Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Chris Kukulski, City Manager
Anna Rosenberry, Finance Director
SUBJECT: Presentation of parts of the Recommended Capital Improvements Plan
(CIP) for FY2013-2017
AGENDA ITEM TYPE: Policy Discussion
MEETING DATE: November 21, 2011
RECOMMENDATION: Listen to Presentation, ask questions and take public comment.
Direct staff to bring back CIP for adoption, with or without changes, on a future Consent or
Action Item agenda.
BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital
Improvements Plan and submit it to the Commission by December 15th. The Commission
usually then holds a public hearing and adopts the plan in parts, over the course of a number of
meetings.
This year, we have made a concerted effort to prepare the Recommended Plan so that the
Commission could hold hearings and adopt it well in advance of upcoming budget development,
and prior to the holidays, if they were are inclined. We have also continued to use the database
system that was developed last year. If you would like to see changes to the plan format, please
feel free to suggest them. We are trying to continuously improve this important document and
process.
49
Tentative Presentation Order:
November 14: Begin Presentations – If we are unable to cover all of these areas,
move them to a future agenda.
Building Inspection Fund CIP
Fire Equipment & Capital Replacement Fund CIP
Tree Maintenance Fund CIP
Street Maintenance CIP
Curb Replacement CIP
Street Reconstruction CIP
November 21: Water Fund CIP
Wastewater Fund CIP
Solid Waste Fund CIP
December 5: Impact Fee CIP’s (Water/Sewer/Street/Fire)
• These are being reviewed by the Impact Fee Advisory
Board. They have recommended adoption of a Water,
Wastewater and Fire Impact Fee CIP. They will vote on
the recommended Street Impact Fee CIP at their meeting
on November 10.
December 12: General Fund CIP
UNRESOLVED ISSUES: None.
ALTERNATIVES: As suggested by the City Commission.
FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the
Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for
FY13.
Report compiled on: November 4, 2011
50
Water FundCapital Improvement PlanFinancial SummaryCurrent YearFY12FY13FY14 FY15 FY16 FY17UnscheduledProjected Beginning Reserve Balance Dedicated to CIP 3,375,761$ 2,619,648$ 78,216$ 2,221,258$ 3,059,033$ 3,966,902$ ‐$ Plus: Water Revenues Dedicated to CIP1,593,103$ 1,664,792$ 1,739,708$ 1,817,995$ 1,899,804$ 1,975,797$ ‐$ Plus: WTP Loan Proceeds8,000,000$ 7,000,000$ 1,500,000$ ‐$ Less: Scheduled CIP Project Costs(10,349,216)$ (11,206,224)$ (1,096,665)$ (980,220)$ (991,935)$ (1,119,645)$ ‐$ Projected Year‐End Cash Dedicated to CIP2,619,648$ 78,216$ 2,221,258$ 3,059,033$ 3,966,902$ 4,823,054$ ‐$ Assumptions Made for Revenue Estimates:Current YearFY12FY13FY14FY15 FY16 FY17Estimated Annual Water Revenues6,098,000$ 6,372,410$ 6,659,168$ 6,958,831$ 7,271,978$ 7,599,217$ Estimated Annual Increase4.5%4.5%4.5%4.5% 4.5%4%Total Estimated Revenues6,372,410$ 6,659,168$ 6,958,831$ 7,271,978$ 7,599,217$ 7,903,186$ Current Revenues Dedicated to CIP %25.0%25.0% 25.0% 25.0% 25.0% 25.0% Plus: Increase Dedicated to CIP0.0%0.0%0.0%0.0% 0.0%0.0% Total % Dedicated to CIP25.0%25.0% 25.0% 25.0% 25.0% 25.0%TtlEti tdRDdi tdt CIP1 593 103$1 664 792$1 739 708$1 817 995$1 899 804$1 975 797$ProjectedProjectedTotal Estimated Revenues Dedicated to CIP1,593,103$ 1,664,792$ 1,739,708$ 1,817,995$ 1,899,804$ 1,975,797$ 12,000,00010,000,0008,000,0006,000,0004,000,0002,000,0000Water Fund Projects & Equipment Page 151
CIP PROJECT FUNDPROJ.DEPARTMENPROJECT NAMEFY13FY14FY16UnscheduledFY15FY17Water FundPW01WATER OPSSHOPS FACILITY EXPANSION PLAN$10,000W03WATER OPSENGINEERING/DESIGN for ANNUAL WATER PIPE REPLACEMENT PROGRAM$22,500$22,500$22,500$22,500W04‐13WATER OPSWATER PIPE REPLACEMENT PROGRAM$1,205,720W04‐14WATER OPSWATER PIPE REPLACEMENT PROGRAM$974,165W04‐15WATER OPSWATER PIPE REPLACEMENT PROGRAM$947,720W04‐16WATER OPSWATER PIPE REPLACEMENT PROGRAM$969,435W04‐17WATER OPSWATER PIPE REPLACEMENT PROGRAM$1,097,145W12WATER OPS1 TON TRUCK WITH HOIST$46,794W17WATER OPS1/2 TON TRUCK$37,856W24WATER OPSFixed Base Meter Read System$90,000$60,000WW23WATER OPSMINI EXCAVATOR & TRAILER$25,000W07WATER PLANTWATER TREATMENT PLANT 22MG MEMBRANE PLANT$9,800,854W25WATER PLANTReplacement Vehicle$40,000Summary for Water Fund (13 items)Totals by year:$11,206,224 $1,096,665 $980,220$991,935FY13FY14FY15FY16UnscheduledFY17$1,119,645Page 252
CIP Project Fund
Water Fund
PROJECT NUMBER
PW01
DEPARTMENT
WATER OPS
PROJECT NAME
SHOPS FACILITY EXPANSION PLAN
FY13 FY14 FY15
$10,000
FY16 Unscheduled
DESCRIPTION OF PROJECT
The construction of the new Vehicle Maintenance Shop at the Lower Yards on Rouse Avenue in FY10/FY11 was Phase I in expanding and
improving our ability to service equipment, store vehicles, and provide work space for Public Works, Parks, and Facilitiy services. Questions
remain about the long-term plan for construction, location, and expansion for: Streets, Sign & Signal, Forestry, Water/Sewer Operations, Solid
Waste Collection & Recycling, Facilities, and Parks & Cemetery departments. This project would develop a master plan. In scheduling this
project, we are recommending waiting until after the Vehicle Maintenance Division is relocated to its new shop and the interior improvements
are made to the Shop at Rouse and Tamarack Street for the remaining divisions.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
From related divisions: General Fund 20% ($10,000), Water Fund 20% ($10,000), Wastewater Fund 20% ($10,000), Street
Maintenance Fund 20% ($10,000), Solid Waste Fund 20% ($10,000).
