Loading...
HomeMy WebLinkAboutWater Renovations Field Survey Project Amendment No. 1_6 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer SUBJECT: Water Renovations Field Survey Project Amendment No. 1 MEETING DATE: August 6th, 2012 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve and authorize City Manager to sign Amendment No 1 to the Professional Services Agreement. BACKGROUND: Attached is a copy of the partially executed Amendment No. 1 with Morrison Maierle, Inc. for the Water Renovations Field Survey Project. When engineering staff got further into the design of the 2012 water renovations project, we discovered that there were additional areas that needed to be surveyed in order to complete the design. This included three areas on North Rouse in and around the Bryant and Bond Street intersections. The additional surveying is necessary to design the extensions required to eliminate a redundant main in Rouse. Also included was Church between Cottonwood and Aspen. By installing a main in this area, we will be able to eliminate several long service lines that go under Bozeman Creek. Finally, we added additional areas at each cross streets along Story from Church to Tracy. This was to facilitate the eventual street reconstruction project that will follow the water main replacement. Engineering staff has reviewed the amendment and found it to be acceptable. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission FISCAL EFFECTS: If approved, this amendment will increase the fee by $11,217.88 from $72,307.88 to $83,525.76. Attachments: Amendment No. 1 Report compiled on: 7/17/12 48 49 50 51 52 53 54 55 56 57 58 59 60 61