Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Chris Kukulski, City Manager
Anna Rosenberry, Finance Director
SUBJECT: Adoption of the Solid Waste Fund Capital Improvement Plan (CIP) for
FY13-17
AGENDA ITEM TYPE: Consent
MEETING DATE: December 12, 2011
RECOMMENDATION: Adoption of the Solid Waste Fund Capital Improvement Plan
(CIP) for FY13-17.
BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital
Improvements Plan and submit it to the Commission by December 15th. On November 21st, the
Commission held a policy discussion to review the proposed Solid Waste Fund Capital
Improvement Plan (CIP) for FY13-17. As a result of that review, the attached CIP is
recommended for approval.
UNRESOLVED ISSUES: The city is currently underway with a Solid Waste Rate Study.
The results of that study may recommend changes to capital replacement policies and funding
related to capital. If the study makes recommendations for substantial changes to capital
policies, we will prepare a revised CIP scheduled to the Commission for adoption this spring.
ALTERNATIVES: As suggested by the City Commission.
FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the
Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for
FY13.
Report compiled on: November December 2, 2011
Attached: Solid Waste Fund CIP
151
Solid Waste Collection & RecyclingCapital Improvement PlanFinancial SummaryCurrent YearFY12FY13FY14 FY15 FY16 FY17Projected Beginning Reserve Balance Dedicated to CIP238,000$ 487,681$ 532,378$ 282,027$ 436,598$ 207,708$ Plus: Revenues Dedicated to CIP249,681$ 249,681$ 274,649$ 302,613$ 331,110$ 360,145$ Less: Scheduled CIP Project Costs‐$ (204,984)$ (525,000)$ (148,043)$ (560,000)$ (360,000)$ Projected Year‐End Cash Dedicated to CIP487,681$ 532,378$ 282,027$ 436,598$ 207,708$ 207,853$ Assumptions Made for Revenue Estimates:Current YearFY12FY13FY14 FY15 FY16 FY17Estimated Annual Revenues2,496,811$ 2,496,811$ 2,496,811$ 2,496,811$ 2,521,779$ 2,546,997$ Estimated Annual Increase in Revenues ‐ 0%0%1%1%1%Total Estimated Revenues2,496,811$ 2,496,811$ 2,496,811$ 2,521,779$ 2,546,997$ 2,572,467$ Current Revenues Dedicated to CIP %10.0%10.0% 10.0% 11.0% 12.0% 13.0% Plus: Increase Dedicated to CIP0.0%0.0%1.0% 1.0% 1.0% 1.0% Total % Dedicated to CIP10.0%10.0% 11.0% 12.0% 13.0% 14.0%ProjectedProjectedTotal Estimated Revenues Dedicated to CIP249,681$ 249,681$ 274,649$ 302,613$ 331,110$ 360,145$ 600,000500,000400,000300,000200,000100,0000FY13 FY14 FY15 FY16 FY17 UnscheduledSolid Waste Projects & Equipment Page 1152
CIP PROJECT FUNDPROJ.DEPARTMENPROJECT NAMEFY13FY14FY16UnscheduledFY15FY17Solid Waste CollectionPW01COLLECTIONSHOPS FACILITY EXPANSION PLAN$10,000SW26COLLECTIONSIDE LOAD PACKER ‐ REPLACEMENT$134,984SW27COLLECTIONFRONT LOAD TRUCK ‐ REPLACEMENT TRUCK$250,000SW28COLLECTIONSIDE LOAD TRUCK ‐ REPLACEMENT TRUCK$275,000SW30COLLECTIONSIDE LOAD PACKER ‐ REPLACEMENT$138,043SW31COLLECTIONSIDE LOAD REPLACEMENT TRUCK$290,000SW32COLLECTIONFRONTLOAD REPLACEMENT TRUCK$270,000SW33COLLECTIONSIDE LOAD PACKER ‐ REPLACEMENT`$140,000SW34CURBSIDEBack‐Up Recycling Truck$70,000SW35CURBSIDECurbside Recycling Truck ‐ Replacement$220,000Summary for Solid Waste Collection (10 items)Totals by year:$204,984 $525,000 $148,043$560,000FY13FY14FY15FY16UnscheduledFY17$360,000Page 2153
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
PW01
DEPARTMENT
COLLECTION
PROJECT NAME
SHOPS FACILITY EXPANSION PLAN
FY13 FY14 FY15
$10,000
FY16 Unscheduled
DESCRIPTION OF PROJECT
The construction of the new Vehicle Maintenance Shop at the Lower Yards on Rouse Avenue in FY10/FY11 was Phase I in expanding and
improving our ability to service equipment, store vehicles, and provide work space for Public Works, Parks, and Facilitiy services. Questions
remain about the long-term plan for construction, location, and expansion for: Streets, Sign & Signal, Forestry, Water/Sewer Operations, Solid
Waste Collection & Recycling, Facilities, and Parks & Cemetery departments. This project would develop a master plan. In scheduling this
project, we are recommending waiting until after the Vehicle Maintenance Division is relocated to its new shop and the interior improvements
are made to the Shop at Rouse and Tamarack Street for the remaining divisions.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
From related divisions: General Fund 20% ($10,000), Water Fund 20% ($10,000), Wastewater Fund 20% ($10,000), Street
Maintenance Fund 20% ($10,000), Solid Waste Fund 20% ($10,000).
