Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Chris Kukulski, City Manager
Anna Rosenberry, Finance Director
SUBJECT: Adoption of the Water Fund Capital Improvement Plan (CIP) for
FY13-17
AGENDA ITEM TYPE: Consent
MEETING DATE: December 12, 2011
RECOMMENDATION: Adoption of the Water Fund Capital Improvement Plan (CIP)
for FY13-17.
BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital
Improvements Plan and submit it to the Commission by December 15th. On November 21st, the
Commission held a policy discussion to review the proposed Water Fund Capital
Improvement Plan (CIP) for FY13-17. As a result of that review, the attached CIP is
recommended for approval.
UNRESOLVED ISSUES: During the policy discussion, the City’s Vehicle/Equipment
Replacement Policy was discussed, (Administrative Order 2010-04, found at:
http://weblink.bozeman.net/WebLink8/0/doc/41332/Page1.aspx) Specifically, the need to amend
section F and the amount of mileage to be reached before we plan to replace a vehicle. We agree
that this section should be amended and will be preparing a change to the policy that will be in
effect for the Fiscal Year 13 budget development.
ALTERNATIVES: As suggested by the City Commission.
FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the
Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for
FY13.
Report compiled on: November December 2, 2011
Attached: Water Fund CIP
Water FundCapital Improvement PlanFinancial SummaryCurrent YearFY12FY13FY14 FY15 FY16 FY17UnscheduledProjected Beginning Reserve Balance Dedicated to CIP 3,375,761$ 2,619,648$ 78,216$ 2,221,258$ 3,059,033$ 3,966,902$ ‐$ Plus: Water Revenues Dedicated to CIP1,593,103$ 1,664,792$ 1,739,708$ 1,817,995$ 1,899,804$ 1,975,797$ ‐$ Plus: WTP Loan Proceeds8,000,000$ 7,000,000$ 1,500,000$ ‐$ Less: Scheduled CIP Project Costs(10,349,216)$ (11,206,224)$ (1,096,665)$ (980,220)$ (991,935)$ (1,119,645)$ ‐$ Projected Year‐End Cash Dedicated to CIP2,619,648$ 78,216$ 2,221,258$ 3,059,033$ 3,966,902$ 4,823,054$ ‐$ Assumptions Made for Revenue Estimates:Current YearFY12FY13FY14FY15 FY16 FY17Estimated Annual Water Revenues6,098,000$ 6,372,410$ 6,659,168$ 6,958,831$ 7,271,978$ 7,599,217$ Estimated Annual Increase4.5%4.5%4.5%4.5% 4.5%4%Total Estimated Revenues6,372,410$ 6,659,168$ 6,958,831$ 7,271,978$ 7,599,217$ 7,903,186$ Current Revenues Dedicated to CIP %25.0%25.0% 25.0% 25.0% 25.0% 25.0% Plus: Increase Dedicated to CIP0.0%0.0%0.0%0.0% 0.0%0.0% Total % Dedicated to CIP25.0%25.0% 25.0% 25.0% 25.0% 25.0%TtlEti tdRDdi tdt CIP1 593 103$1 664 792$1 739 708$1 817 995$1 899 804$1 975 797$ProjectedProjectedTotal Estimated Revenues Dedicated to CIP1,593,103$ 1,664,792$ 1,739,708$ 1,817,995$ 1,899,804$ 1,975,797$ 12,000,00010,000,0008,000,0006,000,0004,000,0002,000,0000Water Fund Projects & Equipment Page 1117
CIP PROJECT FUNDPROJ.DEPARTMENPROJECT NAMEFY13FY14FY16UnscheduledFY15FY17Water FundPW01WATER OPSSHOPS FACILITY EXPANSION PLAN$10,000W03WATER OPSENGINEERING/DESIGN for ANNUAL WATER PIPE REPLACEMENT PROGRAM$22,500$22,500$22,500$22,500W04‐13WATER OPSWATER PIPE REPLACEMENT PROGRAM$1,205,720W04‐14WATER OPSWATER PIPE REPLACEMENT PROGRAM$974,165W04‐15WATER OPSWATER PIPE REPLACEMENT PROGRAM$947,720W04‐16WATER OPSWATER PIPE REPLACEMENT PROGRAM$969,435W04‐17WATER OPSWATER PIPE REPLACEMENT PROGRAM$1,097,145W12WATER OPS1 TON TRUCK WITH HOIST$46,794W17WATER OPS1/2 TON TRUCK$37,856W24WATER OPSFixed Base Meter Read System$90,000$60,000WW23WATER OPSMINI EXCAVATOR & TRAILER$25,000W07WATER PLANTWATER TREATMENT PLANT 22MG MEMBRANE PLANT$9,800,854W25WATER PLANTReplacement Vehicle$40,000Summary for Water Fund (13 items)Totals by year:$11,206,224 $1,096,665 $980,220$991,935FY13FY14FY15FY16UnscheduledFY17$1,119,645Page 2118
CIP Project Fund
Water Fund
PROJECT NUMBER
PW01
DEPARTMENT
