HomeMy WebLinkAbout12- Change Order No. 1 with Apollo for Water Treatment Plant Replacement Project CHANGE ORDER :; MoAt�son No. 1 .�.w MAiEHLLI.tvc DATE OF ISSUANCE EFFECTIVE DATE OWNER_ City of Bozeman CONTRACTOR Apollo,_ c. Contract: —Hyalite/Swrdougb Ua-tpr'--Tr-eafinen-Fplant_ Project:_ City of Bozeman Water Treatment Plant R l lacement rroject OWNER's Contract No. WRF 12-247 ENGINEER HDR/MMI ENGINEER's Contract No, 00...88114 You are directed to make the following changes in the Contract Documents: y Description: Changes as outlined in attached summary. P Reason for Change Order: Refer to descriptions in attached summary. Attachments:Change Order No. 1 Summary with attachments. �- CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times: Substantial Completion: 810 $26,879,130.00 Ready for final payment: 870 (days or dates Net Increase(Decrease)from previous Change Net change from previous Change Orders No. 0 to Orders No. 0 to 0 No. 0 Substantial Completion: 0 $0.00 Ready for final payment: 0 (days) Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial Completion: 810 $26,879,130.00 Ready for final payment: 870 (days or dates Net increase(decrease)of this Change Order: Net increase(decrease)this Change Order: Substantial Completion: 0 $ (32,083.00) Ready for final payment: 0 (days) Contract Price with all approved Change Orders: Contract Times with all approved Change Orders: Substantial Completion: 810 $26,847,047.00 Ready for final payment: 870 (days or dates) Contractor certifies and a ees that there are no additional costs or claims for extra work, additional time, delays or omitted items, of n re whatsoever, associated with the subject change order items,except as identified and set forth herein and les xpressly stated otherwise in the Change Order. And further,that the price agreed-upon herein represents the 11 c t and value for the subject work perf ed d the materials supplied under the terms of the contract an at t work quantities and value were prop ly de Si-mined and are correct. i? T -TOR(Authorized Signature) to RECOMMENDED BY: AP ROVED - (ENGINEER- Signature) Date COV'v'NER(Authorized Signature) Date EJCDC 1910-8-B (1996 Edition Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated Genera[Contractors of America and the Construction Specifications Institute. Change Order No. 1 Summary City of Bozeman Water Treatment Plant Replacement Project Summary This change order consists of fourteen Change Proposal Requests (CPR) and includes both cost saving items and additional work. The following is a list of the CPRs included in the change order: CPR Description Price Time 1 CIPR Venting $ 6,756.00 0 2 Delete ORP Probes ($ 6,511.00) 0 5 Remove Bottled Water ($ 640.00) 0 6 Change MJ Fittings ($39,861.00) 0 13 Remove Door 906A ($ 959.00) 0 14 Install Cup Sink $ 2,930.00 0 15 Lagoon Pipe Screens $ 5,674.00 0 16 Fibermesh for Pipe Encasement ($10,529.00) 0 17 Meeting Room Modifications $ 534.00 0 18 MF Feed Pump Valves $ 2,407.00 0 19 Delete Valve FCV-5225 ($ 199.00) 0 20 FRP Ladders $ 9,581.00 0 22 Type A Partition Wall Modification ($ 3,840.00) 0 23 Glycol for Boilers $ 2,574.00 0 Total ($32,083.00) 0 CPR 1 CIPR Venting This change adds vent piping to serve equipment being provided by the membrane supplier, Pall Corporation. The need for the vent piping was not determined until detailed shop drawings were provided and as such the piping was not included in the project bid documents. Documentation included for this change is CPR 1 with a detailed breakdown and recommendation. CPR 2 Delete ORP Probes This change removes the installation of ORP probes and two switches from the project. It was determined that these items were not needed based on coordination with Pall Corporation and the City. Documentation included for this change is CPR 2 with a detailed breakdown and recommendation. CPR 5 Remove Bottled Water This change removes the requirement for the Contractor to provide bottled water service to the Engineer's construction trailer_ Documentation included for this change is CPR 5 with a detailed breakdown and recommendation. CPR 6 Change MJ Fittings This change changes the type of buried mechanical joint fittings from C110 to C153 in order to reduce project costs. Documentation included for this change is CPR 6 with a detailed breakdown and recommendation. NA210510591construction Docs\Change OrderslCO 11Change Order 1 Summary.docx CPR 13 Remove Door 906A This change removes a door to a storage room that was designed with two doors_ Documentation included for this change is CPR 13 with a detailed breakdown and recommendation. CPR 14 Install Cup Sink The change adds a cup sink in the laboratory and associated drain piping to the garage floor drain system. This allows certain lab waste to be directed to a holding tank for disposal at the City Water Reclamation Facility in order to reduce regulatory risks associated with combining this waste stream with the septic system waste stream. Documentation included for this change is CPR 14 with a detailed breakdown and recommendation. CPR 15 Lagoon Pipe Screens The change adds screens to the drain pipes entering the residuals lagoon to prevent animals from entering the pipes. This project enhancement was developed after the project design was completed. Documentation included for this change is CPR 15 with a detailed breakdown and recommendation. CPR 16 Fibermesh for Pipe Encasement This change substitutes fibermesh for rebar for the concrete encasement for pipes located under the structure in order to reduce project costs. Documentation included for this change is CPR 16 with a detailed breakdown and recommendation. CPR 17 Meeting Room Modifications This change increases the size of the meeting room and upgrades the floor finish in the room. Documentation included for this change is CPR 17 with a detailed breakdown and recommendation. CPR 18 MF Feed Pump Valves This change removes the installation of owner provided check and butterfly valves and adds the installation of owner provided pneumatically controlled butterfly valves on the discharge to the MF feed pumps. This change is required to accommodate a significant cost savings change in the Pall Corporations contract. Documentation included for this change is CPR 18 with a detailed breakdown and recommendation. CPR 19 Delete Valve FCV-5225 This change removes the installation of a flow control valve that was to be supplied by Pall Corporation. This change was identified during the detailed submittal review of Pall Corporation's equipment after the project design was complete. Documentation included for this change is CPR 19 with a detailed breakdown and recommendation. CPR 20 FRP Ladders This change adds ladders to the chemical tank rooms. The ladders were not included in the project bid documents. Documentation included for this change is CPR 20 with a detailed breakdown and recommendation. CPR 22_Type A Partition Wall Modifications This change modifies the partition wails to reduce project costs. Documentation included for this change is CPR 22 with a detailed breakdown and recommendation. NA210510591Construction Docs\Change OrdersW 11Change Order 1 Summary,docx CPR 23 Glycol for Boilers This change adds glycol to the hot water heating system in order to prevent the heating system from freezing. Documentation included for this change is CPR 23 with a detailed breakdown and recommendation. End N:1210510591Construction DocslChange Orders=11Change Order 1 Summary.docx Document2 JMORRISON CHANGE PROPOSAL REQUEST MAIERM,iw- (Not a Change Order) Project: 13OZeman Water Treatment Plant Replacement Project CPR No.. CPR pate: 6f2412o41 Date Sent to Contractor; 6/2412011 Date Recd from Contractor: TO: Apollo,Inc, Please furnish your proposal for executing the following change(s): Pfease provide a price to add 6-inch HDPE vent pipinq to the CIPR piping as shown in the attached drawing_Work will include installation of one 1 owner ProVded valve one(11 building roof ene ration and some/2-inch Piping. Additional work associated with this task includes sIopinq the CIPR&CiPS mainline header ptpins in[he i e qalleU at%'-10's o e down towards the CIP drain pumps.These changes are a result of comments received 6 Pali Coroorallon following submittal review comments on June 8,2011. HDR/MMI Date, 8/24/2011 TO: HDR Engineering,Inc.