New
Replacement
Equipment
Project
FY17
Page 3
53
CIP Project Fund
Water Fund
PROJECT NUMBER
W03
DEPARTMENT
WATER OPS
PROJECT NAME
ENGINEERING/DESIGN for ANNUAL WATER PIPE REPLACEMENT PROGRAM
FY13 FY14
$22,500
FY15
$22,500
FY16
$22,500
Unscheduled
DESCRIPTION OF PROJECT
This item provides for design work to be completed every year, in anticipation of the Annual System Upgrades. As the Water Operations
Division operates the existing system, maintenance projects become apparent. Given our knowledge of system conditions today, the following
projects are candidates for design funding and were identified in the Facility Plan: 1. South 8th Avenue , 2. Koch: Lindley to Bozeman, 3. Lindley:
Olive to Koch, 4. S. Bozeman: Olive to Story As annual operations occur, other more-urgent projects may be identified and designed under this
project heading.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Provides for the design of necessary water system maintenance work.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Water Utility Fund
New
Replacement
Equipment
Project
FY17
$22,500
Page 4
54
CIP Project Fund
Water Fund
PROJECT NUMBER
W04-13
DEPARTMENT
WATER OPS
PROJECT NAME
WATER PIPE REPLACEMENT PROGRAM
FY13
$1,205,720
FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
PROJECT AREA: Mendenhall St: N. 8th Ave - N. Broadway Ave. The timing is important so that we can mill and overlay Mendehall with Gas
Tax Funds, as soon as possible after the water pipes are replaced.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Provides for the construction of necessary water system maintenance work.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Incremental increases in general maintenance costs. Current cost estimate of $12,500
per water-main mile maintained annually.
FUNDING SOURCES
100% Water Utility Fund
New
Replacement
Equipment
Project
FY17
Page 5
55
CIP Project Fund
Water Fund
PROJECT NUMBER
W04-14
DEPARTMENT
WATER OPS
PROJECT NAME
WATER PIPE REPLACEMENT PROGRAM
FY13 FY14
$974,165
FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
PROJECT AREA: N. Montana Ave: E. Lamme St - E. Peach St
N. Montana Ave: E. Tamarack St - S. 34'
N. Montana Ave: E. Peach St - E. Tamarack St
E. Story St: S. Tracy Ave - S. Church Ave
Dell Place: Alderson Ct - E. Story St. The timing of this project is based on our need to mill-overlay N. Montana Ave.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Provides for the construction of necessary water system maintenance work.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Incremental increases in general maintenance costs. Current cost estimate of $12,500
per water-main mile maintained annually.
FUNDING SOURCES
100% Water Utility Fund
New
Replacement
Equipment
Project
FY17
Page 6
56
CIP Project Fund
Water Fund
PROJECT NUMBER
W04-15
DEPARTMENT
WATER OPS
PROJECT NAME
WATER PIPE REPLACEMENT PROGRAM
FY13 FY14 FY15
$947,720
FY16 Unscheduled
DESCRIPTION OF PROJECT
PROJECT AREA: S. Grand Ave: W. Garfield St - W. College St
S. Grand Ave: W College St - W. Main St. The timing of this project is critical to our need to mill-overlay S. Grand Ave.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Provides for the construction of necessary water system maintenance work.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Incremental increases in general maintenance costs. Current cost estimate of $12,500
per water-main mile maintained annually.
FUNDING SOURCES
100% Water Utility Fund
New
Replacement
Equipment
Project
FY17
Page 7
57
CIP Project Fund
Water Fund
PROJECT NUMBER
W04-16
DEPARTMENT
WATER OPS
PROJECT NAME
WATER PIPE REPLACEMENT PROGRAM
FY13 FY14 FY15 FY16
$969,435
Unscheduled
DESCRIPTION OF PROJECT
PROJECT AREA: S. Tracy Ave: W. Garfield St - E. Story St
N. Willson Ave: W. Lamme St - W. Short St
W. Babcock St: S. 10th Ave - S. 8th Ave
N. Montana Ave: E. Tamarack St - N End of Existing.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Provides for the construction of necessary water system maintenance work.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Incremental increases in general maintenance costs. Current cost estimate of $12,500
per water-main mile maintained annually.
FUNDING SOURCES
100% Water Utility Fund
New
Replacement
Equipment
Project
FY17
Page 8
58
CIP Project Fund
Water Fund
PROJECT NUMBER
W04-17
DEPARTMENT
WATER OPS
PROJECT NAME
WATER PIPE REPLACEMENT PROGRAM
FY13 FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
PROJECT AREA: W Olive St: S. 5th Ave - S. 3rd Ave
W. Olive St: S. 6th Ave - S. 5th Ave
N. Grand Ave: W. Lamme St - W. Peach St
N. 5th Ave: W. Aspen St - W. Tamarack St
S. 3rd Ave: W. Harrison Ave - W. Curtiss St
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Provides for the construction of necessary water system maintenance work.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Incremental increases in general maintenance costs. Current cost estimate of $12,500
per water-main mile maintained annually.
