HomeMy WebLinkAbout05-12 North Seventh Avenue Urban Renewal Board Annual Work Plan and Budget - Fiscal Year 2013 Annual Work Plan and Budget — Fiscal Year 2013
a N. 7th Avenue Urban Renewal Board
In November 2006, the City of Bozeman designated the N. 7th Ave Tax Increment
Finance District (TIFD),under which incremental increases in taxes due to
redevelopment are accumulated in a TIFD fund. The stated goals and objectives of
URBAN RENEWAL BOARD the District Plan were as follows:
MISSION and VISION: The N. 7th Urban Renewal District Plan is the City's response to
remedy the conditions of blight found in the August 2005 report through thoughtful
redevelopment of the Corridor. The following Corridor Goals are taken from the Design and
Connectivity Plan (DCP). An expanded description of the intent of each goal is found in the DCP
Chapter 2.
Corridor Goals
A basic goal is to have an active and exciting corridor that is attractive with a distinct
character. A strategy for achieving this goal is to improve the experience for the user by
creating safe attractive walkways and streets and by providing buildings and landscaping that
are of interest to users and passersby. Several key strategies should be followed:
1. Provide a distinct identity for the corridor
2. Develop the corridor as a focus for commercial and entertainment activities that serve
residents and visitors alike
3. Strengthen the corridor as a neighborhood service center
4. Provide mixed use development
5. Clearly define gateways at key locations along the corridor
6. Improve vehicular, bicycle and pedestrian circulation along the corridor
7. Provide pedestrian connections to adjacent neighborhoods
8. Establish a way-finding system
9. Guide new development along the corridor such that it improves the aesthetic experience
10. Coordinate public and private improvements
11. Strengthen connections between complementary uses
12. Provide flexible public space along the corridor
GUIDING PRINCIPLES
In addition to the specifically stated goals for the District the following Guiding Principles have
been adopted to provide a basis for decision making over the life of the District. These principles
should be applied to any development program or other activity that will affect the District:
1. Ensure the health safety and security of the District
2. Balance commerce and livability in the District within the mixed use framework
3. Public open space is essential to a healthy and appealing urban environment
4. The costs of projects and programs shall be weighed against their benefits to the District
5. Private property shall not be acquired for other private use through the eminent domain
process in the implementation of any aspect of this plan
6. The City shall not limit its vision for the District improvements to monies available solely
through the TIF funding
7. Projects shall consider impacts on adjacent neighborhoods
8. The city shall consider the impact on the District of all projects undertaken outside of the
District
N. 7 th Urban Renewal Board Annual Report and FY2013 Work Plan and Budget Proposal 1
FISCAL YEAR 2012 — ANNUAL REPORT
F
NSURB's FY12 AT-A-GLANCE
In November 2011, the bus shelter in front of Van's IGA (912 N. 7th Avenue)was
completed.
The NSURB moved forward on implementing lighting improvements in the District.
Morrison-Maierle completed the initial survey and design phase. A sample fixture has been
installed in front of the Comfort Inn (1370 N. 7th Avenue) so NSURB and the public can
evaluate the NSURB's color choice for the fixtures and invite comment from the District
and broader community. During FY12 the NSURB has expended $76,438 towards these
efforts. Of this, $65,868 was paid to Morrison-Maierle in partial fulfillment of their
contract for engineering services.
In October of 2011, a $50,000 grant to the property owner allowed for the completion of
sidewalk and landscaping improvements in front of the Uhaul property (815 N. 7th
Avenue).
During FY2012, the NSURB approved a total of$16,095 in new N7Rehab grants. This
included one grant for Fagade and Site Rehabilitation and two additional Technical
assistance grants. A total of$53,500 was awarded to applicants in FY2011 of which
$38,453 was paid in FY2012. Separate from the N7Rehab program, $50,000 was granted
to the Uhaul property owner for frontage improvements. A summary of FY12 grant activity
is below.
See Table 1 attached for 2012 expenditures.