(Morrison Malerle, Inc. Proposal: Cost Credit (A time extension is not required for this modification unless otherwise detailed and justified:) Contractor Date TO: Accepted/Not Accepted HDRIMW Date Accepted/Not Accepted Owner:Date Recommend to accept at a total cost of$6,756 as outlined in the attached letter. James Nickelson 03-27-12 G E N E R A L C O N T R A C T O R .. 8 V I L C I I N G ;E O P L E W H O 6 0 I L D G R E A T T M I N G S Mr.Nathan Kutil 02/2912012 HDR Serial Letter AI/BZrYIN—015 1715 South Reserve,Suite C Missoula,MT 59801 RE: Bozeman Water Treatment Plant Replacement Project Subject: APCO—002 CPR-041 Added Venting Dear Mr.Kutil, As requested in the CPR—001 added venting,Apollo,Inc. has prepared the attached quotation for your review and acceptance. The changed work resulted in a cost change of ADD/DEDI;F$6,756.00 as supported by the attached quote sheet and s documentation. Please review this Change Notice lbr approval and contact the undersigned should you have any questions. 5 Project Engineer CC; Nigel Stevenson—Apollo,Inc.—via e-mail Dan Kelly—Apollo,Inc.—via e-mail James Nickelson—Morrison Maierle—via e-mail P133 ACPO-002 1133 West Columbia Drive 9 P O Box 7305 R Kennewick,WA"336 Phone(509)596-1104 0 Fax(509)585.3686 www a l rr .com WAReg.No.APOLLF061K13 OU OR Reg.No.117497111 MT Reg,No.146718 An Equal tO"rtunilyEmployer U) a \a{ °¥% j§ 3 ) � . \ , . / e S \\ w � � § , @U' . o m 2 \ , / „ N ƒ e § ° 10 § / \ \ }J )� ) ) C, z =� co ±/ 222 2 / { z { as \ } )) & E u# ) 4 \k k f few \ { { _ § , ~ ) . ) � � � , {� k# { © » /kk / s©/f] f«tn k ° E7 C ƒ &\2* ` KC ( \ � ) ( ) fk / & § «{ kL \\ \ § = ofo ° e 2°#~EE \ 22 101f)6111 12: 20 PM PDT Harrington Ind Plast Harrington Intl Pane 9 of 3 41730249 I rrington 7>>dustrial Plastic - Quotatianx 02140459 2224 Locust Roue Suite G Q-ui tats N22 Spokane 41 99206 Quote Date 10/06/11 509-926-4142 Expire Date 11/05/1,1 --=509yR26_1366 Fax__________ Page 2 OF 2 Product/Description _----------^_-__ _ Quantity ?rice`_-ITEM_ _-_Extension. P70PC 1 8 .G4 EA 8 .64 PRIMER PT CLR FOR PVC CPVC LOW VOC MC,AC PRICING INCLUDES-DELIVERY OF _ EITHER MATERIAL. Merchandise Tax Est.F eight Handling Net Quote Total 1, 502.28 0.00 ------------------------------------------------------------- -0• 1,502.28 Thanks For Thinking Harrington. _ _ _ _ -----__W Respectfully Nick P. Castilla All Quotations are subject to review upon placement of order. Freight/Handling and applicable taxes if not listed above will be added. Harrington standard terms and conditions apply to this quote. 10/06/11 12: 20 Pm pVT Harrington Ind Plast Harrington Ind Page Z of 3 #1736243 Harrington Industrial Plastid i� � Quotation-', 02146 54 -- 2224 Locust Road SUite 5 Qu ttern: N2l 509-926 4A 99206 QUote Date 10/06/11 509-926-1366 Expire .Date 11/05/11 509-92E-1366 Fax Pace 1 Quotation OF 2 030452 Shi*,a To: APOLLO INCORPORATED BOZEI A WWTP P 0 BOX 7305 C/O APOLLO INC 7022 SOURDOUGH CANYON ROAD I�ENNEWICK, [7A 99336 BOZEMP.N, MT 59715 job. RFQ4 Contact: DAN KELLY ^rship Via. COMMON CARRIER - �_------_-- Phonem: 509-947-0568 FOB / Delivery ARO: SHIPPING POINT Fax:W509-582-6590-- - _ Frt-Terms: PREPAID FFA Product/Desaxaptzon Quantity Price U/M_---Extension *1099 FITTINGS MISC 5 103 .65 DA 621 .90 6" HDPE DR17 TEE WITH 611 FLANG ADAPTER AND RING 854-06U 6 14 .59 EA 87 .54 G" FLANGE V/S S PVC PLAST RTNG 150PSI SCH80 801 -OGO 8 32.16 EA 6" TEE S PVC SCH80 57 .28 847-060 2 37 .24 FA 6" CAP S PVC SCH80 74 .5,9 806 -060 10 19 -12 EA G" 90 ELBOW S PVC SCH80 191 . 20 817-060 2 22 . 98 EA 45. ,'G 6" 45 ELBOW S PVC SCH80 854-060 2 14 .59 EA 6" FLANGE V/S S PVC PLAST RING 29 .18 15OPSI SCH80 801-528 1 23.95 EA 6"x2" TEE RDCR S PVC SCH80 23 . 95 800-020 100 1.35 FT 2" PIPE P/E PVC SCH80 135. 00 806-020 2 1 .68 EA, 2" 90 ELBOW ,S PVC SCH80 3 .36 817-020 2 3.97 EA 2" 45 ELBOW S PVC SCH80 7 . 94 711QG 1 15.7 5 EA SOLVENT CEMENT PVC QT GRY LOW 15.75 VOC HEAVY BODIED MED SET MC,AC Co1zt inued IER IMORRISON REQUEST FOR INFORMATION (RFI) MMRLS,w. PROJECT., City of Bozeman Water Treatment Plant Replacement Project RFI NO.: 001 -CPR1 HDR PROJECT NO__ 00_..88114 DATE: 08-26-11 Regarding CPR1, the 6"vent pipe is not available in sdr 15.5. We propose using sdr 17 in the 6"and sdr 11 in the 2"drain. Will that be acceptable? We could also quote this using Sched 80 pvc. Please advise. HDR Engineering, Inc, Owner Contractor Signature REDLY: DATE:9-26-11 The specification for VTR (vent thru roof) is for solid wall ABS, Schedule 40. This will be fine for both the vent and the drain. Owner Contractor HDR Engineering, Inc. Signature \ \ ` e / §? | l \� 7 ! ; § � � )ƒ\ { / � All\ \ �. V! - � /� | � § { � t gi �|\� � � � ! ! � � � � § � all �| f � 7 I t� _lam' ti i � t F It Li _t r :< _ � � .. .�� t *v �, ,, ��+� '� �Z .�� � i "v*.; 1 ; .. '"� F � ! �_ ��� -. ,� p ! k� � �I .. a -�` / t r g, , � � .. _°° _ .__ �� .:t� t �. .. .. `�`!8 ' .f � 'P t � �� i- � � ��� .' ,� yh �� a �. ° 'µ1�� r� � Yn e �� N� I! _. ;�`� •G-:�. :� S i 1� _. .. � _ Y .� �' F .111 elf� - �-,,�,� � _ .��. � .� _ y ; � 1 �'y�.. . � •i �. rrz � �� 3 i�i++r .... ;eel'�` s<�='�'- g � � M1 l�Ct �. z A%+� _ . � � � ¢� t� .. :s. ��! `Y . +�"'. �� _ `��ry �"" � � � �. '�} y,., .l•cif 4i� r�yY� � ,�� :i �'#• Document2 :MORMSON CHANGE PROPOSAL REQUEST :f MAI);RLE,IYC. (Not a Change Order) Project: Bozeman Water Treatment Plant Replacement Project CPR No.: 2 CPR Date: 8/24/2011 Date Sent to Contractor: 8/2412011 Date Recd from Contractor: TO: Apollo, Inc. Please furnish your proposal for executing the following change(s): Please provide a.price to delete seven(7)owner provided ORP Probes from the project scope.Delete Conlracto_r provided a low pressure switch and an Owner provided low flow switch from the oroiect scope The following are the instruments to be deleted: • AE-1605 ORP Sheet 000Y01 • AE-1805 ORP,Sheet 000Y01 . AE-2601 ORP,Sheet 000Y02 • AE-2201 ORP,Sheet 000Y03 • AE-3007 ORP,Sheet OOOY06 AE-4032 ORP Sheet 000Y08 • AE-1105 ORP,Sheet 000Y09 • PSL-6001 Low,Sheet 000Y12 • FSL-5654 Low,Sheet GOOY15 HDR/MMI Date_ 8/24/2011 TO: HDR Engineering,Inc./Morrison Maiele, Inc. Proposal: Cost Credit (A time extension is not required for this modification unless otherwise detailed and justified:) Contractor Date TO: Accepted/Not Accepted HDR/MMI: Date Accepted/Not Accepted Owner:Date Recommend to accept at a total credit of$6,511 as outlined in attached letter. James Nickelson 04-12-12 G E N E R A L C O N T R A C T O R B U I L O I N G PEOPLE WHO BUILD GREAT THINGS Mr Nathan Kutil 04-09-12 f1DR Serial better AV13ZMN—034 1715 South Deserve,Suite C Missoula,MT 59801 RE: Bozeman Water Treatment Plant Replacement Project Subject: APCO—003R1 CPR-002 Delete ORP Probes Dear Mr.Kutil, As requested in the CPR—002 delete ORP probes and switches and comments received from Morrison lufaierle on 3123112 and 4!3/12,Apollo,Inc.has prepared the attached REVISED quotation for your review and acceptance. The changed work resulted in a cost change of AgD/DEDUCT 16,511.00as supported by the attached quote sheet and supporting documentation. Please review this Change Notice for approval and contact the undersigned should you have any questions. Sincerely Apol1 , c Stacee Keller Project Engineer CC; Nigel Stevenson--Apollo,Inc.