FUNDING SOURCES
100% Water Utility Fund
New
Replacement
Equipment
Project
FY17
$1,097,145
Page 9
59
CIP Project Fund
Water Fund
PROJECT NUMBER
W07
DEPARTMENT
WATER PLANT
PROJECT NAME
WATER TREATMENT PLANT 22MG MEMBRANE PLANT
FY13
$9,800,854
FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
This new Membrane Filter Treatment Plant is the preferred water treatment alternative identified in the adopted Water Facility Plan. It is
recommended to be built with an initial configuration providing 22MGD of water treatment capacity, with future expansion capability to
36MGD. This addresses both the 10- and 20- year capacity requirement forecast for the City’s water treatment system. It is expected to be
online by October 2013.
The current 15MGD WTP equipment is nearing the end of its useful life; the plant’s direct filtration treatment process, while effective most of
the year, becomes only marginally effective during spring runoff or flash thunderstorms in the watershed, dropping plant efficiency as low as
70%; and, rapid population growth and expansion of city water services is increasing demand for water. The current plant capacity may be
exceeded in as few as five years.
ALTERNATIVES CONSIDERED
The Water Facility Plan considered numerous alternatives for water treatment. This was identified as the preferred alternative
in the adopted plan.
ADVANTAGES OF APPROVAL
Planning for increased water supply to meet growing demands and to replace existing equipment that is at the end of its useful
life. The New Plant will be located at the current site in a 49,620 sf building located directly north of the plant. It will include pre-
oxidation, coagulation, flocculation, settling, strainers, membrane flitration, dissolved air flotation thickeners, disinfection, PH
adjustment for corrosion control, drying beds, lagoon, and ancillary facilities.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
This plant is not estimated require an addition to existing plant staff. Annual O&M costs = est. $1,735,901 (including existing staff
plus new plant expenses). None of these costs can be paid with Impact Fees.
FUNDING SOURCES
The most recent estimate of plant costs was provided in the Fall of 2010, at a total of $40.7 Million. It is estimated that 33% of
total project costs (approx $13.4 Milion) are related to capacity expansion of the plant, and therefore are eligible for impact fee
funding. TOTAL PROEJCT: FY08 Pilot Testing: $200,000. FY09,FY10, FY11 Design and Membrane equipment deposit,
construction $7,267,000. FY12 $16,460,000. FY13 $16,460,000.
New
Replacement
Equipment
Project
FY17
Page 10
60
CIP Project Fund
Water Fund
PROJECT NUMBER
W12
DEPARTMENT
WATER OPS
PROJECT NAME
1 TON TRUCK WITH HOIST
FY13
$46,794
FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
This request replaces asset # 2914, a 2001 Dodge 1-ton with a 1-ton truck with a hoist. This truck is used daily in both water and sewer
operations to transport personnel and equipment, and responds to water and sewer line emergencies. This particular truck has proven to be a
very unreliable vehicle; the transmission has been replaced twice. Because of reliability problems and maintenance costs, we are recommending
replacing this vehicle sooner than customary. Flex Fuel Vehicles will be purchased.
ALTERNATIVES CONSIDERED
Keep the trucks and spend maintenance dollars to have truck serviceable
ADVANTAGES OF APPROVAL
Advantages to the City for approving this request include savings on fuel. The new vehicles will improve safety of crews, there
would be lower repair costs and it would help maintain current operations levels.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Water Utility Fund
New
Replacement
Equipment
Project
FY17
Page 11
61
CIP Project Fund
Water Fund
PROJECT NUMBER
W17
DEPARTMENT
WATER OPS
PROJECT NAME
1/2 TON TRUCK
FY13
$37,856
FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
This vehicle replaces current asset #2647, a 1998 Chevy 4x4. It will be replaced once it approaches 100,000 miles, estimated to be FY13. This
truck is used in our water valve operation program and is used in various light duty jobs.
ALTERNATIVES CONSIDERED
Continue to use older vehicle which is becoming unreliable and costly to maintain.
ADVANTAGES OF APPROVAL
Increased reliability and safety for staff and water operations.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Operating and repair costs are expected to be lower than the existing vehicle.
FUNDING SOURCES
100% Water Fund
New
Replacement
Equipment
Project
FY17
Page 12
62
CIP Project Fund
Water Fund
PROJECT NUMBER
W24
DEPARTMENT
WATER OPS
PROJECT NAME
Fixed Base Meter Read System
FY13
$90,000
FY14
$60,000
FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
This system will consist of fixed radio reMivers that are placed on city structures throughout town. The meters that are currently in place
constantly transmit meter read data, instead of driving once a month around the city collecting reads, the receivers will automatically collect the
data daily and transmit that either through the intranet or cell phone modems to finance and the city shops. We plan on deploying the receivers
starting in FY 13, with completion in FY14. Radio studies have the number of receivers at 14 but our vendor states with a new model of
receiver coming out next year that number should go below 10.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Allows daily readings of the water meters and will allow staff to quickly respond to potential water leaks, meter tampering and
backflow events. Will eliminate driving in the areas that are being read by the fixed base units. This will allow us to contact
customers at the start of a leak event and save both money and water.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Water Utility Fund
New
Replacement
Equipment
Project
FY17
Page 13
63
CIP Project Fund
Water Fund
PROJECT NUMBER
W25
DEPARTMENT
WATER PLANT
PROJECT NAME
Replacement Vehicle
FY13 FY14
$40,000
FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
Replacement 4-wheel Drive ½ Ton pick-up, replaces 1997 ¾ ton pick-up that currently has 97,400 miles
ALTERNATIVES CONSIDERED
Keep existing unit in service
ADVANTAGES OF APPROVAL
More reliable, more fuel efficient vehicle
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
none
FUNDING SOURCES
Water Rates
New
Replacement
Equipment
Project
FY17
Page 14
64
CIP Project Fund
Water Fund
PROJECT NUMBER
WW23
DEPARTMENT
WATER OPS
PROJECT NAME
MINI EXCAVATOR & TRAILER
FY13
$25,000
FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
This piece of equipment due to it’s small size, is very useful in excavating where the backhoe cannot fit or due to it’s weight will damage
sidewalks and lawns. This purchase of equipment and trailer will also be shared with the Streets Department.