WATER OPS
PROJECT NAME
SHOPS FACILITY EXPANSION PLAN
FY13 FY14 FY15
$10,000
FY16 Unscheduled
DESCRIPTION OF PROJECT
The construction of the new Vehicle Maintenance Shop at the Lower Yards on Rouse Avenue in FY10/FY11 was Phase I in expanding and
improving our ability to service equipment, store vehicles, and provide work space for Public Works, Parks, and Facilitiy services. Questions
remain about the long-term plan for construction, location, and expansion for: Streets, Sign & Signal, Forestry, Water/Sewer Operations, Solid
Waste Collection & Recycling, Facilities, and Parks & Cemetery departments. This project would develop a master plan. In scheduling this
project, we are recommending waiting until after the Vehicle Maintenance Division is relocated to its new shop and the interior improvements
are made to the Shop at Rouse and Tamarack Street for the remaining divisions.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
From related divisions: General Fund 20% ($10,000), Water Fund 20% ($10,000), Wastewater Fund 20% ($10,000), Street
Maintenance Fund 20% ($10,000), Solid Waste Fund 20% ($10,000).
New
Replacement
Equipment
Project
FY17
Page 3
119
CIP Project Fund
Water Fund
PROJECT NUMBER
W03
DEPARTMENT
WATER OPS
PROJECT NAME
ENGINEERING/DESIGN for ANNUAL WATER PIPE REPLACEMENT PROGRAM
FY13 FY14
$22,500
FY15
$22,500
FY16
$22,500
Unscheduled
DESCRIPTION OF PROJECT
This item provides for design work to be completed every year, in anticipation of the Annual System Upgrades. As the Water Operations
Division operates the existing system, maintenance projects become apparent. Given our knowledge of system conditions today, the following
projects are candidates for design funding and were identified in the Facility Plan: 1. South 8th Avenue , 2. Koch: Lindley to Bozeman, 3. Lindley:
Olive to Koch, 4. S. Bozeman: Olive to Story As annual operations occur, other more-urgent projects may be identified and designed under this
project heading.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Provides for the design of necessary water system maintenance work.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Water Utility Fund
New
Replacement
Equipment
Project
FY17
$22,500
Page 4
120
CIP Project Fund
Water Fund
PROJECT NUMBER
W04-13
DEPARTMENT
WATER OPS
PROJECT NAME
WATER PIPE REPLACEMENT PROGRAM
FY13
$1,205,720
FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
PROJECT AREA: Mendenhall St: N. 8th Ave - N. Broadway Ave. The timing is important so that we can mill and overlay Mendehall with Gas
Tax Funds, as soon as possible after the water pipes are replaced.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Provides for the construction of necessary water system maintenance work.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Incremental increases in general maintenance costs. Current cost estimate of $12,500
per water-main mile maintained annually.
FUNDING SOURCES
100% Water Utility Fund
New
Replacement
Equipment
Project
FY17
Page 5
121
CIP Project Fund
Water Fund
PROJECT NUMBER
W04-14
DEPARTMENT
WATER OPS
PROJECT NAME
WATER PIPE REPLACEMENT PROGRAM
FY13 FY14
$974,165
FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
PROJECT AREA: N. Montana Ave: E. Lamme St - E. Peach St
N. Montana Ave: E. Tamarack St - S. 34'
N. Montana Ave: E. Peach St - E. Tamarack St
E. Story St: S. Tracy Ave - S. Church Ave
Dell Place: Alderson Ct - E. Story St. The timing of this project is based on our need to mill-overlay N. Montana Ave.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Provides for the construction of necessary water system maintenance work.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Incremental increases in general maintenance costs. Current cost estimate of $12,500
per water-main mile maintained annually.