—via e-mail Dan Kelly—Apollo,Inc.—via e-mail James Nickelson--Morrison Maierle—via e-mail P133 ALPO-003 1133 West Columbia Drive R P O Box 7305 R Kennewick,WA 99336 Phone(509)586-1104 R Fax(509)585-3686 tv'mv.0W-1 to-gc.com WAReg.No.APOLLI*06UM R OR Reg.No.117497 R MT Reg.No.146718 An.Equal Opparttfnity Emp1b)vr 0 fc §\) CD 6 § . . , \. \. § . . . . /, , . �. , ! } 2/ _ )} S \/ ` £ i 27 $ ( ){ � §2 ) : : } \ Cf v ( � i - - . . ( § ) � j /k / � ) \ { | n i m - \ ] Lu : «§z § kk\i ) ) / 0 }\\ ' Lj 's ue 'r •"L r hip ``". r L:y Chan e Dreier Pro osal Change Request No: CIO#1 To. APOLLO INC. Date Of Proposal- 3Y14/2012 Job# 12-009 CPR# #2 Job Name.SOURDOUGH/HYALITE WTP Attention- Work To Be Done: PROPOSED DEDUCTIVE CHANGES PER CPR#2. INCLUDES DEDUCT FOR MSEC LABOR AND MATERIAL FOR INSTALL.,CHE—,_OUT, TERMINATIONS; CABLE FOR LISTED INSTRUMENTS. Labor Hours: Hrs: Rate: Supervision Hours: a �3 $ 44.29 $ (4,118.97) A 10/o OF DIRECT!ABOR 9.3 $ 49.73 Labor Burden-included $ (466.81) Total Labor Dollars: $ (4,575.88) Travel Time&Subsistance: Hrs x Rate $ _ Small Tools as a /a of Labor: Material&Supplies: 0.00% %Of Labor $(4,575.88) $ Tools&Equipment Rentals: $ (3,122.00) Estimation, Manager review&Admin Costs: $ _ Additional Safety Costs 0.00/°° a/°O $ (Labor $(4,575.88) $ Additional Milage, Transportation Costs: '– Cleanup&Handling Costs: $ - Consumables: TAURUS Warranty: $ (205,70) Estimated Job❑isruptiordDelay Costs: $ Other Misc.: $ This change requires a time extension of: Total Other Costs. $ (1,327.70) days Pricing void/subject to revision after Total Estimated Direct Costs: The costs represented in this Change Proposal include only those costs which can be identified MARKUP 0.00% $ at this time_No impact or delay costs are included. Should it be determined that the project is impacted $ at a later date by multiple changes,delays,or other causes beyond our control,we will submit these Subtotal: at that time. BOND Q.gt)% $ (47.23) (CROSS RECIEPTS 000% $ Total Proposed Change Order price: $ (5,950.81} Submitted By: Terry Rizzuto Date: Approved By: Date: Title Project Manage r/Estimator Document2 MORRISON CHANGE PROPOSAL REQUEST ---.MERLE,i.w- (Not a change order) Project: Bozeman Water Treatment Plant Replacement Project CPR No.; 5 CPR Date: 8124/2011 Date Sent to Contractor: 8124/2011 Date Recd from Contractor: TO: Apollo,Inc. Please furnish your proposal for executing the Following change(s): Please Provide a price to delete bottled drinking walervendor service from the engineer's Field offi e is specified in 01060 a HDR1MMl � Date: 8/24/2011 TO: HDR Engineering, Inc./Morrison Maierle,Inc. Proposal: Cost Credit (A lime extension •ri regyii'ed for this modification unless otherwise detailed and justifie -Contractor r — - - '� pate To: Accepted/Not Accepted HDR/MMI:Date Accepted(Not Accepted Owner:Date Recommend acceptance for a total credit of$640 as detailed on attachment, �-� James Nickelson 10-20-11 G E N E R A L C O N T R A C T O R B U I L D I N G P E D P L E W H O BUILD GREAT THINGS Mr.Nathan Kutil 10114120]1 I•]DR Serial Letter AI/BZN1N—001,Revised 1715 South Reserve,Suite C Missoula,MT 59801 RE: Bozeman Water Treatment Plant Replacement Project Subject: Change Notice—001 CPR-5 Delete Bottled Drinking Water Dear Mr.Kutil, As requested in the response to Change Proposal Request(CPR)5—Delete Bottled Drinking Water,Apollo,Inc.has prepared the attached quotation for your review and acceptance. The changed work resulted in a cost change ofA UMEDUCT 5(640.37)as supported by the attached quote sheet and supporting documentation. `these costs have already been incurred;as such we request that the added costs be included in the Contract by Change Order to allow payment with our ongoing monthly Payment Application. Please review thi Change Notice for approval and contact the undersigned should you have any questions Sincerely, Apollo,Inc T Levenson enior Project Leader CC: Dan Kelly—Apollo,Inc_—visa e-mail James Nickelson—Morrison Maierle—via a-snail P133 CN-001 1133 West Columbia Drive 13 P 0 Box 7305 0 Kennewick,WA 99336 Phone(509)586-110413 Fax(509)585-3686 a 310- .corn WAReg.No.APOLLI'06M 13 ORReg.No.1174970 Nn'Iteg.No.146718 An Egted OppartunityEmpkvy�er G L) { Q 2 ( » . } , . , . . , . ,. { e \ \ k \ © § „ e � \` \to / j 5 44 } it co/ 2 » / § 2 / 5 \ / \ ( / „ \0 co\ ® d ¢ } ; x ( l Q § )\ Im k ° \\ rx k � ) 2 § = a k tm JD k2 § > [ t \ � � } j ( ) § � ( » § z � § ( \§ // § k \ 2 ± 0 § R ❑ocument2 1M., MORRISON. CHANGE PROPOSA€. REQUEST . MA1FRLF,,i.\c (Not a Change Order) Project: Bozeman Water Treatment Plant Replacement Project CPR No.: 6 CPR Date: 10/1312011 Date sent to Contractor: 10113/2011 Date Rec'd from Contractor: TO: Apollo, inc. Please furnish your proposal for executing the following change(s): Please sign this CPR to execute the change identiFied in RPI-002(change buried MJ fittings from C110 to C1531 and as attached. HDRIMMI Date: 10113/2011 TO: HDR Engineering, tnc./Morrison Maierle, Inc. Proposal: Cost Credit (A time extension is not required for this modification unless otherwise detailed and justified:) Contractor pale TO: Accepted/Not Accepted HDR/MMI: Date Accepted/Not Accepted Owner bate Recommend to accept at total credit of$39,861 per agreement with Nigel Stevenson. James Nickelson 02-28-12 GI_ N R A L C 0 N TRACTOR BUILDING PEOPLE W F 0 BUILD G RE AT THEN GS Mr. Nathan Kuril 11115/2011 UIDR Serial Letter A11I3Z119N-004 1715 South Reserve,Suite C Missoula,MT 3980I RE: Bozeman Water`rreatment Plant Replacement Project Subject: PCO-006 CPR-006 Change l=ittinn-s rronn Cl 10 toC 153 Dear Mr.Kuril, As requested in the response to Change Proposal Request(CPR)6-Change fittings 15.0111 C1 10 to C153,Apollo, Inc. has prepared the attached quotation Ior your review and acceptance. 'File changed wort;resulted in it cost change orAPPIDEDUCT S(39,584.00)as supported by tine attached quote sheet and supporting documentation. These costs have already been it;cu;red;as such we request that the added costs be included in the Contract by Change Order to allow paynnetnt witll our ongoing monthly Payment Application. Please review this hange Notice ror approval and contact the undersigned should you have any questions Sincerelyy` ! Apollo,, i l% oei Stevenson Senior Project Leader CC: Dan Kelly-Apollo, Inc.