ALTERNATIVES CONSIDERED
Continue to rent this piece of equipment
ADVANTAGES OF APPROVAL
Give’s both the Water and Street Departments a piece of equipment that can work in small spaces
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: Operating and repair costs are expected to be lower than a normal size backhoe
FUNDING SOURCES
Total Cost $75,000, split 3-ways between Water Fund, Wastewater Fund, and Street Maintenance Fund ($25,000 each.)
New
Replacement
Equipment
Project
FY17
Page 15
65
Wastewater FundCapital Improvement PlanFinancial SummaryCurrent YearFY12FY13FY14 FY15 FY16 FY17UnscheduledProjected Beginning Reserve Balance Dedicated to CIP 2,490,000$ 1,836,580$ 1,899,722$ 2,182,751$ 2,379,612$ 2,971,474$ ‐$ Plus: Wastewater Revenues Dedicated to CIP1,241,260$ 1,315,736$ 1,394,680$ 1,478,361$ 1,567,062$ 1,629,745$ ‐$ Less: Scheduled CIP Project Costs(1,894,680)$ (1,252,594)$ (1,111,650)$ (1,281,500)$ (975,200)$ (825,700)$ (5,215,000)$ Projected Year‐End Cash Dedicated to CIP1,836,580$ 1,899,722$ 2,182,751$ 2,379,612$ 2,971,474$ 3,775,519$ (5,215,000)$ Assumptions Made for Revenue Estimates:Current YearFY12FY13FY14FY15 FY16 FY17Estimated Annual Wastewater Revenues5,855,000$ 6,206,300$ 6,578,678$ 6,973,399$ 7,391,803$ 7,835,311$ Estimated Annual Increase6.0%6%6%6%6%4%Total Estimated Revenues6,206,300$ 6,578,678$ 6,973,399$ 7,391,803$ 7,835,311$ 8,148,723$ Current Revenues Dedicated to CIP %20.0%20.0% 20.0% 20.0% 20.0% 20.0% Plus: Increase Dedicated to CIP0.0%0.0%0.0%0.0% 0.0%0.0% Total % Dedicated to CIP20.0%20.0% 20.0% 20.0% 20.0% 20.0%TtlEti tdRDdi tdt CIP1 241 260$1 315 736$1 394 680$1 478 361$1 567 062$1 629 745$ProjectedProjectedTotal Estimated Revenues Dedicated to CIP1,241,260$ 1,315,736$ 1,394,680$ 1,478,361$ 1,567,062$ 1,629,745$ 6,000,0005,000,0004,000,0003,000,0002,000,0001,000,0000Wastewater Fund Projects & Equipment Page 166
CIP PROJECT FUNDPROJ.DEPARTMENPROJECT NAMEFY13FY14FY16UnscheduledFY15FY17Wastewater FundWW28WRF PLANTDESIGN PHASE II ‐ WRF PLANT IMPROVEMENTS$2,615,000WW29WRF PLANTENERGY RECOVERY (METHANE CO‐GENERATION) PROJECT$2,600,000WW30WRF PLANTREPLACE DIGESTER MIXERS$41,000$41,000PW01WW OPSSHOPS FACILITY EXPANSION PLAN$10,000WW02WW OPS1 TON TRUCK WITH HOIST$45,000WW03WW OPS1/2 TON FLEX FUEL TRUCK$25,000WW07WW OPSENGINEERING/DESIGN for ANNUAL WASTEWATER PIPE REPLACEMENTS$22,500$22,500$22,500$22,500$22,500WW08‐13WW OPSWASTEWATER SYSTEM UPGRADES ANNUAL$886,000WW08‐14WW OPSWASTEWATER PIPE REPLACEMENT PROGRAM$1,003,150WW08‐15WW OPSWASTEWATER PIPE REPLACEMENT PROGRAM$914,000WW08‐16WW OPSWASTEWATER PIPE REPLACEMENT PROGRAM$952,700WW08‐17WW OPSWASTEWATER PIPE REPLACEMENT PROGRAM$803,200WW21WW OPSFLUSHER TRUCK$253,094WW23WW OPSMINI EXCAVATOR & TRAILER$25,000WW26WW OPSFLUSHER VAC TRUCK REPLACEMENT$335,000Summary for Wastewater Fund (15 items)Totals by year:$1,252,594 $1,111,650 $1,281,500$975,200$5,215,000FY13FY14FY15FY16UnscheduledFY17$825,700Page 267
CIP Project Fund
Wastewater Fund
PROJECT NUMBER
PW01
DEPARTMENT
WW OPS
PROJECT NAME
SHOPS FACILITY EXPANSION PLAN
FY13 FY14 FY15
$10,000
FY16 Unscheduled
DESCRIPTION OF PROJECT
The construction of the new Vehicle Maintenance Shop at the Lower Yards on Rouse Avenue in FY10/FY11 was Phase I in expanding and
improving our ability to service equipment, store vehicles, and provide work space for Public Works, Parks, and Facilitiy services. Questions
remain about the long-term plan for construction, location, and expansion for: Streets, Sign & Signal, Forestry, Water/Sewer Operations, Solid
Waste Collection & Recycling, Facilities, and Parks & Cemetery departments. This project would develop a master plan. In scheduling this
project, we are recommending waiting until after the Vehicle Maintenance Division is relocated to its new shop and the interior improvements
are made to the Shop at Rouse and Tamarack Street for the remaining divisions.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
From related divisions: General Fund 20% ($10,000), Water Fund 20% ($10,000), Wastewater Fund 20% ($10,000), Street
Maintenance Fund 20% ($10,000), Solid Waste Fund 20% ($10,000).
