RF1#1 response. REVISED 4012112010. Modifywith a non-load bearing,§IgO turret.parapet pEQject,to.4.IN above the highest point of the tapered insulation ��� (12.5 IN from to of CMU)..._Use 2x6 cold form channel,with 16 IN OC studs,and cap channel..on top. Maintain roofing and cap flashing as previousLy shown- HDR/MMI Date:. 1012812010 TO. HDR Engineering, Inc.Morrison Maierle,Inc. Proposal: Cost 9116.50 —Credit (A time extension is not required for this modification unless otherMse detailed and justified:) Contractor McAlvaiin Civil Constructors,Inc Date 1107/2011 TO: Accepted/Not Accepted HDR/MW Date Accepted/Not Accepted Owner:Date Recommend to accept for a total cost of$8,800 per agreement with Harrison Hotchkiss on 10/27/11. James Nickelson 11-11-11 ANE Equal Opportunity Employer TITLE: FT1#I -Digester Roof Termination CHANGE ORDER REQUEST PROJECT, Bozeman WWTP Digester No. 03 No. 20 TO: HDREngineering DATE: 01/07/11 ATTIC- Coralynn Revs McALVAEVO'4 NER.7OB NO. 210001, Following is the detail for o-ur proposal to complete the following changes in contract work: CPR 024b --Modify with a non-load bearing steel turret parapet project to 4 IN above the highest point of the tapered 'insulation(12.5 IN from top of CMU). Use 2x6 cold form channel,with 16 IN OC studs,and cap channel on top. Maintain roofing and cap flashing as previously shown. The prices below are valid until 01/20/11. 1 :Metal Stud Parapet Open 0 1.S 2 Extend TPO Roof and Metal Open 0 LS 5270.05 Coping 3:Profit&OR @ 5% Open 0 1n14 5199.90 4:CMU Cap Nailer Open 0 1.S $4,198.51 S:Profit and OR @ 15% Open 0 Ls $629.78 6: 1%CRT Open 0 1.S $90.26 TOTAL S911.6.50 SUBMITTED BY: APPROVAL: McAlvain Constru tion,Inc. HDR Engineering By: _. Approved: r Gary Wat Coralynn Revis ,r Rejected:— hate: ! i Date: fL RCE-14471 5559!Nest Gowen Road,Boise,Idaho 83709 (208) 362-2125 FAX(208)362-4356 1 r � rp . •' ,, wtrrw.empretatJlandpJaster.com stlizev[ 180carn.net 1kingT(cD1$0com net kwood, 180com.net PD Box 21346 Billings,MT 59104 (406)245-4214 FAX(406)245-2289 November 10, 2010 Aa Project: Bozeman WRF Digester# Attn: Macy Lui Email: macyl mcalyain.com Y Macy- Please note additional costs for labor and material tce the following. Metal stud framing only. Scaffold or hoists provid6*dkb' thers. Quote Please call with any questions. � Thank you, Lance Icing 2100 CH fi- 37.9-0t a� Empire Lath&Piaster, Inc.is certified as a Disadvantaged Business Enterprise. Certification Noi 0035 etalwo rks of MT Quote CPR#24B Ios,r /4' 'F m ��. credit (A time extension is not requiredfar this modificati n uni s otherwise detsited and jsstined:) Gontraoto �.5 •lfrt - Date f�9 Proposal. Cost ,Z/", X credit (A time extension is not regvimd for this rnodlfti aktinffunl6ss otherv�sse detailed and juafflet) contrmtor (fltr- l « Date d1 k91-1 o t , 3 M cl'�, xcr cv .cz �s U,* tax 60a.(f)- EF, ca n 4 LO (q N t�i c3z i co W *1✓ C/t (D M h� C.GI c�a 0) -41 d7 «_ RS tI7 0 m cc 0 7aeraortN M C\t LO tv �3 �3 tL �. C4 u CC) a C°a nab L x .L �c n3 Pag-e 1 of 3 Macy Lui From: Revis,Coralynn [Coralynn,Revis@hdTinc.com] Sent: Friday, October 29, 2010 12:09 PM To. Macy Lul Subject- RE. Bozeman Digester-CPR 024 Yes, please use 3/8' plywood on both sides of the metal stun_ Pleaseuse metal to match the coping,or bring the coping down the full distance. Yes, support the 2.5"gap so there is bearing. From: macyl@mcalvain.com [mailto:macyl@mcalvain.comJ Sent:Thursday,October 26, 2010 2:34 PM To; Revis, Coralyrin Cc. garyw@mcalvain.com; dennisc@mcalvain.com Subject, RE: Bozeman Digester- CPR 024 Hi Cora, I have couple questions on the revised digester roof termination. Do you want plywood on both face of metal stud? What kind of finish do you want on the outside face (EIFS, Metal to match copping)? On the clouded area,the deck is cantilever from joist. The rest of the deck is seated on the top cord of joist which is 2.5"above CMU- Do we need to put any support on the clouded area? Thanks, Macy 1/7/2011 Page 2 of 3 1.1 `x21)-to ST�£L Ciaw�'FtG d xe t t i r �1 SE00 u opfk=— Gx12' R IWAt#LE � :1rJsaiil; From: Revis, Coralynn mailto:Coralynn.Revis@hdrinc.com] Sent:Thursday, October 28, 2010 12:45 PM To: Macy bui Cc:James Nickelson; Paula Madden Subject.* RE., Bozeman Digester-CPR 024 Let's try this instead.. From: m'acyl9mcalvain.corn [mailto.macyl@ calvairi.com] Seat:Thursday, October 21, 2010 3:24 PM To: Revis, Coralynn Subject: RE: Bozeman Digester-CPR 024 Hi Cora, I am looking at the new turret cap.The roofing is on taper insulation. an the low point, it will be 41/2"above CMLI; on the high point, it will be 8 Y2"above CMU (see attached sketch). Do you want me to continue pricing on your cap detail? Thanks, Macy From. Revis, Coralynn [mailto:Coralynn.Revisc@hdrinc.com] inI2011 Page 3 of 3 Sent: Wednesday, October 20,2010 11:31 AM To. Macy Luj;Tracey Felix; Gary Watson Cc: James Nickelson; Paula Madden Subject: Bozeman Digester Coralym Revis,P.E. Project Engineer HDR ONE COMPANY I Many Solutions 1715 South Reserve Suite C I Missoula, MT 159801 Direct:406,532.22191 Fax,406.532.2241 Email-, Coralynn.Revis(o)hdrinc.com 1/7/2011 .......................... ................... ................. ...................................... ............. .......... JACIFI, 0/0 ell oll 'go .. ....... .............. ful ' pRM,pN CHANGE PROPOSAL REQUEST NW EE,i.N (Not a Change Carder) Project: Bozeman WRF Digester No.3 and Solids Dewalering Building CPR No_: 025 CPR gate: 1 011 212 0 1 0 Bate Sentto Contractor: 1 011 2/201 0 Date Rec'd from Contractor:. TO: McAWin Civil Constructors Please furnish your proposal for executing the following changes: 1. supply and install embed and kicker placement on digester stair-per RFI#5 HDR/MMI Date: 1011212010 TO: HDR Engineering, Inc./Morrison Maierle,Inc. Proposal: cost 4093.69 Credit (A time extension is not required For this mortification unless otherwise detailed and justified:) Contractor McAlvain Civil Constructors, Inc Date 10/14/10 TO: Accepted/Not Accepted HDR/MMI: Date Accepted/Not Accepted Owner: Date Recommend to accept at total Cost of$4,093,69. r games Nickelson 67-02-12 Equal Opportunity Employer TITLE RF1##5- embed and kicker on digester stair CHANGE ORDER REQUEST PROJECT: Bozeman W TP Digester No,03 No. 21 TO: HDR Engineering DATE- 1.0/14/10 ATTN: Cnralynn Revis Mr—ALVA1N/OWNER JOB NO. 210001, Following is the detail for our proposal to complete the following changes in contract work: Supply and install embed and kicker on digester stair per RFY 95 The prices below are valid until 10/29/10.. Pl✓{1��ezrr`�.� ��.�� `�� ,� � ��� �.:_��,ap�,e afl��.,�. ��nY2�y .r`..._-. -� t��F:nc ,��-= �3�;o�d 41:Supply and InsCa1]esntaed and Gpen � f.S a3,86Q.16 kicker an digester stair 2;Profit and 011 @ 5% Open 0 1.S 5193.00 3-. 1%G£tT opezl 0 LS 54t M TOTAL $4093.69 SU13MITTED BY: APPROVAL- : cAlvain Cons tion,Inc. HDR Engineering y. Approved: Gary Coralynn Revis Rej ected: .-_.._ _ .Date: Date: Ill RCE-14471 5559 West Gowen Road,Boise,Idaho 83709 (208)362-2125 FAX(208)362-43S6 l 1546 N 25�"E Idaho Falls, Id 83401 Phone:208,528.7544 FRQ 6.2 Fax:208.528.7548 l:oni fete Steel Services _...... CHANGE ORDER REQUEST IEl Change Order Request No.02 Revised Date: 9/14/2010 Issued to: Project: McAlvain Construction Inc. Bozeman Digester 5559 W.Gowen Rd Bozeman,MT Boise,ID 83709 1 El Job Number: 1074 Attention: Macy Lui Issued By: Morgan Richardson Reference. RFI##05 This change request covers the following work scope: At time of bid the rolled stair material sizes,connection details, and dimensioning were not provided. Once these details were furnished, it was determined that additional labor and material above the bid assumptions is required. Cost Breakdown: —. __.. ._.._..._.__ Fabrication $870.00 Embed Placement $1,420.08 Kicker Placement and Welding $ .,570.08 Total $3,860.16 Date: Accepted* By(signature,title): *Please note that signing this change order authorises 0 to proceed with the work outlined herein-it also is occeptance of listed cost and schedule impact. This price and schedule once accepted shall not be re-negotiated. COR#02 revised Labor breakdown Installation 1. Embed Placement: a. 2 Ironworkers @ 8 total hours x$96.26/hr $770.08 b. 1 JLG @ 8 total hours x$81.25/hr $650.00 c. TOTAL EMBED PLACEMENT= $1420.08 2. Kicker Placement and Welding a. 2 Ironworkers @ 8 total hours x$96.26/hr= $770.08 b. 1JLG @ 8 total hours x$81.25/hr= $650.00 c. 1 Welder@ 8total hours x$18.75/hr= $150.00 d. TOTAL KICKER PLACEMENT= $1570.08 Total $2990.16 Labor rates are based on prevailing wages,fringes, per diem,burden costs and 15% overhead and profit. MC "I HSI - 3 1 Equal Opportunity Employer REQUEST FOR INFORMATION RFI No.S TITLE: Stair Details DATE: 03/1.9/10 PROTECT: 210001. RESPONSE REQUIRED: 03/24/10 Bozeman WWTP Digester No.03 TO: HDR Engineering E-NIAIL: PHONE: A.TTN: Coralynn Regis FAX: REQUEST: Specification: Drawing: Sheet l 100A07,Please provide Stair Material Sizes,Connection Details and all Dimensioning needed to locate this stair system.Sheet 110OS14 Note 4 refers back to sheet 110OA07 for Stair Framing details. PROPOSED SOLUTION: ANSWER: See attached drawings and details. REQUESTED BY: ANSIATRED BY: Signed: Signed.Coralynn Revis Gary Watson Date; 03/19/10 Date: 4/27/2010 ID RCE-14471 5559 West Gowen Road, Boise, Idaho 83709 (208)362-2125 FAX(208)362-4356 N tPl 0 F �w u r � y \r " Cl sus' Y /� ¢ 3 N z IL Vrh 11 zz� �A N ....,.. ............ ... ,.......,.,.__.. ................. d :ax q d:t w � van e 0 i ,RR t R fY 4 x R ' f , I I r� 0 4 4n X a ME � rn Spt" I: Ywi� uy a� t3 �1 l7 0 ^z s3 y-tl a ,00 P 5h m`l� `__�i ILI" G � r IN f sa c v T s w f W°� r.� ................. ........................... ....................... ......................................................... ........... .......... ........................................ 0/40/10/m// faq MCM80N CHANGE PROPOSAL REQUEST ,M I AJERLE,!.,Nc (Not:3 Change Order) Project. Bozeman WRF Digester No.3 and Soltds DewaterinQ Building CPR No.: 033 CPR Date: I V1512L)10 Date Sent to Contractor: 1111512010 Date Reo'd from Contractor: TO: McAlvairi Civif Constructors Please furnish your proposal for executing the following clianges: f7rq_T.the high point in the drain lines-which should be the 6-V from lhe HSVV Tank,on the SCLIlh side of the Saws Dewatering.Building,where the 6-V elbows into the 8-DOF,add a tee connecting one side to the DOF and the other side.With a reducer,extend a 4-IN vent line up through the roof Addibonalty,.rOLIle a 2-IN vent from the main drain sorno in the yard underground,throucin the waij.. and Ioin)rIsth the 4-IN vent through the roof. Ulilize the existing 2-DFM opening,on the lid which wasn't Used fc,,the dra-nage lorcernain. HDRAJIMI Date. 1111512010 TO: HDR Engineeftog,Inc.Jfvlorrison Maferte, Inc Proposal: Cos[ J$3,03230 Credit (A time extension is not required for this modification unless othewise detailed and justified:) Contractor Date T 0'. Accepted/Not Accepted HDRIMMI�Date- Ac,cepted/Not Accepted Owner: Recommend to accept. James Nickelson 09-13-11 R� a c m a ui � n C� Iq Lq o Us Q; r o C r C-4 N m C3 N C+0 ro tti 'tV N r N C`3 N M u7 C 10 r C a CO --» s i T 0 Q 0 CD Gti fL` ry 0 a w w CC N Z U) C) 0 r' 4 N m 0 C :D co LLI .v -C3 a z z C; c"Ji7 O —� Q1 LL V) -73 s t1 O U a CL' cY3 0 CO a- O W x Q � _ 0 mt) W o 0 ams i Plumbing Heating Utilities J % July 12, 2011 McAlvacn Civil Constructors Attn: Harrison Hotchkiss 5559\N. Gower)Rd. Boise, ID 83709 E3WWTP D[gesier 99589 RFP 4005--CPR 33 revision#4 Dear Sir: RFP Di SCRtPTION: Furnish and install 6-V line at HSW lank. Pricing includes (1)A"roof seat, fI Subcontractors- H VA,C-100 TEMP CON TROLS-101 TEST &BALANCE-1 02 INSUL-109, CHEMICAL TREATNIFNT Subtotal-Subs Overhead Subs 0 00% Subtota[-Subs-w CH Profit Subs 5.00% Subtotal-Subs-w OH & Profit Material 906 Labor Hours 26 1,382 Direct Job Costs 174 Subtotal 2,4132 Overhead 115.00% 369 Subtotal w CH 2,831 Profit 0.00% - Subtotal w OH&Profit 2,331 Subtotal Subs &Material, L2bOf, Direct Job Costs 2,831 BOND 0.0% - GROSS REC TAX 100% 29 Total 2,860 Sincerely. -IWO&V'5-;mac,'Kti Project Manager Williams Plumbing,Healing lAlities.Inc - 3OX tO 2131 lndus!r;aI Drive t Bozeman,MT 59715 405-597.0269 - FAX 405-585-9458 computer Totals 906 10011/1 SOS 26" 100-44 % 26 $54.00 1,382 MVWTP Digo!"wr 99589 ,Adjusted ' 'A Adjusted LABOR LABOR Labor LABOR LAE30R TOTAL DESCRIPTION MATERIAL Ad] MATERIAL HOURS FACTOR HoUm--RATE COSY COST ZT-RHFIATERtAl. 906 1001. 905 25 100 100% too 116 cc 100% 100% S5400 100% IOU% 55400 100% 100 a S54.00 I 0041. 100 $54.00 100%. 100% 554 c0 100% IGO 554,00 loove 100 S54,00 1.00"d IGO $64,00 100% 100 554.03 IW% TOO% $54.00 100% 100% S54.M 1CM - 100 li, $54.00 Icco, 100% S54 W 100% IGO 9e $54.00 100% 100 564.00 iw% 100 1h $54.00 10014 100 li'a 4554,00 10 0%. 100% S5 .00 100910 - 100% S54,00 1001,10 100 ok $54.00 100% m p/0 $54.00 100?0 1 a a 1A $54.00 100% 100% S54M 10M 700'k 554,00 1 Go-IQ to() 11-. $54,00 100% 1 tjo S54.ao I GO% "00 % S54,t0 1001/0 i00 9tl .554,00' I OGLY. IGO% $54,110 7 00% 100 $540C 100% • -100 $54,OP ,I QW1. 100% 554,00 t OT1% I CO 9�-, $54,OC I N 111�100% I I o M'q 100% 100 1/. 554.00 100%. 100 14 $54-00 I OG144 100 $54 OC 100% t 0 0 554.00 100 $54,00 '00 354.00 100 364,00 . I too $64,00 00'Y, too $54.00 100 $54.00 I GOV. 100 554.00 - lacy 100 la $54,00 100% 100 "4 S54,00 I a p,% 100'k �54.00 100% 400% S54.00 100% 100 14s 55400 100% 100% S54.00 100610 100% $54,00 100% 100% 554.00 100% 100% $54,00 Oath 100 % 554.00 1009". 100 t00%- - 100 - $54,00 - - TOTAL 905 13041, 906 26 iuc% 26 $5400 1,382 2,209 Mist MISCELLANEOUS COSTS: 174 BWWTP DiqerI.er#96a9 OTHER[ LABOR LABOR ADJUSTED LABOR LABOR TGTAL DESCRIPTION MATERIAL HOURS FACTOR LABOR HRS RATE COST COST PERMIT-1011910 IGO $54.00 CRANE a FORKLIFT-70111 UiQ 1001/1 $54.00 SPECIAL FREIGHT-701/11/0 100 'A $54.00 WELDER&GAS-70111?JO IQ() ,/, $64.00 CUTTING,GRIN DING-70111 310 100 I'll $54.00 MISG HOIST-701f1410 100 V, $54.00 ADDITIONALHARDWRE-701/1410 100 C", $54,00 FIRECAULK 100 Ss -554.00 10 D $54,00 100 ,11, $54,00 TOOLS miSC-70111710 100 PA $54.00 MOBILIZATION-70 III W 100 11, 554.00 O&MIS-7otflM 100 1/1 $54.00 SCAFFOLD-701120/0 100 4'/� $5400 VEHICLE-701/2110 100 0/ $54.00 100 ox $64.00 LODGING-70112310 100 0/1 $54,00 TRAVEL IOU -/' $54.00 PIPE ID-70IJ17110 100 0/1 $54.00 INSIDE EXCAVATION 100 0/1 $54.00 SLEMNG 1001/1 $54,00 �CLLANING 100 Qi $54,00 CONCRETE DEMO Ino "1" $54.00 EXTERIOR EXCAVATION Ica 1/1 $5400 INSTRUCTION 100 °11 $54,00 No iMo 100 % $54.00 Mos Pate 100 Of $54,00 Autom2tin. 100 1/ $54.00 0 JOe SMACK-701/1510 0.07 275 20 loc 71 554.00 20 TELr-PHON&70111610 0.07 100 1 100 q/ $54,00 'JTIL-70112210 0 07 75 5 100 1/1, $54.00 5 SUPERVISION IN FIELD-hrs 3 65 141 100 `z" $54.00 141 100 1/1 $54.00 - i 1100 % 554,00 Ica V, $54.00 100 ! $54.00 JOG is $54.00 100 $54,00 100 1/1 554,00 100 14 554.00 100 °1 554.00 100 Y, $54M 100 '/ 554,00 100 IX 554.00 - - 100 P/( $54,00 100 0/1 $54,00 100 1 $54,00 /1 100 °11 $54.00 100 % $54-00 Ica 14 '4q54.00 100 61 $54.00 100 ly, 554,00 100 0/1 $54.00 100 9/1 $500 100 01, $54.00 too C/1 $54.00 100 G", $54,00 ICU 1/1 $54Z0 100 OA $54,00 100 1/ $54.00 TOTAL 174 0% MIA 174 Page 1 Mollie MGKieman From: olang@willplumb.