--via e-mail Stacee Keller-Apollo, Inc-via e-mail James Nickelson-Morrison Maier€e-v via e-mail P133 CPR--006 1133 West Columbia Drive K P p Box 7305 IA Kcanc,vN icic,WA 99336 Phone(509)586-110413 Fax(509)585-3686 SVSyw-a P p iler-v c.c o m WA Reg.No.APOLLI*061IB ■OR Reg,No.117497 M MT Reg.No.146718 An Equal OpparttrnityEinploycr }a / { eae \\j to \ , . m , . , . . , . , , . . . . § r � } � \\-T / { )\ . . « / , . - - ° ® } \ \\ \ \§ k e» 000 &� o \ f\ \\ co / \ow / — g\ § \ ( / E _ u ca § _ \\ , � ) _ _ { ! / \ § k \ / � f LL } k § - § ) fB 4 \ 2 az § I § ) 2 a %\ \ƒ§ \ § /\ \Co g \} \` , � . / / Bozeman, MT Hyalite/Sourdough WTP Improvments Qty. Item CHO Price 0153 Prig Unit Diff Total Diff T 13 42"MJ Acc Pack $810.59 $676.80 $ 214.85 S 2,793.04 6 36" $554.73 $459.20 $ 1S1 Oo 90602 9 30" $416,73 $269.49 188.91 $ 1,700.22 6124y' $201,271 $150.86 $ 70.54 $ 423.22 8118" $127.09 $77.42 $ 62.38 $ 499.03 1 42 MJxF Adapter $3,283,64 ;':: ,:, .;. $ _ 23011 $1,554.55 $1,43246 $ 277.55 $ 55509 2 42x30 MJ Tee $10,145.45 $7,403.52 $ 3,756.48 $ 7,512.95 1 42x24 $8,054.91 $7,271.04 $ 1,584.96 $ 1,584.96 2 36x24 $5,502.55 $3,074.74 $ 2,978M $ 5,956.13 1 30X24 $4,909.09 $2,254.63 $ 3,145.37 $ 3,145.37 1 18 $1,665.45 $1,012.80 5 709,20 $ 709.20 1 42x30 MJ Reducer $5,170.91 $3,381.12 $ 2,306.88 $ 2,306,88 2 30x18 $2,025.27 $1,640,80 $ 587.00 $ 1,173.99 2 18x14 MJ SEB Reducer $1,565.45 $1,417.92 $ 304.08 $ 605.15 1 42" MJ 90 Ell $7,440.OD $5,388.34 2,795.66 $ 2,795,66 2 36" MJ 45 Ell $3,679.64 $2,81520 $ 1,232.40 $ 2,464.81 1 30"MJ 45 Ell $2,452.91 $1,934.40 $ 763.80 $ 763.80 1 18" MJ 45 Ell $852.82 $423.77 $ 514.33 $ 514.33 1 18"MJ 22 112 Ell $820.91 $420.34 $ 482.66 $ 482.66 1 24" MJ Cap $780.50 $388.11 $ 470.44 $ 470.44 $ 37,365.95 Document2 :?MOprRT�Mp1rO�N CHANGE PROPOSAL REQUEST -x_ MINE' P,.,iw (Not a Change Order) Project: Bozeman Water Treatment Plant Replacement Project CPR No.: 13 CPR hate: 1/1012012 Date Sent to Contractor: 1110/2012 Date Recd from Contractor: TO: Apollo, Inc. Please Furnish your proposal for executing the following change(s): Please provide a cost to remove door 908A enlirefy from the proiect. HDR/MMI I/j'// bate. _!/1012012 TO: HDR Engineering, Inc.(Morrison Maierle, Inc. Proposal: Cast Credit (A time extension is not required for this modification unless otherwise detailed and justified:) Contractor Dale TO: Accepted/Not Accepted HDR/MML Date Accepted/Not Accepted Owner:Date Recommend to accept at a total credit of$959 as outline In attached letter. �- James Nickelson 03-23-12 G E N E R A L C O N T R A C T O R B U I L D I N G P E O P L E W H O BUILD GREAT THINGS Mr,Nathan ICulil 03-19-12 HDR Serial Letter AI/BZMN—021 1715 South Reserve,Suite C Missoula,MT 59801 RR: Bozeman Water Treatment Plant Replacement Project Subject: APCO—017 CPR-013 Delete Door 906A Dear Mr.Kulil, As requested in the CPR—013 to delete door 906A,Apollo,Inc.has prepared the attached quotation for your review and acceptance. The changed work resulted in a cost change of DEDUCT$959.00 as supported by the nttached quote sheet and supporting documentation. Please review thi Change Notice for approval and contact the undersigned should you have any questions. Sincerely Apollo„ln PI ee Keller roject Engineer CC: Nigel Stevcnson—Apollo,Inc.—vin e-mail Dan Kelly—Apollo,Inc.—via e-mail James Nickelson—Morrison Maierle—via e-mail F 133 ACPO-017 1133 West Columbia Drive M P O Box 730514 Kennewick,WA 99336 Phone(509)586-1104 Et Fax(509)585-3686 www.apolo-gc.corrl WAReg.No.APOLLIK061KB U OR Reg,No.11749717 MT Reg.No-146718 An Equal OpportunityEmptoyer . )/ & Z S\ 2 /$2 \ t ) , , , , . , , . , , . . \ , , . / 2 k §/ S 2a j\ m \ �� \ F � � § \ _ ) § In co \ � j� \( \$ R 77 �g �\ § ) u * k� } _ ( Sk z }# \\ { m 2 k } § FT ) 5 / � oE § \ § » a & .. B « $ / fo ) k \ @ oa- I EL ® / § � 2 % 3_. 2 / \\ ( \ \ ) / ) � 0 \ / 3 3 c swic 0---N/L -iff I C IF, BrIMMA10 iWArEa1AH ,"5BCr1M SERVICES KALISPELIL MONTANA 59901. (A06) 75213% Fax (406)752-8394 Email: teorey a btncvvest.com. QUOTE DATE. M=h 1, 2012 TO: Apollo, Inc. ATTN. Nigel RE: Bozeman WTP-CPR#12 & CPR#13 CPR#I2: CPR#f13: Delete hollow metal door,frame and hardware for opening 4906A. ***Total Deduct For CPR#13 <$734.00>*** FOB shipping point with full freight allowed Materials only unless specified otherwise above No glass or glazing No tax included Subject to review after 30 days Thank you for your consideration Tyler Corey CPR 14 Documencz HAR IMORRISON CHANCE PROPOSAL REQUEST M.AII�LE,ISC (Not a Change Order) Project: Bozeman Water Treatment Plant Replacement Project CPR No,: 14 CPR Date: 1/131201 bale Sent to Coniraciar: _ 1118!2012 Date Rec'd from Contractor: TO: Apollo,Inc. Please furnish your proposal for executing the following change(s): Please provide a cost to install a cup sink just north of lab sink 1 and route the drain to lie into the Garage area floor drains as shown in the attached. HDR/MMI Date: 1/1312012 TO: HDR Engineering, Inc./Pdorrison Merle,Inc. Proposal: Cost Credal (A time extension is not required for this modification unless otherwise detailed and justified:) Contractor `Date TO: AcceptedtNot Accepted HDR/MMI_Date___._--- Accepted/Not Accepted Owner:Date Recommend to accept at a total cost of$2,930 as outlined in attached letter. � - James Nickelson 04-03-12 J" r fti� G E N E R A L C O N T R A C T O R .. BUILDING PEOPLE WttO BUILD GREAT THINGS Mr.Nathan Kutil 04-02-12 HDR Serial Letter AI/BZMN-031 1715 South Reserve,Suite C Missoula,MT 59801 RE: Bozeman Water Treatment Plant Replacement.Project Subject: APCO-01 SRI CPR-014 Add Cup Sint;and Drain Piping Dear Mr.Kutil, As requested in the CPR-014 which added cup sink and drain piping,Apollo,Inc.has prepared the attached quotation for your review and acceptance. The changed work resulted in a cost change of AI3viIXIDL-I $2,930.00 as supported by the attached quote sheet and supporting documentation. Please review this Change Notice for approval and contact the undersigned should you have any questions. Sincerely, Apo11a,1 ry St Keller Project Engineer CC: Nigel Stevenson--Apollo,Inc.-via e-mail Dan Kelly-Apollo,Inc.-via e-mail James Nickelson-Morrison Maierle--via e-mail P133 ACPO-018 1133 West Colu znbia Drive N P O BOY 73305 N Kennewick„WA 99336 Phone(509)586-1104 n Fax(509)585.3686 dvw►�aPo�4-°-.bc�e WA Reg.No.APOLLI^06AB M OR Reg.No.117497■1YIT"Reg.No.146718 Are Equal Opportunity Empla yer )!� Li \/§ � ) - � . , .�, . . , . . ) . . . , . . . . . , . . \ 1 / %) }/) j . , . . . .. . . . . . . . . . . . . . / ( ` ( ! §f E \ \ k , } J � 2 � ! � _ k � ( T c _ § /) \ �® & PROPOSED CH Q AS GE ORDER K aMiBsatila,Montana 4G PLUMBING & HEATING 728-1515 �4 P.Q Box 17140 Missoula, MT 59808 �co Ph:(406)723-1515 Fx:(406)728-6257 Date: 2-Apr-2012 Project Flo.: 2533 To: Apollo Construction Project.Title: Bozeman Hyalite WTP 1133 W Columbia Dr Kennewick,WA 99336 CO Request No,2533-02 Attn: Stacee Keller Reply to RFP- CPR-#14 We are requesting a change order for the following additional services- Installing waste and vent for new Lab Cup Sink 2-Cleanouts were added. Clean outs required every 50' by plum ing code Cup sink provided by others - --- Qty Description Cast Each Cost Tot-a[ 1 MATERIAL $ 99.00 $ 99.00 13 LABOR UNDERGROUND ROUGH-IN $ 64.71 $ 841.23 1 MATERIAL $ 59.00 $ 59.00 6 LABOR ABOVEGROUND ROUGH-iN/TRIM OUT $ 64.77 $ 388.26 2 FIXTURES/CLEANOUTS $ 95.00 $ 190.00 2 EXCAVATION $ 80.00 $ 160.00 3 BACKFILL $ 80.00 $ 240.00 1 BEDDING MATERIAL $ 40.00 $ 40.00 15% OVERHEAD/PROFIT 302.62 —75770 ta 2,320111' 10% PROFIT $ _ 5% 1OVERHEAD $ u tots , 0% IMONTANA GROSS RECEIPTS TAX $ _ 0% BOND $ 'total $ 2,320 Attachment If you have any questions concerning this Change Order proposal, Time Extension in Days please call. All Change Order pricing is valid for 30 days from the above date unless otherwise noted. gy; Cory Hanninen cory@4gplumbinq.com 4G PLUMBING&HEATING,Inc. LOCAL##41 LOCAL##459 8UTTE/B07FMAN MISSOULA BASE RATE $ 28.25 $ - $ 26.