New
Replacement
Equipment
Project
FY17
Page 3
68
CIP Project Fund
Wastewater Fund
PROJECT NUMBER
WW02
DEPARTMENT
WW OPS
PROJECT NAME
1 TON TRUCK WITH HOIST
FY13 FY14
$45,000
FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
FY12: Replaces a 2000 1-ton truck with a hoist. At the time of replacement, this truck will be 11 years old. Replaces a 2004 Ford F250, asset
#3232. At the time of replacement, this truck will be over 10 years old. While this vehicle is only 10 years old, its not big enough to properly
function as a service truck; very limited carrying capacity. It will be passed down to another department for continued use within the city.
These trucks are used daily in both water and sewer operations to transport personnel and equipment. The existing truck will not be traded in;
it will be utilized as a back-up vehicle when needed.
ALTERNATIVES CONSIDERED
Keep the truck and spend maintenance dollars to have truck serviceable.
ADVANTAGES OF APPROVAL
Advantages to the City for approving this request include savings on fuel and emissions. The new vehicles will improve safety of
crews, there would be lower repair costs and it would help maintain current operations levels.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Wastewater Utility Revenue
New
Replacement
Equipment
Project
FY17
Page 4
69
CIP Project Fund
Wastewater Fund
PROJECT NUMBER
WW03
DEPARTMENT
WW OPS
PROJECT NAME
1/2 TON FLEX FUEL TRUCK
FY13
$25,000
FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
This is to replace asset # 2916 which is a 2001 Dodge Dakota ½ ton pickup. At the time replaced, this vehicle will be 12 years old and have
approx 100,000 miles. This truck is used to transport operations crews performing one call locates. Crews respond to over 5,000 calls a year
for locate requests. The existing vehicle will be traded in, to reduce the total purchase price.
ALTERNATIVES CONSIDERED
Continue to use older vehicle which is extremely small for the average water department employee.
ADVANTAGES OF APPROVAL
Advantages to the City for approving this request include continued reliability in water operations. Repair and maintenance costs
will be minimized with replacement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Wastewater Fund
New
Replacement
Equipment
Project
FY17
Page 5
70
CIP Project Fund
Wastewater Fund
PROJECT NUMBER
WW07
DEPARTMENT
WW OPS
PROJECT NAME
ENGINEERING/DESIGN for ANNUAL WASTEWATER PIPE REPLACEMENTS
FY13
$22,500
FY14
$22,500
FY15
$22,500
FY16
$22,500
Unscheduled
DESCRIPTION OF PROJECT
This item provides for design work to be completed every-other year, in anticipation of the Annual System Upgrades. As the Wastewater
Operations Division televises (views) the existing system, maintenance projects become apparent. As annual televising continues, other more-
urgent projects may be identified and designed under this project heading.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Provides for design of necessary sewer system maintenance work.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Wastewater Utility Fund
New
Replacement
Equipment
Project
FY17
$22,500
Page 6
71
CIP Project Fund
Wastewater Fund
PROJECT NUMBER
WW08-13
DEPARTMENT
WW OPS
PROJECT NAME
WASTEWATER SYSTEM UPGRADES ANNUAL
FY13
$886,000
FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
PROJECT AREA: W. Main St: N. 7th Ave - N. Grand Ave
W. Main St: N. Grand Ave - N. Tracy Ave, E. Main St: N. Tracy Ave - N. Black Ave
E. Main St: N. Black Ave - N. Church Ave, E Mendenhall St: N. 7th Ave - N. Grand Ave
W. Lamme St: N. 7th Ave - Mid block East, W. Lamme St: N. 5th Ave - N. Grand Ave
W. Beall St: N. 5th Ave - N. 3rd Ave, N. 3rd Ave: W. Beall St - W. Villard St
N. 3rd Ave: W. Villard St - W. Peach St, N. 4th Ave: W. Villard St - W. Short St
N. 5th Ave: W. Beall St - W. Peach St, N. 6th Ave: W. Villard St - N. 5th Ave
N. 7th Ave: W. Villard St - W. Peach St, W. Peach St: N. 7th Ave - N. Grand Ave
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Provides for the construction of necessary sewer system maintenance work.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Wastewater Utility Fund
New
Replacement
Equipment
Project
FY17
Page 7
72
CIP Project Fund
Wastewater Fund
PROJECT NUMBER
WW08-14
DEPARTMENT
WW OPS
PROJECT NAME
WASTEWATER PIPE REPLACEMENT PROGRAM
FY13 FY14
$1,003,150
FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
PROJECT AREA: N. Grand Ave: W. Mendenhall St - W. Main St
S. Grand Ave: W. Main St - W. Babcock St
S. Grand Ave: W. Babcock St - S. End of Line
N. Willson Ave: W. Mendenhall St - W. Main St
N. Willson Ave: W. Main St - W. Hayes St
S. Tracy Ave: W. Main St - W. Garfield St
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Provides for the construction of necessary sewer system maintenance work.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Wastewater Utility Fund
New
Replacement
Equipment
Project
FY17
Page 8
73
CIP Project Fund
Wastewater Fund
PROJECT NUMBER
WW08-15
DEPARTMENT
WW OPS
PROJECT NAME
WASTEWATER PIPE REPLACEMENT PROGRAM
FY13 FY14 FY15
$914,000
FY16 Unscheduled
DESCRIPTION OF PROJECT
PROJECT AREA: S. 3rd Ave: W. Olive St - W. Lincoln St
S. 4th Ave: W. Babcock St - W. Olive St
S. 4th Ave: W. College St - W. Lincoln St
S. 5th Ave: W. Olive St - W. Lincoln St
W. Babcock St: S. 6th Ave - S. Grand Ave
W. Olive St: S. 6th Ave - S. 3rd Ave
Alley N of Koch: S. 5th Ave - E. End
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Provides for the construction of necessary sewer system maintenance work.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Wastewater Utility Fund
New
Replacement
Equipment
Project
FY17
Page 9
74
CIP Project Fund
Wastewater Fund
PROJECT NUMBER
WW08-16
DEPARTMENT
WW OPS
PROJECT NAME
WASTEWATER PIPE REPLACEMENT PROGRAM
FY13 FY14 FY15 FY16
$952,700
Unscheduled
DESCRIPTION OF PROJECT