-com Sent: Monday, July 11,2011 3A3 P[V1 To: Mollie McKiernan Subject: CPR 33 re-price Attachments: CPR 33 price quote and take off,xis CPR 33 price Quote a 7 rr-4 taxe of- Molly, CPR 33, high strength waste vent. Craig and -wer-L over this and this is we agreed on. . .Can you get- this pr'.ced and se= JOB: BWWTP Digester#3 CPR 33 pricing Division 15 Mechanical. Ram E)ecription: Qvanity Ea Price Ea, Hows Ea Hours tolai Price TWai Price Sob H2rigers &Supports 5 30 1 6 180 4' GI no hub pipe 40 8 0.3 12 320 4" Cl no hub 90's 2 13.61 O's 1,2 2722 6"x 4"CI no hub wye 1 41.59 2 2 41 59 6" no hub couplings 2 943 0,2 0.4 1886 4" no hub couplings 10 3.72 0.2 z 372 4"rcof boot 1 6 1 1 6 5"core drilled hole 1 275 1 1 275 0 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 G 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTALS 25.6 905,87 ..................................................... .............................................. ......................................... ........ ........ ................. ............. FFIN/I"//I I,-I",- ...... .... ww�ow woo"o,// .......... ..........I% .. ........ ... ............. ...... i?Zao WO ............. ......... "I',"",OEM;, .......... it U, R M10WISON CHANGE PROPOSAL REQUEST NIAMLE, (NoL a Change Order) Project: Bozeman WRF Digester No.3 and Solids Dewatering Building CPR No.: 038 CPR Date: 12/1412010 Date Sent to Contractor: 12/1412010 Date Ree'd from Contractor: TO: McAlvain Civil Constructors Please furnish your proposal for executing the following changes: Provide roof drain and bVp ass down, through roof and out sidewall. Run drainage rain chain from roof drain piping and bolt to roof of Digester No. 3 (RF1 002) HDRIMMI Date, 1211412010 TO; HDR Engineering, Inc /Morrison Maierle, Inc. Proposal: Cost Credii (A time extension is not required for this modification unless otherwise detailed and juslified.) Contractor Date TO- Accepted/NotAccepted HDR/MMk Date Accepted/Not Accepted Owner.Date Recommend to accept for a total cost of$4,659.31 James Nickelson 10-21-11 r > 6 W r � as tZ zU CZ 4? u� © t3 0 O 0 0 C. 00 co r- C] t7 ly &'M 0 I`-- V- V) 0 a) tr) _ CO LO _ C7 t'�? N Lo (1) N U') � � to Ni C� e co ` C tq 6r)- tf} ky} 69 44 }�- FF- tom- -- H � crj 0 Q 000 ❑ 0 ra m MrL z U) U mU) a. E sue ¢a) Of ❑ � m m < w LO M cn z U3 U CK 4f} m co G7 U7 CD r ❑ cu �k U) ii 0 i a) cu .0 tWf i � (DO 6 n cr 0 00 LL ;^ Co , N _ ro c 1 U C 5 ; a, f� UT1 f7 tiliams 1 I I Plumbing g a Heating Utilities �itGw4iritt (,oinmGtm it.t Dittau,n i i I July 12, 2011 i McAlvaiin Civil Constructors. Attn: Cary Watson 5559 W. Cowen Rd, Boise, 1D 83709 BWWTP Digester#9589 r RFP 011--CPR 38 revision#1 i Dear Sir: Provide 2 Roof Drains and 2 Over Flows through Roof and out sidewail. With drainage chain. Per I RFl#002. Subcontractors:. HVAC-1 00 TEMP CONTROLS-101 - TEST& BALANCE-102 INSUL-105 CHEMICAL TREA"rMLNT - Subtotal-Subs - Overhead Subs 0.00% - St.ibtotal-Subs-w OH - Profit Subs 5.00% Subtotal-Subs-w OH & Profit - 6 Material 1.973 Labor Hours 26 1,399 Direct Job Costs 411 Subtotal 3,782 Overhead 0.00% - Subtotal w OH 3,782 Profit 15,00% 567 Subtotal w OH & Profit 4,350 I Subtotal Subs& Material, Labor, Direct,lob Costs 4,350 BOND 0.00% - GROSS REC TAX 1,00% 44 Total 4,394 Sincerely, 1 l ✓ We a Project Manager ; Williams Plumbing,Heating utilities.Inc BOX 10 2131 lndUstrisl Drive - Bozeman.WT 69715 406-557-0969 - FAX 406-585-9458 JC?8: BWWTP Digester#9589 RFP 011--GPR 38 revision #1 R ABCR MATERIALS QTY ITEM EAC 1H EXT. EACH EXT, 100 3"No Hub Piping Cast Iron 008 80 $11.28 $1,128,00 6 3°" 90` No Hub Fitting 04 2A $16.86 $101,16 4 3"45' No Hub Fitting 0A 1.6 $13.88 $27.75 2 3"Wye No Hub 062 1.2 $22.46 $44.92 2 3" Down Spout 0.75 1.5 $123,40 $246.80 32 3"No Hub Coupiin s un 0.1 $6.98 $223.36, 1.6 Drainage Chain STAINLESS STEEL 0 003 0.1 $1.50 $50.00 1 testing 2 2.0 -- 12 Hanger Supports 0.75 9.0 $12.56 $150.72 Totals: 1 25.9 $1,972.72 Hand HAND TAKEOFFS TOWS 1,973 26 100% 26 54,00 1,399 3,371 BWWTP DiqesterM589 AdjUSted LABOR LABOR Labor LABOR LABOR TOTAL DESCRIPTION MATERIAL HOURS FACTOR HOUrs RATE COST COST -S-tormdraln 1,973 26 100 Q/. 26 $54.00 1,399 3,371 100 % $5 ,00 100 % $54.00 100 % $54.00100 1/0 $54,00 100 % 100 $54.00 100 % $54.00 100 % $54.00 100 % $54.00 100 % $64.00 100 % $54,00 100 % $54,00 100 % $54.00 100 % $54,00 100 % $54.00 100 % 554,00 100 % $54.00 100 % $54M IQG % $54,00 100 % .$54M 100 % $54,00 100 0/c $54.00 100 G/c $54.OQ 100 Wc 1 $5400 100 % $54,00 100 % $54,00 100 % $54.00 100 % $54.00 100 % $54,00 100 % S54,00 i0o % $54.0 100 % $54.00 100 % $54,00 100 % $54.00 100 % $54.00 100 % $54,00 100 11/0 $500 100 % $54.00 100 0% S54-00 100 % $54.00 100 % $54,00 100 % $54,00 100 % $54m 100 % $54M 100 % $64,00 100 % $64.00 100 % $54M - - 100 Yj $54.00 100 % $54,00 100110 $54,00 100 % $54,00 100 % $54.00 10 % $54.00 100 % $54.00 100 % $54.00 100 % -$54:00 - 100 % - $54.00 100 % - $54.00 - 100 % $54.00 - - TOTAL 1,973 26 100% 26 $54.00 1,399 3,371 Page 1 MISCELLANEOUS OOSTS: 411 0 30.00 BIWVVTP Digester 99589 OTHER/ LABOR LABOR ADJUSTED LABOR LABOR TOTAL DESCRIPTION MATERIAL HOURS FACTOR LABOR HRS RATE COST COST PERMIT-7011910 100 % $55,00 CRANE&FORKLIFT-701/1010 100 0/4 $55.00 SPECIAL FREIGHT-70111 110 100 Y, $55.00 WELDER&GAS-70111210 100 $56,00 CUTTING,GRINDING-70V13/0 100 D/ M $55.00 - Manlift-701114/0 80 100 Q/1 $56m 80 ADOMONAL HARDWRE701114/0 100 0/1 $55.00 FIRECAULK 1100 0/f - $55.00 100 0/1 $55.00 100 0/1 $55.00 TOOLS MISC,70111710 26 100 %, $55.00 26 IVIOBIL17ATION-701/1810 100 0/4 $55.00 OWS-701/1910 100 VM $56,00 SCAFFOLD-70112010 100 $55.00 VEHICLE-70112110 20 100 0/1 $55-00 120 100 $55.00 - LODGING-701/2310 100 */l $55.00 TRAVEL 100 C/4 $55,00 PIPE ID-7011171/0 10011/1 $55.00 INSIDE EXCAVATION 100 0/1 $55.00 SLEEVING 100 0M $55,00 CLEANING 100 1/t $55.00 CONCRETE DEMO 100 1/ $55,00 EXTERIOR EXCAVATION 100 '/ $55,00 INSTRUCTION 100 0/. $55LOQ - No Mo 100 % $55.00 - - Mos Rate 100 0), $55,00 Automatics: 100 0/ $55.00 0 JOB SHACK-70111510 0.07 275 20 100 9/1 $55m 20 TELEPHONE-701116/0 007 100 7 100 0/ $55,00 7 UTIL-70102/0 0.07 75 6 100 % $55,00 6 SUPERVISION IN FIELD-tars 3 55 142 100 0k $55.00 142 10011/1 $65.00 100 "/$ $55,00 100 OKI S55100 100 IM $55,00 100 0/1 $55.00 100 % $55.00 100 OA $55,00 100 I/x $55,00 100 0/1 $55,00 100 VA $55,00 100 4/1 $55.00 - - 100 'Ile $55.00 100 ®I $55.00 IQ 0 % $55.00 100 1,/, WM 100 U/1 $65.00 100 $55.00 100 $55m 100 1/1 $55,00 100 1/( $55.00 100 % $55.00 100 0/1 $55.00 100 (1/1 555,00 - 100 0/f $55.00 100 a/ $65,00 100 of; $65.00 100 $65.()0 100 $55m TOTAL 411 00/0 5000 41 Page 1 ................................................................................... -,,......... ................... ...................................- ........................- .......... .................... ........................................................... and ZEN,am/ `/////,/,�/�/. ....... ............ "AMOD/d/// "'Wow .............. .......... .......... ........ ... ........... .............. ............... ........... �I/Vw////......... I..........."I h';jR, MORRISMICHANGE PROPOSAL REQUEST NIAIENLE,ix (Not mohwigeOroc4 Project: Bozeman vVRF Digester No.aand SnouvDrwa*rmg B^udinS CPR No. CPR Date: Daus Sent toContnacvoc 01117/2011 Date noc'd from Cunuaotoc To: McAlvmm Civil Co^ntruuo`s Please furnish your proposal for executing the Wnmv|n8d`mngnx HoR8NM/ onto._. 0111712010 _ TO: xDR2ngmeo ring,`nc,/wornrnna^aier|a. wc- prop^uaL --`------------------'--- ---'---------------- Cost c/e& (*time extension is riot eqo,nufcrm,umnaUinoiivnun|:no otherwise Wv(ai<ed and iug|Ked) Contractor Date To� mccepto^/Nntxccepteu uonm4W oa,e__ AcrepterMox Accepted Qwnar�Da! Y L r t� OL V d to ca 0 m ua o to LO I- C? rn m 0) t-- tf3 tl� le CD t� Pam- N I.0 V� r- in r3 Cl) Cl) R In U? W fy i T- C7 t Tt O � U d 0 - 0 000 r 0 {V Q' < C1 Q < �.1.) L) � {.L.@ Q CC i7 ~' � 41] Q [j C) CZ Era e] 0 Q) CK Q) U� A I -0 0 _0 F L B (D CD 2 CU �t E o C7 u J mC) c tit W01 Q 'is ii a tq x Plumbing - Hcatinb UjilitieS J 0 il�fit q,;k July 12,201' McAl[vain Civil Constructors Attn: Gary Watson 5559 W. Gower Rd, Boise, ID 83709 BVvWTP Digester#9 5 8 9 RFP 013 --CPR 040 revision#1 Dear Sir, Re-route 1/2-FC.- 3-FC and HWS/HWR per RF1 89 S Lf bcon tractors: HVAC-100 TEMP CONTROLS-101 - TEST&BALANCE-1 02 INSUL-1 05 CHEMICAL TREATMENT S(Jh[Gt8l-SUbs Overhead Subs 0.00% Subtotal-Subs-v,v OH Profit Subs Subtotal-Subs-w OH &Pro-R Material 970 Labor Hours 43 2,300 Direct Job Crisis 289 Subtotal 2,559 OvertIead 0.0 0 111/v - Subtotal w OH 3,559 Profit 5 00114t 534 Subtotal w OH & Profit 4.093 Subtotal Subs &Material, Labor, Direct Job Costs 4,093 BOND 0.00% GROSS REC TAX 1,00% 41 Total 4,134 Sincerely, Project Manager 'Niiiiams Pvr))bino_,Heat ng Uiilalss,Inc BOX 10 2131 Ulnae 9oatuiao FAX 406-585-949.II Computer Tn1al5 M IDDIA 970 43 10011. 43 454 CC 7,30C 3.27a BWlAtTP 1710ester#95D9 AllIpSted I'll Adjusted LABOR LAROR mbar LABOR LA90R TOTAL DESCMPTION NIATERIAL Adi MATERIAL HOURS FACTOR Hours RATE COST COST ........... TP—P 46-F,,AT EIVALS 970 1001,10 .370 43 100 554 00 2 lv!o 270 1 rlo;/, 1.00 $5400 100". 100 1". 55400 1 oo4xo 100 sv $54.00 1061/6 '100 $54.00 1 Co% 100 34 S54,00 100% 1 Go 55400 1007 too% 554 CG 1001% 100 INC $64 OU 100% i0o% S54.0C IOU% 100% 554,00 I 00110 100 lll .. $54 00 1001A, 100 S54.00 100116 IQU 554M 10010 100 p554.00 1 100% 100 $5400 10011, 10014 554,00 100% 1100 ib s54.o0 1 Qc% IGO $6,4 M 1 00,11p loc% a54.00 10016 IGO CE 554.00 10016 1 GO $54.00 IGO% 100% $54.00 100% 100 of: $54,00 too 100 1A $54LOQ lool/. IGO 1* 354-00 100% Too $54,00 too V. $54.00 $54.00 1901/1: 1CO $54,00 2 5,1 o 0 00% IGO,* ',Z54 03 100% 100 l4 554.00 100 S54.00 Ica $54,0C 100% IC0 plc $54,00 100% 100 554M 100'.; 100% �E,4.00 100 100% 100% 554,00 lcl% Ica zv, $54.00 Ica $54-00 1100 $S4.00 "Do 654 ou iDU31, 100 364,00 ,400% 100 Y. SZ,t.ao 100% 100 $5400 100111, - loc $54.00 100% IOG $54,00 1000.E 100 ly, 554 00 I Doil. - IGD s54.00 100% N..Go 0, S54,00 100% 100 $54,00 looclla 100 Ye $54.00 10014 iao $54.00 10014 IGO�q $r;14.001 100-':, $54,00 130% S54,00 -F I�AL 970--- 570 43 1 c 0,f, 43 S54 Page 1 misc MISCELLANEOUS COSTS so D 289 13'WINTP Digester 98569 OTHER) LABOR LABOR ADJUSTED LABOR LABOR TOTAL DESCRIPTION MATERIAL HOURS FACTOR_ LABOR HRS RATE COST COST PERMIT-701A410 10 CRANE&FORKLIFT-70111W0 100 ly, $54 00 SPECIAL FREIGHT-70111VO 100°, $64,00 WELDER �GAS-70111213 1001/1 $54.00 CUTTING,GRINDING-70111310 100 0/1 $54.00 ,Manfift-7011i4/0 IQ 0%, S54.00 ADOMONAL HARDVVRF-70111410 1001)" $54,00 RRECAULK 100 °11 $54.00 00 t/I 1 $54,00 1 10 0 llri 554.00 TOOLS MISC-70 111710 10()01 554,00 MOHILI7ATION-70111810 I OD $54.00 OW'S-70111910 100 q/1 �$54,00 SCAFFOLD-7QU20/0 100 $1 $54.00 VEHICLE-70i12110 100 ,/. $54.00 100 IV, $54.00 LODGING-70112310 100 1/ $54L00 TRAWL 100�/r $5400 PIPE IID-7011171YO 100 11/1 $54.0D tMSIDE EXCAVATION 100 o/l S54.00 SLEEVING too 1/1 $54.00 CLEANING 100 ly, $54.00 CONCRcT'E DEMU 100 �?. S54M EXT ERIOR EXCAVATION 100 1/1 S54,00 1,14STRUCTION 100 11/1 S54,00 No MQ 1 OQ v, S54,00 Mcs PZ,,aLe 100 ly, $54.011 AuIomatics. 100 % 554,00 0 jC)B SHACK-701116)0 0 12 275 33 100 1/1 554,00 "TELEPHONE40VI610 012 Ica 12 100 41' 554.00 f2 LMi,701,12210 0,12 75 9 100 ov $54,00 ,SUPERVISION IN Fi'--LD-hrs 4 55 234 100 6/; 354,00 100 $64.00 100 54.00 100 7/ S"14,0D 100 li $5400 .Do 1 $5+00,111; 100 114 S54.00 100 iuo 100 Ili 100 %. $54.00 100 6/1 S54L00 1100 51 $54.00 iro ll,° 554,00 100 1,/. 1 ca o7 100 o/l 10 0 t/I 100 is S54M 100 l/ S54.00 100 Dx $64M 100 11/1 $54,00 '100 "/, $54.00 1007. $5400 100 $54,00 100 `i $54.00 100 9/. $54-00 100 $54ko TOT A:. 285 co 289 Mollie McKiernan From. clang@wfllptumb com Sent: Monday,July I 1,2011 3.30 PIVI To: Mollie McKierrian Subject-. CPR 40 re-quote Attachments: CPR 40 price quote and take off As -PR;10'Emce quote Holly, can you 21-1-ce r.hlis out and send it ti-irough, Th-is is for Craig and I ,-;ent over and this is what we agreed on. . Tharks JOB., BWWTP Digester 43 CPR 40--RFP --13 Dvision 15 Mechanical; It_-rn Decfiption.- QuanRy Ea Pare E-a. Hours Ea Hours total Price Total pt�ca SW) Hangers&Supports 10 20 1 10 200 2 1/2"Sch 40 Btk pipe 20 7,2 0.19 3.8 144 1 114"type L copper 40 3,65 0.06 24 146 1/2"GPVC sch 80 pipe 80 2 07 0,03 24 16 15�6 3"sch 80 CPVC pipe 20 1444 20 288 8 1 1/2"sch 80 CPVC pipe 5 509 08 4 25-45 0 a 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C 0 C 0 0 0 G, 0 0 0 0 0 0 0 0 0 0 C 0 0 0 0 0 0 0 0 j 0 0 0 0 TOTALS 42.6 969.85 ....................................... .................-mll................ .............. .................. .................... .......... ............. ........ ........... .............. .... ...... .............. .......... I-al 'IORMSON CHANGE PROPOSAL REQUEST el, R L E,ISO. (Not a Change Order) Project. Bozeman WRF Digester No.3 and S6ids Dewatering Building CPR No.: 046 CPR pate: 2118/2011 Bate Sent to Contractor: 2/18/201 1 Date Reed from Contractor: TO: McAivain Civil Constructors Please furnish your proposal for executing the following changes: Remove heat loop pumps(Section 15515), 1200-HLP-02 and 11 00 HLP-06 from the project per submittal review comments. HDR/MMI pate: 2/18/2011 TO: HDR Engineering,Inc./Morrison Maierle, Inc. Proposal: Cost Credit (A time extension is not required for this modification unless otherwise detailed and justified,) Contractor Date TO: Accepted/Not Accepted HDR/MMI: Date Accepted/Not Accepted Owner:Date Recommend to accept for a total cost of$61 .89 per attached detailed breakdown. James Nickelson 07-02-12 .J �- a� c [a p m L 1 rl_ I'r 1- 0 4 0 LO 00 0 m om{ f.6 C6 L" nnLr)P J w G3 C L C- ._1 CL 0 ? J M X Cz d 2 CO to d !11 C3 w ca C) J C) to r a C Cl.. o CLl i E Lo 'f CL U c C) L ED >, "J -� 1.L cc E � W0110 iams Plumbing a Heating Utilities Date 4127111 McAlvain Civil Constructors Attn: Harrison Hotchkiss Address Fax# BWWTP#9589 RFP##021 CPR#046 Dear Sir. Credit for smaller HLP pa&06 pumps and cast add for larger HLP 05. Subcontractors: HVAC-100 _ TEMP CONTROLS-101 _ TEST&BALANCE-102 _ INSUL-105 _ CHEMICAL TREATMENT _ Subtotal-Subs Overhead Subs 10.00% - Subtotal-Subs-w OH _ Profit Subs 5.00% Subtotal-Subs-w OH&Profit _ Material 8q.7 Labor Hours 0 (325) Direct Job Casts (27) Subtotal 495 Overhead 0.00% - Subtotal w OH PraTrt 15.00% 74 Subtotal w OH & Profit �"� 569 Subtotal Subs&Material,tabor, Direct Job Casts 569 BOND 0.00% - GROSS REC TAX 1,00% 6 Total 576 Sincerely, Project Manager Williams Plumbing.Hoating Utilities,Inc. - SOX 10 . 2131 Industrial Drive - Bozeman,MT 59715 405-587-0969 * FAX 406-685.9458 CoMput®r Totals 947 tOn44 WT (S) 0% L BWV',TP#$589 Adjusted (3x5j 522 °fs Adjumted LABOR LABOR Ls6or LABOR LABOR TOTAL DESCRIPTION MATERIAL. Adj MATERIAL HOURS FACTOR Houm RATE COST COST €'umpswapout 847 100% SAT (6( 100 b M 365.00 (323} 622 lw% 100% 505,00 100 6 1;0% . .00 100% 100% 501f.00 100% 100 9+a $OS,00 160% - In 55 . .UO i00%_ 100 100% 100% Sti5;00 iw% 106% Stlti.60 r 100% id0 Moo 1tAp96 100 6 $66-00'- - 1IId9±a ico °k 3B5 0d 100% - 100� 303.t10 - 100% 100 % 5t1b.AQ 100% 100"k 385.00 100% i00" - 386.00 i00% 10 3d#.00 100% 100 *",do, 1009E 100 90 366.00 - 1009E 100% 585.00. 100%- 100% 31g5.00 i00% r 100% $06.00 100%` 100 SOb.Oo' - 100% a 100% moo 100% 100% - 366.00 100% 100% -$65.70 100% . 100% - 105 00 l 00% - 1 d0% . 385.00 1OD% 100% $86.00 100% 100 % $05.00 1009E 100% 306.00 lob% 100% 505.00 100% 100% 30M 100% 100% 306,00 DO% 100%, - $65.00 100% 10T3% $85,00: 1" 100% 366.00 I Do% 100 - S0$.00 IDO% 100..