$4 FOREMAN RATE $ - $ 30.86 $ 29.09 GENERAL FOREMAN RATE $ - $ - $ 29.34 BENEFITS HEALTH&WELFARE $ 4.75 $ 4.75 $ 4.75 MT PENSION $ 3.45 $ 3.45 $ 195 NATIONAL PENSION $ 3.20 $ 3.20 $ 4.32 APP TRAINING $ 0.85 $ 0.85 $ 0.60 INTERNATIONAL TRAINING $ 0.10 $ 0.10 $ 0,20 INDUSTRIAL PROMOTION $ 0.03 $ 12.35 $ 12.35 $ 12.75 BURDEN FICA $ 2.16 $ 2.38 $ 2.74 SUTA $ 1.58 $ 1.76 $ 1.54 FUTA $ 0.23 $ 0.25 $ 0.29 WORKER COMP $ 3.76 $ 4.14 $ 3.96 INSURANCE. $ 7.29 $ 7.90 $ 7.15 VEHICLES,TOOLS $ 15.02 $ 16.43 $ 15.68 SUBTOTAL $ 55.62 $ 59.64 $ 57.52 SAFETY&CONSUMABLES $ 4.73 $ 5.07 $ 4.89 SUPERINTENDENT - PROJECT MANAGER $ $ $ SUBSISTENCE $ - $ - $ TOTAL $ 60.35 $ 64,71 $ 62.41 ORRISON CHANGE PRC)POSAL REQUEST H R., A MAIER,E,lz{(� (Not a Change Order) Project: Bozeman Water Treatment Plant Replacement Project CPR No.: 14 CPR hate; 1/1312012 Date Sent to Contractor: 1/13!2012 Date Recd from contractor: TO: Apollo,Inc. Please furnish your proposal for execrating III&following change(s), Plead provide a cost JWirtstati a cup sink n h f f b sink 1 and route the drain to lie into the Q.9rage area floor oraina as shown in the attached. HDR/MMi bale: 1 11 3120 1 2 TO: HDR Engineering,Inc./Morrison Maierle,Inc. Proposal: rov Cost—$ .J I Credit (A time e anion is not required fqr this modification unless otherwise detailed and justified_) Cankacior —rt/�Ol ?t/ rtt !. Date TO: Accepted/Not Accepted HDRIMMI:Date Accepted/Not Accepled Owner:pale � T 'fjF'�y�l wre+ � h e � � oft` -�• e.L� r r J ...{� CL CL CL _N CIO ' 00 CL CL > _ co -En-l' W T CO M - � CIO •a CL CO CL im - ' O O CO = Cp E - -� a� O -C CO E CD CD � C) cry � a >1 > x x x O O O (D N 0- CL Q -0 co Li w LU � E >) o `7(D .: ' CCU �-- � � s4 r m C (l7 u. . .. ........ 1. pij SDI Ali .1 Document2 1i R., MORRISO CHANGE PROPOSAL REQUEST -._:MAIERLEjNc. {Not a Change Order) Project: Bozeman Water Treatment Plant Replacement Project CPR No.: 15 CPR Date: - 1/20/2012 Date Sent to Contractor: 1/20/2042 Date Rec'd from Contractor: TO: Apollo, Inc. Please furnish your proposal for executing the following change(s): Please provide a cost to provide lagoon overflow pipe end screens an 3 pipes Per the attached detail.-/HDRIMMI Date: 1/20/2012 TO: HDR Engineering,Inc./Morrison Maierfe,Inc Proposal: Cost Credit _ (A time extension is not required for this modification unless otherwise detailed and justified.) Contractor pate TO: Accepted/Not Accepted HDR/MMI:Date Accepted/Not Accepted Owner:Date Recommend to accept at a total cost of$5,674.00 Per attached detail. James Nickelson 02-28-12 J/ I./� yr;II._. :'� ?Grp, G F N E R A L C 0 N T R A C T 0 R e8UILnING PEOPLE WHO BUILD GREAT T H 1 N GS Mr.Nathan Kutil 01/3012012 HDR Serial letter AV13IAI.;N—010 1715 South Reserve,Suite C Missoula,MT 59801 RE: Bozeman Water Treatment Plant Replacement Project Subject: APCO—019 CPR-15 Inlet Screens Dear Mr, Kutil, As requested in CPR-15 to provide lagoon overflow pipe end screens on 3 pipes and as modified between your,5elt' and Dan Kelly,Apollo,inc.bas prepared the attached quotation for your review and acceptance. The changed work resulted in a cost change of ADD[PPl)UGT-$5,674.00 as supported by the attached quote sheet and supporting documentation. Please review this Change Notice for approval and contact the undersigned should you have any questions. Sincerely, �oElo,Inca Stacce Kell Cr Project Engineer CC: Nigel Stevenson—Apollo,Inc.—via e-mail Dan Kelly—Apollo,Inc.—via e-mail James Nickelson—Morrison Maierle—via e-mail P133 CN—001 1133 West:Columbia Drive I t P O Box 7305 0 Kennewick,WA 99336 Phone(509)5$6-1104 t7 Fax(509)585-368£ www.apd1_ikgC.corn WAReg.No.APOLL11"06M 191 OR Reg.No.117497 0 MT Reg.No,146718 Aga Equal Qpportuni yEmployer E 15 _ r r /©( \y& mk& \ n } \ . , . . \ « , . , . . , . , , . . . \ } §\ 2 \/ §� /\ . � ( \ � ¥ 2 } 5 \ \ } \ / \Ln ID \ \< j \($ 2 } uj _ ( k { k 7 ƒ\ § � (\ } \ 25 & � § @ � ( , : 2 � / f § ƒ} y § z 2 ƒ w \ LU \ E k) k ( s \ o § ( { g k ` � ± § $R S R Z E J2 NTE 7105B Lolo Creek Road NDU5TRIAL Lolo, Montana 59847 Phone: (406) 723-6097 Fax (406) 829-0748 January 28,2012 To: Apollo,Inc. Attn: Stacee Keller Re: City of Bozeman Hyalitc/Sourdough Water Treatment Plant Replacement Project CPR#15 Overflow Outlet Screens—Revised Quote Scope: Supply Overflow Outlet Screens 1 —36"304 SS Outlet Screen fabricated from 2'!"x.1 77 wire screen and 3116"plate flange 1 —24"304 SS Outlet Screen fabricated from 2 Y"x .177 wire screen and 3116"plate flange i -- 8"304 SS Outlet Screen fabricated from 2 %2"x.177 wire screen and 3116"plate flange I8—L3x3x114 SS Brackets 36 5/8"SS bolts 36"&24"screen will mounted to the inside of the pipes 17—Delete%"bolts&sleeves previously required Cost of three 304 stainless steel outlet screens FOB jovsite:$3,894.00 Contractor certifies the above listed material has been changed front what was originally shown in the contract documents. The material listed above is approved as an additive change order and amount quoted will be added to the contract amount if the change is accepted, ACCEPTED: Apollo,Inc. By: Date: i Document2 i MORRISON CHANGE PROPOSAL REQUEST r MAIERIE,tic (Not a Change Order) Project: Bozeman Water Treatment Plant Replacement Project CPR No.: 16 CPR Date: 7!1812012 Date Sent to Contractor: 111812012 Date Recd from Contractor. TO: Apollo,Inc. Please furnish your proposal for executing the following change(s): Please provide a cost to delete rebar in the pipe encasement and replace with fibermesh additive HDR/MME Date: 1/1812012 TO: HDR Engineering, Inc./Morrison MaierEe, Inc, Proposal: Cost Credit I (A time extension is not required for this modification unless otherwise detailed and justified') Contractor Date TO: Accepted/Not Accepted HDR1MMl:Date Accepted/Not Accepted Owner: Date Recommend to accept at a credit of$10,529.00. This is based on utilizing $131yard material vs. the $30/yard price in the detailed pricing and eliminating proposal preparation time as agreed to by Nigel Stevenson. James Nickelson 02-28-12 G E N E R A L C O N T R A C T O R BUILDING PEOPLE- WHO Bu tr D GREAT THINGS Mr.Nathan Kutil 1 U1512011 HDR Serial Leiter AI/BZMN--006 1715 South Reserve,Suite C Missoula, MT 59801 RC; Bozeman Water Treatment Plant Replacement Project Subject: APCO—0I3 CPR-XXX Delete Rehar in Pipe Fneasements and replace with Fibermesh Dear Mr. Kutil, As discussed between yourself and Ilan Kelly,we offer to delete the rebar its the pipe encasements and replace with fibermesh as a Valise Engineering proposal,as such we have prepared the attached quotation for your review and acceptance. The changed work resulted in a cost change of ADDfDE;D1JCT S(6,532.00)as supported by the altaclted quote sheet and supporting documentation. Please review this Change Notice For approval and contact the undersigned should you have arty questions sincerely, AlPoll�r r gel tevenson J Senior Project Leader CC: Dan Kelly—Apollo,Inc.--via e-mail Stacee Keller—Apollo, Inc—via e-rail James Nickelson—Morrison Maierle—via e-mail. P133 APCO—012 1133 West Columbia Drive®P O Box 7305 M Kennewick"WA 99336 Phone(509)586-110418 Fax(509)585-3686 nnv_y4-Ap9-llo�c.coP.i WA Reg.No.APOLLI"61KB ■OR Reg.No.117497®MT Reg.No.146718 An Equal Oppotrruiiri Emplover �f� \©( \\\ akm C. . § � \ „ ( } &§ / \\ ' \\ j § � 2 \ In �/ /® o `« o / °$ )�) \° w \ � \ ) ] rn- k � i } 2 / }\ f \ \\ # , ; 2 ) } = t 2 ( CL { } } I i - & 3 c A 2 � ) a § ®CL / > ! ® d " R = I / \ ® CL eon 2 � ! w & ° § § ) § / § Q 0 @ \ : \ /� ) 52 \§ ) § £ \ § . ) f� -i Charge� l CO-001 I CHA14GE ORDER Bid Item No.: Job No.: [job Description: Original C/O Date: Revised C/o Date: 002 17103096 Bozeman Sourdough Hyalite WTP 10/17/11 sell T0: A10289 Apollo,Inc. 1133 W.Columbia Dr.,P.D.Box 7305 Kennewick,WA 99336 USA Change order Description: Deduct for Pipe Encasement directly below building DosoripNon Type ouantily Unit Price Line Amount Rebar Grade 60 Black Deduct -1 LS 12,600.00 -12,600.00 Total: 12,600.00 Deletion 7o Contract Harris Reber Salt Lake Inc. 1526 South,700 West Bldg.A,Salt Lake Oily,UT 84104,USA T.801-596-2668 F.801-596-2686 Customer Copy 0l Stevenson Pmnz Dan Kelly Soot: Wednesday, November O2. 