Loading...
HomeMy WebLinkAbout11-29-12 SIF Oak Street Fifth LaneCIP Project Fund Impact Fees Streets PROJECT NUMBERDEPARTMENT Street Impact Fee PROJECT NAME Oak Street fifth lane FY14 $250,000 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT Complete the missing 5th lane of Oak Street on the south side of the street. This will finish the full section from 7th to 19th Avenues. This will not only provide additional lane capacity from the immediate construction but will enable full utilization of the existing lane segments and bike lanes. The intersections at either end of this road segment are already configured for full lanes in between them. The Right of Way and road base are in place. This project will complete the paved surfaces. In addition, the 5th eastbound lane of Oak Street located immediately west of the intersection with Oak Street would be included. The project could be divided into two parts, one on either side of 19th Avenue ALTERNATIVES CONSIDERED Wait for adjacent development – no time frame known; fund from other sources; do nothing ADVANTAGES OF APPROVAL Finishes the street section and enables maximum effectiveness from this key portion of the transportation network. Small construction cost for the anticipated benefits. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Fractional additional maintenance for the additional one-quarter to one-third lane mile. FUNDING SOURCES The project is fully impact fee eligible. Oak Street is also an urban route (U-1202) which could allow the use of Urban Funds for a share of the project. New Replacement Equipment Project Impact Fee Funds Project and Equipment Scoring TOTAL SCORE: FY17 REQUIRED - CAPITAL or DEBT SERVICE REQUIRED - USEFUL LIFE 10+ YEARS REQUIRED - CAPACITY EXPANDING BENEFITS TO NEW DEVELOPMENT: (Up to 20 pts) DIRECT BENEFITS: (Up to 10 pts) FUNDING CERTAINTY: (Up to 10 pts) COMMISSION WORK PLAN PRIORITY: (Up to 10 pts) FY18