% ki0b.00 100% 100 55 385,00 d0% 100 waloo IDO% 100 % 385.00 100% 166 95• 385.00 100% 100% 386.00 i00% T00%' N8.00 100% 100% ssra.00 JDO% 160 96 $0,00 10094 j00% 5,m" iom 100% $65;00 - 100% 100% - ;6:00` 100% 10d 9F 385 00 100% 100%, S85:kt0 10096 100% - S01s.00 166 i00% 305.00' 100% i00%. W.00 100% l04 56 - $86m 9011% 100 % 585,00 'ob% 100%, 305.0p IW% 100% $65,00 TOTAL 347 1009E 841 S 325 522 T'a�u 1 J0B, $ P #9589 RFP#021 CPR#046 LABOR MATERIALS CITY ITEM EACH EXT. EACH EXT. 1 Credit for smaller HLP-05 -5 -5.0 -$1,113.00 -$1,113.00 1 Credit forHLP-05 -5 -5.0 -$1,137.00 41,13T00 1 Add for larger HLP-05 5 5.0 $3,037.00 $3,497.00' Totals: �a.4 $847.it0 Wsc WISCELLlxNEOUS COSTS- (27) 0%. - WDO EV�Yi1TP#9fi89 (27) OTHERd LAHOR, LABOR - ADJUSTED LABOR LABOR TOTAL' DESCRIPTION I+IIATEMAL HOURS FACto LAB A Hks I ATE COST COST PERMIT TOIL? 100 Dh CRANE&FQRK-FT40111010 10p"°r# „[}0 SPECIAL FkSirG 40111110 100.Ix $B5$S.CDO, WELDER&GAs•70111 m 100°h W.00 CUTTING,GRINDING,40111Z70 100 i - 585.00. MISC HOIST-701114M n *,( _ do 100 ADDITIONAL HARbWRE-70111410 $9Sbo, loo,9 $85,00 T0OLSM$+G-701fj71D 10 °C MOB10Z00N-701111€D 1 d:% $85.00 F {&MI -700111WO 10q ox SCxAFt 0LD-70112010 10 % $60-00 J IIGL1 7�1121n0 loo,f - $66.00 10o ° - 566.00 - LODGING-7011=0 loo ° - W.00 TRAVEL 160 °,5 - se6,00 - PIPt'10-701AM0 _ 160 q INSIDE EXCAVATION 140 °4 - $s5:fld SLEF-tin�tO $ " $65.Li0+ aS,D o CLEAh1IN[1 ir.��° � _ CONCRETE DEMO 1w°k - $65,00 EXTBRIQR EXCAVATION 100 5 _m sako0 .._ - INBTRUCTIok i0D No . ,Mo loo Dd _ $65.Do. _ Mos Rate 1D0 9f - 585.00 Automatics: 1do'i4 .DO (0) JOB SHACK-701/1SI0 #4# 275 (4) in �( - $65.0o - (4) TELEPHONE-701116IG 1 100 {1) 100 °.4 - $$5.00 - (1)' UTIL-70112210 ###I 7 (1) 1DO'A SUPERIIt i6 fNFIELD-hrs -1 421 (21) 106Di1 - S85,OfJ (21), 1D0*A 100 100 - 100 9I - 555;D0 - 100 100 °! - $86,00 160 'A W, 0. - 100 si 100°S - $65100. loo s - $66,00 - 100-1 06.00 MAC 100�'A W5 o10 - 109 W.00 100 sc 365,Ff0 104 100 If SgEr.€1(1 lad-X 5Kw 1 d0-X $O6.00 100°,( $66.60 TOTAL 271 0% - $0.00 - Page 1 h:%vri)dowslexcet5\PrjMngmttLivPO�RFP Master Summary 0412WO11 1 37 PM Meti&Misr- 158°r6 Jots: awvvrp#9689 tabor -63% RFP # 021 CPR#46 Subs 0% TOTAL.RFP 519 Profit s% 'PRO n[T&OH 25 Bonding D°la MARK-bi'COST 5 Number of men Er7CPOSLIRE 619 478°h E3#ecty�Iabor LABOR° aRETURh�- X>�R� LABQR FtF,T�� �tD "."`�'� DIVISIO MATERIAL HOURS LABOR TOTAL TOTAL FROM BELOW 847 -5 -210. 637 LABOR DISCOUNT *'*"w,"•'••*k*•*' D -115 -115 TOTAL 84? -5, -325 522 MISC HOURS 4 �' TOTAL WITH MISC HOURS 5 -325 TAX ON SAT L _( ..�_m_m_ 0: fJBCc3 1T�ACT ITEMS IrArMAT`L FACTOR ` _._1tl �s tt HVAC-100 $0.0 a TEMP CONTROLS-401 $tl= COST 522 TEST&BAL 02 $I1X0 Overhead 0/4pvjjga�': 0' CHEMICAL TREATMENT $0.00 Cost&P&0, H -SUBCONTRACTORS O Ovethe3d°,o 1tyAQtDlAi D Profit% k _ . ii°�' 0 MjSCELLfANEOUS 27 Profit°7a ° _00411 1 TOTAL 51 g BOND t J 0aioi {} 'GROSS REC TAX b C�� O GRAND TOTAL 519 PROFIT-&OH 25 TOTAL SUBS so-D4 5 MAT ERIALIiABOR DETAIL. MATERIAL Adjuster{Flours LABOR TOTAL FROM COMPUTER TAKE-OFF 847 (5) (325) 522 FROM HAND TAKE-OFF- - _ TOTAL B47 5 325 522 Page 1 03117120il Thu 07.26 ID:#478217 Page I of I NORTHWEST PIPE FITTINGS, INC, S'n-e virc Z�t�e Nwo RO BOX 124t V'Q 8QX4tM lM),ATvtvYtjCMj �fLO3S FLATS nD 33 8-��WigrftEa 1901 MEADCA-LAAK GfFAT-Aill MY WN tCkUSPfLy,#4-.SCpo4 bl�tQRAOC UT 5W714 5694770 ElLuwas MT wo BUT-C M7 Wot PkONFOOV27,04$ PS e(4M 752-D562 PA014{U:3M-X43 P)4CK(fA 252.0142 FAX E4"j 4U.i7&3 F6Xi406)7S241 53 FM(W)Us-2m VAXj4M 4+6-Nn FAX!"4V-vA? 94868 03/07/11 (REMrr M RO 110111258,BILLINGS MT 59103) SOLD WILLIAMS PL-BG HTG & UTIL INC SHIP WILLIAM PLBG HTG UTIL INC Tip: BWBZ DIGESTER 3 TO. 2131 INDUSTRIAL DR 13WRE DIGESTER 3 BOZEMAN MT 59715 BOZEMAN MT 59715 C 0 N F I R M A T 1 0 X 0 Iq L y tmo� BRBE bryan 9589-35 OUR TRtfCK L 2� JOTH "CITY % FREIGHT-IN FREIGHT IN CHARGES 137,6NS40136 3097 .65 i! KV2006 TACO PUfP 80 GPM 301 HEAD FEET 1_5 HP 46OV/3 PHASE 1100-RLP-05 lrmms ORDERED aUT NOT HAVE BEEN CANCELLED AND WILL PHEfGHT QHARCIE TO FOLLOly ON INVOICE N NOT BE SIqIPKD UNLESS ENTERED IN GOLUMN HEADED 18.0 1 ITEM2 0.00 ENTERED IN GI)LUMN W!LL BE SHWED UPON RECEIPT" PAST DUE AccDlJNTs SUBJECT To SALUTAX 0.00 TIME PAY OiFFEFIENTIAL OF I 50.,6 PEFI MONTH F'RoGw 0.00 CUSTOMER BO MAN MT 59718 9 /1s/o9 S1842934 ¢ MR-To ��a caaa?�cs ara�x� i WE TD: ALL BIDDERS BOZEMAX ALL BIDDERS BOZEMAN ,TOB QUOTES UOB QUOTES )SOZEMAN, MT 59715 BO.204AN r MIT 59715 �.�.wLr•Ausayy�-.��{{4K�aY1'.... j��°�:`"' �!W3�049:� � 4��. f '�- ..� 6y18yy 8 WRV DIGESTER [�y (� y BQZEP+IM Hr3USE ACCT L.sii+;.i�i`Yss�.,*• e '�'�:. `" '!` MVy} :�r�+3a �.' Y. ._.` s f pyw}.yc' I. .L� 'M:+.+:+.s.s.�Ju.+nfi+,";;y—,.,.... �3.w;✓�J#C^�Fj JOEL OT �R{� 12 j3 6 � � ! X /0 No :,:� ti'a`{r.�``¢`Y� ?�.. ,,; ,y, `'' �"',�'.,:`:, �:.�&1ft,3�li�•} r � hf cwsaiwsiuk:..w =•t:. eu...x.Ts.C%�,..L::s ."lu, ,:... +.:.SStu..' xt .�..`,d.�u:•�ry a,<r 7..,.F..;.�'�.`.. �.� �".+� ,�. r .�.F•f�.G/�}�FC• �,:. lea N1:LKINS MODEL S S'�RA191 2-1-1 - Subtotal��...... �.e �r � t E ------- lea^ W1LKI.NS MDI)M, S STRA1-NEE 2-1./2- Subtotal ------ lea WILKINS MODEL S STRAINER 3 r, Subtotal ------ Pumps - -- lea TACO XV-4007 240 GPM g 1760 RPM 46OV/3 P"RkSE subtotal -_.-__-_ 11C1b_ ,Pn-D5 lea TACO KII_1507 60 GPM � 321 1.5 �Jp 1760 RPM 46OV/3 PHASE r � Y - ,__ Subtotal -- --_ _r t 11.1.3.Q 0 _ F lea TACO KV-:1507 60 GPM 0 40, 2HP� 1760 RPM 46QVf3 PHASE i Subt Continued orl 1 e t Page M* - _ ._. . al _ I No Text fal "MORRISON CHANGE PROPOSAL REQUEST jQMAIRLE,lvc. (Not a Change Order) Project: Bozeman WRF Digester No.3 and Solids Dewatering Building CPR No.: 047 CPR Bate: 3/1/2011 Date Sent to Contractor: 31112.011 Date Rec'd from contractor:. TO: McAlvain civil Constructors Please furnish your proposal for executing the following changes: For the interior drain(D)pipes that were supplied with bituminous coating in lieu of removing the provided coating and painting with the s ecified S stem 2 Please clean the sgb ect drain pipes and provide a commensurate credit to the Owner. HDR/MMI Date: 3/1/2011 TO, HDR Engineering,Inc./Morrison Maierle, Inc. Proposal: Cost credit (A time extension is not required for this modification unless otherwise detailed and justified:) Contractor Date TO: Accepted/Not Accepted HDR/MMI: Date Accepted/Not Accepted owner: flute Recommend to accept for a total credit of$2,977.67 as shown on attached sheet_ . ., James Nickelson 11-11--11 e= q O -� rn a- Q o L m C] C7 CJ O O O 0 Cn c(? to g! G Q7 69- 1 i ull 6-> uz}ffj Cf} fA p popcn �..� J c en m U LL OLU (Y C1 co C) CC m t!a (!1 rs� � J ua D) C p co CL' y� :3 05 Q) m Ca C �- E2, �-- T & L Painting, Ine. Date 5/11/2011 509 Colorado Ave. NW Great Falls, MT 59404 406-454-0567 Fax: 406-454-0567 Change Order Request Form Customer: Location: Harrison Bozeman Digester 3 McAlvain Civil Constructors Bozeman, MT 5559 W, Gowen Rd. Boise, ID 83709 Customer Request No.: CPR 047 Change Description: Deduction for not painting interior drain piping. $ (2,780.00) Total Change ............. ...... $ (2,780.00) Authorized Signature. Jim Lundquist, T & L Painting ........... ........... .................- ............................................... ....................................... ................ ................... .............................. . ......... lll��/,`. ........ .......... 4 mg pv�/ ......... ON"', xw� ........ ... ......... -_4 WE!............. jim .......... ...........//", I.............. A/w, -,2000 ............. "Ald000 WE Ow /I k/ .. ....... ac faq MOMSON CHANGE PROPOSAL REQUEST I—IiJ, MIAIERLE,t.%c- (Not a Change Order) Project: Bozeman WRF Digester No.3 and Solids Dewatering Building CPR No.: 053 CPR Date-. 412012011 Date Sent to Contractor: 412012011 Date Rec'd from Contractor: TO: McAlvain CMI Constructors Please furnish your proposal for executing the following changes: Provide explosion proof motors on the sin-ift-phasefans: 12.00-SF-C)5.12()O-S.F-D6 and.1200-E.F-08, HDR/MMI f Date: 412012011 TO: H DR Engineering,Inc.Morrison Maierle,Inc. Proposal: Cost Credit (A time extension is not required for this modification unless otherwise detailed and justified.) Contractor Date TO: Accepted/Not Accepted HDRIMMI:Date Accepted/Not Accepted Owner:Date Recommend to accept for a total not to exceed of$2,992.67. Field labor mast b-e tracked and the total to be reduced if hours are less than listed. James Nickelson 06-03-11 Total cost is $2,992.67 based on field labor estimate matching actual hours. James Nickelson 10-10-11 p Y 6 d Y G �} C7 py� 6 (� u C�7 L} C RF o CD h0 O h C:)h c�`1 CAD t~o X CV .-- tV CV cq Ky } Y cv CL m 6} 63 5e}'6t1 EFY#> V)- 64 84 b} Im LL co d 0 X } t ` w w0 � C? �] cq fit? a {17 Cl cc: c 0 IL 0 � rr. Ln � a X 0 w c tox h(DCD j � J D LL 2 U) LLI ' c C!) LL1 z LIJ i L o rlr ' CO LL rxs > o C? M LL LL7CL ' -0 E Wiolliaams tIII Plumbing o Heating - Utilities {ntejr;tj : meat - Gamr<ccr�G u May 11, 2011 McANain Civil Constructors AUn: Harrison Hotchkiss 5559 DIY, Gowen Rd. Boise, ID 83709 BWWTP Digester#9589 REP#023—CPR 53 revised Dear Harrison, Per CPR 53, the provision and install of explosion-proof motors on three(3)single phase farts. Please note there could be a 4-6 week lead time on said motors if not in stock. If fans are part of substantial completion,W PH will need extra contract days. Subcontractors: HVAC-100 $2,405,00 TEMP CONTROLS-101 - T6ST &BALANCE-102 - INSUL-105 - CHEMICAL TREATMENT Subtotal-Subs $2,405,00 Overhead Subs 0.00% - Subtotal-Subs-w OH 2,405 Profit Subs 15,00% 361 Subtotal-Subs-w OH & Profit 2,766 Material - Labor Hours 0 - Direct,lob Costs - Subtotal - Overhead 0.00% - Subtotal w OH Profit 15.00% - Subtotal w OH &Profit - Subtotal Subs w&.Material, Labor,Direct.lob Costs 2,766 BOND 0.00% - GROSS REC TAX 1.00% 28 Total 2,794 Sincerely, Project Manager Williams Plumbing,Healing UMRies, ira� • BOX 1e 2131 Industrial IOrive Baseman.hfir 59715 t 406.537-0953 - FA}1406-5$5-9458 ,tfCT?1.WORKS W't9 ONTAivI1 IFVC". fZ00jirry>A11 Tykes � t z hw tax" S ' llua,tfi:t5 n!u Shirt rLlr 1+rd ra+arf Itor fr+r,,^ 4ir Conflulorrin trod Heating Of JF.-FF GORI}ON,Previdenr FEET I�1raPl,,�1�hon 4067?4-MNO �r f3lgio�rrpe IiOC+o'aca:��rx�.a, �� Frr�-t06 7?f-�Cr�1 *SPrrFrrless 5`tc=rl arrrf.4fturzlraaarrr Welding 5dirrfs<urrd lITAc phmw 44M-7 8.507ld *General MiM.Meral rabricatirm a rdx 406-72S-5087 •Architectural Sheet Mufal P tJ_Bees.10 •Design I Build 11 MC 36-0 W.tUy uchrar Alrssoulrr,;tlnniornr 3 �fi8 At�ditional Work Authorization EVI5EO -5/11/11 Contractor: Williams Plumbing & Heating Date: 4/21/11 Project Name: Bozeman WRF Project Number: 210103 (Digester 3) COP, MOM-3 Contents: CPR-053 Supply and install 3-explosion proof motors 1200-SF-05 trio new sheaves required); 1200-EF-06 (New sheaves included. field installed)and 1200-SF_06 (flew sheaves included, field nstailed) Purchased Equipment $1,198-00 (Equipment supplier received special pricing) Quick Ship Option $89.00 Field Labor (Hours 14) $658.00 Sub Total $1,945.00 overhead 10% $195.00 Shop Burden 7% $150.00 Profit 5%. $115.00 Total for Change $2,405-00 Additional Costs for this work: Two Thousand Four Hundred Five & 001100 Approved Signature: Approved Dote. Note: There is no credit for the existing fan motors. Thanks Dan Brennan Vemco, inc. .................... ................- ...................................- ................ ......... ........................................... ...... ......... g-5 ze 0 lOw" gagg" -- ------ ........... .................. ............. .......... MORPdSON CHANGE PROPOSAL REQUEST „ MMERL ,iNc (Not a Change Order) Project: Bozeman WRF Digester No. 3 and Solids Dewatering Building CPR No.: 058B CPR Date: 10/3/2011 Date Sent to Contractor: 10/3/2011 Date Rec'd from Contractor: TO: McAlvain Civil Constructors Please furnish your proposal for executing the following changes: Provide steel plate cover(sl as shown on attached sketch. Bevel edcle of plate, provide bolt holes for pick points, sealing stria under plate and paint with non-slip System 2 or similar! H D WMM I Date: 10/312011 TO: MDR Engineering, Inc./Morrison Maierle, Inc. Proposal:. Cost Credit (A time extension is not required for this modification unless otherwise detailed and justified;} Contractor Date TO: Accepted/Not Accepted HDR/MMI: Date Accepted/Not Accepted Owner: Date Recommend to accept at total cost of$4,608.00. James Nickelson 11-2-11 � MQ Li 4] L9_I � 0 UD �- C. C? U C) L6 p c7 t7 0 — r C? r r r O Y C7 Y r CV Y C`� CD 0 Q N r .tom � LOto [[] lt9 IL] CSS Lk'7 C{? M L4 C N LO CSC] cn CE7 �cT � �c4 Sfi tf a7 tll U Kr, Y 1 I �+ <CD LO O a_ F u7 ��- o Q Q 0 } u5 CL (j) Cl) ea � ¢ cx � ca o 02 4 mLLI ca E ca 0 0 LO co CL C6 0 p tfi EtT � � ua �1 C/a Cn J J w ,- CO G 0 I90cz ,.Q "r P;af,", '< t 'E W T i 4 u9 Ca i U7 CD 0 al CC) 'ate`-. LL c5 C? tw t *� ° cis 0 v Q Custom I1 Mew Fabication 406-686--6809 5601 Monfarion School Road 406-58E-2590(fax) Bozeman,MT 59718 BID AND PROPOSAL )7)e 411i+14 d" DATE: PROJECT. TE.I 1=PHONE; �? /d,c- IA 4L S SPECIFICATIONS: structural weight Bid Includes the following: f l 9 LYIilR4\IV '� �E�Y: DATE t?� �t PRQJ.NO. =i �ERLE,INC. CHK: DATE PAGE: OF 6„w w { 3 r E �� ti .............. ...................................................................................................................................... ............ ............... .......... .............�7o........... .............. .............. ... ........ .. ...... ..... onw/m/ ................................. ............ fill 1VIQj J50NC CHANGE PROPOSAL REQUEST -JA MME.RLE, (Not a Change Order) Project: Bozeman WRF Digester No. 3 and Solids Dewatering Building CPR No.: 059 CPR Date: 611612011 Date Sent:to Contractor: 611612011 Date Rec`d from Contractor: TO: McAlvain Civil Constructors Please furnish your proposal for executing the following changes: Modi€v hardware package on the west man door to be similar to the other man doors include lock and panic bar. HDRIMMI Date: 6116/2011 T0: HDR Engineering, Inc,/Morrison Maierle, Ino. Proposal: Cask $1,47'4.49 Credit (A time extension is not required for this modification unless otherwise detailed and justified:) Contractor Date TO: Accepted/Not Accepted HDR/MMi:Date Accepted/Not Accepted Owner: Date Recommend to accept. "` James Nickelson 09-13-11 6 — 0 — C2 0 co 0 co 0 C) LO �o co 4,; m in C) m a, rn IQ o o rn rn � lllr llt llr (q It UD m CrA 0) M N to co U') 't 't �D co Nr Cl) U-1 4) xt m �l CL 0 Els 6-1 69- bgF W. 6IX e9- E19. 64 ERP U), "1 04 (f). :-F ,3: Lo w Lo F- F- NC� 0 0 0 0 0E- 0 0. F- C) CL M CL z U) In V) m co CL CO m < �L 0 F- ;5-; 0- C) 0 F- q UtJ of < w O 64 cn C) z QNi cCf Cf) 46 i U) (D LO 4- 0 ry LL 16 c) n Cl) rr- 0 C) rr, 0 C: CJ) U- LO o E 0 (D 0 < -0 :3 0 C) U3 < From: Krystal Ernineth [krystale@adhrnontana.com] Sent. Monday, July 11,2011 3:33 PM To: Macy Lui Cc: Harrison Hotchkiss Subject: Change Order for Bozeman Digester Macy, Here is the price for the Exit device 9500E x YR08M. w/trim, cylinder and keying - $984,00 ClUr prep Char,-,C WOUld be $75.00 If you have any questions, please calf Peggy. Thank you. Krystal .,a-n%20WWTP%2 ODige5ter'/D2O"/�233/Clt.uigcs/()Nvncr'�/02oCha�age%2oPro pos�ti%7f)Request/CPRO/o2OO59/ADH%20%2OQiio 1c.tx((7113/20 11 83 1 A 3 AM] Trip Cost Calculator- Maxirrliz.e Your Fuel Savings - GasDuddy,com Page 1 of 3 f8eepmeA Nlar:5LerU KnA iqi Fol➢oW Us Facabc,�k '•��ktor PindLocal Gas Prices Jon GzsBuddk.Corn norV _ .. .... ,�.7y'+y��,{{r pp� ggypg� Free classilreds at 5uperAtfe eom I �, r G'�"�'M�✓Buddy n 61+ (.00.➢C'�r34 HotG3 Oeals sS i{4f{ISUV.Cotri I 1 Horne Blog Gas Prices P➢ cf,Cl )Js Ch;P*ice Mass 5cTnts&Prizes FfobT'Ie App,; f tr„:day Co i" rol Fuel C..�I,G>(l. i 1"i,)Cost CaICWlatot' t3as PrICP.s� � I E Y Stake/Pro tree I City Stag&-------es r➢ael Saving Tips re<+kurnd Spop�')r 1�scOyef p an Toad-Fi so uZasrausanN Com:..Qlfer C 61ek h�„tn ter rno�rr info Trig Cost Calculator Plan My Route lnslruclIons Tnp Summary I My Fllis i V ew Man I slap Bczeman.My i Ens ellln�s,MIT Trip Summary ! AtddRrOInr„nR Qne Way0 ierwn7rip Bozeman,Mt to Billings,Mt to Bozeman,tit Vehicle Information zeal Total Trip Cost Toyota $6 1.6 6 'runora A§MG(Au90 5 7;..,4WD) I ¢ i City siwy dank Pue4Tyre 1}riC of Gas 13 17 26.0 Regular { $3.612 r, ar or Fnmr Ddv tf�jn InfarMallon v,x„v Aroer� e I f N;Jlnce Fuel Used calhon F')Oi7rinr Advanced Options °'" �' 287 mf "'s C7.g7 gat L y 409,71 Ibs i i ANoillls required an Ws trip, i rtSy`.sviragt k A Bozeman,Mt 143 3 rni Obout 2 hours 16 minsl ilstf Billings,M{ fi tf' 5tvrt�C�rnC(ran5 I 1437m,(aboul 2 r•'ours d8 mins) Bozeman,Mt http.1/gasbuddy-coi-n/Trip—Calettlatc)r.aspx 7/11/2011 ................... .........................