20112:28PM To, Nigel Stevenson Subject, FYV bozemenwtp Backup unwhat the fiber mesh costs DAN I<T'!LLY oupenwTewosmr APOLLO INC- soo-o*pnsso ----'-_--_-_-.-___---__-'_---'-_-'--_-. -_'--'--__._-- _-_---___-_-.'----_'---_ - Frmon� Etchart, Sent, Friday, October 21, 2O118v45AM To. Dan Ke/|y 0zRadme, Mark Subject: RE: bozamnnwtp Bozeman Water Treatment Plant Product Quantit Price Buckeye Ultra Fiber 500 3 |bs./C.Y. $13.00/u. RbevneshG50 3 |bs./C.Y. $30.001CY. (price ba.5ed on 160-180 cubic yards) Let me know what you decide. Thanks, To in Etchaz± Projoc18dun��u� }vIouutuioIogion-Belgrade Division Pb. (40G)38D'6832 ext. 11 �r.(40O) 88O-8347 r V g V, 444- nNIrE RIVER NI, From. Dan Kelly Sent:Thursday, October 2O,20117:12 AM To: Etchsrt,Tom Subject: Re: bcoemanvvtp Please price both ways From: Bchart,Tom < > To: Dan Kelly z Ni el Stevenson From: Dan Kelly Sent: Thursday, November 03, 2091 6:18 AM To: Nigel Stevenson Subject, Ernailing: Secondary Concrete Reinforcement, Shotcr-Propex Concrete Systems Contact Us I Search Site: CONCRUESOLUTIOUB BY PRUPEX Inl:oznit>tion: FIB]ERMESH 650 MACRO FIBERS : ���.=- _ W MACRO-SYNTHETIC FIBER ALTERNATIVE FOR SECONDARY CONCRETE ', ti REINFORCEMENT c l��ibers ccl ! liner SOIL1 i0rts } , •# ----."---- —-- _ 1:ibcnneshA@ 654 is a specially engineered alloy polymer macro-synthetic fiber designed �....,:. to Provide high-performance secondary concrete reinforeemeul.An excellent altcrnalive to traditional steel reinrorcemcni,Fibcrmesh 650 macro concsetc fibers feature our Patented '`" tion Information: c3A©fiber technology,which helps provide superior long-term durability,including impact,abrasion anti shatter resistance.IMErms designed for slab-on-ground applications, vrltial 5labi composite metal decks and exterior flatwork such as driveways,sidewalks,overlays and ticri;ial Slabs parking areas.In addition,fibernresh 650 can be used as shoscrele Fibers in undergrouncl trial Slabs and tunnel appiications. )ositc Ndetal Decks 5i FEATURES END TECHNOLOGY FOR BETTER PERFORMANCE -rele kind tJndCrgratittd t i .portation Fibri-mesh 6505E1Ms e3A(D techilelogy is a blend orpolypropyiene,concrete fibers =' engineered three wayex0 by Iangth,thickness and mix ratio.This technology allows the - - fibers to disperse quickly and evenly throughout the concrete mix.It also ensures that the t AA fibers are snanitfactured to an optimum gradation with a top ss7e Aspect Ratio of f00. 1 These graded fibers are highly oriented for groatcr surface area cuiatact within the concrete, t+ providing urercased interfacial bonding and flexural toughness efficiency. ao r.► �t - is a- EASY TO PLACE s r �+ a•"41 '� 1 hIi 1''ibernreshAV 650,instaliatiost is easy.The I=ibermesh bags are simply added to the ' [ruck at lire ready mix facility.Because lhcred6f"+s no additional fonning,handling or positioning,I:ibermesh 650 is also saner to use.Plus,no costly lifting,equipment is required.Fiber reinforced catarete is easily pumped to multistory elevations,and it places and finishes with standard equipment(or faster,more efficient construction. FEATURES & BENEFITS 1 •Alternate to wire mesh and some light rebar contigui ations Graded alloy polymer provides greater surface area resulting in increased flexural toughness(residual strength) • 100%non-corrosive •Inhibits formation of phtstic shrinkage and plastic scitlemcnt cracks Provides impact,abrasion and shatter resistance •provides improved durability •Control of drying shrinkage and Temperature cracking •Improves cohesion resulting in enhanced pumpability •Easy to finish witlr standard techniques Reduccs labor and in-place costs and installation liability •Saves construction€ime—quicker pouring schedule •Complies with ASTNI C 111 G Type l i 1 4.1.3 •Typical addition rates range from 3 to S lbs per cubic yard* *Addstfon rate will vary depending on type of application,mix design and perfonnance requirements of each particular project. APPLICATIONS •Slabs-on-ground •1'ttrking areas •Sidewalks/driveways •Non-ma;netio applications •Exterior pavements 7 Shotcrete •Overlays&toppings •Composite metal decks 'opex Operating Company, LLC.All Rights Reserved. Ilntn. 3 ent2 fin" ,A��O�7RrRpI�STO�N CHANGE PROPOSAL REQUEST -JsJ LY33llF:RLE,Isc. (Not a Change Order) Projeot: Bozeman Water Treatment Plant Replacement Project CPR No.: 17 CPR Date: 1/23/2012 Date Sent to Contractor: 1/23/2012 Data Recd from Contractor: TO: Apollo,lne. Please furnfsh your proposal for executing the following change(s): Please provide cost to remove a wall from the meeling room as shown denoted by letter:;C"in the attached Associated with this change would be moving double door number 901 B(letter"A"in the attached?,.flipf)fno the dirgction of opep for double door 9088(fetter"B'attached)and moving the localion of a single door 905 A fleeter "D"attached) HD R/MMI Date: 1/2312012 TO: HDR Engineering,Inc./Morrison Maierfe,Inc. Proposal: Cost Credit (A time extension is not required for this modification unless otherwise detasled and justified) Contractor Dato To! Accepted/No l Accepted HD RRviM t Date Accepted/Not Accepted owner:Date Recommend to accept for total cost of$534 as detailed in attached letter, c James Nickelson 03-23-12 G E N E R A L CC) N T R A C TO R ... B U I L D I N G P E O P L E W H O B U I L D G R F A T THING S Mr, Nathan Kutil 03-23-12 HDR Serial Letter A1lB MIN—024 1715 South Reserve,Suite C Missoula,MT 59801 RE: Bozeman Water Treatment Plant Replacement Project Subject: APCO—021 CPR-017 delete Wall and Change Flooring in Room 902 Dear Mr.Kutii, As requested in the CPR—017 to delete the wall in room 902,additional conversations with you on 3120112 you requested the deletion of the quarry the in Room 901 and 903 and added stained concrete on the entire floor area (901,902 and 903). Please note that the walk off mat at door 901A remains and has been ordered,the specific details of the area above the wall remain to be finalized in the field. In response to CPR--017 and modi fication we have prepared the attached quotation for your review and acceptance. The changed work resulted in a cost change of ADD/D9DUCT$534.00 as supported by the attached quote sheet and supporting documentation. Please review this Change Notice for approval and contact the undersigned should you have any questions. Sincerely,,, Apo/llo�� ' Her— - Project Engineer CC: Nigel Stevenson—Apollo,Inc_—via email Dan Kelly—Apollo,Inc_—via e-mail .lames Nickelson—Morrison Maierle—via e-mail P 133 ACPO-021 1133 West Columbia Drive■P 0 Box 7305■Kennewick,WA 99336 Phone(509)586.1104 i Fax(509)585-3686 _ I c.co WA Reg.No.APOLLI'-061KB IN OR Reg.No.117497 e MT Reg.No.146718 An Equal Opportunity Empleyer \f} \2§ LO § § j 2( }/ q) I § ! . \ & (C; FQ& ( ® §@ )2}0 § # . . . . p . . . / \ . - ( S( J® k \( . . ,» \f g# - ) \ } � ) 0 LL } m } ) } !E E 3! # - k § ) A 0 CY ) ) k / \/5M\} § \k = ) o « q - ? � � [ ( \ § kmc,3, }f 2 )§ j - ' ƒ _ - § # � m | § ] . § no #oo o 80 Don }\ k� }\\ i f L I � �l r. DE I 76 r � f I C, f L - � J BMCSELECT BUILDING MATER1ffj TfW CP0N SERVICES KALI<SPELL MONTANA 59901 (406}752-839x3 Fax(406) 752-6394 Email: teore y@bmcwcst.com. QUOTE DATE: February 14,2012 TO: Apollo, Inc. ATTN: Stacee Keller RE: Bozeman WTP--CPR#17 The following is a deduct for eliminating doors#902A& 902B and the associated hardware for these doors. There is no change in cost for changing the swing of doors 4908E and the location of doors#901B. ***Total Deduct For CPR 917 <$2,067.00> Thank you for your consideration Tyler Corey ) ,. www.empireIathand plaster.coni r stilzey@180com.net Iking@180com.net kwooc plWcom.net PO Box 21346 Billings, MT 59104 (406)245-4214 FAX(406)245-2289 March 14, 2012 Project: Hyalite/Sourdough Attn: Nigel Stevenson Re: CPR No: 17 Nigel- Please note deduct per CPR. No 17. Deduct reflects eliminating wall that separates room 902 from 903. Please advise what RCP becomes especially if additional framing is required for gypsum board `dormer'. Deduct: $2,242.00 Please call with any questions. Thank you, Lance King ..)MORRISON CHANGE PROPOSAL REQUEST �d4 MAIERLE,),ic (Not a Change Order) Protect: Bozeman Water Treatment Plant Replacement Project CPR No.: 17 CPH pats: 112.;12012 Date Sent to Contractor: 1/2 312 01 2 Date Ree'd from Contractor; TO: Apollo,Inc. Please furnish your proposal for axacuting the following change(s): Mease provide cost to remove a wall from the meeting room as shown denoted by_latter.;C"_In the attached. Assooiatedwith this oh"ngs would bp.moving double door number 901B(letter"A"in the attached) tlianfno the direction of open for double door 908j8(Jetler"B"cached)and moving the locallon of a single door 905 A(letter "D"attached), 1-1DR/MM} Data: 1/23/2012 TO-. HDR Engineering,Inc./Morrison Maierle,Inc. Proposal: rr � ` Cost -.