PROJECT AREA: Interstate/walmart: N. Rouse Ave - N. 3rd Ave
Pea Cannery Line: N. Rouse Ave - End
Juniper Street: N. Rouse Ave - E. Tamarack St
N. Rouse Ave: Humane Society - Bridger Center Dr
Bridger Center Main: Bridger Drive - N End of Main
Industrial Dr: Trunk Main - Half way to Griffin
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Provides for the construction of necessary sewer system maintenance work.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Wastewater Utility Fund
New
Replacement
Equipment
Project
FY17
Page 10
75
CIP Project Fund
Wastewater Fund
PROJECT NUMBER
WW08-17
DEPARTMENT
WW OPS
PROJECT NAME
WASTEWATER PIPE REPLACEMENT PROGRAM
FY13 FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
PROJECT AREA: Alley N of Story: S 5th Ave - E. End
Alley N of Dickerson: S 5th Ave - E. End, Alley N of Alderson: S 5th Ave - E. End
W. College St: S 5th Ave - E. End, W. College St: S 4th Ave - S. 3rd Ave
Alley N. of Harrison: S. 5th Ave - S. 4th Ave, Alley N. of Cleveland: S. 5th Ave - S. 4th Ave
S. 6th Ave: W. Babcoc St - Alley N. of Olive, S. 6th Ave: W. Story St - W. Grant St
S. 7th Ave: Alley N of Olive - W. Story St, S. 7th Ave: W. Story St - W. Harrison
W. Olive St: S. 6th Ave - S. 7th Ave, W. Story St: S. 6th Ave - S. 7th Ave
Alley btwn 7th & 8th: Alley N of Olive - Alley N. of Koch
Alley btwn 7th & 8th: Alley N of Dickerson - W. Harrison St
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Provides for the construction of necessary sewer system maintenance work.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Wastewater Utility Fund
New
Replacement
Equipment
Project
FY17
$803,200
Page 11
76
CIP Project Fund
Wastewater Fund
PROJECT NUMBER
WW21
DEPARTMENT
WW OPS
PROJECT NAME
FLUSHER TRUCK
FY13
$253,094
FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
This vehicle replaces current asset #3031, a 2002 Freightliner with over 20,845 miles and 7,653 hours on it. According to the manufacturer’s
engineers the fact that the engine is running at 2,400 rpm to run the water pump each engine hour equals 50 to 70 miles. Based on that data the
truck’s engine has between 382,650 to 535,710 miles on it. This truck is used to flush over 200 miles of sewer main every year and is a critical
piece of machinery for the sewer department that is used almost every working day of the year. This unit will have a TV camera which will allow
us to see objects/defects that cause the flusher to stop. This camera has become an industry standard piece of equipment.
ALTERNATIVES CONSIDERED
Continue to use older vehicle which will be costly to maintain.
ADVANTAGES OF APPROVAL
Increased reliability and safety for staff and wastewater operations. Camera will eliminate need for follow up TV inspection by the
TV van.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: Operating and repair costs are expected to be lower than the existing vehicle.
FUNDING SOURCES
100% Wastewater utility fund
New
Replacement
Equipment
Project
FY17
Page 12
77
CIP Project Fund
Wastewater Fund
PROJECT NUMBER
WW23
DEPARTMENT
WW OPS
PROJECT NAME
MINI EXCAVATOR & TRAILER
FY13
$25,000
FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
This piece of equipment due to it’s small size, is very useful in excavating where the backhoe cannot fit or due to it’s weight will damage
sidewalks and lawns. This purchase of equipment and trailer will also be shared with the Streets Department.
ALTERNATIVES CONSIDERED
Continue to rent this piece of equipment.
ADVANTAGES OF APPROVAL
Continue to rent this piece of equipment.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Continue to rent this piece of equipment.
FUNDING SOURCES
Total Cost $75,000, split 3-ways between Water Fund, Wastewater Fund, and Street Maintenance Fund ($25,000 each.)
New
Replacement
Equipment
Project
FY17
Page 13
78
CIP Project Fund
Wastewater Fund
PROJECT NUMBER
WW26
DEPARTMENT
WW OPS
PROJECT NAME
FLUSHER VAC TRUCK REPLACEMENT
FY13 FY14 FY15
$335,000
FY16 Unscheduled
DESCRIPTION OF PROJECT
Replacement of the City’s Flusher Vac Truck. This flusher vac truck is used daily to excavate around critical infrastructure i.e. fiber optics, gas,
and electric lines in addition to flushing and vacuuming sewer mains. At time of replacement, this truck will be approximately 10 years old. The
existing truck will be sold at auction.
ALTERNATIVES CONSIDERED
Continue to use older vehicle which will be costly to maintain.
ADVANTAGES OF APPROVAL
Increased reliability and safety for staff and wastewater operations. This piece of equipment eliminates costly repairs because we
can avoid hitting utilities with a hoe and utilize the vacuum instead.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: Operating and repair costs are expected to be lower than the existing vehicle.
FUNDING SOURCES
100% Wastewater utility fund
New
Replacement
Equipment
Project
FY17
Page 14
79
CIP Project Fund
Wastewater Fund
PROJECT NUMBER
WW28
DEPARTMENT
WRF PLANT
PROJECT NAME
DESIGN PHASE II - WRF PLANT IMPROVEMENTS
FY13 FY14 FY15 FY16 Unscheduled
$2,615,000
DESCRIPTION OF PROJECT
In January 2006 Morrison & Maierle Consulting Engineers completed a comprehensive Wastewater Facilities Plan. The plan recommends the
City proceed with a 3-phased project schedule that includes the construction of the new Water Reclamation Facility (WRF), capable of handling
our increased flows while also reducing the amount of Total Nitrogen discharged to the East Gallatin River. Phase two is expected to include
one new primary clarifier, more BNR reactor basins, clarifiers, tertiary deep bed filtration, liquid sludge storage tanks, anaerobic digestion, and
effluent re-use pumping station. The capacity expanding (impact fee eligible) elements are: reactor basins, clarifiers, and pumping station. It is
possible that this phase of the project could be further divided into phase 2A and phase 2B, if necessary.
