Loading...
HomeMy WebLinkAbout09-12 Galavan / Streamline Directors Report / Director’s Report September 25, 2012 STREAMLINE: 602 is at M & W with a bad engine so we will go ahead and switch out the engine from 606. Everything else seems to be up and running. Working with Justin from RideSystems, I think fixed GPS units are our best bet to solve the tracking issue. He sent us two to install on a trial basis. He said he would send the rest at his cost when we are ready which I think we are. We are all set for the Belgrade Fall Festival Parade this Saturday. The sign guys have been out and are working diligently to get all of the signs accurately placed. GALAVAN: Galavan added 21 new customers in August and gave a total of 1,639 rides in 23 days of service. Michael Behr has been hired as a Galavan driver. He will work the normal day shift and will also begin driving on Saturdays on October 6. His hire will help offset the loss of Seth who will no longer be driving on a regular basis. Eric has all the parts and pieces for our second server in the new facility, so we can now move further ahead with the RouteMatch software.