--`- Credr - — ` �oC � (A time eXtenslo i aired for this diGcati unless otherwise detailed and"justified') Contractor. Date TO: Accepted/Not Accepted Hf7Rlft MJ:Date Accepted/Not Accepted Owner:Date J JMOP MON CHANGE PROPOSAL REQUEST -4-j MAIERLE,tiz (Not a Change Order) Project: Bozeman Water Treatment Plant Replacement Project CPR No.: 18 CPR Date: 2P29/2012 Date Sent to Contractor: 2129/2012 Date Recd from Contractor: TO: Apolio,Inc. Please furnish your proposal for executing the following change(s): Please provide a cost t!2 remove installation(owner orovided)of five 16-inch check valves and adjacent manual butterfly valves from the discharge of membrane.[filtration feed pumps(P-3102A,,B,C,D,E) Additionally,please op in their place provide a cost to install owner provided pneumatically operated 16-inch butterfly valves,.,.,„ H DRIMM i Date: 2/29/2012 TO: HDR Engineering,Inc.Morrison Maierle,Inc. Proposal: Cost Credit (A time extension is not required for this modification unless otherwise detailed and justified:) Contractor Date TO: Accepted/Not Accepted HDR/MMI:Date Accepted/Not Accepted Owner.Date Recommend to accept at a total cost of$2,407 as outlined in attached letter. 9- James Nickelson 04-12-12 GEt4 E RAL CON TRACTOR BUILD [ N G P E O P L t WHO BUILD GREAT T H I N G S Mr.Nathan Kutil 04-11-12 1IDR Serial Letter A,IBK'YI N—040 1713 South Reserve,Suite C Missoula,MT 59801 RE: Bozeman Water Treatment Plant Replacement Project Subject. APCO—030R2 CPR-018 Delete OFCI Check Valves and Butterfly Valves and Install OECI Pneumatic Butterfly Valves Dear Mr.Kutil, As requested In the CPR—01 S to delete the installation of 5 OFCI check valves and butterfly valves and install S pneumatic butterfly valve and discussions with you on 3/26112 and 3/27111 we have prepared the attached REVISED quotation for your review and acceptance. The changed work resulted in a cost change of ADD/T'�GT 52,407.00 as supported by the attached quote sheet and supporting documentation. Please review this Change Notice for approval and contact[lie undersigned should you have any questions, o er Project Engineer CC: Nigel Stevenson—Apollo,Inc.—via e-mail Dan Kelly—Apollo,Inc.—via e-mail James Nickelson—Morrison Maierle—via e-mail P133 ACPO-030 1133 West Columbia Drive M P O Box 730511 Xenneivick,WA 99336 Phone(509)586-11G4 M Fax(509)585-3686 wz .a�a![o•ac.cott� WA Reg.No.APOLLI*0611 El OR Reg.No.117497 N MT Reg.No.146718 An Equal Qpportrcnity Em plo)vr )K, . . . \ . . . . , . \ \ � )\ . . . . . . . . . . . . . ` r4 N \a(\me ! / . ,§ . }/ . . •|}rRRw; ' | : k 2) \ /2)2!29 K � k& § : ; : f „ }« � �\ ) kitag \ \ lm B //§ / " !&S ; \/a&`§® §< 2,! CPR 19 Documentz filq 'MORRISON CHANCE PROPOSAL REQUEST r MM E, (Not a Change Order) Project: Bozeman Water Treatment Plant Replacement Project CPR No.: 19 CPR mate: 2/29/2012 Date Sent to Contractor: 2/29/2012 Date Ree'd from Contractor: TO: Apollo, Inc, Please furnish your proposal for executing the Following change(s): Please provide a cost remove owner provided valve FCV-5225 installation entirely from the project.This valve is located on 000Y13 and 300D11. rr HDRIMMI Date:----?/29/2012 TO: HDR Engineering,Inc_!Morrison Maierle,inc. Proposal: Cost Credit (A time extension is not required for this modification unless otherwise detailed and justified:) Contractor Date TO: Accepted/Not Accepted HDR/MMI: Date Accepted/Not Accepted Owner:Date Recommend to accept at a credit of$109 as outlined in attached letter. James Nickelson 04-12-12 GE N E R A L C O N T R A C T O R -. BUILDING PEOPLE WHO BUILD GREAT THINGS Mr. Nathan Kutil 04-09-12 HDR Serial Letter AllBZi' N—037 1715 South Reserve,Suite C Missoula,MIT 5980I RE. Bozeman Water Treatment Plant Replacement Project Subject, APCO—031 CPR-019 Delete Installation of OFCI FCV-5225 Dear Mr.Kutil, As requested in the CPR—019 which deleted the installation of OFCI FCV-5225:Apollo,Inc.has prepared the attached quotation for your review and acceptance. The changed work resulted in a cost change ofADDIDEDUCT$199.00 as supported by the attached quote sheet and supporting documentation. Please review this Change Notice for approval and contact the undersigned should you have any questions. Sincerely, Apollo, c tacee Keller Project Engineer CC: Nigel Stevenson—Apollo,Inc.—via e-mail Dan Kelly—Apollo,Inc.—via e-mail James Nickelson—MotTison Maierle--via e-mail P133 ACPO-03 I 1133 West:Columbia Drive 0 P O Box 7305 W Kennewick,WA 99336 Phone(509)586-110412 Fax(509)5 95.3686 w%yw.apo110-gc.co nt NVA Reg.No.A1'0LLI*061KB 12 OR Reg.No.117497 M MT Reg,No.146718 An Equal Opportunity Employer §<� L) G/a CL � � § [ ( I wa $\ . . § ) \® \aa [ 3 Li I � �& ] S» ) ° / § . § ƒ � \ [ / \ . \ / m .. § ( /kk § § § ® §7 \ ) f \ \ ) U ) ; kf \0 ) § \ §\j Document2 fin, MoRFJSON CHANGE PROPOSAL REQUEST M lERLE.I\c (Not a Change Order) Project: Bozeman Water Treatment Plant Replacement Project CPR No.: 20 CPR Date: 2121!2012 Date Sent to contractor: 2121 12012 Date Rec'd from Contractor: TO: Apollo, Inc. Please furnish your proposal for executing the following change(s): Please provide a cost to add_five(5)PRP ladders in area C The attached shows the location and specifics for these 5 Ladders. HDRIMM1 Date- 2/21/2012 TO: HDR Engineering, Inc./Morrison Maierle, Inc. Proposal: Cost Credit (A time extension is not required for this modification unless otherwise detailed and justif ed) Contractor Date TO: Accepted/Not Accepted HDR/MMI:Date Accepted/Not Accepted Owner, Date Recommend to accept at a total cost of$9,581.00 per attached detailed breakdown. James Nickelson 0229-12 \& � C3/0 \\ \ k \ ( } 2( i« \\ j 5 }J \ tt ) UL Li § G § ofor § °\ \ z / _ \ R ) \ )\ ! p ( ® r \ \ � / \ ! ƒ � - ƒ § \ � ) Or \ ° Gm @ E a)\ LU $ G - %' _ & § < \ § J\ ) )\Q Dale: 02/22/12 Change Order 01 Composite Stru tunes/ Change Order Form Project: Hyalite/Sourdough W7P Replacement City: Bozeman State: M7 Work Order No,: 725352 PO No.: P1330019 Contact: Ryan Roberts Email: rrobertsLfibercrc,9e.carra Phone: (254)977-1397 Fax: [254)977-1318 Attention: Dan Kelly _ Phone: (509)586-1104 Company: Apollo, Inc. Email: Action Requested: ._.App roval Other: _ Probable Effect: Increase Price Value: $7,075 Reference: Spec.Section: Addenda: Discription of Change: Fibergrase adder to provide 5eo. FRP Ladders as noted on returned REV 1 Aoprovai Drawing (sheet 5 of 14) for$7,075 4 -Ladders goes from elevation 5207 to 5125 I- Ladder does from elevation 5207 to 5200.50 Other Comments: Approved By Company Date I m " LU ¢ W 'u -*a dvz it a y � z .. I -o t I s I 0. 