Loading...
HomeMy WebLinkAbout03-30-12 South University District Park Plan Review Bozeman Recreation & Parks Advisory Board P.O. Box 1230 Bozeman, MT - 59771 Park Plan Review SUBJECT: South University District PLANNER: Brian Krueger FROM: Subdivision Review Committee REVIEW DATE: 3/30/2012 BACKGROUND: • This is a final submission for a park plan that was previously reviewed on 12/9/2011. The plan is basically unchanged. • The parkland acreage for Phase 1 is sufficient to satisfy the required dedication for that phase. The development will include a large open play area that will be graded, seeded and irrigated to city specifications. A perimeter trail will encircle the park with a North/South connector to Kagy Blvd. will be constructed. Subsequent trail development in this phase will be installed as social usage is assessed. • A private open space with public access will be created between the residential/group living buildings with a gathering area on the West end connecting to the dedicated parkland. COMMENTS: • A street frontage variance will be required for the parkland that will be developed with Phase 1. In light of the master plan as a whole the committee recommends approval of the variance. • Whether on not Arnold Street runs continuously between 11th and 19th when the southernmost phases are developed remains under review, pending the development of the subdivisions to the south and the possibility of locating a city operated Aquatic Center on the development's southern park area. • We favor the proposal to have on street parking and bike lanes on 14th and 17th when they are built, that is, built to local plus standard. We are, however, concerned that a conflict might arise between public parking and student parking. Respectfully submitted, Sandy Dodge, RPAB Subdivision Review Committee