FUNDING SOURCES
100% Water Utility Fund
New
Replacement
Equipment
Project
FY17
Page 6
122
CIP Project Fund
Water Fund
PROJECT NUMBER
W04-15
DEPARTMENT
WATER OPS
PROJECT NAME
WATER PIPE REPLACEMENT PROGRAM
FY13 FY14 FY15
$947,720
FY16 Unscheduled
DESCRIPTION OF PROJECT
PROJECT AREA: S. Grand Ave: W. Garfield St - W. College St
S. Grand Ave: W College St - W. Main St. The timing of this project is critical to our need to mill-overlay S. Grand Ave.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Provides for the construction of necessary water system maintenance work.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Incremental increases in general maintenance costs. Current cost estimate of $12,500
per water-main mile maintained annually.
FUNDING SOURCES
100% Water Utility Fund
New
Replacement
Equipment
Project
FY17
Page 7
123
CIP Project Fund
Water Fund
PROJECT NUMBER
W04-16
DEPARTMENT
WATER OPS
PROJECT NAME
WATER PIPE REPLACEMENT PROGRAM
FY13 FY14 FY15 FY16
$969,435
Unscheduled
DESCRIPTION OF PROJECT
PROJECT AREA: S. Tracy Ave: W. Garfield St - E. Story St
N. Willson Ave: W. Lamme St - W. Short St
W. Babcock St: S. 10th Ave - S. 8th Ave
N. Montana Ave: E. Tamarack St - N End of Existing.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Provides for the construction of necessary water system maintenance work.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Incremental increases in general maintenance costs. Current cost estimate of $12,500
per water-main mile maintained annually.
FUNDING SOURCES
100% Water Utility Fund
New
Replacement
Equipment
Project
FY17
Page 8
124
CIP Project Fund
Water Fund
PROJECT NUMBER
W04-17
DEPARTMENT
WATER OPS
PROJECT NAME
WATER PIPE REPLACEMENT PROGRAM
FY13 FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
PROJECT AREA: W Olive St: S. 5th Ave - S. 3rd Ave
W. Olive St: S. 6th Ave - S. 5th Ave
N. Grand Ave: W. Lamme St - W. Peach St
N. 5th Ave: W. Aspen St - W. Tamarack St
S. 3rd Ave: W. Harrison Ave - W. Curtiss St
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Provides for the construction of necessary water system maintenance work.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Incremental increases in general maintenance costs. Current cost estimate of $12,500
per water-main mile maintained annually.
FUNDING SOURCES
100% Water Utility Fund
New
Replacement
Equipment
Project
FY17
$1,097,145
Page 9
125
CIP Project Fund
Water Fund
PROJECT NUMBER
W07
DEPARTMENT
WATER PLANT
PROJECT NAME
WATER TREATMENT PLANT 22MG MEMBRANE PLANT
FY13
$9,800,854
FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
This new Membrane Filter Treatment Plant is the preferred water treatment alternative identified in the adopted Water Facility Plan. It is
recommended to be built with an initial configuration providing 22MGD of water treatment capacity, with future expansion capability to
36MGD. This addresses both the 10- and 20- year capacity requirement forecast for the City’s water treatment system. It is expected to be
online by October 2013.
The current 15MGD WTP equipment is nearing the end of its useful life; the plant’s direct filtration treatment process, while effective most of
the year, becomes only marginally effective during spring runoff or flash thunderstorms in the watershed, dropping plant efficiency as low as
70%; and, rapid population growth and expansion of city water services is increasing demand for water. The current plant capacity may be
exceeded in as few as five years.
ALTERNATIVES CONSIDERED
The Water Facility Plan considered numerous alternatives for water treatment. This was identified as the preferred alternative
in the adopted plan.
ADVANTAGES OF APPROVAL
Planning for increased water supply to meet growing demands and to replace existing equipment that is at the end of its useful
life. The New Plant will be located at the current site in a 49,620 sf building located directly north of the plant. It will include pre-
oxidation, coagulation, flocculation, settling, strainers, membrane flitration, dissolved air flotation thickeners, disinfection, PH
adjustment for corrosion control, drying beds, lagoon, and ancillary facilities.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
This plant is not estimated require an addition to existing plant staff. Annual O&M costs = est. $1,735,901 (including existing staff
plus new plant expenses). None of these costs can be paid with Impact Fees.
FUNDING SOURCES
The most recent estimate of plant costs was provided in the Fall of 2010, at a total of $40.7 Million. It is estimated that 33% of
total project costs (approx $13.4 Milion) are related to capacity expansion of the plant, and therefore are eligible for impact fee
funding. TOTAL PROEJCT: FY08 Pilot Testing: $200,000. FY09,FY10, FY11 Design and Membrane equipment deposit,
construction $7,267,000. FY12 $16,460,000. FY13 $16,460,000.
