Loading...
HomeMy WebLinkAboutResurrection Parish Water Pipeline and Access Easements Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Dustin Johnson, Project Engineer Richard Hixson, City Engineer SUBJECT: Resurrection Parish – Water Pipeline and access Easement MEETING DATE: May 7, 2012 AGENDA ITEM TYPE: Consent Agenda RECOMMENDATION: Authorize City Manager to sign BACKGROUND: Attached are copies (original to Stacy Ulmen), of the partially executed easements for the water pipeline and access easement for the above referenced project. Two easements have been provided for the two separate properties in which the proposed water pipeline will be constructed. The first is from the Resurrection Parish to the City of Bozeman and the second is from West Kagy Professional Building Condominium to the City of Bozeman. These easements will provide and easement for construction and maintenance access of the new water main needed to facilitate the expansion of the Parish. Engineering staff has reviewed the easements and found them to be acceptable. The Water Pipeline Easement was included as a condition of approval with the original site plan that was reviewed and approved by the Commission on February 28, 2011. FISCAL EFFECTS: None. ALTERNATIVES: As suggested by the City Commission. Attachments: Water Pipeline and Access Easements Report compiled on: 4/18/2012 30 31 32 33 34 35 36 37 38 39 40