- .................... ........................... .......... ........................................................ .......................... MI/M .......... .......... ;/��;,/W.............. xw ............ 0/00, 00, jti MORMON CHANGE PROPOSAL REQUEST ST 211 a m- (Nat a Change Order) Project; Bozeman WRI;Digester No,3 and SoEds Dewatering Building CP?Z No.: o CPR Dater 7WO11 Date Sant to Contractor: 71L12 11 Data Rac"d from Contractor: TO: McAlvaln Civil Constructors Please furnish your proposal for executing the following changes- Mod1y hot water loops to i ucie 30 ro ene Oycol. Include glycol feeder to§g fie -loca eer o - site. Cut s r I l r is nect feederW the min hot nkqLO& n PiN.Aawithin IQ ofthe rnai HDRJMMI Date 71512Cit1 TO: HDR Engineering. Inc.,Morrison Maierie,Inc Proposal: $28 �32.48 Cost —Credit (A time extension is not regtslred for this modification unless otherwise detailed and justfied:) Contractor Date TO: Accepted/Not Accepted HDRUMl.Date AcceptediNot Accepted Owner. Date Recommend to accept. James Nickelson 08-29-11 cl A 0 0 Cl -4 LO �5 .5 a C� LO Ul) 0 Lf) "D i ram-m C� C! Cli C! C* i n LO N V) eq DD — 04 C4 r— r- OD CIZ CCL N (N rq CL C.) rn 0) 696 afa 6% ter rrs 6% &51 yr E 800 CL 0 D -1 0 cu a) pC Of CL to ui F- W z 0 tff - 0 10 -6 U) C .Q m -5 CO L) zC; 0 0 ry U- Ca CL Q Of 0 0 � 0 FL U- E C) 0 E < Cd 0 CL C/5 0 m L) 1§ �—I i �i 0 1 illiams Plumbing a Heating * Utilities 4nA, fnee rtt CommioNtKt Conmt nRt� July 25, 2011 McAlvain Civil Constructors Attn.Harrison Hotchkiss 5559 W. Cowen Rd, Boise,ID 83709 Bozeman Digester-WPH 9569 RFP 030-CPR 50 Harrison: RFP Description: Pricing to modify hat water leaps to include 30%propylene glycol. Excludes any leaks occurring in existing piping, Subcontractors: HVAC-100 TEMP CONTROLS-101 TEST&BALANCE-102 INSULA 05 _ CHEMICAL TREATMENT Subtotal-Subs Overhead Overhead Subs 0,t3f3°lo Subtotal-Subs-w OH Profit Subs 5A0°I� Subtotal-Subs-w Ohl&Profit Material 19,011 Labor Hours 0 3,623 Direct Job Costs 448 Subtotal 23,082 Overhead 0,W% - Subtotal w OH 23,082 Profit 15"00% 3,462 Subtotal w OH&Profit 26,545 Subtotal Subs&Material,Labor, Direct Job Costs 2f%15 BONI) 0,00% - GROSS REC TAX 1.00% 268 Total... 23 Sincerely, 'two aw, Project Manager 'tMlllisma PtumWng,Heating Utlibfies,Inc. > BOX 10 - 2131 industriat Chive • Bozeman,MT 55715 406-Sa7-0$6$ • FAX 406-585.0458 ��� BWWTP. Phase 3 (Digester 3) CPR 60 Division 15 Me-chartical.Pre arad by Clwen tart Item 2ecri ffan: quanfty Ea Price Ea, Hours Ea, Hours total Frxe Total Price Sub, propylene cal 1500 10.75 0,03 45 16125 cai feeder unit 1 2497 4 d 2497 1"black iron pipe 50 2.91 0.2 10 145.5 1"socketwJeld 90's 6 4.471 0.3 1.8 26.82 1"thread-o-►et 1 5.41 2 2 �.41 1"threaded tall valve 1 11.5 0,5 0,5 11.6 misc hangers 6 7,5 0.2 1.2 45 care drift 2"hale 1 125 2 2 125 I"riser damp 1 5,51 0.1 0.1 ' 5,5 1"x 9"a.S flex 1 24 0,5 0.5 24 0 0 0 0 0 0 0 0 0 0' 0 0 0 0 0 _0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .0 0 a 0 0 0 0 0 o 67.1 19010.73 Dompintr Computer Totals 19,011 IOU% 19,011 57 IDal/ % S7 494-00 1,623 22,634 BWWTP#W9 Adjusto d % Adjusted LABOR LABOR L bor LABOR LA13OR TOTAL OESCMPTION M!TFRIAL MATERIAL HOURS FACTOR Hours RATE COST COST OPR80 i9.011 Ad 10056 1g.1311 67 100% 57 $54.00 $8M 22534 10036 100% 55400 1DO% 160% 564.DO 1b0% 100% $54 a0 iw% IGO% 100% 10D% $54.00 Lam; 100°% Sb4.00. 1DOW r100% $Cr+iaOD" 160% 160% IGO% 100,% 160% 106% 10it3o 'too % $54,DD 100% 100 % 354.49 100% IGO % $5d;oa 100% 10B% $!S4.00 1wDM - 100 % :$u 00 IGO% 100% $54„60 100% 10a% SK00 100% 100% 554.00 1D6% 100% WOO 166% #0a% V 4.o0. IGO% 100% $StOD 1gp°J4r 16o% ^ 1:5�PD - 166% 100% $54.00 1DO% '100% $64,00 - 100% 100% $KOO 100% 100 9 S54,Da 100g6 I'm % $64.60 100% 300% $54.00 100% 16a% $54.a0 100% 100% S54.D0 100% 100% $54.00 10094 100% W-00 1[1Dya 100 % 100% t0a% $54.0D 100% 100% $$4,OD 100% 100% 100% 100%. IGO% 100% $6COO 100% 100% $54.00 100% tDD% 534.00 100% 160% U4.00 100% 100% $S4,00 1DD% 100% IWO 100% 100% $54,00 100% 100% S64,00 100% 100% 534.00 100% i99°% $M,a0 1., .• 00AG - d0h6 SS 100% 1"00% $54.00 10aw 13ID% $5c4�.DiDn 16o.% 64[7A. 10096 ;1U0% 554.00 _., 100°" 100%, 36q.00 WOO i0096 - ,100"% - SSi.oO - toa9b 100 .oa 100% 100% $64.00 TOTAL ° 19 011 1:DOk 19,011 &T tDD% 67 $54 Oa 3,623 22 634 PvGe hAISC MISCIWLLANEOLiS COSTS; 448 $0 00 448 8WWTP#9689 OTHER/ LABOR LABOR ADJUSTED LABOR LABOR TOTAL DESCRIPTION MATERIAL HOURS FACTOR LABOR HRS RATE COST COST, 1"ERIW-7011el0 � 4` CRANE&FORKLIFT"-701110M 1OQ°h CUTTINC , INOIFkC7it1 3!0 1001 WELDER&GAS-76111"2-p- 1fN1, oA _ - 554:00: - MSISC MOIS`-Alli46 -100 0A ADD17116NALFIARDWRt-701/iA/O 14Mt°.5 $Ir4.flti: - FIRECAIKK. 1C 4"R .00 100 6A - $54.00 TOOLS M{SCN 554.00 701l1Tl0 . 100'A - -$ 4Ao }{OBILl7ATtC3N-701f18l0 100 aA - U COO O8[�lS-70111910 100%, $54.00 S FFOL0-761120l0 140 11.4 $54.00 VEHIGLE 701121l0: - CfO 9 - ;54.66 . 100 bA $64.00. L4pGlFJC 74112 10 106% $54,06 TRAVEL 100M.94 - $54,00 PIPE°10-701l17110 100 6.4 554,00 INSIDE.EXCAVATION 100 9� 55d,00 CLEANING 100 A S54 00 CONCRETE MW 10Q 01 $54.06 EXTERIOR EXCAVATION 100 "A $54.00 INSTRUCTION 160-A $54,00 No Me I00 °A $54.00 Nos Rate 700 5t $54,00 Avlornattcs: 100'A $54.00 - 0 ,JOB SHACK-70111510 0.19 Z'5 52 100° $54.00 - 52 TELEPHONE-70111'10 019 100 18 100'°G $54.00 19 UTIL-701l2 100*0.19 75 14 100 - 454.00.: 14 SUPERVISION IN FIEL04irs 7 54 362 100,4 - $54.00 362 166% - 554.60; 166 °A $64:00 100% - $64.00 106„N - 554.00 - 100% $54.00 ,60 % SS4.00 100% - 554.00 100°y4 - $54.00� Ido 'f �0V 100 cA - .$54.a0 - 100 (h S5d:C10 100 Ix - 554s m lob:°l= 554,00 - 10p,oA =100 'A $54>7{1 100°A $54.00 .100 'A 554.00 "l 60°A $5440 100 94 $54,00 �1 ob 94 - 364 0 100 100'A 100 DA - -$54.00 104�:94 - S54 DQ't - 10.01 94 ,$64'00- _ r TOTAL 448 - 50.00 44d Page 1 AVA A INDUSTRIES LTD. MODEL SF10O PACKAGED HVDRONICSYST",�`l FEEDER ~ The S1~1 00 contains everything required try feed crud pressurize closed hydronic heating or cooling systems in a neat, simple package that is easy to install and operate, It is compatible with both water and waterl"glycol solxrtions, t Q� l FEATURES and BENEFITS M 208 litre (55 US gallon) tarok for storage and mixing In Plugs inio rayry standard 115 YAK`outlast 0 Fluid level switch shuts the pump rlff jf'the.storage tarok level gets low Accumulator lank prevents excessia,e puanp cycling I No direct connec°bran to pokable }voter supply eliminates need for hac° flaw prevention tb4'ake-up,flared stored in the,feedw,tank can be lore-treated Diverter valve fr'ar purging of"air on initial start-up and manual ais twiun rrf.waitron M Prevents mcyor_flvods- in the event oaf steata rupivre, only the rontetnis elf the lank can be pumped into the system Provides leak derection--drtappingfluid level provi(ks itnmediwe notice that the system hcas clew.=!taped ra leak :Fluid drained,for,wervice can erasi"v be pert buck into the slystcm Flexible connection hose with.system check valve muke,v insurllarian easy Represented By: AXIOM PNl'}US7RlE5 l,kNlkD Z6151NEM11T21lVENt3E SASKATOCJN.SK 57K 5J t /i%���� ✓�✓ �/ 1' r 7C7Li FREE.{$77}651-t8t5 PNt3NE:(306)65jrt8Y5 FAX�{3U6)242-3373 14 r� a1 . .., ., , , ,. �, .DIf,Wi�/ /J��✓r,(�dG r���,lr�rf��J� � o,,� �. !� dui ��/�����/,s� � � r,,,l ro.., INDLSTRIE SF100 FIYDRONIC SYSTEM) FEEDER TECHNICAL INFORMATION WEIGHT- 16 kg,35lbs. z4 6101AM ELEt rRICAL 115160/1,0.7 amps 3-From,plug and curd — I PUMP PERFORMANCE txtr� Sto ageank 0,09 l/s(1.4gptn) a tree flow ss s�attons ry 0-06 Vs(I.0 gpm) r@t 345KPa(50 pssg} z a t'iiars Self-pritningtip to 2.1 in(7 feet) I Maximum iic)uid temp.77 C(t70 F) Certified to CAM/CSA 9901055 C22-2 No,69 Conforms to UL73 c us SPECIEICA"Cl Q1�1 Hydronic system feeder slant)be AXIOM tNQUSTRtES LTD.Model SF100,System shall include 208 litn.(55 LS gill onl storage/mixing tank with cover;pump suction hose with intet s'trainee'ptessur'�Pump Willi tltunnal a;ut-uul. integral pressure switch:integral cheep valve;cord and plug;pre-charged accumulator tank with LPDtvt diaphngnr'- manual diverter valve for purging air and agitating contents of storage tank;pressures regulating valve adjustable(35 —380 KPw..5 55 psig)complete with pressure gauge;iattegral replaceable strainer;built,in check valve,union connection: 12 rnm x 900 min(36")long flexible connection hose with check valve;lose level pump cut-out, pressure pump shall be capable of rurming dry without damage.Power supply 11.5/60/1 0.7 A.Unit shall be completely pre-assembled and certified by a recognized testing agency to CSA s=dard C22.2No 68, ACCESSORIES RIA 10-I-SAA—Low Levol Alarm Panel cleat Remote Monitoring Dry Contacts mid 5cicctabie Audible Alarm LIMITED WARRANTY The SF100 is warranted against defects in materials and workmanship for one year. Project Location Consultant Contractor Unit Tag Sales Agent .............................. ....................... ...................................... ...................................................................... MWO e a/m,"Oo "wm/mAl n/ —AN v W/ mpwl /,own/ .......... .. ........ .......... luq MORRISON CHANGE PROPOSAL REQUEST (Not a Change Order) Project: Bozeman WRF Digester No. 3 and Solids Dewatedng BuIldIng CPR No- CPR[late: _71812011 Data Sent to Contractor: --ZL§12011 Date Rec'd from Contractor:, TO: McAlvain Civil Constructors Please furrilsh your proposal for executing the following changes: install owner-furnished single Port regulator at fte waste gas burner and supu[yLvrqjed-furnished double wart requigfor to the oymer for a sQaW,& .la We re Iator 1;g yarge 44D series Pressure Relief Valve..Sitze_4_',Ran 2--1 F��1bg 449 aeries.oombin-eq the 366§en s Pressure Relief valve and the 5010 series RameArreSterwilh a Thermal shut-off bypa,54 vale eintect and,raled into the uni; porifinate in IaHafion o(the Name arrester a b ss valve with the exisbnq flare wmnpement and the owner, HDR/MMI Date. 702011 TO- HDR Engineering,Inc.Xorrison Maierle, Inc Proposal: Cost 1$1,337.81 Credit (A tirm extension is not required for this modification unless otherwso detailed and justified:) Contractor Date TO: Accepted/Not Accepted HDR/MMI: Date-_ AcceptedlNot Accepted Owner Date Recommend to accept. James Nickelson 08-16-11 C3 cm L6 o C) C) Lr) ko to co E cq LL 0 0 000 f— CL 13- m D CL z Cl) cl 0 w 0 0 z to to 0 0 U) M "S 9 cn im W Cc 0 CL tfA CU 0) 0 65 C/) ce) c; z LL .2)0 C) LL 0 m I.- LL E co: W U < Ncts 0 C1. :3 a 0 co L) U) Wi'olli'Dams Plumbing - Heating Utilities fAcejfitt t Ora rnitlneht GOAmitnit3 July 2.5,2011 McAlvain.Civil Constructors Attn: Harrison Hotchkiss y 5559 W.Gowen Rd, Boise,)D 83709 a i Bozeman[Digester-IN PH 9589 RFP 031 -CPR 64 a 9 Harrison: e RFP Description.- Install owner-furnished single-port regulator- Subcontractors, HVAC-100 TEMP CONTROLS-101 TEST&BALANCE-102 INSUL-105 CHEMICAL TREATMENT I Subtotal-Subs Overhead Subs 0.00% w Subtotal-Subs-w OH ' Profit Subsa.00°fo Subtotal-Subs-w OH&Profit Material 286 Labor Hours 0 713 4 [Direct Job Casts 88 SubtoW 1,086 {overhead 0,00%Subtotal w OH 1,086 Profit 15.00% 163 Subtotal w OH & Profit 1,249 Subtotal Subs&Material,Labor, [direct Job Costs 1249 CROSS REC TAX 1.00% 13 Total 1,262 Sincerely, Iwo a,"4, tic�2snc�r� Project Manager W€Ihams Piumbmg,HeatiAg tlltliltes,Inc - BOX 10 2131 lndusWal Dave +�Bozomarl.MT 59715 406-597-0989 • FAX 40fe-5fs5-9458 BWWTP. Phase 3 (Digester 3) CPR 64 Division 15 mechanical.Pra aced b Cowen 1-an flem DoEC i` liar): Quanrty Ea Prue Ea. HOUrs Ea. T lours total Pke Total Price Sub. 4"class D 316 S,S flange rino 2 82.5 2 4 165 1"x 3"S.S m i2ple 2 8.5 0,2 0.4 17 1""S.S threaded valve 1 35 0.2 0.2 35 I"S.S threaded 90 1 9.51 0.2 0.2 9.5 V S.S PiR2 2 12.5 1 2 25 4".9arfoll gasket 2 4.5 0.2 0.4 9 1121`5.S swa e lock union 1 11 0,2 0.2 11 time for re-piping pilot tube 1 2 2 0 1"S,S threaded tee 1 14 0.8 0.8' 14 re"-install auto drip trap 1 1 3 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 _0 0 0 0 0 0 0 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 13.28 .5 compute* Compoor TotsW 286 100% xe6 10 1aD3:'4 13 ; .o1i 113 S98 13WWTP#BbD9 Adjwtad Adjuslod LABOR LABOR Labor t LSOR LABOR TOTAL 13ESCRIPMN MATERIAL"Ad MATERIAL HOURS FACTOR Howe RATE COST COST CPR 44 208'10094% 286 -1.3 1010% 13 33 3S44A 7 gas % $64.00 _ 1OQ°h ID0 7% a54a 1t74R5n 100 SG4.t1a. '7100% 100% • 5#id,00= - .. iFSOg6 106% I % i0CP95 100% 5'S4:t40'_ fOCri76 iikE}% $54,00 100% 1[11t 9h 454,00' % ss :rio 100% - I 1 100% S54.DD' 10ow '.160% 5'54.00 100°h 100% •106% .100% $54,00 100% 100% SCP4.00 - 100'tf 100% 354100 100% 100% 554,00 160% 100% 554.00, Da% 1i D $54,00 199% 100% 464.00 14?0% 100% 554.00 1.00% 100% 04.D0` iooi[ 100% S54.DO 100% 1 DO% 100% 100 .% 554.r�0 im% iD0% 1 $64,00 1009E 1DO% 354.D0 100% 100% 154.00 100% 1 DO:'6 $54.00 10D% lob% ;u'oo - 9 DO% 1 D0% 554.W 100% i00% 154,00 100%, 10,0% SGyr4;j.VI0IY. 10D% 100,% Y. 100% 166% x5q.fiO 100y 1D0% 354.00 100"R 1GO% 354,00 100% 100% iS4.OD io* .100% S54„00. 1015% i00,% bt=4.00 1D046' 100% 354,00 100% -Ida% 354.00 100% 160% 464-00 100Y. 160% - 354.00 100% 10b 5S - 354.00 1o4 94 sai o0 itXl"�6i _ lob% 10O 45 36-COD. 100% 100%, 00 1 DO% 100' SUM 100% 100% urwoD - 106% 100% $M.00 100% ioO ib - 454.00 10% 100 4r, ss4.00. lob% 100% 354.00 - WIXE-7 286 1{1s,7°A 286 13 100% 13 $5400 713 998 P 1 MISC MISCELLANEOUS COSTS: as 0% :a 00 ga BWtA TP s 9589 OTHER] LABOR LABOR ADJUSTED LABOR LABOR TOTAL DESCRIPTION MATERIAL HOURS FACTOR LABOR HRS RATE COST COST PERMIT-7011910 100°,0 - $5COO _ W CRAKE&FORKLIFT-70111010 104Y - SPECIAL h"1ZlIGFiT-70ii'111o: IC1°h S54 tjtJ i _ WELIJER B GAS70111210 100% 5 1110 TnNC GRINDING40111310�' 10K!x34 60 A . Ll Cll Uq Iai15C kiC3J5T 7{3111�1(I , : o" ;' _ DITIONA-kAR6WRE-�70111410 100 'A FIRECAULK 166°.F $5.1w�0�0� - I M A - $54.t10. 100% $54,00 TOOLSMISC-70111710 I 1% $5 0 MoBiLtzAribN-76irl ra 1iD% $54,00. 06M';701111#103 6 04 . 1 :00 - SCCAFFFOLI3.70112010 400 -A 554.00 _ VEHICLE46112ii0 "[ 100•°R $54.00 LO€C4NC-701123T0 I aA - $54:00 TRAVEL 106 q 554.00 PIPE ID-7011171/0 lbd°k I�0 JNSIpE EXCAVATION 100% - SLEEVINCI CLEANING 100 OA 554.00 CdNdRETE DEW 100 0A $54.00 - EXTERIOR txdAVATION 100*A $54,00 INSTRUCTION 100 0/4` - $54.00 No Mo 100°ry $54.00 Mos Rate 100 CA $54:00 Autornaks. 10o °A - $54,00 - 0 JOB SHACK-70111610 004 275 10 106-A - $54.60 10 TELEPHONE-701116YO 004 100 4 i0o°h $54.0(} 4 UTIL-70l122d0 004 75 3 100` t 554.0t1 3 SUPERVISION IN FIELD-hrs 1 54 71 106 $54.00 71 106,f $54.00 106,% 104-h $54.00 100 611 $54,60 100% $64.00 100 *A ,$54.,OU 100-A W5 00 - 100- $54,00 100°h $54,G0 - do°A $54.00 _ 100°A $54.00 ; 100 OA WL00: Boa°h - ss4.oa - '1u0 j0i3,% 554„0o"100 66 - 100% S54.aD Ido C 354;00 100'A $54.00 100-A S54.00 100 % $54.W , 1`100 0A S54A - 400 0A 554:00 f00 3 35 .DO' . 106°,4 $54; 100% $5d.00 $54.00 3QO $54.00 TOTAL 9>3 0l0 $0.00 8I3 Page 1 ......................................... ............ ......... ................. ................ .................... ........... ............................................... .............................................. AN/l/I 1 wa /00/ gypp eo ///"/.............../" F ",-Am MORRISON CHANGE PROPOSAL REQUEST -J-,A1M0RM,m (Not a Change Order) Project: Bozeman WRF Digester No.3 and Solids Dewatering Building CPR No.