New
Replacement
Equipment
Project
FY17
Page 3
154
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW26
DEPARTMENT
COLLECTION
PROJECT NAME
SIDE LOAD PACKER - REPLACEMENT
FY13
$134,984
FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
The division is averaging 2,000 hours per year on the side load trucks. The chassis should be good for 12,000 hours with proper maintenance.
Therefore replacing the packer bodies every four years will save about $140,000 and maximize the value of the chassis. The packers are what
generally wear out first. The grabber arm functions around 400 repetitions per day times 4 days per week is 1,600 reps per week times 4.33
equals 7,000 reps per month or 93,528 per year. With a life expectancy of four years that is 336,000 reps.
Old packer will be traded in or saved for parts.
ALTERNATIVES CONSIDERED
Buy new trucks with new chassis and body. Continue to operate with increasing repair costs, down time lowering resale value.
Lease new truck and packer for $75,000 annually if one is available.
ADVANTAGES OF APPROVAL
Saves $140,000 every 4 years per side load truck. With four side load trucks and 2 back up trucks, this adds up quickly.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: $10,000
FUNDING SOURCES
100% Solid Waste Division Enterprise Funds.
New
Replacement
Equipment
Project
FY17
Page 4
155
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW27
DEPARTMENT
COLLECTION
PROJECT NAME
FRONT LOAD TRUCK - REPLACEMENT TRUCK
FY13 FY14
$250,000
FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
This truck is a replacement on the CIP for the collection of residential and commercial refuse. The new truck will ensure continued efficient,
cost-effective refuse collection that will allow the Division to meet the demands of a growing city while maintaining the standards the Bozeman
residents expect.
(replacing Asset #3319, 2005 Autocar)
ALTERNATIVES CONSIDERED
To use existing truck that will have more than 10,000 hours of hard use. Repair costs will continue to increase and the resale
value will continue to decrease. The truck will also take an inordinate amount of shop time to maintain.
ADVANTAGES OF APPROVAL
Maximize resale value, Minimize repairs, parts, (if available), and down time, Improve safety and collection efficiency, Keeps the
Division up with growth rates.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: $12,000
FUNDING SOURCES
100% Solid Waste Division Enterprise Funds.
New
Replacement
Equipment
Project
FY17
Page 5
156
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW28
DEPARTMENT
COLLECTION
PROJECT NAME
SIDE LOAD TRUCK - REPLACEMENT TRUCK
FY13 FY14
$275,000
FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
Replacement of a side load chassis. Asset #3314. The current truck will have 12,000 - 14,000 hours on the chassis and 5,000 hours on the
packer body.
ALTERNATIVES CONSIDERED
Continue to use asset beyond its useful service life, resulting in significantly increased maintenance costs and down time.
ADVANTAGES OF APPROVAL
Providing excellence in public service to 7,050 residential customers
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: $30,000
FUNDING SOURCES
100% Solid Waste Enterprise Funds.
New
Replacement
Equipment
Project
FY17
Page 6
157
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW30
DEPARTMENT
COLLECTION
PROJECT NAME
SIDE LOAD PACKER - REPLACEMENT
FY13 FY14 FY15
$138,043
FY16 Unscheduled
DESCRIPTION OF PROJECT
This item is to replace the garbage packer on Asset #3452. The division is averaging 2,000 hours per year on the side load trucks. The chassis
should be good for 12,000-14,000 hours with proper maintenance. Therefore replacing the packer bodies every four years will save about
$140,000 and maximize the value of the chassis. The packers are what generally wear out first. The grabber arm functions around 400
repetitions per day times 4 days per week is 1,600 reps per week times 4.33 equals 7,000 reps per month or 93,528 per year. With a life
expectancy of four years that is 336,000 reps.