4 N 1 I N I U, w E x — � II m Y's I i O p I —iA I I Fl $ v7 er uj !-- -- ------- --- Illk � I .r w i o �! r LL �a # z Ed o � 5 nm <6 °ga A cy a� �a4wel4'Wd Otr"Ed�b ZlOZItrZR haeyS Or^P'Epg00[tEBbL lZ6RE�6�!K+Mwd4� r} a � v �j �s hC m U ai '0 0 ca a / ,, �� f � '� 4 �,.�� Y _ � _ � tLL .l..•��� ..�� —tr �s° - - r �� �1� • ti� �'+• �� . r �. -�: � � -- s �� �., . �� � . .t - T I� f. � c4 S Ln 4� N � E auj e a 0 tw �. m o > �+- a, a L U E t0 dl � L d) d) J � � CPR Document2 ti .�. A �MORRISOi1' CHANGE PROPOSAL REQUEST _j1, MA1ERL ,l r (Not a Change Order) Project: Bozeman Water Treatment Plant Replacement Project CPR No.: 22 CPR Date: 212 712 0 1 2 Date Sent to Contractor: 2127!2012 Date Rec'd from Contractor: TO: Apollo, Inc. Please furnish your proposal for executing the Following change(s): Please provide a cost to use partial height Partitions on Type A partition walls per RFS—72 item#2. HDRIMMI Date; 2/27/2012 TO; HDR Engineering,Inc./Morrison Maierle,Inc. Proposal: Cost Credit {A time extension is not required for this modification unless otherwise detailed and justified:) Contractor Date TO: Accepted/Not Accepted HDR/MMI:Date Accepted/Not Accepted Owner;Date Recommend to accept for a credit of$3,840 as outlined in attached letter. 1 G James Nickelson 0403-12 fly ?', GE N E R A L C O N T R A C T O R .. R U 1 L D S N G PEOPLE W H O BUILD GREAT THINGS Mr.Nathan Kutil 03-23-12 HDR Serial Letter Al/BZMN—025 1715 South Reserve,Suite C Missoula,MT 59301 RE: Bozeman Water Treatment Plant Replacement Project Subject: APCO—029 CPR-022 Type A Drywall Changes Dear Mr.Kutil, As requested in the CPR—022 to reduce the Type A wall heights per the response to RI-I—72 item#2 we have prepared the attached quotation For your review and acceptance. The changed work resulted in a cost change of ABB/DEDUCi'53,840.00 as supported by the attached quote sheet and supporting documentation. Please review that age Notice for approval and contact the undersigned should you have any questions. Sincerelv, Apollo n SW Keller Project Engineer CC: Nigel Steveenson—Apollo,Inc.—via a-snail Dan Kelly—Apollo,Inc.—via e-mail James Nickelson—Morrison Maierle—via e-mail P133 ACP O-029 1133 West Columbia Wve a P O Box 7305 9 Kennewick,WA 99336 Phone(509)586-1104 0 Fax(509)585.3686 wwwApaHO_-�.co WARcg.No.APOLL1*061KB N ORReg.NNo.117497 E3 N1T Reg.No.146718 An Equal Opportunity Employer Z < ¢} §\ \ � { �/�s $ ! . � _ mom �) ` §% § /. . . . . . . . . . . . . . . . . . . . . . . \ k k ${ � \ } k ` - ( \\/} §\ § j � _ - : ( § \ \ \ ) k \ k \\ 1MORMSON REQUEST FOR INFORMATION (RFI) '�'!Y . l.Q MAIERM,LAC PROJECT: City of Bozeman Water Treatment Plant Replacement Project RFI NO.: 072-Drywall HDR PROJECT NO.:00...88114 DATE: 02-23-12 1. At the 6"exterior furred walls slip clips have been specified. Typically slip clips are required to accommodate vertical deflection of the structure. in this instance there should be no deflection and attachment of the stud wall to the MBS could be achieved by kicking the head of the furred wall back to the z girt with studs every 4'or so. It clips are still desired, I would suggest using only one row in lieu of the 3 that have been indicated,and attach them to the top track every 4'or so. This would still provide the deflection that is currently indicated. 2. Are all type A partitions intended to extend full height to structure,or is it acceptable to extend 6"above and laterally support the walls with corner/wall to waif bracing,or kickers to structure above. Partial height partitions would greatly reduce the overall project cost 3. Please confirm that the typical stud material can be 20 ga or equivalent,except of course where a heavier gauge is required to meet limiting wall heights. Response Required By; 02-27-12 Owner Contractor HDR Engineering,Inc. Signature REPLY: DATE: 1.Slip clips are required at locations and spacings as indicated on the plans. 2. Type A partition walls are permitted to stop approximately S" above finish ceiling height with corner bracing and full height kickers or bracing.Contractor is to provide corner and kicker bracing layout,spacing, plan,and attachment schedule to engineerfor approval. 3.Stud material is required to be 18 Ga.as indicated on the plans. Owner Contractor H'OK Engineering,Inc; Signature Document2 1i R", MORRISON CHANGE PROPOSAL REQUEST __i _,LJ MM Gyp (Not a Change Order) Project: Bozeman Water Treatment Plant Replacement Project CPR No.. 23 CPR Date: 3/512012 Date Sent to Contractor: 3/5/2012 Date Recd from Contractor: TO: Apollo, Inc. Please furnish your proposal for executing the following change(s): Please provide a cost to add 30% 1 co!to the boilers and additional strainerslvalves per field order#4 HDR/M M I Date: 3/5/2012 TO: HDR Engineering, Inc./Morrison Maierle, Inc. Proposal: Cost Credit (A time extension is not required For this modification unless otherwise detailed and justified.,) Contractor Date TO: Accepted/foot Accepted � HDR/MMI:Date Accepted/Not Accepted Owner:Date Recommend to accept at a total cost of$2,574 as outlined in attached letter. James i - N ckelsan 04 `€2-12 GENERAL C O N T R A C T O R 6UILpIi� G PEOPLE WHO BUILD GRLAT THINGS Mr,Nathan Kutil 04-09-12 I1DR Serial Letter AI/BZMN—435 1715 South Reserve,Suite C Missoula,1%4T 59801 RE: Bozeman Water Treatment Plant Replacement Project Subject: APCO---034 CPR-023 Add 30%Glycol and Strainer Dear Mr,Kutil, As requested in the CPR--023 which added 30%glycol and strainer and comments received on 413112,Apollo,Inc. has prepared the attached REVISED quotation For your review and acceptance. The changed work resulted in a cost change of ADD/PEDUGT$2,574.00 as supported by the attached quote sheet and supporting documentation. Please review this Change Notice For approval and contact the undersigned should you have any questions. Sincerely, / Apollo,In Keller oject Engineer CC. Nigel Stevenson—Apollo,Inc.—via e-mail Dan Kelly—Apollo,Inc.—via e-mail Jarnes Nickelson—Morrison Maierle—via e-mail P133 ALPO-034 1333\'+(lest Columbia Drive R P()Box 7305 M Kennewick,WA 99336 Phone(509)586-110413 Fax(509)585-3586 www.alxallagc.com WA Reg.No.APOLLI"06110 0 Olt Reg.No.117497 N MT Reg.No.146718 An Equal Opportunity Employer (:w ef§ ) . . . .�, .�. . . ,. . , . . . . . . \ . j . . . . . . . . . . . . . . . .;§ , § q{ /e\ g } �f # . . . . . ]. . . , . /.. . . . . . . § . � j � a }\ ® \k � a _ | } { � } ® # � - £ � e ra §[ § CHANGE ORDER a fV�issoula,MonLaiya � 4G PLUMBING & HEATING 728-1515 �� P.O. Box 17140 9 p Missoula, MT 59808 2jCL cod¢ Ph: (406)728-1515 Fx:(406) 728-6257 Date: 2-Apr-2012 Project No.: 2533 To. Apollo Construction Project Title: Bozeman Hyalite WTP 1133 W Columbia Dr Kennewick,WA 99336 CO Request No:2533-04 Attn: Stacee Kefler Reply to RFP: CPR-23 We are requesting a change order for the following additional services: Addalycol to heating system,add valve and strainer to chilled system Qty Description Cost Each Cost Total 65 Gallons Propylene Glycol $ 17.20 $ 1,118.00 6 Labor to mix and install at 30% $ 64-71 $ 388.26 1 4"flanged wye strainer with flan es and bolt kits $ 231.17 $ 231.17 3.3 Labor to install strainer $ 64-71 $ 213.54 0% $ 15% OVERHEAD/PROFIT 292.66 Subtotal 2,243,62 --15°x° OVERHEAD/PROFIT $ _ u tote 0% IMONTANA GROSS RECEIPTS TAX $ _ 0%c IBOND $ _ Total $ 2,244 Attachment If you have any questions concerning this Change Order proposa9, Time Extension in Days please call. All Change Order pricing is valid for 30 days from the above date unless otherwise noted. By; Cory Hanninen s� cc)Ty2?4qp1urnbJng.com 4G PLUMBING&HEATING, Inc.