N7Rehab GRANTS — STATUS REPORT
N7Rehab—Technical Assistance Grants (TAG)
1) Stockman Bank of Billings—302 N. 7th,formerly Frontier Pies,NE corner of Beall and
N.7th
Brett Potter of Focus Architects assisted Stockman Bank and a potential purchaser
of the property. Focus Architects provided a site analysis, improved parking lot
configuration,N. 7th frontage improvements including a landscaped boulevard and
reduction in a drive accesses and architectural renderings compliant with the Bozeman
Design Objectives Plan. The grant was disbursed in FY2012. The building and site
analysis provided by the technical assistance was utilized by the Human Resource
Development Council, Inc., (HRDC) for the reuse of the site. The site is now occupied
by the The Community Cafe. The cafe is an extension of the Gallatin Valley Food Bank
and was established to provide hot evening meals to those who need them_ The HRDC
has expressed interest in making additional site improvements analyzed by Focus
Architects with this grant.
Grant amount: $7,200
N. 7th Urban Renewal Board Annual Report and FY2013 Work Plan and Budget Proposal 2
2)Nelson Investments—411 N. 7th, Quonset but property
Keith Redfern of Concept Seven Design partnered with Madison Engineering to
provide building and site analysis to address the following concerns: lack of relationship
between buildings and the street,new building locations, pedestrian access,bicycle
parking, landscaping deficiencies, storm water control deficiencies, demolition needs,
and ADA compliance issues. A conceptual site plan proposing new building locations,
parking and site circulation was completed to assist the property owner with marketing
the property.
Grant amount: $7,200
3)BCE,LLC—416 N. 7th,little brown house
Keith Redfern of Concept Seven Design partnered with Madison Engineering to
provide building and site analysis to address the following concerns: lack of relationship
between building and the street, pedestrian access, bicycle parking, landscaping
deficiencies, storm water control deficiencies and ADA compliance issues. The
technical assistance has provided conceptual drawings for a new facade and analysis for
site improvements. This work is being utilized to market the property. It is currently for
sale or lease.
Grant amount: $3,600
4) G and C Land,LLC (aka Debos Pawn)—705 N.7th
Brett Potter of Focus Architects assisted the property owner with analysis of
potential building, signage and parking lot improvements. Building facade and frontage
improvements including boulevard and sidewalk(the site currently lacks sidewalk along
N. 7th)were proposed. A shared drive access to a parking lot shared with Cats Paw to the
north was analyzed.No construction activity has yet resulted from this grant.
Grant amount: $4,600
5) Haley Enterprises(aka Cats Paw)—721 N.7th
Brett Potter of Focus Architects assisted the property owner with analysis of
potential building, signage and parking lot improvements. New parking lot striping and
circulation plan to be jointly used by Debos Pawn were proposed. Frontage
improvements including boulevard and sidewalk(the site currently lacks sidewalk along
N. 7th)were proposed. No construction activity has yet resulted from this grant.
Grant amount: $7,200
6)Amerco Real Estate Co. and Uhaul Real Estate Co.—815 N.7th
Brett Potter of Focus Architects assisted the property owner with analysis of
potential building, signage and parking lot improvements. Solutions to site drainage
issues were explored and frontage improvements including boulevard and sidewalk(the
site currently lacks sidewalk along N. 7th)were proposed. Plans were completed
allowing the NSURB to consider funding for the sidewalk and landscaping
improvements. Ultimately, the NSURB decided to provide a $50,000 grant to reimburse
the property owner for the public improvements completed in October of 2011.
Grant amount: $7,200
FY12 TAG TOTAL: $37,000*
*This includes$25,200 in TAGS awarded in FYI] that were not paid until FY12.
N. 7 th Urban Renewal Board Annual Report and FY2013 Work Plan and Budget Proposal 3
N7Rehab—Grants for Demolition and Facade/Site Improvement Construction
Activities
1)2LT,LLC—654 N. 7"'Avenue(aka Aaron's retail store)
NSURB awarded a grant up to $17,500 for the demolition of an existing
foundation. The award was granted upon the completion of building construction and site
improvements per Final Site Plan application#Z-10329.
Grant amount: $13,253
2) 2 LT,LLC— 706 N. 7tb Avenue (aka Aaron's Regional Office)
NSURB awarded up to $4,295 for site and fagade improvements which greatly
enhanced the aesthetics of the buildings and brought the site's landscaping into
compliance per completion of improvements under Certificate of Appropriateness
application#Z-11153.