ALTERNATIVES CONSIDERED
Buy new trucks with new chassis and body. Continue to operate with increasing repair costs, down time lowering resale value.
Lease new truck and packer for $75,000 annually if one is available.
ADVANTAGES OF APPROVAL
Saves $140,000 every 4 years per side load truck. With four side load trucks and 2 backup trucks, this adds up quickly.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: $10,000
FUNDING SOURCES
100% Solid Waste Division Enterprise Funds.
New
Replacement
Equipment
Project
FY17
Page 7
158
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW31
DEPARTMENT
COLLECTION
PROJECT NAME
SIDE LOAD REPLACEMENT TRUCK
FY13 FY14 FY15 FY16
$290,000
Unscheduled
DESCRIPTION OF PROJECT
Replacement of a current front-line residential collection truck, Asset #3367. This truck will will have over 12,000 hours at time of replacement.
ALTERNATIVES CONSIDERED
Continue to operate the existing truck with increasing operating and maintenance costs.
Lease a new, (or used), truck.
ADVANTAGES OF APPROVAL
Allow the division to continue to provide excellent service to over 7000 customers. Increased fuel economy; Reduced exhaust
emissions; Less down time; Increased productivity
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Operating and maintenance costs should be reduced by replacing an aging unit with a new more fuel efficient, cleaner running
truck
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY17
Page 8
159
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW32
DEPARTMENT
COLLECTION
PROJECT NAME
FRONTLOAD REPLACEMENT TRUCK
FY13 FY14 FY15 FY16
$270,000
Unscheduled
DESCRIPTION OF PROJECT
This truck is a replacement for Asset #3421; the collection of residential and commercial refuse. The new truck will ensure continued efficient,
cost-effective refuse collection that will allow the Division to meet the demands of a growing city while maintaining the standards the Bozeman
residents expect.
ALTERNATIVES CONSIDERED
To use existing truck that will have more than 10,000 hours of hard use. Repair costs will continue to increase and the resale
value will continue to decrease. The truck will also take an inordinate amount of shop time to maintain.
ADVANTAGES OF APPROVAL
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Maintenance costs: $12,000/year
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY17
Page 9
160
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW33
DEPARTMENT
COLLECTION
PROJECT NAME
SIDE LOAD PACKER - REPLACEMENT`
FY13 FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
This item is the replacement of equipment on one of our side-loading garbage trucks. It will replace the 2008 Curbtenter Packer on Asset
#3455 - 2008 Craine Carrier Chassis. The chassis should be good for 12,000-14,000 hours with proper maintenance. Therefore replacing the
packer bodies every four years will save about $140,000 and maximize the value of the chassis. The packers are what generally wear out first.
The grabber arm functions around 400 repetitions per day times 4 days per week is 1,600 reps per week times 4.33 equals 7,000 reps per
month or 93,528 per year. With a life expectancy of four years that is 336,000 reps.
ALTERNATIVES CONSIDERED
Buy new trucks with new chassis and body. Continue to operate with increasing repair costs, down time lowering resale value.
Lease new truck and packer for $75,000 annually if one is available.
ADVANTAGES OF APPROVAL
Saves $140,000 every 4 years per side load truck. With four side load trucks and 2 backup trucks, this adds up quickly.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: $10,000
FUNDING SOURCES
100% Solid Waste Division Enterprise Funds.
New
Replacement
Equipment
Project
FY17
$140,000
Page 10
161
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW34
DEPARTMENT
CURBSIDE
PROJECT NAME
Back-Up Recycling Truck
FY13
$70,000
FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
Purchase of a used recycling truck for back-up duties. Currently, we have one Curbside Recycling Truck. When it breaks down, it is extremely
difficult to serve customers. This equipment would help ensure that curbside recyling collection can still happen when the truck is out-of-service.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Continuity of operations when the primary equipment fails.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Solid Waste Enterprise Fund
New
Replacement
Equipment
Project
FY17
Page 11
162
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW35
DEPARTMENT
CURBSIDE
PROJECT NAME
Curbside Recycling Truck - Replacement
FY13 FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
This would be a new chassis and new sideload recycling body, to replace the exising Curbside Recycling Truck, which is expected to be at the
end of its useful life in 2017.
ALTERNATIVES CONSIDERED
Lease
ADVANTAGES OF APPROVAL
To maintain a level of service to the curbside recycling customers
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Maintenance costs are $15,000/year & Operating costs are $15,000/year
FUNDING SOURCES
Solid Waste Enterprise Fund
New
Replacement
Equipment
Project
FY17
$220,000
Page 12
163