-_ 065 CPR Date; — 7114/2011 Date Sent to Contractor, 71102011 Date Ree'd from Contractor-. TO. McAlvain CMI Constructors Please furnish your proposal for executing the following changes- Replace sump 1)omps 1100-DP-05.06 of the Dew nq Building with smallg-,r drain pumps similar to Fiyqt CP 3045.091--252.Design point is 100 gpm at 16 ft TOK Provide all a2ggrtenances needed towatkilh piping,ratll and control Panel In the control Panel,Qrovide labor and materials to replace the two.GMC.32 cant tors and two GT-40 overload rely with GMC-22 contaiztors and GT-22 overload relays, The GT-22 overload rely ys..should have range of 2.5k 4A. Modify..exislin discharae 6wing to utilize the exrstin forcemalin,until the south side of the building,where 1he pipink should be removed from ioining the man dram.U_M2 forcemain,and instead route to the 8-DOF lust before gxajf2q_the buHdlp_q. HDR/MMI Date: M412011 TO; HDR Engineering,Inc.tMorrison Maierle,tnc Proposal: Cost 1$13,996.13 credit (A time extension is not required for this modification unless otherwise detailed and justified!) Contractor Date TO: AccepledlNot Accepted HURIMMI; Date� Accepted/Not Accepted Owner. Date Recommend to accept without start up services for a total cost of $13,996.13. Start up services to be provided when other equipment by supplier is started up or by Engineer, James Nickelson 08-16-11 rL,-- E — = 0 a, — LL (U E cR LO cc C� C) C) C? C3 C3 C) to m 0 LO Lo C> C) to V) CD co m C:� V) m 00 V-) V (D U? c U-j 0 U) OD IN 0 C4o V3, 651 03� 6-1 4% 69k tp,61). 4.41, C%4 0 - 0 0 0 o D- P rL 0 0 IU 0 -- V- z zi IL 0 0: CO U) M 0 2 0 0 C, m C) Ci 00 uj - 9 J4- C%L z to z U) 0 0 0 � 69- co co co ca co CO 4= cc (D co CL E o CL Z a E a) CL ua C) 0 E 'o- tL co L CL CL L 0 z Ul 0 IX) 4) A LL (D CL E 8 w 2 a CL E < 0 M 2!, 0 ITT Industries Engineered for life C,H.Spencer&Company 1075 South Pioneer Road Salt Lake City,LIT 94104 Phone:801-975-0300 x.110 Fax: 801-972-52 1.6 To: McAlvaln Construction Attn. Harrison Date: .duly 13,2011 Re%renm- Bozeman Pumps C.H.Spencer tit,Company Is pleased to offer the Following proposal for products and senricas as defined In this scope letter for the above referenced projea I.EQUIPMENT DESCRIPTION Section 11066 Pumping Equipment:SUMP Pump Room Drain Pumps(11Oo-1313-05&110o-DP-Os) Quantity(2)Flygt CP3045.091-252 Submersible Pumps -Rated for 100 gpm al 15 ft of head 1.8'HP 460V 3 phase XP.Submersible Motor 30'of power cable and sliding brackets -z'cant iron discharge connection -3I4`304 SS Upper Guide Rail Bracket -3f4'x r Intermediate Guide Rag Bracket G.H.Spencer&Company's scope of supply ends at the suction and discharge flanges of the pump and at fhe terns final boxes of the motor. Instetfation,widng,anchor bobs, foundations,templates,miscellaneous piping not integral with the pumping equipment, external lubrication piping systems and tnstrumentatlon, valves, gauges, controls, motor starter, finish paint at the Job site, unloading and movement of equipment at sate,storage,assembty of equipment at site,field testing and or/setsmic analysis,and comtnisisssiorring,switch gear,and other miscellaneous Hems required for installation and proper operation of the proposed equipment which are not specifically noted above. are not Included with this proposal. intermediate bearing supports for intemredtate shafting are to be provided by others. Any bolts, nuts or associated'hardware required for motors,pumps or pump cares is not part of C.H.Spencers Scope of Supply,Any type of lubrication or 0 required for the equipment described above is not part of C.H.Spencer's Scope of Supply. 0:APPLICABLE SPECIFICATIONS: 22:A)SS Guide Rails are not Pert of C.H.Spencers Scope of Supply, 2.4:B)Not Part of C.H.Spencers Scope of Supply, 2.4:EJ Not Part of C.H.Spencer's Scope of Supply. 2.5:E.5,6&7)Not Part of C..H.Spencer'$Scope of Supply, Part#31, Is not part of C.H.Spencer's Scope of Supply. The specifications iP$1ed above are the only specifications that$tall apply to this proposal either directly or by reference. Any specification that is not specifically Included as past of this proposal is excluded from this offering. Furthermore any Rem that is not listed above Is not part of C.H.Spencers Scope of Supply,any Rem required by specification and not listed above is not part of C.H.Spencers Scope of Supply.Any additional sperAcalann or Drawing required Is not part of C.H.Spencers Scope of Supply. V.SERVICES: I.tsted Above Via SCHEDULES: Submittal drawings and procedures for approval vAll be available within(24)weeks after date of ITT Industries,Industrial Products Group order acknowfedgement; provided that C.14.Spencer& Company has received a written, technicWty complete,commercially acceptable purchase order and all of the required design IrTformationtrom the customer. Any delay after 15 days on reluming the approval submittals from ft customer may impact the price andfor equipmrd delivery schedule. Please allow an estimated delivery of(4-6)weeks for delivery to job site from date of engineering approval. V11.PRICING: C.H.Spencer is pleased to offer the tolkming pricing for the abow referenced project: pumps: 46,300.00 Start-Up. $11244.00 Total: $7,500.00 Pricing doesn't included taxes.FOB point of manufacture with(might pre-paid and allowed. PrIcIng does not include any State.Sales,Use andlor other taxes as may be applicable to this project. VIM ESCALATION: The prices as quoted will be held film through the quoted delivery period provided C.H.Spencer & Company has received a written,technically complete,commercially acceptable purhase order from our customer and all the submittal data has been relumed approved to C.H.Spencer& Company within the 30 days from the date submitted and the equipment has been released to manufacture. JX:TERMS AND CONDMONS. This proposal is valid for acceptance through (15) days from referenced bid date and Is subject to the attached 117 industries terms and conditions. If there are any differences betften the ITT Inclustriiies terms and any part of the bid ,specifications,then the ITT Industries terms shalt apply and take precedence. ITT Industries&C.H.Spencer riMlj not be responsible for any form Of back charges or Liquidated damages or any form for the above referenced project. ITT Industries will be willing to negotiate final terms and conditions with the awarded contractor after the bid date. X:WARRANTY- The ITT Industries standard warranty as per the attached terms and conditions shall apply to this proposaLAny form of pushWI charges associated with project due to warranty is not part of Gould's or C,H,Spenceft Scope of Supply. M.,TERMS OF PAYMENT: C.H. Spencer&Company te=s of payment for this proposal is net 30 days from the date of invoice,subject to our Credil Department approval, All equipment Wit be invoiced on the date or shipment, Partial shipments and partial payments are to be akwied. Very truly yours. Danny Seek Sales Engineer C,H,Spencer&Company our Standard Terms and Conditions as stated at the end orthis quotation apply and are a part of INS proposal: Accepted by(type name) Date: Signature: for C.H.Spencer&Company Firm Name. Signature: Da C.H.SPENCER TERMS&CONDITIONS 1'bttRtAHTY-Cww.powY w Wvo ou to no pod-e of.wd.-tom a nw.d wdht wNPawwet>.med.t M aNfPrwx 6 dkary.d M Ptach.ar,dW»a en.sb.w.e h+,kdprr..nt np.at Aw.a w.,e..t of Cwwpww,fa wrwlodww,sd.a wr.,rrn sir pru8itq.}m d .f kr.d ba dw..d 1.d dkw a k*""rw p•M-p.,p.ww., M W•+•T br k kJpr.twnt 1.wdr..+r,tp b.wih«krwt wwdywa�tdvdw. .dt...M,rd h»ota.f.ea �w�P••a'•1 rA P rdn.w wry b.w wry b,aww.WW*w tom,N p...t s.. W wwoomw.kdp red ft"W TAWS WARRANTY 13 EWREMY tlw L IV aF A" l.rm,aP.-M-,C+n'P"n'.7:ea+h.09-b y a..vur w pill w prdk p.y— bTFIEFC WAPJIAW 3.INCH.XW40 Wr NOT UMITEO TO WP9:M WAF wnU a.wornddws N...opw+fw�dnp or 4rt.4rdtq m.wfanr...vmaYlrty NW., r�.wytl OF M9IC wTAWIWTY AKa FawE33.AND CON3T3Tms rTe ONLY WAK"ANfTY WYpmw4Au*ben mad.,rr het.ad.d;.;;bvnMord.r,pw.drq roo&vt alirod. OFCOW MY WITH K0WCT TO TI,%PRPikaP:tiM7 ,euwepr„�. rf wAdd.me ywa be d.w wtww wPwFkn.bed mt rnone hew wghawrr w+w.t.trwrt TAXES.•Arry oot,duba du/u w ala,w.,rain.w bs,ddood w OR"b.atmt boo dr.a Wir.wwd by Cawprry a* h.m d psoduck.;,Pvdrow deew,kw*A roach eda.d tq M Prk••rd Mwkw.d•.P.Ady h,bw apa.ptW.1,�wrr,pnr.urft u A Woo.rr.root a w....WW.kww.rd P—peY.0.Cw.gr,y an*"4 v M.n..L ■.rLfrdf. Do-o" I.aa A.r..dy Xt h wgraawfvmra.Woo W Coy.W.Wow oapwwmwi ar nP•ka r.pteaow.eetahSw lien we7dw/sl�Ntndiewt nf�Yea prrwheef(a;_Rret.pw,Arll UWYA'naN OF UAMUTY.96*w awmpaw m to vxp6ona,As b.labia,mhamr Aoo r aA n pwrnr /wwd a.P.ru'W ewaea,.f,h"A*d.r. ..W h.ipM kn M awrwea wkn rrt w t,+dw Any bt rtpW suwry,lar h.a a uwe,trA,r.rr w peen,w ww.+.edm raw tea(—hay A.."m Th.w ukrlp.Sm.-A avMi4ara*A for m44-01ool 0 of Kk.W.# wp.twm.+q.w A.Iwdd.NW,.Mrtraat,w.P.d+l .rued W 1e4t•w oct f•r•kxnk.a..d by C.."q M.wwM.Cwrp.wy,"hew.M. w wau«pw dwr,p000,w hw r r Doer I.er w waW a rwkr fypin„w lar dWnm Alta N d,gww arprrNrwple..d by it t'a.ntr.r.mrw.00 to P..PYy Cewrw 1'1 to rai�wyr. Fxrd»car tar dx,n.g.,.t r wcM..r w aN.finew«�Lk-A-C..w"W-A 1.1.-ft, aI m.m+r.rst d.t m W pakty,.w..t.fri w V�prW.oMYp..prlw W pwrA..+b,p••Y *+t av--h 'br Ubk too%I-d-A-4p.4..a w gu ado ad s v—h. a ..Dodd#Avlw bona d.ryooaw.to dva Co.orH-Ps>reha.wr»Leah 7.Ioe.4.01.4 Nwdta.,l.•twP2•Y••Y.w*Purrdv,.r.ode..wwo.aAwa er.ue,pa.r., .an+nf.pt d.,w.Wwtd.Wt w me.a.Wdot d-Ah P'.P.warf n.nstN far rpids,tu +a+'N'w.od wop—.ibt the Cwmpimy, IN NO EyEW SHALL,COMPANY BE LUWLE W EXCESS OF THE SALE#PRrCE OF T1iE P14tCT15}OR PRODUCT mmD DEFECTIVE.. AACY SEPARATELY rSSTL?A TrFu OF "talk ATtX9UCT(3) NlCC+7t is ttQr V-ALN FACTURED RY TH9 CCWANY Is NOT WARRANTER BY COYPMY.rd rkkr DENF..w•P;O-v-y wAt.mply ran.k 1iw.w.pptad.W Cw.wpwry.CwrkYir,w b.c —dwry by tM—p.n..wme 4,0. ..f 1ho wew.arArw wt.vxwf, -Wt OStV..w W-,Iw bd"...t.r Sera Lww e,Mpp coot•P••=dw.w wr a d,w TMS STATES PtW-HASE"E=USM RE14 EDY MWNST COMPANY AND fT3 Ms T F.ha..dk rwpw. firer ad F4reP.wo.r.4el Th.W—a dw.3NN a Hn.YWX po•'•trr Me vAdMy,ktemrehdwn rw'xwlwww...d k.ry cmb.d of a.l'Ad.dr.,e TART 04RL REI AW TO'l'NE AL,7 ORY T4#tET}1kR H t-.ARMH;'S'OUT Car ptvvkWwo rs a p,rt,.N d p1.My eR.<f to.ry nJea�,aralnq d*.s.remK at la++e 41 TORT oR T", ANY aTItE1t L.EDAL TA ar R AM METH ER ALLATRt 017E OF TWA do aw%m and arty od+r chow.wh'•p•Atay ramr.4 too ma bolno a part h_f. W.fECT fTiF,, NYCAt77lATlON3, IrY[TRikGTx7Ns, IM1ISYAIkabtgt6S aR r.i ftftlha srdr,axl.waemiht**J.w mwew.mS a,h.Y nal M.,madOd ftoW1. OF ECYS FItDr.l AATf CAUSE.CwwpwrysM/r atT>E w.Mkl aww+w atdp.Ifm a Yo whl Wj""bf Wh p.rd.e.tkt....nw.r..modt,d.1 ed..,wa o ph_,. —y pwrdug xkkh tta b..n MA•-P•ry dowd w h.w:t.d.w wd.dh h..rW b.wr wdw It px id-Ua dm wry. A.Ww..d nwy b...&„dy,s9 w.%-taxe.wt d a of mniaeatnd aa6brehap to$.w $A C.w f w-,PA.boo w'.d bathprb... ACCEPTANCE.Tba Ntmrkadm..a ormT.saw.rash P•t...pu.rrdow.W br tEuy"DATA-TM.ky pwf.mmaa b avd.pkd w-d.P.san.w wAVoy rp to ytr brad rot r.WJ a 1st,y N.A.e.d r aw*4W ca W*-w%extbrs+.d lurma.00e.l Co^WdY.rHr re 40.A'r»pa.d t,slr"kdwtn.tm,L.da,tnp ty4,9 otuewxt, oowdb.ibdp—.h.dwd.ofw,w 6ayr.ote kr.o,w_ .rod W rWArM Psw.m.rcAWO..wr.,bA— INStECTIOtta4EyYGCtTTN4-Tkw G.a.pmy tdawaa as d,rtry that A W haws W'+tbl4 N1-d V* Mkn Pi N.P S.. 9W vwl wKsr v twff&Pt.0. w kr san+�w+twwc,,.w .www w.paa4d Wm a+ N Y,new.A wdt br a..p.:p.,,ww are Ax"D— Areal awWwpfw9amwAafaataw,aAt.ptwi mutawAy antaPirda toot+.. k"Oemau Avow ww'W."W.,t 72)r% -oft w-ok"m 00 to rNr b r.w6S%Y,lrxatar,. Prler le weah wikL We s,gaK DELAYm.W CorrMP•^Y..d..x dkeTbr p,dorm...w duw W arty p+w...t,Agwd,a. . k.wdrw bA rW*W d r.d of pod.W.W or hd+ t..4 a i>P++m.newat,ea w PWMS•Tnr Pak—*o d hw oy,.W r..r.eAn fir.,fur d..prima wp W.dfo etwtwd Ake ar mwbdm of K-k..ew,Ar.Cooed,twit.w*W tw:btr,swot,.w dkry 1.abpb.M ktlw+^•r+<Pr-4*q d.,,aapmw*r r.d dol-)d by lh..+.r.rww M.Np....d k drwp.d hom..od�w r.kahta.w+tw.matktxla.:mP.awd•,ay+�+w.t ar d..worlkf..,b,. bf ie»cwt+rzw Myo.,e wa,rdp..kn rm. rt 4M&epwf.M, FW+.wCtwawwd rt t Wax d pwrlwwnawaw eh.f G a e.ndw s P+dwd pt iww aqa.)to Asa p.nad of ma dof.r t*rrAw In aR.et M.Of rhl L iodu+#M�4 aMarw.od m.m txc.f f.rdheQ cawos..M m.w and d.wtue.taary C+xnparer,Jt tea to P—N—n4a W"m„*m a wa.K"the edpwNd Pei#b.s..a t^ h..0*W.row rW,lndt-*,d.W.V. A.aa.r.Lar toot Met Cweycewy8aeerarrois of w jakh dk.Y. w Iom PAM rr F.aE.s Npp4m P*a t W—we,rrA..•P•dd•d- V"—p*A WTORADE-Anykrn oft.PradAtirr;wrt whkh.s,•WO..ctrrpa+h'¢iwwgNhdryod r7 �t and d.w morM••P•rt•�e'•eu A b Wpm.A of tAwmdt rq rwrd*,Prasl.+m.Ye aw.koL w M eeudem wtkh.A.ct Puabe .tally to pwwu,.r. �ba.,ab dwo.k Wot *w t oo hm y"A w.Y ty .ks hw.Pr•A+•t{+;r•*Y f»C•oow.d W n•A,.a by eemv.m too Pmdre.'.w,wrd .n Of—by I.C••".y,w h.mW t oI pwdrmwd b *k„aewvwA,rspe pr... rid lklk. P.wdwoo.r. SA4PY.CK-R.t—^Wtpre,rC m,.r.d.koowy N tw k U cwdw M.osa.&na.vd h CONTROU34P FROV WON3-Thr.o Um-..,d a..ai w mhA cw*a Van tw"a o I*do"k.n...of Ma.mow,Corefkow MY wret.P"Al 04m.nbL cmp. ** try P.r9a,er~w m.roo of are'Cw WwW*f•od•rm• Na wwrrr..M.r.ten r mkaet—drad pt twm5w1oll p rood root..trfwwn a.o...,I—.}'.p&ar (Wmw Pw Amdtolbw a shoo 4--wrd wndLbww rd..hrr m P..,k000W.pus+..ardh .r w Prdh m-1144 th.owed and.w...a W b to troy d,.hwrrtd t-o kt.ms—w f. otMrk..WwA boo r.Md awrwea d,..+k,.r.,kw.oen w r 4m"dm 1..p.01udr fryu, Ward..rr.ire tab.da.o sm mt t.**aft d x d.+lirrLan,�de.dr.,Eaei Awo•Fbd 11 warp rd kpr.d by-**—hsd,.y®aroawa.t h,.Cweperf. maorw w m m tm w Ool*.y pawl HUH da.ow&At 4l ikr d M.lw,and vv AmWu;row"t.4w6.14n. F.r fww wt w1Wh dw ikkrd Sisen,cw'"•t' l +r.yadrm Iwrd,r E»t3R d c,e ftfto md(hW.W Win,Wid mrdrme aN .n+d k -.rots kw tA.W crp.Ow W pow.a a kris*4 oxp.ret wads P.aa—r. -0-1•M m*Wg row.wwry wr,rrdAwrwarmt fa wwaa t—%O. ..d Pr"W ep r00+Mkv4ocwmwft PAOPONO-ZWAPTI-d-4 b.Waa..L bwr.d or va d W miw+atd,V*N Ora WP PM*DEVICEtI»awdnw,mwrA.tm ode+hnaYod ln.M»ra.uM.wtr L*.dm ; ao---Wwo---W9PEQkL3 tdeaaP.far�#Pad�ibF'w4 c.tfea stmmw w Crteda.COMVW y bww OR rrom N edd W ha b.**,m a..W t.)4sa.0. wru.of awy.Padar Npom dw.Vcw jb.rk,r.k,trp.&A oral.,adb.r d'.ki.)weed t rn"Of CREDrr...LYdea 4twod.•p•dtrf ktrrtdwp.Preow,m"b.m.4 bM w awAW.m r>ohtt d.Dmd.0)bi"k*d,ohm i.Lr M,Fos o,M wN be yoar m krwoo*wk MW f w.A I.Moo awo.FW.N Cotton},.4-.d b/.-*Lmk Cb.r.b.r to Cwrpry a pro d.wkw kt,...seas—,ddun+,.{os.d+apraAym,hditd bwik.tcw.ptA*1.d»Car"hy and WVA6 s for PooYw4M in kd M LWW$Wb TrrLE Aim Mtf Wnr•TM W If"Prow,*-;rid**,A lau w dam o k.wA paw Ia"wl'tsa Df"aNw Pr 41%WW M V4 ft"Ca.v "b,kf wy nrm bnY d Ids N Pia ha.w at t f-a,p.frd.-too but a-&M"kiW W m V.y.edae"-a ON".pm-wed Iron i"*g**Mom kom Co,"p4wfm%oho d dab y M*4 fmi pto.w.w&ww,ry Aapte.'A and wrwia W C.••Pi 'r»prd.r,.f mad.at of ambat lorr,oc isdaks at w.rur.4etRva a hew tarot.r ray W of 7e.M.ad.Nwd rOCTnraat m reWtty w bhbr VOWdy,wpm Ah.ha Prlq Ise boom PWd in to k -*A"&WWY arrh*.torh W.N P.rl.at Lae Woad and P.Yp W%hd Y.T-d Pudh..w.v to d..!.da—."My t.pwled..,d m•.A*and—At,btar.ws, mh dnddi awn oMWnot Yt4 leer of mat W a.p..h w'dk%,W 0,0 b.m.d. ..d to Xcu d C.mPml/a k%W..t by♦dk*mU y+nwdwh de.prod,N"),p•k.t k..w .qm.Knotm of war axebtlraa.00 at m.m.d:xw:Iw too or umw sufto WN A de..wp.Irwn W*d.,W eew,w„th Cwnp.ryrv.wrdaa lwwwwd w m*—,k dVppMtdadurwewl,k.>Ey wr.ets+rd tmrywryAw pr.,rstwd tT f..,,tY od.rraf.o.ham TIMINS af=PAYTtEW•lkd.r ul—i-40.4 ea Pay---ft k A b.14"TtaftY W M.at"Ns Wr wgiwr m tiwat�ab�h mbar d.a .poor W—but sm a Ww.fiord. 0".rd M t4t d%.%.,dpilon, M.yao room p.yrn...t.ha fi.sarwm ddo...a h du toad.Irn*"o tar IN PurAaear'e st d rwC d.k.Am Stang. k oft —.d-V4 n.rff 04.—t a p*m pr.hw.e A coca.ad.4 b.p.,bx r kwunsd In arks n.�'+f�r+A bs p+rf'd�k Wr dsmv�i 1m l+a x .