Grant amount: $4,295
FY12 DEMO AND FACADE/SITE TOTAL: $17,548
FY12 N7Rehab TOTAL: $54,548
Uhaul Grant— 815 N. 7tb Avenue
NSURB awarded $50,000 for public right-of-way improvements including a new
sidewalk and landscaped boulevard which greatly enhanced the aesthetics of the property's
frontage and the District. The grant was awarded per completion of improvements proposed and
authorized under sketch plan application #Z-11267
Grant amount: $50,000
Grants TOTAL: $104,548
N. 7 t" Urban Renewal Board Annual Report and FY2013 Work Plan and Budget Proposal 4
FY2013 BUDGET PLAN AND REQUEST FOR APPROVAL
In 2008, the Board began implementing the North Seventh Urban Renewal District Plan by
establishing their top three priorities for the District: improving sidewalks, lighting and
landscaping along the N. 7' Avenue corridor. During the next fiscal year, the NSURB proposes
continuation of the redevelopment incentive program (N7Rehab) and focusing funds towards the
installation of new street lights and related improvements in a portion of the corridor. The
NSURB recommends allocating their available funds as follows:
Engineering Services $ 63,953
Engineering services are needed to assist the Board with three of the District goals:
• Provide a distinct identity for the corridor
• Clearly define gateways at key locations along the corridor, and
• Improve vehicular, bicycle and pedestrian circulation along the corridor.
Morrison-Maierle, Inc. has been hired to provide Lighting Design and Construction
Administration for N. 7th Avenue from Interstate 90 to Tamarack Street. The installation of
new light fixtures for the corridor was identified as one of their top three priorities for
District Plan Implementation in 2008. The NSURB recognizes that new light fixtures will
help establish a distinct identity for the corridor, define key intersections, improve vehicular
and pedestrian safety and improve the aesthetic experience of the corridor.
It is an allowable expense under Section 7-15-4288, MCA which states, "Costs that may be
paid by tax increment financing" allows the municipality to use tax increments to pay the
following costs of or incurred in connection with an urban renewal project: (1)land
acquisition; (2) demolition and removal of structures; (3)relocation of occupants; (4)the
acquisition, construction, and improvement of infrastructure...; and 5) costs incurred in
connection with the redevelopment activities allowed under 7-15-4233...
These services will be paid for out of the remaining balance of the Big Box Fund allocation
to the NSURB.
Grants $261,0001
This funding proposal is for the N7Rehab redevelopment incentive program to encourage
developers to build on parcels along the N. 7th Avenue corridor. It recognizes the
complexities of redeveloping parcels which have existing substandard buildings and
infrastructure and was created to offset the costs of those complexities with grants for those
proposing work which eliminates blight and advances the implementation of the District
Plan. The program was approved by Resolution 4307 and is administered by the NSURB.
N7Rehab meets the mission and goals of the District Plan by
• guiding new development along the corridor such that it improves the aesthetic
experience and by assisting in
• coordinating public and private improvements
These proposed expenditures are allowable under Section 7-15-4233, subsection (1)(a),
MCA,which grants the City the power to formulate and coordinate a workable program as
specified in Section 7-15-4209, MCA, which states : (1)A municipality may formulate a
N. 7th Urban Renewal Board Annual Report and FY2013 Work Plan and Budget Proposal 5
workable program for utilizing appropriate private and public resources:
(a) to eliminate and prevent the development or spread of blighted areas;
(b)to encourage needed urban rehabilitation;
(c) to provide for the redevelopment of such areas; or
(d)to undertake such of the aforesaid activities or other feasible municipal activities as
may be suitably employed to achieve the objectives of such workable program.
(2) Such workable program may include,without limitation, provision for:
(b)the rehabilitation of blighted areas or portions thereof by re-planning, removing
congestion, providing parks, playgrounds, and other public improvements; by encouraging
voluntary rehabilitation; and by compelling the repair and rehabilitation of deteriorated or
deteriorating structures; and
(c) the clearance and redevelopment of blighted areas or portions thereof.
Additionally, Section 7-15-4288, MCA states, "Costs that may be paid by tax increment
financing" allows the municipality to use tax increments to pay the following costs of or
incurred in connection with an urban renewal project: (1)land acquisition; (2) demolition
and removal of structures; (3)relocation of occupants; (4)the acquisition, construction, and
improvement of infrastructure;... and 5) costs incurred in connection with the
redevelopment activities allowed under 7-15-4233...
'Fagade and Site Rehab $50,000
Technical Assistance $36,000
Demolition $100,000
Public Right of Way Improvements $75,000
Part-time staff and other Professional Services $ 10,000
The Board needs staff to assist with District Plan implementation.
