HomeMy WebLinkAbout12- Skyridge Estates Subdivision Property owners Agreement with City for Sourdough Water Treatment Facility After Recording return to:
Greg Sullivan, Bozeman City Attorney
P.O. Box 1230
Bozeman, MT 59771
AGREEMENT
This AGREEMENT, made the first day noted below, the day of
,
¢ AU CV,4j-
2011, between the City of Bozeman (City), a municipal corporation and politics subdivision of
the State of Montana in Gallatin County and the Property Owners (Owners) of the Skyridge
d Estates Subdivision, aka COS 1103 and its subsequent amendments, has three purposes:
1) The Owners acknowledge and approve the City's plan to utilize a portion of Tract 6 of
COS 1103 for expansion of the City's Sourdough Water Treatment Facility in
accordance with the plans, details and descriptions attached as Exhibits "A, B and C".
2) The Owners agree that the proposed Water Treatment Facility, as represented in
Exhibits 'A, B and C", is consistent with the intent and purposes of the Amended
aE Skyridge Covenants as recorded with the Gallatin County Clerk and Recorder, on Film
109, Page 727.
3) Within two and one half years of the agreement date, the City agrees to construct the
¢r' water treatment facilities, landscaping, screening, fencing, earthen berms and irrigation
�E systems as shown on Exhibit "A, B and U.
TUB Furthermore, the City of Bozeman agrees to file this Agreement with the Gallatin County Clerk
r and Recorder. Exhibit A is a description of building and landscaping modifications agreed to by
N-9= the City in response to public comments. Exhibit B is the Overall Landscaping Plan, sheet
CN OOOC28, from the Water Treatment Plant Replacement Project. Exhibit C is a site plan showing
f) the general land uses on Tract 6 of COS 1103 and Tract 1 of COS 633C.
(D �=
In WITNESS WHEREOF, the undersigned have set their hands and seals to this
AGREEMENT on the dates so noted on the following pages.
au�
For the Citv of Bozeman:
on
Chris Kukulski, City Manager Date
Attest:
State of D a-
(County) of (�` Q�Ctt1
This instrument was acknowledged before me on '51 by �lS
nA
(Sig ature of notarial officer) 1�
'.
Notary's name—typed, stamped or printed
Notary for th State ot Montana
� q `\��`� Residing at
�'"" "1011111100 My commission Aires:
v
a�
o ti rn o (M 00 00 00 0)
IL
0o 0) 00 00 00
*� °° 000 coo 0) 00 0) � m rn
_ LO L() LO LO LO 10 CV LL) t-0 Liz
Q ,f, �- � � � �- Or r a) T- mr Or Or
E ++ � 0) r � � LO7 d� 'iI` ti 7 � > I-
U) J J CD m -= 0) "L O)
N L
L
L
Q N Z u- N LL F= U) E Z E U) E E w E U) E
p L o N Lo m } C) N Lo � Q N L{) N C� a) o m co N
EL Cl C O N E N r CL M N O N (0 N (v N (N N M N 0} N
00 O � O M (D O r O r O r- O (O O r o O
'+O 00 m co m r (O m O) m moo rn m r m CF) CO O) m
Eco _
o
c'w ,
LL
0 Z �_
F— - L m ° o a
_0 m
Q � c� °D
.Q U N — U = Y
� mc a) � C7 --j _j U (D r-
L
06 CD ca
p m ❑ Q ❑ L U) U
V N (6 L Q? O 0() I— —
cn a) � N C
� �
O E U) O Q n
O L
Cl) (� O L O 4 ti3 7 O (� s O
� � � L.L _ }- = J � a � U) m ❑ 0 E
• r N C� Lo 00 0) O
r
Exhibit "A"
To the City of Bozeman SkVridcle Subdivision Agreement
September, 2011
The following is a list of items that the City of Bozeman agreed to as a result of public
comments regarding the building and landscaping design for the Hyalite/Sourdough
Water Treatment Plant Replacement Project. These items are currently reflected in the
building and landscaping plans.
Building modification items: (These are added to the original building design that called
for removal of the current water treatment building, construction of an approximately
45,120 square foot, single story building, gable roof design, all roofs to be pitched, sheet
metal siding with doors and windows to break up the wall line mass, roof dormers and
skylights to break up the mass of the roof, and the use of earth-tone siding and roof
colors.)
- Reduce all roof pitches from 4112 to 3112
- Rotate the roof ridge line from east-west to north-south on the east module
- Add horizontal banding to the walls
- Use downward directed exterior lighting and generally minimize the use of
exterior lighting to protect dark skies of the neighborhood
Landscaping modifications: (These are added to the original landscaping concept that
called for a landscaped earthen berm buffer along the north and east sides, a six-foot
high fence around the lagoon and drying beds north of the building, mixed tree species
on the berms, and low maintenance, native species grass mix.)
Add earthen berms to the northeast and east building walls
- Reshaped the berms north and east of the lagoon and drying beds to a more
natural configuration
- Add trees to north side of the building
- Add trees to the south and southeast of the parking lot
- Include the landscaping and irrigation items in the overall project bid
End of list
r I
♦ ``\`\ I'I LAGOON
rff \! LIFT STATION
r FUTURE I
I CLEARWELL I
l I
I SITE 1
i r
� � l
i
LAGOON
f
♦ e
I
f I'
1
FUTURE I I
I CLEARWELL I
1 SITE
` , l
cl I
Cy {
�33G
G015
z STANDBY GENERATOR
WITH WALK-IN ENCLOSURE
N uj AND SOUND WALLS
EMERGENCY �� TREATMENT BUILDING
OVERFLQW .� 94' F.F=5207.0
FLOOR DRAIN
RETENTION
BASIN 360'
ASPHALT
PARKING&DRIVEWAY
YARD_ EXISTING I I
4°.AHYDRANT WATER 1 FUTURE PRETREATMENT
=y TREATMENT I BUILDING (10:t YEARS) I
PLANT 1 {
FIRE 1 -----------1
HYDRANT --------
/
SOURDOUGH /f
CONNECTION /
BUILDING HYALITE f/
,CONNECTION
BUILDING 't 633
�015 J /
I Mol
U—i MAI
MF�a:
1 2 3 4
Lag
�D
°O I p5
2 °
I
F
EXISTING TREE
TO REMAIN]
6
`I y
.EXISTING TREES I I ° Ob �� -`;•'t
+ --ra REMAIN i
p5
OS
07 % Ti
OB 08
_ a
•
i:--
' 5TING'TRE>=S - -
i0 REMAN
,
i
I
CASHMAN NURSERY& �
r
LANDSCAPING
P.O.Box 10242 r
Bozeman,MT 39119 {
(406)581-3406
PROJECT MANAGER 0. HARMON
DESIGNER 1: S. ENGLER
�,J� �7 /�
DESIGNER 2: J. NICKELSON
1 MORRISON DRAWN BY: J. HOCKADAY
T=,�T J�A T•t R E,INc 1 Ly� CHECKED BY: T. MEYER
.� 1A^vtm�r�o�,.ar �
wnn Enpinm'sW.Inc
ISSUE DATE DESCRIPTION ,PROJECT NUMBER i 0000000000681 i4