+y.1I C,""m 66M-d WW&MFP17..Ppf Y y}Wkri i91MeU1. Y�''tJrxln�l.MYd.O . M P. �rvn xwnr, CC78�IPAHY Aa 0.UEtlf-rr co+aFw�ym.sr.pr a Mcr a.>*.n +'d by aM lh+�n6d Oarirr`mud,mr�anptwn.ne arwdC�*P./ m v'^^NA Cwnr..sryr mm8ra wch rwraafoex a Maur adt asa�m W"tf as 1rD+�a hx tM „-d Dta Ya u.'�°se�ch+aar.ruF r�rtswvq ax�yxt to��hd hwrrns+ wwmee�M.ray°s�Mrr.t..a xvr...p.,&WUM6p w d.k Yt+a+r+e+,•1 asa.apams n{as PaxsM.awir Pa.:p.rnar a a Williams Plumbing m Heating s Utilities l�.te,�r�t�i • Corninrtment • CQ��,acnc't�i Juty 25,2011 Mc.Alvain Civil Constructors Attn:Harrison Hotchkiss 5559 W.Gowen Rd, Boise,ID 83709 Bozeman Digester-WPH 9589 i RFP 032-CPR 65 I Harrison: RFP Description,. Pricing to replace sump pump in dewatering building, j i i Subcontractors: HVAC-100 TEMP CONTROLS-101 TEST&BALANCE-102 INSUL-1175 j CHEMICAL TREATMENT - Subtotal-Subs Overhead Subs 0,00% _ Subtotal-Subs-w OH Profit Subs 5.00% Subtotal-Subs-w OH&Profit Material 1,314 Labor Hours 0 3„688 Direct Job Costs 456 Subtotal 5,458 Overhead 0.00%n - 9 Subtotal w OH 5,458 i Profit 15.00%m 819 n Subtotal w OH &Profit 6277 Subtotal Subs&Material„ Labor,Direct Job Costs 6,277 BOND 0.00% GROSS REC TAX, 1.00% 63 Total 6,340 Sincerely, }� Project Manager Williams Plumbing,Healog Ul ties,Inc - BOX 10 2131 industrial Dnve - Bwernan MT 59715 406.597-0989 - FAX 405-585-9458 PHASE (digester#3), CPR 065 Division 15 Mocha hfcaf;Pre tired by Owen hart Item Decri tion: 4uanity Ea Price Ea. Hours Ea;. Hors total Price Tout Price Sub 3"x 2"concentris D1 f reducer 2 302 1 2 604 21"S.S slip on weld flange 2 36 2 4 72 2"type304 S,S pipe 8 6,5 a 5 4 52 3"baif Eacks S.S bolts. 2 13.5 0.5 1 27 S.S anchor bolts 8 6.5 0.5 4 52 0 0 t"arte for removal of NmWPedistai 2 5 10 0 time for reinstall of pomps/pedistai 2 6 12 0 0 0 4`°pl ra-pip (using exhisting pips) 1 0 0 4"AVVWA roove 90 2 125 2 4 250 4"DA blind flange 1 65 1 1 65' B"x 4"C-900 gasketed me 1 130 4 4 130 rnisc anchors 1 50 2 50 demo i e/stands/sv rts 1 5 5 0 re-"install pipe(using exhistn2L 1 15 15 0 4"gatv. Bolt pack 1 11,5 0.3 0.3 11,5 0 0 0 0' 0 0 0 0 11 0 0 0 0 0 0 0 0 0 0 D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0'. 0 0 0 0 0 0' 0 0 00 0 0 0 0 0 0 6U 1313.5 Compuier Computer Total% 1,314 100% 1,314 68 10011 % 811 $54,00 3,688 5,002 RY""ID#8688 Adjus ied % Adjustsd LAHOR LABOR Llb(W LABOR LABOR TOTAL OESCR)PTION MATERIAL M MATEMAL FLOURS $rACTOR Hours RATE C08T COST OPR 65 1,314. . '100% 1.314 68 100% B8 354.00 3 688 5 002 100% 100% - $54.00 100% 100 S% 554.00 1 CW96 100% 55100 10046 100% i54.D0 i iCM1% S'4,610r 100% '100% $64 00 iU036` 1D0% 8 -4,00 =i Go 6 106% 4D096 1oD% 564,00 100% t5l];95 5s4 tW„ M409G 14f0% .100% 100'% 00 $64_ 100 , 1D0 Sir 364.QbGa - iiltl9h` - 1,D0% ;x :100% - 1DO 5% S5a,00 ° AM 100 9% 454.00 - 100% 10D% - 454,00 100% 100% $54M 10045 y00% ",00 'i w% ti4a% $64.00 ,100% t00% S5400. 100% 100% -%-.. $54.00,, 100% 100% 554,00 - 1 DD7rn 100 9w S64.D0 400% 106% 554`00" j pP16 104% 10096 500% f4.00 .100% 100% 554,0t3 IDO% 100% Sum 100% 100% SS4.00 100% 1Q0% 854.00 100% 100 100% 100 100% 100% $64.00 100% i00% S154:00 100% i00% VA.00 IOD% IN% W,00 400% - - 1 100'% - $64.00 100% 100°db T94:66: 1009c 100 96 S64"bb 160% 100% ss4bo° - 1DO% i00% SUM 100% 100% $y�.5���4��♦:+'.00, - 100% 100% m - 100% 100% iS4,Q0 .100% 100% 85A,00 100% 100°5 $54,00 .100% 1(J0% $64.60 100l6 100 94 W.t10 �•100% 100% SS l.i10 1GO%fr y % 4U.00 100% 100.46 i54.ti0g b'y 10% 46400 - �� 104% �� 100% 1iMy r 100% $64.o i 10096" '100% 100% Sr4.00a 10094; 100 95 $64.D0" .TOTAL 1,314 106% 1.314 68 100% 68 354 00 3,688 S 00Z PtbOe 1 MISC MISCELLANEOUS COSTS. 456 09n $Q.t)q 455 BWWTP"#9569 OTHER/ LABOR LABOR ACDJUSTEIJ LABOR LABOR TOTAL DESCRlFhO C MATERIAL HOURS FACTOR LABOR HRS RATE COST COST PERMIT4011910 top"° $54.00 CRAM= F6RKuF.7ol/l Ap Q@°h $54.L7p VYELDI_R a yGxS io1112Ji1 ftK4°l $5400 CEiT[IF1G,G1 IY1(31N 70.1113/p i,D65A "�a4 p41 MIwS'�HI715T;70111410 ` .', �.1ttN((f�/ - 554 00 - ADCt1TIOJMU4R" tAR171NFC,E7{)111410 $54,00`_, FIRECAULK �7ean�°rf 354 q0 p _ 00°A MOBILIZATION 701/18/0 100 S54�oo T44LS MISC701/1710 .' �EIO9S O3NIS 701119/p SCAFF01.D7701=10 Ida"Ix VEHICLE-Tpil2il0'' ' - 100 5I - $54. LOD{3WG 70'l123/0' r10i1 S 4100 - TRAVEL ; 40CI PIPE ID-701f1711�. 100°h $54 t34 INSID> EXCAVATION 100° $5W00 SLEEIIIN[3 ;1a 5i CLEANING,, 100°h 5Fr#.4!0' CO14CRE t E DEMO • .�- 1ptf'9i - $5a90 - MRIOR E..CCAVATION ,loci°k - INSTRUCTI.OW 100;% No Ma 1OC ',G 554.00' Mos Rate bb°k $54.00. Automatics' i66% $54.00 0 JOB SHACK-7p1l1510 0.19 275 53 106% $54,00 53 TELEPHONE-701116/0 0,19 100 i9 100°k $6*60 19 LML-701122/0 019 75 15 100% $54;00 15 SUPERVIS$ON IN FIELO-hrs 7 54 369 100°k $54:00 369 10a°k $5d:n0 1p0°k i-Pa - IftQ, 00 ;1001% 3s4 00; IOC3 E $54,00` - 100�QA $54.00 toy,% '100% - 100 0; 55400 - 00"91 $54.00` , p1f °.i 454.00_ 100°i $54 ool - �; 100.° * oo f1U°f $64,00 ,100°,f" 00 too 01 $64.00 too CA $54,00 100% - $54.00 to nk $54;g0 too,''A $54.00 Aw hi $54,00 TOTAL 466 0% $0,00 Page 1 h"-R MORRISON CHANGE PROPOSAL REQUEST MAERiZP (Not it Change Order) Project-, Elm men WRF Dlgeater No,3 and Salida Dawatering f4ulld'rtg CPR No.— CPR Dato: M4aotl Daft sent to Contractor: ZdAzti Date Reed kom Contractor; TO; MrAlvafn Cal Conatrucbm Please Iumlab your proposal for executing the"hmring ebanges: Reaboa durrrs Wiens ttgQ-f?F0,Mgt i n 1 and control panel. br thn control panel pray ft_pl JQr w)d materfais to replace the twrp Cah"conUKtm and two 9JAQnvarload � T--pittirtp shpsAd be rLrrxrved J6olm the main drafn pump fprr 2 In 00d Instead route to fha,ik0C7F iecrtt E aFnrlS pp"r exiffm the buddkrg. 9 f HDR/MMI Dais: 717M24i1 TO: H—DRR Engkwerur,+g,Inc,Nm sw NbLk"ie,Inc J l Propaael.t ,-ram ✓ar c"ki 5 r c' a f e '``r� tY!!,f /"�''/a rY�M ✓� -. F"yvr Cred'd (A ffrrm exrenalon ks not mq€;ked for this modrtication unless otherwise detelled and Juatbted:) COnt.a. r Date TO: AcaegledNotAcce0ed -- HDRfMbhf:Datt AccepWdNat Accepted Owner:Date i ............... .......................................... ............ ...................................................... ...................................................................................... ........ ..... . ........ IIIIIIII-A/M........... ........... ........... �NR, p§z . .............. ............ .......... fal � ORRISON CHANGE PROPOSAL REQUEST WERLE,wc (Not a Change Order) Project: Bozeman WRF Digester No.3 and Solids Dewatering Building CPR No.: 066 CPR Date: 7/14/2011 Date Sent to Contractor: 7/1 41201 1 Crate Reed from Contractor: TO: MoAlvain Civil Constructors Please furnish your proposal for executing the following changes: Provide emergency boiler shut-off switches m shroom head at the entrances to the Dewatering.Building in accordance with Section 4 of the ASME boiler code_ Provide switch aust,inside the door(within an elbow's reach, but a farther reach than the light switches)and label"Emergency Boiler Shut-Off'. HDR/W Date: 7/14f2011 TO: HDR Engineering, Inc_Morrison Maierle,Inc. Proposal: $ ,276.1Q Cost Credit (A time extension is not required for this modification unless otherwise detailed and justified:) Contractor Crate TO; Accepted/Not Accepted HDR/MMl: Date Accepted/Not Accepted Owner:Date Recommend to accept. James Nickelson 09-13-11 � r 0a LLI va � CD Li o- o o LO Ln © m in CD� C, 0 C7 N N O N N N LO r CV N CO] cq N O c7 Ili N N Yd to -- Y N N N a) N N N N N N C31 n C � E N � b A 6KT ff 6} 49 to 6% ov 4H I.11A ro F— Lo (D 0 00 Cam) n O CD a. a U) v� In co a LL 4 0 U Q :E Q ca o m ry N w Q {gip C) cr- m `t3 Ct3 *.. 0 C7 cLLJ� (D 0 a (D tJ) OAS 0L3 C is D � LL tU U) [1 0 y 1L CL 0' ! a 0 L L , � Q N C o LL � �, a Q m C) U) F- 4 7/1 6.. 1-1/4" 3/16" p 0 7/32" Dia. Hole O R,y K� z1 to ww FLUSH BUT rO PrLLA ELEC,PROD.HODEL BSD 120 IACICSONVrLLE, L32207 Type 4X/4/12/3 UL Listed Nonmetallic 5/3.. Q Q 0 Enclosure 7/32" Dia. Bole (standard) LA P1LLA MODEL BSD120 (Sailer shut-down) PUSH BUTTON STATION TGE Tryon-General Electric Inc. Change Order Quotation To McAlvain Civil Contractors Date 8J9J2011 Address 5559 W. Gowan Rd. Change Carder Number CPR 66 Address Job Name WRF DIGESTER City Boisie State ID 83709 Attention Job Description Adding Boiler E stops(3)by each man door LABOR - 11 hours@65.00 $715.00 MATERIALS-E sto switches,conduit.and)Wire $1,273,00 Profitloverhead $137.00 Total $2,125.00 Labor and Material $ 2,125.00 Travel $ - Equipment and Teals $ Subcontracts $ - Total Change Carder $ 2,125.00 Exclusions From This Quote x This Quotation Valid for 30 Days. We Require gays Extension of the Contract Time. x Please Sign. Date.And Return Confirmation of Change Order. Signed By Date Project Manager Office 406-586-5895 t Electric westofce.net Fax 406-586-8453 Cell 406-539-9 i 16 P.O.Box 3102 Bozeman, MT 69772 ................. .........................- ..................... ..... . ..... .............. ........... ME ................ . . ........ . ........... .................- Mq CIRMSON CHANGE PROPOSAL REQUEST , MERLE,i c. (Not a Change Order) Project: Bozeman WRF Digester No.3 and Solids Dewatering Building CPR No.; 067 CPR Date; 8/2/2011 Date Sent to Contractor: 8/212011 Date Rec'd from Contractor: TO. McAlvain Civil Constructors Please fumish your proposal forexecuting the following changes., For the capacitance level sensor 1101-LE/LSH/LSL-02,restock existing probe and provide a similar probe of shorter length. Probe to have 11 inches,of.operatinq range,and rated for Class 1 Div 1 installation, Total probe length is 12 inches for as needed with dead zones?,with operating points 11 inches apart. See attached sketch for future installation. This CPR is forthe probe alone provide level element to Owner for installation through the Phase 1 contract. Provide any credit for planned installation of the existing level sensor, HDR/MMI Date: W212011 TO: HDR Engineering,Inc.Morrison Maierle, Inc. Proposal: Cost ' $' ` Credit (A time extension is not required for this modification unless otherwise detailed and justified.) Contractor Date TO: Accepted/Not Accepted HDR/MMI:Date Accepted/Not Accepted Owner:Date Recommend to accept. f, N `, James Nickelson 09-13-11 4 I rl ro rt G 3 ^{ a In � ry 0 (4 3 F1 Z + R 4A ED CD Cn w M W i u �C zo C� �p CUM p " CO rri zFr fl �+i -u m G7 w � 0 o Uw ) U p ' R LO 0 Q t� O q '.Q Cq q O 117� CR N L17 C7 O l73.... l.JCD�` V) U) r CO Q IL t- r r r El CJ7 m `- � z- 3 0 m © © D i- D � 0 v) of U co Cl� d CL Q ¢ [D C) < w �— cn U O 03 cn CJ7 L3 C'\l C C] Ca '777,,�7/ ;, to P 0 ui (D 4 C= a) m co rn Ilb- CD U) cu A. i Co fl ik E co N m C) C!7 i- Qa- (- faq AM01080 CHANGE PROPOSAL REQUEST MEKE,tvc: (Not a Change Order) ProjectM Bozeman WRF Digester No.3 and Solids Dewatering Building CPR No.: 067 CPR Date: 8M2011 Date Sant to Contractor, �01 I Date Rec'd from Contractor: TO: MeAlvain Civil Constructors Please furnish your proposal for executing the following changes: For the capacitance level sensor 11 01-LEILSHtLSL-02,restock existing gLobe and providea,sirnilpj probe of shorter length.Probe to have 11 inches of operating range,and rated for Class 1,Div I installation. Tolal probe Iength is 12 inches For as needed with dead zones),with operating 12nints 1.1 inches apart. See attached sketch For ruture in tioJ2. This CPR is for the probe alone,provide level element to Owner for installation through the Phase I contract Provide,gLa.cLecift for planned J in HDR/MMI Date: 81212011 TO- HDR Engineering,Inc./Morrison Maiede,InG, Proposal; Pro V1 W e- /,2 ro �2,s S�e ee C/ / I�41 .2,14,VV5 L,4JS0&__ZP 466,tQ69E 20 6f—SF Cost 1166 OC Credit (A time extension is not required for this modification unless otherwise detailed and justifiefl �V7 Contractor -7, Date TO, AcceptedihlotAccepted HDRIMMI:Date Accepted/Not Accepted Owner Date __ 0 C4 u i i 6 ! I p r i 1 T I y r P i h 1 I 6 V V 9 00 Ch ! o a'a y D I N CD i C7 N-C D C7 CD (D s(D.C� C� C7 C7 4 i qy Q 11 may: b9 V -- ri - i r {{ r ! f R 0 'Cap E {5! ! e I � +,i.�Q bi 1 IDI d'i �37t L ! k Cfl � lTf C3k D'. c5 � C• CfS � � dll� CU' i"*'"c m1—•r i 1 " (i�1LLJ, . (63 i ep. Lca �:w� ' i�! CKd C'IiI 4? LI( LD2� I v �cL:u=!LL 'C�!U;C7�t-!w iu �rrrr i d c� r, .................... ------ ............... .......... .............. 01111 om /...... ........ ........... .... ...... AJ ///////--lll---,//",�,!"/.......... ........... "/,/�,/"�"/"/�//////,�,/�//............... o/o/l/VP .........//,Y/. ..... ........... 4 as /e/A OWES ............ . ....... ............. .......... .......... .......... .......... 7 NEWBORNS .......... 111111111111111���Illlll............ I UIR -JARMSON CHANGE PROPOSAL REQUEST MEKE,INC. (Not a Change Order) Project. Bozeman WRF Digester No.3 and Sol"ds Dewalering Building CPR No.: 068 CPR Date: 8612011 Date Sent toContractor., 8t5/2011 Date Rec'd from Contractor: TO., McAlvain Civil Constructors Please furnish your proposal for executing the following changes: Modifv foam suppression units inlet elevations for the existing di ester area oer RFI 127 Response, HDRIMMI Date. 8/512011 TO: HDR Engineering, Inc./Morrison Maierle, Inc, Proposal: Cost 1$2,63813= Credit (A time extension is not required for this modification unless otherwise detailed and justified:) Contractor Date TO: Accepted/Not Accepted HDR/MMI:Date Accepted/Not Accepted Owner: Date Recommend to accept for a total Cost of$2,638.13. Reduction due to MCC double markup. James Nickelson 08-6-11 C F- 0 — c a- 4 p C) 0 z-- — r r- CO BCD Cl) Fd n v co N � L r E c*i ci ci c i c�i a Z,7 =o °7 a fs> rrr � 6»W, fill u Gc> r coCD C3 <t L 4 <C <C o Q '0 000 U as Co v5 m U) U a. CDD 4 m d us co co t z 0 d 0 al V> to Z ca U) r- 0 u-a 'r � tU (1} f / � 0 A � N � C? �L 9(pia„ Z n U) co M CD LL 0 en P O CU U 0 �y CO r P c) 0 U '3 co C.) co i W o o illiams rI Plumbinga Heating o Utilities tn.t��rct p �amm.�:tnGent � C�m.rnt�r�tty August 11,2011 McAlvain Civil Constructors Attn: Harrison Hotchkiss 6559 W. Gowen Rd, Boise, ID 83709 Bozeman Digester-WPH 9589 RFP 034-CPR 68 Harrison: Modify foam suppression units inlet elevations for the existing digester area. Subcontractors_ HV'AC-100 TEMP CONTROLS-101 TEST&BALANCE-102 _ INSUL-105 _ CHEMICAL TREATMENT _ Subtotal-Subs Overhead Subs 0.00% Subtotal-Subs-w OH Profit Subs 5.00% Subtotal-Subs-w OH & Profit Material 746 Labor Hours 0 1,242 Direct Job Costs 154 Subtotal 2,142 Overhead 0.00%b Subtotal w OH 2,142 Profit 15.00% 321 Subtotal w OH &Profit 2,463 Subtotal Subs & Material, Labor, Direct Jab Costs 2,463 BOND 0.00% - GROSS REC TAX 1.00% 25 Total 2,488 Sincerely, WAD ae, M 2 Project Manager Williams{plumbing,Heating UtiBsties.Inc. BOX 10 2131 Industrial(Drive Bozeman,MT 59715 406-587.0969 . FAX 406-585-9458 JDB:Digester#3 Foam Suppresser CPR 6 Division 15 Mechanical: Item Decrtption: Quanrty Ea i Price Ea hours Ea. Hours total Pnce"Total Prize Sub 4"316 L.Class D weld flanges 4 83 2 $ 332 4"316 L sch 10 weld pipe 2 37 1 2 74 4"316 L S.S blind flange 2 93 0.5 _ 1 186 4"S.S haft kits 4 33 05 2 132 4" 150#garfoil gasket 4 5.5 0.5 2 22 time for cutting and welding part 4 2 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 0 0 0 0 0 --- 0 0 0 00 0 a a 0 0 0 0 0 0 o a 0 a a 0 a 0 0 0 0 0 0 0 0 0 a a 0 0 0 0 0 0 a 0 0 0 0 0 a TOTALS 23 746 Computi Kr _ TWals T46 100°I^ 746 23 s 100°f%1 23, $64.00 1,142 i 1,98& BWWWTP#'9569 — y A jusked i _ 1% A ustedI LABOR LABOW h_ Labor LABOR' LABORS TOTAL DESCRIPTION j MATERIAL�AdV MATERIAL I HOURS Z FACToR< ( Hours i RATE; 6bsT' COST ir$1 /ll / /rrJf%/ r 746 1,242 1,988 /./`// /%%�/% %//rir%%//il�d�/ —� _... ✓/f//r/�// /r'��' dy f :.,. /° �%/ a/i//fir%i/pj,/✓i!i%�/%��i�� ��� of...__.... _.. rr����/��� ,('��;y4 _� i _-- !f f _ ��� q !.—.. ! / al ✓/�f/r%/�����//f//���� 'LYE�' ,,, ��// %f/��� I ��G/ ,dog �� ��/,t7�1"f .. _......,, ....._... 