This money is a permissible use under state statute 7-15-4288, (5), "costs incurred in
connection with the redevelopment activities allowed under 7-15-4233 and 7-15-4288 (7)
"administrative costs associated with the managements of the urban renewal area..."
Outreach $ 1,500
The Board has requested money for public noticing and outreach events in the District. The
purpose of these outreach events is to inform property owners and the public of the District
Plan and the N7Rehab program.
This money is a permissible use under state statute 7-15-4233, "Powers which may be
exercised by urban renewal agency or authorized department...(f)to disseminate blight
clearance and urban renewal information;"
Lighting, Gateway and related Sidewalk Improvements $534,349
The NSURB plans to implement installation of new street lights, gateway improvements
and related sidewalk improvements during the first quarter of FY 2013. Cost estimating is
being completed by Morrison-Maierle. The project scope includes new street lights and a
few sidewalk improvements from the south side of the Interstate 90 interchange to Birch
Street.
See"Engineering Services" above for District Plan goals and applicable sections of the
MCA.
N. 7 th Urban Renewal Board Annual Report and FY2013 Work Plan and Budget Proposal 6
Interstate 90 Bridge Enhancement $ 25,000
The NSURB plans to work with the Montana Department of Transportation to improve the
visual aesthetics of the I-90 bridge. A number of opportunities have been discussed
including installing landscaping enhancements and/or stonework on the end caps of the
bridge to extend and define the District's character. The NSURB has also discussed
installing a custom made metal sign on the bridge face, visible to I-90 motorists.
See"Engineering Services" above for District Plan goals and applicable sections of the
MCA.
Oak Street Shared Use Path (CTEP Match) $ 15,000
The Oak Street Shared Use Path project was recommended by the Bozeman CTEP
committee and is a joint project between the City and County. Completion of the project
will fill in missing sections of pedestrian facilities on the south side of Oak Street between
N. 7th and N. Rouse Avenues. A 10 foot wide asphalt path is planned. The NSURB has
pledged this money in partial fulfillment of the CTEP cost share requirement for the City's
portion within the District.
Planning Consultant—N. 7th Specific Zone Code $ 20,000
The NSURB sees value in codifying elements of the District Plan to improve predictability
and ease redevelopment of commercial parcels within the District. The selected consultant
will reconcile inconsistencies between plans previously adopted by the City and reinforce
the goals and objectives of the District Plan by creating a development code specific to the
commercial and light industrial portions of the District. NSURB staff is currently preparing
a Request for Proposals to advertise.
TIF Correction $ 30,000
This money is being set aside for potential tax increment paybacks that may be due as a
result of pending applications before the County tax appeal board for reductions in valuation
of properties. As of writing this report, the NSURB has not received confirmation that this is
no longer a concern, but the general sense is that any overpayments will be corrected in
future increment disbursements.
N. 7 t" Urban Renewal Board Annual Report and FY2013 Work Plan and Budget Proposal 7
SUMMARY
See FY13 SUMMARY below and Table 1 detailing FY2012 revenues/expenditures and the
proposed FY2013 fund expenditure. The North Seventh Urban Renewal District has on-
going projects and funding sources allocated in previous fiscal years which have not yet
been expended. As such, these funds are included in Table 1 as "rollovers" and deducted
from "remaining revenue" for the preparation of the FY13 budget.
Actual Tax Increment Financing Funding fluctuates with on-going building and re-assessing
of property values. The FY2013 anticipated TIF amount may be different than estimated in
the attached report. Appeals to property valuations are currently under review may result in
a reduction in available funds. The NSURB will update their budget on an as-needed basis
and with approval from the City Commission.
FY13 SUMMARY
BALANCES FY13 TO BUDGET
TIF Balance 896,849
Big Box Funds 0
Total $896,849
PROPOSED FY13
Expenditures BUDGET
Grants 261,000
Part-time staff and other professional services 10,000
Outreach 1,500
Lighting and Gateway 534,349
I-90 Bridge Enhancement 25,000
Oak Street Shared Use Pathway(CTEP match) 15,000
Planning Consultant-N. 7th specific zoning code 20,000
TIF correction 30,000
Total $ 896,849
Report prepared May 25, 2012 by
Keri Thorpe,Assistant Planner
N. 7 1h Urban Renewal Board Annual Report and FY2013 Work Plan and Budget Proposal 8
\`
\\ �