Loading...
HomeMy WebLinkAboutApprove Resolution No_ 4420, Authorizing City Mana_6.pdf Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer SUBJECT: Hyalite/Sourdough Water Treatment Plant Replacement Project – Change Order No. 2. MEETING DATE: November 26, 2012 AGENDA ITEM TYPE: Consent RECOMMENDATION: Motion and vote to authorize the City Manager’s signature on the Hyalite/Sourdough Water Treatment Plant Replacement Project – Change Order No. 2. BACKGROUND: Attached is a copy of change order number 2 for the above referenced project. This change order includes twenty eight items. Ten of the items are credits while the other eighteen are additions. Pages two through five of the change order entitled “Change Order No. 2 Summary” provide a short description of each of the items involved with this change. The remainder of the document contains the detailed backup cost information for each item. Overall this change will increase the contract price by $261.00. There is also a change in contract time of 5 calendar days associated with this change. The final recommended change in cost and time for these items is reasonable and commensurate with the work involved. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: Overall this change order increases the contract amount by $261.00 from $26,847,047.00 to $26,847,308.00. This will decrease the contingency on the project from $1,711,403.00 to $1,711,142.00. The contingency is included in the overall budget for the project but not in the construction contract which is why the change order must be processed. Attachments: Change Order No 2, Resolution No 4420 Report compiled on: 11/15/12 20 1 of 2 COMMISSION RESOLUTION NO. 4420 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH APOLLO, INC., KENNEWICK, WASHINGTON. WHEREAS, the City Commission did, on the 25th day of May 2011, authorize award of the bid for the City of Bozeman Hyalite/Sourdough Water Treatment Plant Replacement project, to Apollo, Inc., Kennewick, Washington; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Apollo, Inc., as contained in Change Order No. 2, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 21 Resolution No. 4420, Change Order2 for WTP Replacement 2 of 2 PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 26th day of November, 2012. __________________________________________ SEAN BECKER Mayor ATTEST: ________________________________________ STACY ULMEN, CMC City Clerk APPROVED AS TO FORM: _____________________________________________ GREG SULLIVAN City Attorney 22