ALTERNATIVES CONSIDERED
A variety of treatment technologies and alternatives are presented in the January 2006 Wastewater Facilities Plan.
ADVANTAGES OF APPROVAL
Major capital expansion of the Bozeman WRF will enable the City to meet its estimated demand for wastewater services and still
produce a high quality effluent that is in full compliance with the City’s MPDES discharge permit. Expansion of the Bozeman WRF
is consistent with the City’s long-term need to accommodate rapid growth and economic development in the Gallatin Valley.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: no estimates at this time.
FUNDING SOURCES
Total Design Cost: $5,230,000. We estimate that half of the costs are related to regulation and maintenance issues and would be
borne by the Utility Fund. Half are related to capacity expansion, and would be borne by Impact Fees. 50% Wastewater Fund,
50% Wastewater Impact Fee Fund.
New
Replacement
Equipment
Project
FY17
Page 15
80
CIP Project Fund
Wastewater Fund
PROJECT NUMBER
WW29
DEPARTMENT
WRF PLANT
PROJECT NAME
ENERGY RECOVERY (METHANE CO-GENERATION) PROJECT
FY13 FY14 FY15 FY16 Unscheduled
$2,600,000
DESCRIPTION OF PROJECT
Utilization of smart energy technology that will recycle an average of 175 kW of electricity and 974,000 BTU/hour of thermal output using a
generator powered by Water Reclamation Facility digester gas.
ALTERNATIVES CONSIDERED
Continue to flare the digester methane gas. Micro-turbines and fuel-cells have been analysed and continue to be possible
alternative energy recovery technologies for this project.
ADVANTAGES OF APPROVAL
Current plant waste gases will be captured and utilized to reduce plant operating costs. The project has an estimated net dollar
savings of $230,000 per year. It supports the City's Municipal Climate Action Plan goals.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Once construction is funded, this project results in an estimated net dollar SAVINGS of $230,000/year.
FUNDING SOURCES
Wastewater Fund, other grants or community partners.
New
Replacement
Equipment
Project
FY17
Page 16
81
CIP Project Fund
Wastewater Fund
PROJECT NUMBER
WW30
DEPARTMENT
WRF PLANT
PROJECT NAME
REPLACE DIGESTER MIXERS
FY13
$41,000
FY14
$41,000
FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
The Bozeman WRF needs to replace two defective/failing digester mixers. This equipment is essential to the operation of the existing anaerobic
digesters. These digesters contain a total of 4 draft tube mixers, two of which have already been replaced. Our plan would be to purchase one
replacement mixer in FY13 and the final one in FY14. The new EIMCO draft tube mixers will replace the defective OTI micers we are currently
using. Our original OTI mixers have been plagued with multiple bearing failures, seal failures, oil lubrication system failures and almost constant
propeller fouling. There are currently only two mixer manufactureers in the world that manufacture this type of draft tube mixer. Therefore,
in order to replace these defective OTI mixers, we must order our replacement mixers from a sole source vendor. This vendor is EIMCO
Technologies, in Salt Lake City. They are the only manufacturer capable of fabricating a replacement mixer which will mount directly to our
existing digester draft tubes. EIMCO model #RDT-V 7.5 Hp mixer assembly. Installed project cost for each: $41,000.
ALTERNATIVES CONSIDERED
Continue to remove, disassemble and rebuild our defective mixers annually. This is not cost-effective and is not a sustainable
option. The annual cost to rebuild one unit is approximately $15,000 plus extensive staff time.
ADVANTAGES OF APPROVAL
Replacement of these to remaining digester mixers will assure continuous operation of these essential plant components. The
plant cannot run without functioning anaerobic digesters.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: 7.5 Hp each, ongoing power costs.