New
Replacement
Equipment
Project
FY17
Page 10
126
CIP Project Fund
Water Fund
PROJECT NUMBER
W12
DEPARTMENT
WATER OPS
PROJECT NAME
1 TON TRUCK WITH HOIST
FY13
$46,794
FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
This request replaces asset # 2914, a 2001 Dodge 1-ton with a 1-ton truck with a hoist. This truck is used daily in both water and sewer
operations to transport personnel and equipment, and responds to water and sewer line emergencies. This particular truck has proven to be a
very unreliable vehicle; the transmission has been replaced twice. Because of reliability problems and maintenance costs, we are recommending
replacing this vehicle sooner than customary. Flex Fuel Vehicles will be purchased.
ALTERNATIVES CONSIDERED
Keep the trucks and spend maintenance dollars to have truck serviceable
ADVANTAGES OF APPROVAL
Advantages to the City for approving this request include savings on fuel. The new vehicles will improve safety of crews, there
would be lower repair costs and it would help maintain current operations levels.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Water Utility Fund
New
Replacement
Equipment
Project
FY17
Page 11
127
CIP Project Fund
Water Fund
PROJECT NUMBER
W17
DEPARTMENT
WATER OPS
PROJECT NAME
1/2 TON TRUCK
FY13
$37,856
FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
This vehicle replaces current asset #2647, a 1998 Chevy 4x4. It will be replaced once it approaches 100,000 miles, estimated to be FY13. This
truck is used in our water valve operation program and is used in various light duty jobs.
ALTERNATIVES CONSIDERED
Continue to use older vehicle which is becoming unreliable and costly to maintain.
ADVANTAGES OF APPROVAL
Increased reliability and safety for staff and water operations.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Operating and repair costs are expected to be lower than the existing vehicle.
FUNDING SOURCES
100% Water Fund
New
Replacement
Equipment
Project
FY17
Page 12
128
CIP Project Fund
Water Fund
PROJECT NUMBER
W24
DEPARTMENT
WATER OPS
PROJECT NAME
Fixed Base Meter Read System
FY13
$90,000
FY14
$60,000
FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
This system will consist of fixed radio reMivers that are placed on city structures throughout town. The meters that are currently in place
constantly transmit meter read data, instead of driving once a month around the city collecting reads, the receivers will automatically collect the
data daily and transmit that either through the intranet or cell phone modems to finance and the city shops. We plan on deploying the receivers
starting in FY 13, with completion in FY14. Radio studies have the number of receivers at 14 but our vendor states with a new model of
receiver coming out next year that number should go below 10.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Allows daily readings of the water meters and will allow staff to quickly respond to potential water leaks, meter tampering and
backflow events. Will eliminate driving in the areas that are being read by the fixed base units. This will allow us to contact
customers at the start of a leak event and save both money and water.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Water Utility Fund
New
Replacement
Equipment
Project
FY17
Page 13
129
CIP Project Fund
Water Fund
PROJECT NUMBER
W25
DEPARTMENT
WATER PLANT
PROJECT NAME
Replacement Vehicle
FY13 FY14
$40,000
FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
Replacement 4-wheel Drive ½ Ton pick-up, replaces 1997 ¾ ton pick-up that currently has 97,400 miles
ALTERNATIVES CONSIDERED
Keep existing unit in service
ADVANTAGES OF APPROVAL
More reliable, more fuel efficient vehicle
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
none
FUNDING SOURCES
Water Rates
New
Replacement
Equipment
Project
FY17
Page 14
130
CIP Project Fund
Water Fund
PROJECT NUMBER
WW23
DEPARTMENT
WATER OPS
PROJECT NAME
MINI EXCAVATOR & TRAILER
FY13
$25,000
FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
This piece of equipment due to it’s small size, is very useful in excavating where the backhoe cannot fit or due to it’s weight will damage
sidewalks and lawns. This purchase of equipment and trailer will also be shared with the Streets Department.
ALTERNATIVES CONSIDERED
Continue to rent this piece of equipment
ADVANTAGES OF APPROVAL
Give’s both the Water and Street Departments a piece of equipment that can work in small spaces
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: Operating and repair costs are expected to be lower than a normal size backhoe
FUNDING SOURCES
Total Cost $75,000, split 3-ways between Water Fund, Wastewater Fund, and Street Maintenance Fund ($25,000 each.)
New
Replacement
Equipment
Project
FY17
Page 15