4 MIA r lr�//r/ / /j/// /�� � _ .. ....._,..,. r ���/1' %,�._.... .."_..%% - ,,,,,,i TOTAL 7461 100%! 746 f 23{, ta0dl 1 1 23 $54.00° 1,242 1,988 Page 1 MISCELLANEOUS COSTS: 154 BW'NTP#9589 _ --_. _ I OTI-iM LABOR LABOR! ADJUSTED LABOR LABOR, TOTAL DESCRIPTION MATERIALR HOURS FACTOR _ OR HRSI RATE COSTI COST �1p�iii��"�rjf/�1��'�!�!f/j�f✓i/%/i / / / r ' / /%�i//% / '�/ '�'!'j /C j� '�ril �i rr ��a%%r��'� 1,Dl�r- ////1"//r„f,�%//l%H !// ! '//j��%' r %%%/ l�%/��/'%%�%%//i'//���1���✓c_. �' .. iy, �/ G.,l'' �r ',.. /�%/// ' l%r%i,;,/rir//i✓/�i�/j��//,/%����/l�'�i// !i%/ �,, _✓c. `'y!i1 t he //- i r - , .. 01, A k - �r t 1� 11�// /,i/pro✓/i i,,, /i // /�%/�%�� �����>��� �„ 4 IIvt`gyp , !I� / — C1 Wos lRale - Aulc+mallcs NO ... OB SHACK-7blMFVq 1­ 67{ �7 - fi _ r, �s TELEPt10NE-7f1111CL 007 100 7 _. UTIL-70112210 007 1 75' S % i% i//%%� 4c �r, S?IPI=RVISION IN FIELD firs — 21 541 124 '// �i//%/ii��/�l �'�a '�"D/✓ a .... _. 174 it✓/%/��✓��/�J�'r/ /„ /f; /// /i,� ��� ii°�r!i�/�/ u _ „ � , OKI ''I 7. ✓E , - r�i�r� //�� /��/����/����//�J//r / �ir�d���//,Jln�/���1/Ir✓„/l�rrJll�!% / / .. ._.._._..—r �LH';�n,/9 I/�r ,�G � ✓✓/!!aG>_ �: ,«..,...!� l/:,.///„ ./ /wi./ll.��/i�� „l., �r '�i TOTAL ! � 1Sd: p°/a' Si3.00 . 154 Page 1 4 4n{l j M, cALVAIN 9 .CIVIC, CONSTRUCTORS INC. Equat Opportu+city E+raptoyer REQUEST FOR INFORMATION RF1 No.. 127 TITLE: DG foam suppressors piping DATE: U"1 25!201 1 PROTECT: 210001. RESPONSE IZEQUIREEI: 076)01201 I Bozeman WWTP Digesler No. 03 TO- HDR Engineering E-MAIL: Coral y tin,Rcvis(:e.6lidrinc.coan. PHONE: 4065322219 ATTN: Coralyno 4eevis FAX! 4065322241 REQUEST: �peeifieation: Drawing: Picase see attached PROPOSED SOLUTION: ANSWER: ..his is no! prefera.bki-. 4Ic7?mever, modifying the inlets on, the fc'n 'I! ""--ppiessicorl uni' s (m vifl" 1hcn) n '� i4Q) Sid tllc"'t ;1ew pl:f"Y` 4.1 .!`.Ci}("1$fN"plTl the:l t:.'CS a�lt'���tw.:l' w he rL C'a:f-d 1 f:'Cr:pt✓hl e. REQUESTED BY: ANSWERER BY: Si ned: _.. sighed; C-or�lynn Revrs lacy-L". Date: 07/25/2011 Date: 71 Z 812'011 ID RCE+-14471 5559 West Go4ven Road,Boise,Idaho 81709 (208):362-2125 FAX(248)362.4356 r �.� Williams I Plumbing - Heating - UlIjijc�s REQUEST FOR INFORMATION Date:07-25-11 Project Name: BWWTP Digester#3 Project NO. 9589 RFI No.44 Re: DC Foam suppressor piping A/E, HDR Contactor:McAlvain Phone: 208-871-3085 Email, dennisc(Ermcalvahi.com. Attu: Fix: Comment:Would it be acceptable to pipe the foam suppressors in the digester#1 building as shown on the drawing below?? This would eliminate having to re-pipe the 4"DG line that exits these tanks, Reverence: Specification No: Drawing No. Submitted by: Owen Lang Phone No;406-922-1498 Email.- oIana(-(t'nyilIJ)IL1mb.com No of Pagc5 attached: I of I Need response by, % ....................................................... ................................ .......................................... ............................. .......... ........... ........... .......... .. ............ oewd .......... ... ........... ......... IUR MOMSON CHANGE PROPOSAL REQUEST IVLUERLE,i,�c (,Not a Change Order) Project: Sozernan WRF Digester No.3 and Solids Dewatering Building CPR No., 069 CPR Date,, 81112011 Date Sent to contractor; W112011 Date Rec'd from contractor: To: McAlvain Civil Constructors Please furnish your proposal for executing the following changes. Lnstall1I00-8EaV-_01 re '±eL��all)as shown on sheet 1 100D07 removed m.th e_fl.2 r HDRfMMI Date: 3Y112011 TO: HDR Engineering,]ric./Morrison Maierle, Inc. Proposal: Cost 1$876,16 Credd (A tirre extension is not required for this modification unless ntheRvisF det6ed and justified:) Contractor Date TO: AcceptedlNot Accepted HDR/M101-Date AcceptediNot Accepted f Owner: Date Recommend to accept for a total cost of$876.16. MCC markup reduced to 5%. 4� James Nickelson 08-13-11 a. m cu cn °) O O ram^' CD CD 1(D CD cco o ri GCf 60 wr- M OS — C C T R^ M to T a Y _0) Q) Q < < o 0 _ Q a X Q m0 a. ZcL O CL o O < AD L31 t3 0o w co w 2 V) z us 0 C) w U) U) co _ 0 CO GCS j11 v 6 M Nr, co ✓, �� a 0 riyCo (0 CL E c3 w n �2 as -- o a- mU nS iiams Plumbing Heating4 Utilities e r(tjtj �o pt n,i.c t, August 10, 2011 McAlvain Civil Constructors Attn: Harrison Hotchkiss 5559 W. Gowen Rd. Boise, ID 83709 Bozeman Digester-WPH 9589 RFP 033-CPR 69 Harrison: InstalI 11 00-8PRV-01 at the gas building Subcontractors: HVAC-100 TEMP CONTROLS-101 TEST& BALANCE-1 02 INSUL-105 CHEMICAL TREATMENT Subtotal-Subs Overhead Subs 0.00% Subtotal-Subs-w OH Profit Subs 500% Sublotal-Subs-w OH &Profit Material 165 Labor Hours 0 486 Direct Job Costs 60 Subtotal 711 Overhead 0.00% - I Subtotal w OH 711 Profit 15.00% 107 Subtotal w OH & Profit 818 Subtotal Subs&Material, Labor, Direct Job Costs 818 BOND 0,00% GROSS REC TAX 1.00% 8 i Total 826 Sincerely, Project Manager Williams Plumbing, 6OX 10 2131 Industrial Drive Boze�n)a� Heating hims Inc 01' 59715 JOB Digester#3: CPR 059, move BPRV-1100 Division 15 Mech;anicat: Item Decription: Quanity Ea Prim Ea. Hours Ea. Hours total Price Total Price Sulu. 4"S:S class 0 weld flange 2 82.5 2 4 165 removal and reinstall of BPRV 1 5 5 0 _0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0' 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 c� o 0 0 0 0 _0 0 0 0 0 0 _. 0 0 a o 00 0 0 0 0 0 0 0 0 oTALS -65- computer computer Totals 165 100% 165 9 100°lo Ja 9 $54.00 465 651 SWWTP q 9689 Adjusted Adjusted LABOR LABOR Labor LABOR LABOR TOTAL DESCRIPTION _MATERIAL. Adj MATERIAL HOURS FACTOR Hours RATE COST GUST GPR Fig 165 100% 165 _ 9. 100% 9 554,00 480 651 100% 100% 554.00 100% 100% $54.00 10M - 100 554.00 100% 100% $54.00 IOU% 100 I 554,00 100% 100% $54,00 1001A 100% $54.00 1000 100% $54.00 10D% 100 41 $54.00 100/a 100 % 554.00 100% 100 % $54.00 100% 100;'c $54.00 10016 100 r1 $54,00 100% 100°✓a 554,00 100% 10D".n $54,00 100% 100°a $54-00 100% 100% $54,00 100% 100 '% $54,00 100% 100 % $54,00 100% 100 < 554.00 11'00% 100 io $54.00 100% 100 Q1 $54.00 100% 100% $54-00 100°r°s - 100% - 554.00 100°k - 100 554.00 10014 100% $54,00 1001/6 100/s $54.00 1001k - 100 0f,. - $54.DD - 100% 100% 554.00 100% 100°h $54 00 100% 100 Y. S54M 100% 100% 554.00 '100% 100 4111 S54 00 100% 100 $54 00 10014 100 yu $54.00 1000/1 100% 554.00 100% 100 °> $54-00 100% 100% $$54,00 - 100% 100 ;M $5,L00 1W% 100 rq $64.00 1001/a - 100% - $54.00 10091, 100 4 $54.00 100% 100 Sb $54.00 100% 100 % 554.00 100% 100% $54.00 100°/v 100 13 $54-.00 100% - 100 S. - $54.00 .. 100% 100 1. $54.00 100% 100 r/. $54 00 100% - 100`. - $54,00 400% 100°ro $54.00 100% - 100% - $54,00 . 1000l6 - 100✓ - $54.00 - 100% 100% $54.00 100% 100% $54,00 100% 100% $54.00 100% 100 1/1 $54.00 IUD% 100°6 $54.00 iDO% 100°6 $54.00 TOTAL 165 100% 165 9 100% 9 $54 00 4B6 651 Page 1 Misc MISCELLANEOUS cosTs, 60 Q so 00 BWWTP#9589 OTHER/ LABOR LABOR ADJUSTED LABOR LABOR TOTAL DESCRIPTION MATER9AL HOURS FACTOR LABOR HRS RATE COST COST i0o -x PERMIT-701/910 CRANE&FORKLIFT-,701110/0 100 $54.00 SPECIAL VREIGHT-701111I0 100 $54,00 WELDER&GAS-70111210 100 0/1 $54.CQ CUTTING,GRINDING-70111310 100 0/1' $54,00 WSC HOIST-70111410 100 0/; $54.00 ADDITIONAL HARI)WRE-70111410 100 ox, $54.00 FIRECAULK 100 0/c $54.00 100 0/1 $54.00 100 0/1 $54,00 TOOLS M[SC-70111 7/0 100 0/1 $54,00 MOB ILQAMON-70111 810 100 QY $54,00 O&M'S-701/1910 100 0/1, $54,00 SCAFFOLD-701/20/0 100 OX $54= VEHICLE-701/2110 100 IK S54.00 100 OA $54.00 LODGtNG-70112310 IOU,/ $54.00 TRAVEL too 0/1 $500 PIPE ID-701/171/0 too-i $54.00 INSIDE EXCAVATION 100 °A $54,00 SLEEVING too./, $54.00 CLEANING 100 /; $54,00 CONCRETE DEMO 100 V% 554.0 EXTERIOR EXCAVATION 100 t $54.Q0 INSTRUCTION 100 'V. $54,00 No mo 1001/1 SS4,00 Mos Rate 100 0/1 $54,00 - Automatir3, 100 OA $54.00 0 jOE3 SHACK-70111510 0.03 275 7 100 1/9 $54.00 7 TELEPHONE-70111610 0.03 100 3 100 0/1 854.00 3 UTIL,701122/0 0.03 75 2 100 0/1 $54.00 2 SUPERVISION tN FIELD-I rs 1 54 49 too ox* S54,00 49 too -x $54.00 100 % $54.00 too D/," $54.00 100 14 $54.00 100 0/. $54.00 100 0/, $54.00 100 0/1 S54-00 100 0/1 $54.00 100 °% $54,00 100 1/1 $54,00 1001/1 $54= 100 0/1 $54.00 100 $54,00 100 'A $54.00 100 % $54= 100 ox $54.00 100 0/1, $54.G0 100 01. $54,CQ 100 9A $54.00 100 411i $54,OD 100 Ili $54.00 100 0/1 $54,00 100 0A $54,00 100 0/t $54.00 100 VA S54.00 - 1001/1 $54.00 100 DA $54.00 - 100 51, $54.00 - TOTAL 60 - 094 $0,00 60 Page I ........................................................................ ............... .................... ............ ... ......... ........ . .......... -/am/........... ......... ...... .. ............ .............. ............... ........... IDI ' MORMSON CHANGE PROPOSAL REQUEST Not a Change Qrder �R7�.�,IBC � g ? Project: Bozeman WRF Digester No.3 and Sofids Dewatering Building CPR No.: 073 CPR Date: 8118/2011 Date Sent to Contractor: 8/18/2011 Date Rec`d from Contractor: TO: McAluain Civil Constructors Please furnish your proposal for executing the following changes; Regardinq the foam suppression units in the Di ester Control Building No. 1.: Provide power("'P12"per Conduit and Gable Schedule on Sheet 1401El1)to new Foam Suppressors 800-FS-01 and 800-FS-02 located in the existing Di ester Buildin . Provide conduit Wring, and accessories, and materials and labor for complete,fully functional installation. Use existing breaker in Circuit 28 of Panel A of the MCC-CA (Administration Building MCC located on the main floor across from the boiler) confirm availability of this breaker with Owner prior to beginning work. HDRIMMI Date: WM2011 TO; HDR Engineering,Inc.IMorrison Maierle, Inc. Proposaf: Cost Credit (A time extension is not required for this modification,unless otherwise detailed and justified:) Contractor Date To: Accepted/Not Accepted HDRIMMI: Date AcceptedlNot Accepted Owner:Date Recommend to accept at a total cost of$1,2 3.19 per attached detailed breakdown. _�-- James Nickelson 03-08-12 �5 w a. CL k E 0 0 00 0 LO LO 0 LO 10 C11 � o c6 c6 c4 cQ C-i LO LO N t- M as U) as m co 0 m C� < cb EFk 6q 03� 4i� �4 4A. F. F. to co z 0 U) E < ?i 0 0 C) CD C> 0 < 0 m LO < .2 LLJ U) 0 co 0 0 0 CC CU _0 ca co CL :3 C3 U) z F= — CO CL C) 0 E C) CI CD 0- 3: U) 2r3 to 0 " . -D 40CL ul cr) cq cir) 0 LL 0 4- c 64 C a) — —j E 0 0 -a < W N 0 0 0 CL 0 .......................................... .........................................................;;,�................................... ............................. ............................. ................................................................ ............................................ V11111 ........... W/mAJAim. ........ ............. .......... ................ .......... ................ 10R, JMORRISON CHANGE PROPOSAL- REQUEST 2:J MMERIE,wc (Not a change Order) Project: Bozeman WRF Digester No.3 and Solids Dewatering Building CPR No,: 074 CPR Date: 1 01912011 Date Sent to Contractor. 1013/2011 Date Rec'd from Contractor-, TO: McAlvain Civil Constructors Please furnish your proposal for executing the following changes, Provide ad2 ional.glycol as needed to bring the beating water system up to 30%qlvcol per CPR 60. Assumed based on HDR1MMl Date: 1013/2011 TO: HOR Engineering,Inc./Morrison Maietle, Inc. Proposal: Cost $10.75/gallon Credit (A time extension is not required for this modification unless otherwise detailed and justified:) Contractor Date TO: Accepted/Nat Accepted HDR/MW Date Accepted/Not Accepted Owner.Date Recommend to accept at a total cost of$12,786 based on attached detailed breakdown and McAlvain markup. James Nickelson 07-02-12 < o 0 illiams o Plumbing - Heating Q Utilities fnte�ri�� Golnmtt:t�.ent r;omm.wani��l May 24,2012 McAlvain Civil Constructors Attn: Harrison Hotchkiss 5559 W. Gowen Rd'- Boise, 1D 83709 Bozeman Digester-WPH 9589 RFP 037-CPR 74 Harrison Pricing to provide additional glycol based on a unit price. Subcontractors; HVAC-100 TEMP CONTROLS-101 _ TEST& BALANCEµ102 1NSUL-105 CHEMICAL-TREATMENT _ Subtotal-Subs Overhead Subs 0.00% - Subtotal-Subs-w QFl Profit Subs 5.00% - Subtotal--Subs-w OH &PL oftt Material 8,967 Labor Hours 25 1,350 Direct Job Costs 167 Subtotal 10,484 Overhead 0.00% - SubtoW w OH 10,484 Profit 15.00% 1,573 Subtotal w OH &Profit 12,057 Subtotal Subs &Material, Labor, Direct Job Costs 12,067 BOND 0.00% - GROSS REG TAX 1.00% 122 Total 12,179 Sincerely, Project Manager Williams PlumbNnq,Heating Utilities„Inc. - BOX 10 2131 lndustriaL Chive - Bozeman,MT 59715 406 a8%-0969 - FAX 406-58 -9458 Computer 7,52E 25 B 1DD 1f 25I $54m 9,;i5C1 E,B7S Com liter ITgtals o 7525 100PI f a WWTP#968g _ � .., T- LABpR_�LA6C)R4._ Labor I�tA8C7R� LAO�CSR 1 Tf77A[. CESCRIPTIDN ( �1A"tERIAt,TAdq MATNmRk,AL i 1#01JRS I FACTOR `Hours I F2ATL1 CC1S7 I COST _.. CFIR 74-704 ga1-($1a.75 7,525 aTOOT.� 7 525_y 25 15% 15 i''554.00, 1.350 I 8,875 1Do5u _ 1on,Pa54.00 1D0�uj - s lop�pQ ...., �100 q} 100% .._ 9 in 1(1[i°lo� g 1Da"/ $54,01' __,_ 1aa r $s4.ao � 10o9u .._ _ � f�? $ $54 ap 14FD1nr S54 off _ 1oDr _ 1DtI a " J°�[_ $5UD Tao°k1 ; °ll 554.00' ye ......,.,.� 1DE1961 1a1r��Al 1D 4 DD _ 1 DD F° .._—_ $54 oD". "I6A, 1 �' 1opio _... 100 gas r; $54, 0 "top% too 10 _. — .10 P P. $5t1.¢YJ 12D03o�_._ tDD 554 Dq -- - S54 oa _ ..,.__ too 11aos1s ---" 1aD 9°r �- -. 1afl°Pr ""lop > ..� _ - 1Da/d " 100%1 554,60, --- 1DC)3ot 1100�I m f $54100 ....._. �_ t00%! lo 10 $S4,Do it10% $.54 DD W r Y 1oD I $5ADo.s I s ff E 1009�1... - 1DDia/',_ - , $54.00 p - 1DD96 10DJ%" $54:00 1DDPmI 1DiR9 A $54.od 1 D4% 1 a J _.._. 14D%� LL 100 $54.00!ssmw . 1DDa _ i00% 1D m $54'011 I 1gDh.__. , 1oD91 1CJ0 /a $54,0 _ - 10056 1a0%t^— 1DD'4� 104* 10DI%l v _.._. r _ 1t)094 1oa(%� 1 $54.DD' TgTAI 1 7,5257ry ?410°Pal 7,525 26 1 lom 5 $54,00 i 1 39a mm8,675 Page i I�nls�: MISCELLANEOUS COSTS i 167 0%) -1 $0 0o ! 67 _.___._. ....� OTHERS LABOR` LABO ADJbSTEC"LABQR� LABOR! TOTAL DESCRIPTION _....___.. �. . _—1 RATE- _ ..-_-- . —._.._. ,. Ole, 1@ RATE .COSTS COST CRANIH& ORKLIFi 7b11101C3 _ �� 1.p0 t y54 00 � d MATERIALS HOtIRs FACTOf2 LABOR HR51 $54 00 .. SPECIAL FREIGHT-70111116 1 0, 54 00 WELDE' , 'dAS:tlh`2a0 1p0°✓ I$64 00.' uTrltv �zlwtar =7ar� ro A 7131TIeOI ��01liAtb 54#k#3�_ MISG i�i OtaAL k{ARCIINRE-71}tl1410 10 °f, m .. FlF2ECAULK1:$54 00 T`dop Si is,-' 01117J0 MOBILIZATION-701J18lb t]&Mt540 1 11 810 — r S�Cfi.FFOLC+701,�2btbt VEHICLE701f211b L0061' 54 II{i _ Ole 54M� PIPE IA 701117110 a � f / /��/ / �i i i j /i r// ii i/ iNS1EE"EXCA1fATlc7N �i % // � ��i�/� i/�i�i�y �i� ii�1Qt °1 5400, SL1=iCENgG CLEANIfCa co _ $54"bb _ _. ETXTyE[Rp1a^Fi-y,XCf1'u'.IATIONtUb�1° Y Sql tgp5 S if0 R Mos olla I� AutarxraUcs _ ! k % 100 LIT P 1 b7b175f0... 0,07 �^T59 20 54TELEOCl: .. JOB SHACK 7b 7161b 1 007 1001 %1a0° _ $54:(}4 �_ 7 C b 07 7S 5 �y��1 Cif° 54a10 _5 SUPERVISION IN FIl LD Itrs 3 541 135 " ;<�� "1!).Q $54.b6�(_ � 135 _._..d._ $54.00 10 v�54.bb"— r 54bb 10 � p S54 Ob! i 1b0 $54 00, 1©C}% _(554 }�540[k n ��iiij� 10 _1$ 0b %r %'10 ° r$54 00 $40 $54 00I_ .. _.. a0 I$ bb i .._,.. _ /3(Ib 00 21 0 0 °2 $54 OD 1 C 100> A 4.001 p;E "$5 Ala 04/o9 I 1 �b 00 k i67 Page 1 ................ ........................... ............... ............ ............................ ................................. .................................................... .... .. ......... .......... ........ ............. .................. .... ............... ................. ... ...... ... .................... list . ............. ..........I'll, .......... ............. ................. R, NIOMSMT CHANGE PROPOSAL REQUEST KA1EWF',,J\C, (Not a Change Order) Project: Bozeman WRF D gcster No 3 and Solids Dewaternig Building CPR No,;---- 075A CPR Date, qpdated2/15/2012 Date Sent to Contractor'. Date Rec'd from Contractor: TO: McAlvain Civil Constructors Please furnish your proposal for executing the following changes: Provide a 7-day programmable thermostat,with temperature override, for the Dewateriba-Ugildir t IVAC controls A,Iso_p.Lovjde,th followin modifi cations from Dan HaTmon's tetter: Addition of an outside air temperature element located on the north side of the buildinci. Electriacontrals indicated you have a standard outside iprobe you use for that ap_plication. We would like to add this outside air temperature element,including installation in a conduit and raceway back to the building TCP. This will require elimination of the temperature sensor to the outside or The isolation damper for 1200-SF- 01 as that sensor is no longer needed., HDR/MMI Dale: 12/21/2011 TO: HDR Engineering, Inc,/Morrison Maierle, Inc. Proposal'. Cost -Credit (A time extension is not required for this modification unless otherwise detailed and justified'.) Contractor Date TO, Accepted/Not Accepted HDR/MMI-.Date AcceptedlNot Accepted Owner, Date Recommend to accept at a total cost of$1,605,59- James McWson 03-21-12 aZ m rL O CD LO LEA C3 Lr) IX) 'el' O m D- C) ca m rn o a) rn r~ m cn t rn U) rl-. ash r r- LO LO a , r- O LL U 69-rtr 601), GO-69, 609- c-r to-s cn C < Q m Oa Cam] 000 � �x{ O w m m z �t F- 0. <02 [ o < mLiJ Ca C? O 4Ti a 2 U) �? O m U) �43 to En J 0) d E 7CY -0 RS � µ / ca 0) s &- /i n T � � 1 ' LO , tf c m i�- CQ t� d �LO -cs Q %Gd CD C7 � cta J 'W0111. 0 �, I !Itams III Plumbing a Heating utilities J, March 20, 2012 McAlvain Civil Constructors Attm Harrison Hotchkiss 5559 W. Gowen Rd. Boise, ID 83709 Bozeman Digester-WPH 9589 RFP 039- CPR 75A Harrison: Provide 7-day programmable thermostat with temperature override, and outdoor air sensor and install. Subcontractors: HVAC-1 00 - TEMP CONTROLS-101 1,428 TEST& BALANCE-102 - INSUL-105 CHEMICAL TREATMENT - Subtotal-Subs 1,428 Overhead Subs 0.00% Subtotal-Subs-w OH 1,428 Profit Subs 5.00% 71 Subtotal--Subs-w OH & Profit 1,499 Material - Labor Hours 0 - Direct Job Costs - Subtotal - Overhead 0.00% Subtotal w OH Profit 15.00% Subtotal w OH & Profit Subtotal Subs&Material, Labor,Direct Job Costs 1,499 BOND 0.00% - GROSS REC TAX 1-00% 15 Total 1,515 Sincerely, Project Manager Williams Plumbing,Heating Utilities,lnc SOX10 2131 Industrial Drive Bozeman,%IT 59715 406-587-0969 - FAX406-565-9458 Electro ControlsQuotation "r 820 Latimer St#A Phone:(40G)721-3064 Fax.(496)541-4,115 Electro r, 'Controls To_ Willianxs PIut3jl3ij)(;,jr)(I FfC,,j(iny RE Bozeman'WRY Digester iv o, a and Solids I)ew<tt iu;= L3ttilzliit4� Bozeman, Momaim 'W, ure pleased to quote),ou on the following. Cats. Description Cost Lot CPR No.:()75 Provide a 7-clay I-sroyrati-miable tl)emiostat,with telilp ovenide. S 300 Outdoor Air Sensov and hisiMlatiou 'rotai S 1,428 Motes or Exceptions: Theimiostat price oWN includes pi-oviding'7 day pt•opramniable the)-11105tat with overt°isle. OA Sensol, prier}to include new sensor, conduit, wh ing, and installation. Rcspccttitlly Submitted: E L ECTRO CONTIROLS, INC. .......................... ................................... ",................... ....................................................- ..............................- ................. .............. .................. Eg ......... ......... FOR MORRISON CHANGE PROPOSAL REQUEST -.'.-JVLkl-11RLE,iw (Not a Change Order) Project: Bozeman WRE DigEster No.3 and Solids Dewatering Building CPR No,: 077A CPR Cate: 212112512 Date Sent to Contractor: 2/2,1/2012 Date Reo'd from Contractor; TO: McAlv@in Civil Constructors Please furnish your proposal for executing the following changes: UPOATED CPR 77, Lise the fcllo�Avir jristeadl: For the Gas BLJiIdLpRHWRJHWSIines. Upsize'W branch lines to 1 1/," for the stem to the Gas Buildino Utilize the 2"burred sleeves to replace the piping through the buried section. Install a tertiary heat loop 2LMp on this branoh to ui i ir r per flows arid provide electrical service New. smafler _�ovide sup Jy the Gas B Id ng Rebalance fo a _L _to - p 1200-HLP-6.to be sized at 22 opin and 20 ft of head. This CPR to tie finahzed in road ngbori with CPR 46_rrhi ovided a ct ditfor the smakr heat jqo fps HDR/MMI Date: 2/2112012 TO: HDR Engineering, Inc./Morrison Ma)erle, Inc. Proposal: Cost Credit (A lime extension is fid required for this modification unless otherwise detadled and justified--) Contractor Dale TO: Accepted/Not Accepted_ HDRIMML Date Accepted/Not Accepted- Owner Date Recommend to accept excluding pipe insulation and test and balance. Engineer will provide test and balance services. Total cost with these items excluded is $5,302-00. James Nickelson 03-23-12 D oa a� Ea C a- � c C C7 C6 LO LO Ca w tA7 may, C) CO LO 0 co CD co 12 CD CO cc TQ CO cc a: fr 0., u �Y yr C_n 0 J ,.t J J J m I ua 1— OFF- m °- 0' G!7 ( U] fn C17 (L w < G) O < to CD < LU u7 LO w rr z Gil O Q u G7 f1] J 7 T CC5 " N U co Q�? a) MLo h (Cf � M CL 0 EC) 0 y b CL 0 CQ C.) rn i� I-- �ams 4, 111 Plumbing o Heating utilities f L't'll - Co Ili M 6 :n"Z;L l; if M,rq !t i-, February 22,2012 McAlvain Civil Constructors Attn: Harrison Hotchkiss 5559 W. Gowen Rd Boise, ID 83709 Bozeman Digester-WPH 9589 RFP 038 -CPR 77 Harrison: Upsize gas building HWSIHWR lines. New 1200-HLP-6. Subcontractors: HVAC-1 00 TEMP CON-FROLS-101 414 TEST&BALANCE-102 1,200 INSUL-105 1,900 CHEMICAL TREATMENT - Subtotal-Subs 3,514 Overhead Subs 0,00% - Subtotal-Subs-vv OH 3,514 Profit Subs 5.00% 176 Subtotal-Sub5-w 01-1 & Profit 3.690 Material 1,390 Labor Flours 31 1,679 Direct Job Costs $15 Subtotal 3,884 Overhead 0,00% Subtotal w CH 3,884 Profit 15.00% 583 Subtotal w OH & Profit 4,466 Subtotal Subs& Material, Labor, Direct Job Costs 8,156 BOND 0.00% - GROSS REC TAX 1.00% 82 Total 8,238 Sincerely. V70#'ve, Project Manager Williams Plumbing,Heating UtflWes,Inc, - BOX 10 2131 IrdLisinal Dove Bozeman, 405-587-0969 - FAX406-585-9458 JOB: B'vVWTP Digester#3 CPR 77A Pricing Division 15 Mechanical: Item Decription: Quanity Ea. Price Ea. Hours Ea. Hours total Price Total 1 1/2"sch 40 black iron pipe 105 2.85 0.2 21 299.25 2 1/2"x 1.1/2"threaded bushing 2 5.45 0.1 0.2 10.9 1 1/2"socke weld weld 90 10 10 0.5 5 100 1 1/2"threaded union 2 11.57 U 0.4 23.14 1 1/2"threaded blk iron tee 1 6.47 0.2 0.2 6.47 1 1/2"x 1"blk iron beli rducer 3 5.21 0.2 0.6 15.63 1 1/2"x 6"blk iron nipple 3 3.84 D-I 0.3 11.52 1 1/4`°socket weld tee 2 10.6 0.4 0.8 21.2 1 1/4"x 3/4<"socket weld inset bushing 2 5.6 D.1 0.2 11.2 1 1/4"socket weld coupling 2 4.55 0.2 0.4 9.1 1 1/2`°unistrut clamps 6 1.02 0-1 0.6 5.12 1900 series pump 1 845 1 1 845 1900 series pump flanges 2 15 0.2 0.4 30 TOTALS 31.1 1199.53 CompWk&,- computor Totals 1,390 1001A 1,300 31 31 554.00 1,1579 3,069 BWVVTP#9589 Adjusted % Adjusted LABOR LABOR Labor LABOR LABOR TOTAL DESCRIPTION MATERIAL Adj MATERIAL HOURS FACTOR Hours RATE COST COST -EF13 7-7 1,390 'loolk 1'390 -Ti-100 4h 3 1 -$5-4,00 ' 100% 100 $54 00 100% 100% $54.00 100% 100 $54.00 100% 100 $54.00 100% 100 510 $54 GO 100% 100 $54m 100% 100 $54.00 100% 100% S54.00 100% 100 p/. S54,00 100% 100% $54.00 100% 100% $54M I0V14 - 100% S50,00 - IGO% 100% $54.00 100% 100% S54M 1 GO14 100% $54,00 1001% 100% $54,00 IGO% IGO 91 $54-00 100% IGO % $54.00 100% 100 % $54.00 100% 100% $54.00 100% 100% $54.00 100% 100% $54.00 - - 100% - 100 k/. $54M 100% IOD% $54.00 100% 100'k 554.00 100% 100 1/. $54.00 100% 100 % $54.00 100% too 14 $54.00 IDO'k 100% $54-00 100m - 100% $54.00 100% IGO % 554.00 100% 100 IYQ $54,00 100% 100 % $54,00 100% 100% $54-00 100% 100% $54,00 100% 100% 354.00 100% 100% 55400 100% 100% S54.00 100% lot)% 554.00 - 100 io IOU % S54.00 IQDh 100 ib 554.00 IDOPA 100 $54.00 10014 IOU 0S 554.00.. 100% 100% $54 00 100% 100 % S64.00 100% 100 % 554.00 I oolllb 100 % S5400 100% IOU % $54.00 100 % S54,00 100% 100 % $54,00 IGG% loo% $54-OD 100% 100% 554,00 100% 100% S54,00 I 001Y. 100 V. $54.00 100% Too% 454.00 100 0 100 1/. S54,00 100% 100% 100% 100% 554,00 100T. - 100% $54.00 ,TOTAL 1.390 100% 1,390 31 100% 31 S54.00 1,679 3.069 Page 1 misc MISCELLANEOUS COSTS: 383 a 0-0 432 BWWTP#9689 OT.HERI LABOR LABOR ADJUSTED LABOR LABOR TOTAL DESCRIPTION MATERIAL HOURS FACTOR LABOR HRS RATE COST COST TEWMI-f--70119fl) 1001/1 $54.00 CRANE&FOR KLIFT-701 ti 010 100 $5400 SPECIAL FREIGHT-701/1 1/0 60 100 $54.00 50 WELDER&GAS70111210 - 100 0/1 $54.00 CUTTING,GRINDING-70111310 100 0/1 $54.00 MISC HOIST-70111410 loo ox $54,00 ADDITIONAL HAIRDWRE-701/14/0 100 -x $54.00 FIRECAULK 100 0/1 S54,OG - - DRAIN,FILL,PURGE GLYCOL B 1001/. 8 $54.00 432 432 100 OX - $54,00 TOOLS MISC-70111710 100 011, $54,00 MOSILIZATION-701118/0 100 'A $54.00 O&M'S-70111910 100 ON $54.00 - SCAFFOLD-70112010 126 100 0/t $54.00 125 VEHICLE-70112110 1 DO 6/k $54-00 - 10 0 OX $54.00 LODGING-70I12310 100°A $54.00 TRAVEL 100 % $54.00 PIPE ID-7011171/0 100 % $54.00 INSIDE EXCAVATION 100% $54.00 SLEEVING IOU % $54-00 CLEANING 100 J, $54.00 CONCRETE DEMO 100 0/1 $54.00 EXTERIOR EXCAVATION 100 % $54,00 INSTRUCTION 100 0/t $54.00 No 'M a 100 0/1 $54.00 Mos Rate 100 '/ $54.00 Automatics. 100 0/1 554.00 0 JOB SHACKa701/1510 009 275 24 100 C/I 554.00 24 T-E-LEPHONE-70111610 0.09 Ico 9 100 CA $54.00 9 IJTIL-70112210 0.09 75 7 100 OA S54.00 7 SUPERVISION JN FIELD-hfs a 64 168 100 C/ $54.00 165 100 a/, 554.00 100 $54,00 IOU 0/1 S54X0 100 % $54,00 IOC 1/ $54m - 10 0 $11 $54,00 100 OA $54,00 100 D/I $54.00 100 0/1 S54.00 100 6/1 $54.00 I OD ®! $54.00 100 IV, $54.00 100 0/( $54.00 100 % $54,00 10 G% $54.00 100 m $54,00 100 0/1 $54,00 100 0/1 $54.00 100 0/1 $54-00 100 0/1 $54M 100 04 $54.00 100 °/. $54.00 100 0/1 564.00 100 $54,00 100 P/I $54.00 100 0/1 $54,00 100 'A $54,0:0 100 OA $54.00 - TOTAL 383 a 100% B $5400 432 ---al ii Page 1 Otinotatio Electro Controls 2,520 Ujfimcf S�'-;'A MiSSOUla MT 5�308- Fvbrvjr�N 24,2012 PhonL;(406)721-3034 F,ix (406)541,44145 <S>Efectro Controls To: Williams Plumbing wind Heating RE. Bozem,,m 1t RI: Diuesi�i No. 3 and'So ids L)Qwateiin-- tRutdin-1, Bozeman, Montant Lf M'I I0 LjkkOle VOIL 01-1 the COMM 111UY, QtN% Dewription I Lol CIIR Nlw'077 s Valve 1*0i, ]'-00-fTA'DH-(j-:, Total 414 Mies or Exueptioiis� Price includes providing ne)) control I-Ave and re-instaffilig existing actuator Oil new Price (1()J,S llot ilICIU(je illStIffiltioll (piping) of ljeaN� Cojltj,Dj Nrdvo Re;:XCItiffly ELFCTRO CONTROLS,INIC. I�m Vinorio "TR-- ��Iqru(a)w 1055 Apples Way Belgrade, NIT 59714 PHONE: (406)3-39-52.51 FAX;(406)388-6649 DATE 2-21-12 WE HEREBY SUBMIT SPECIFICATIONS AND ESTIMATES SUBJECT TO ALL TERMS AND CONDITIONS AS SET FORTH ON BOTH SIDES AS FOLLOWS; Pi11L' MSLIIation forW' of 11/1" pipe from basernent to gas building wig acketing 1,900,00 CONDITIONS: ALI,MATERIAL IS GUARANTEED TO BE AS SPECIFIFF). Al L WORK tSTOBE' COMPLETED IN A WORI<MANIAKSMANNER ACCORINCTo STANDARD PRACTICES. ANY ALTERATION OR DEVIATION FOR SPECIFICATIONS INVOLVING FX FRA COSTS WILL BE FXECUTED ONLY UPON WIZFITEN ORDERS, AND WILL 13hCOME AN EXTRA.CHARGE OVER AND ABOVE THE ESTIMATE ALL ACRIN\111.,'NTS CONTINCENT UPON STRIKES, ACCIDENTS OR DELAYS BEYOND OUR CON'l ROL, OWNTER TO CARRY FIRE,TORNADO AND OTHER NECESSARY INSURANCE. OUR 'AlORKERS ARE FULLY COVERED BY WORMVIENS COMPENSATION INSURANCE. WE.PROPOSE HEREBY TO FURNISH LABOR AND MATERIALS-COMPLETE IN ACCOPE)ANCE WITH ABOVE SPECIFICATJONS, FOR THE' AL\110UNU 01`:51,900.00 THIS PROPOSAL MAY BE WITHDRAWN BY US IF NOT ACCEPTED WITf IIN 30 DAYS, PRO INSULATION INC. BY: ROBERT NEWSTROM,PRESIDENT ACCEPTED-THE ABOVE PRICES,SPECIFICATIONS AND CON RITIONS ARE SAFISFACTORY AND ARE HEREBY ACCEPTED AND AUTHORIZED TO DO THE INOR!",As SPECIFIED, PAYMENT WILL.BE MADE AS OUTLINED ABOVE., DATL: SIGNATURE: pa 'c I of I Mollie McKiernan From: Owen Lang Sent: Tuesday. February 21, 2012 9.37 AM To: Mollie McK�ernan Subject. FW: Digester#3 Change order Attachments: Digester#3 C.O 1.5 pipe to gas bld-doc As well I have a verbal price for test and balance for 1200.00 from Terry-Just waiting on the cost of the purnp-Owen From: Robert Newstrom. [proinsulation@hotmail.com] Sent. Tuesday, February 21, 2012 8:12 AM To: Mollie McKiernan; Owen Lang Subject: D gester 93 Change order 'I'hisshould do for what You need. Give Ille a call with any questions. Thanks, Kris w/PRO 5,90-2498 02/22/2012 No Text ful 'MORMSON CHANGE PROPOSAL REQUEST (Not a Change Order) Project: Bozeman WRF Digester No.3 and Solids Dewatering Building CPR No.: 070 CPR rate: 2/17/2012 Date Sent to Contractor: 211712012 Date Rec"d from contractor: TO: McAlvain Civil Constructors Please furnish your proposal for executing the following changes: Soffit for the Dewatering Building sludge,load'out H D R/M Mi Elate: 2/17/2012 TO: HDR Engineering,Inc./Morrison Maierle, Inc. Proposal: Cost Credit (A time extension is not required for this madification unless otherwise detailed and justified) Contractor Date TO: Accepted/Not Accepted HDR/MMI. Date Accepted/Not Accepted Owner: Date Recommend to accept at a total cost of$3,219.03. James Nickelson 02-17-12 - � ° o D N m �, :7 W. a co < -7U ; a m c w co n p r` ram' ro w '� r�s r-- " e o Q CL 0 p �. ,..... 73 r r— coco 0 @ @ < { X fA o 0 z m A a o Ln m 0 0m D o > v�i oa ' cn > r � � co —t0 C xc cC r r 0 �.� 000 0 0 � � Q � O � D eti A rr- r- r r r 63 r f N b3 4 t of s9 fp Ef7... to tfi 69 ffl Old m sm a 9 ra' c s w N C ' tv w N N .I 0 � cl� -b, C11 C3 W CAR ill Cn O O 6 Ct CI'? C33 b N C to _ tp c7r rr C7 41] a O C D C m _ .................................-,......................... .................... ... ...... .. . ........ -AWONTRO/ ww/ ............. re ........ ...... -�/.......... ............. "Ild 'Aml M®R .... .......... "WE I............ ........... R WSON CHANGE PROPOSAL REQUEST ERLE,iNc (Not a Change Order) Project- Bozeman WRF Digester No.3 and Solids Dewatering Building CPR No.: 080 CPR Date: 312212012 Date Sentto Contractor: 3/22/2012 Date Rec'd from Contractor: TO: McAlvain Civil Constructors Please furnish your proposal for executing the following changes: Provide credit for electrical work not being completed Per Items.#I,,#3 of TGE's letter. HDRIMMI Date: 3/22/2012 TO: HOR Engineering,Inc./Morrison Maierfe,Inc. Proposal: Cost Credit (A time extension is not required for this modification unless otherwise detailed and justifiefl Contractor Date TO: Accepted/Not Accepted HDR/lVlMl-. Date Accepted/Not Accepted Owner: Date Recommend to accept for a credit of$3,365.39 as outline on attachment. James Nickelson 05-18-12 � ro U C1. C 0 A �y M Cc! C37 — 0 a) t- C) Cal m 0 J C57 N r !@. O3 tEti N 6 uy U Ci7 17 4) m m U} w CD C7 'e'•' Cat �- C�$ f"1 'LI q3 C) 5n W' 0 FH Ef3 fft 64 5FB Ei} bt} 49-&} CFf 1-- J J ,J J 1 F< IFC n— A KL 0 0 0 0 J J CT.. 'u) m (n IS ® ^ < m c*) Cn C) 0 N Q C4 N 0 (] G9 u co 4/) (D J J -' LC) Z u) Ct ,ca - 4-a mrs (Y) -�e •- Jzfn 1 q) i3 fir' U) Qa 0 - M C) LL W «l c W r {� C ) L) a+ LL co C: u -a a C E o 0 C9 C7 I- C7 �p 0 X TGE i Tryon General Electile Inc. Bozenia a, Montana February 28,2012 To Whom It May Concern, This letter is in response to the"Electrical Work Deficiencies"letter we received on 1/19/2012 from McAlvain Civil Contractors. One purposed solution is to offer a monetary allowance/credit for the deficiencies as follows. I. Offer a Credit,in the amount of$2099.30 to leave the lock nuts/sealing looknuts in use,rather than replace with Meyers Hubs. 2. Offer a Credit,in the amount of$3019.26,to leave the SO cable as the lighting fixture whip,rather than replace the whips with Liquid Tight Flex. 3. Offer a credit in the amount of$1042.68,to leave the Flex-Lt(all locations)as is, where it is longer than the specification requirements. We would be happy to discuss these items in more detail if you would like. Sine rely, Scott Tryon Owner—Tryon General Electric