FUNDING SOURCES
100% Wastewater Fund
New
Replacement
Equipment
Project
FY17
Page 17
82
Solid Waste Collection & RecyclingCapital Improvement PlanFinancial SummaryCurrent YearFY12FY13FY14 FY15 FY16 FY17Projected Beginning Reserve Balance Dedicated to CIP238,000$ 487,681$ 532,378$ 282,027$ 436,598$ 207,708$ Plus: Revenues Dedicated to CIP249,681$ 249,681$ 274,649$ 302,613$ 331,110$ 360,145$ Less: Scheduled CIP Project Costs‐$ (204,984)$ (525,000)$ (148,043)$ (560,000)$ (360,000)$ Projected Year‐End Cash Dedicated to CIP487,681$ 532,378$ 282,027$ 436,598$ 207,708$ 207,853$ Assumptions Made for Revenue Estimates:Current YearFY12FY13FY14 FY15 FY16 FY17Estimated Annual Revenues2,496,811$ 2,496,811$ 2,496,811$ 2,496,811$ 2,521,779$ 2,546,997$ Estimated Annual Increase in Revenues ‐ 0%0%1%1%1%Total Estimated Revenues2,496,811$ 2,496,811$ 2,496,811$ 2,521,779$ 2,546,997$ 2,572,467$ Current Revenues Dedicated to CIP %10.0%10.0% 10.0% 11.0% 12.0% 13.0% Plus: Increase Dedicated to CIP0.0%0.0%1.0% 1.0% 1.0% 1.0% Total % Dedicated to CIP10.0%10.0% 11.0% 12.0% 13.0% 14.0%ProjectedProjectedTotal Estimated Revenues Dedicated to CIP249,681$ 249,681$ 274,649$ 302,613$ 331,110$ 360,145$ 600,000500,000400,000300,000200,000100,0000FY13 FY14 FY15 FY16 FY17 UnscheduledSolid Waste Projects & Equipment Page 183
CIP PROJECT FUNDPROJ.DEPARTMENPROJECT NAMEFY13FY14FY16UnscheduledFY15FY17Solid Waste CollectionPW01COLLECTIONSHOPS FACILITY EXPANSION PLAN$10,000SW26COLLECTIONSIDE LOAD PACKER ‐ REPLACEMENT$134,984SW27COLLECTIONFRONT LOAD TRUCK ‐ REPLACEMENT TRUCK$250,000SW28COLLECTIONSIDE LOAD TRUCK ‐ REPLACEMENT TRUCK$275,000SW30COLLECTIONSIDE LOAD PACKER ‐ REPLACEMENT$138,043SW31COLLECTIONSIDE LOAD REPLACEMENT TRUCK$290,000SW32COLLECTIONFRONTLOAD REPLACEMENT TRUCK$270,000SW33COLLECTIONSIDE LOAD PACKER ‐ REPLACEMENT`$140,000SW34CURBSIDEBack‐Up Recycling Truck$70,000SW35CURBSIDECurbside Recycling Truck ‐ Replacement$220,000Summary for Solid Waste Collection (10 items)Totals by year:$204,984 $525,000 $148,043$560,000FY13FY14FY15FY16UnscheduledFY17$360,000Page 284
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
PW01
DEPARTMENT
COLLECTION
PROJECT NAME
SHOPS FACILITY EXPANSION PLAN
FY13 FY14 FY15
$10,000
FY16 Unscheduled
DESCRIPTION OF PROJECT
The construction of the new Vehicle Maintenance Shop at the Lower Yards on Rouse Avenue in FY10/FY11 was Phase I in expanding and
improving our ability to service equipment, store vehicles, and provide work space for Public Works, Parks, and Facilitiy services. Questions
remain about the long-term plan for construction, location, and expansion for: Streets, Sign & Signal, Forestry, Water/Sewer Operations, Solid
Waste Collection & Recycling, Facilities, and Parks & Cemetery departments. This project would develop a master plan. In scheduling this
project, we are recommending waiting until after the Vehicle Maintenance Division is relocated to its new shop and the interior improvements
are made to the Shop at Rouse and Tamarack Street for the remaining divisions.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
From related divisions: General Fund 20% ($10,000), Water Fund 20% ($10,000), Wastewater Fund 20% ($10,000), Street
Maintenance Fund 20% ($10,000), Solid Waste Fund 20% ($10,000).
New
Replacement
Equipment
Project
FY17
Page 3
85
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW26
DEPARTMENT
COLLECTION
PROJECT NAME
SIDE LOAD PACKER - REPLACEMENT
FY13
$134,984
FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
The division is averaging 2,000 hours per year on the side load trucks. The chassis should be good for 12,000 hours with proper maintenance.
Therefore replacing the packer bodies every four years will save about $140,000 and maximize the value of the chassis. The packers are what
generally wear out first. The grabber arm functions around 400 repetitions per day times 4 days per week is 1,600 reps per week times 4.33
equals 7,000 reps per month or 93,528 per year. With a life expectancy of four years that is 336,000 reps.
Old packer will be traded in or saved for parts.
ALTERNATIVES CONSIDERED
Buy new trucks with new chassis and body. Continue to operate with increasing repair costs, down time lowering resale value.
Lease new truck and packer for $75,000 annually if one is available.
ADVANTAGES OF APPROVAL
Saves $140,000 every 4 years per side load truck. With four side load trucks and 2 back up trucks, this adds up quickly.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: $10,000
FUNDING SOURCES
100% Solid Waste Division Enterprise Funds.
New
Replacement
Equipment
Project
FY17
Page 4
86
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW27
DEPARTMENT
COLLECTION
PROJECT NAME
FRONT LOAD TRUCK - REPLACEMENT TRUCK
FY13 FY14
$250,000
FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
This truck is a replacement on the CIP for the collection of residential and commercial refuse. The new truck will ensure continued efficient,
cost-effective refuse collection that will allow the Division to meet the demands of a growing city while maintaining the standards the Bozeman
residents expect.
(replacing Asset #3319, 2005 Autocar)
ALTERNATIVES CONSIDERED
To use existing truck that will have more than 10,000 hours of hard use. Repair costs will continue to increase and the resale
value will continue to decrease. The truck will also take an inordinate amount of shop time to maintain.
ADVANTAGES OF APPROVAL
Maximize resale value, Minimize repairs, parts, (if available), and down time, Improve safety and collection efficiency, Keeps the
Division up with growth rates.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: $12,000
FUNDING SOURCES
100% Solid Waste Division Enterprise Funds.
New
Replacement
Equipment
Project
FY17
Page 5
87
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW28
DEPARTMENT
COLLECTION
PROJECT NAME
SIDE LOAD TRUCK - REPLACEMENT TRUCK
FY13 FY14
$275,000
FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
Replacement of a side load chassis. Asset #3314. The current truck will have 12,000 - 14,000 hours on the chassis and 5,000 hours on the
packer body.
ALTERNATIVES CONSIDERED
Continue to use asset beyond its useful service life, resulting in significantly increased maintenance costs and down time.
ADVANTAGES OF APPROVAL
Providing excellence in public service to 7,050 residential customers
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: $30,000
FUNDING SOURCES
100% Solid Waste Enterprise Funds.
New
Replacement
Equipment
Project
FY17
Page 6
88
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW30
DEPARTMENT
COLLECTION
PROJECT NAME
SIDE LOAD PACKER - REPLACEMENT
FY13 FY14 FY15
$138,043
FY16 Unscheduled
DESCRIPTION OF PROJECT
This item is to replace the garbage packer on Asset #3452. The division is averaging 2,000 hours per year on the side load trucks. The chassis
should be good for 12,000-14,000 hours with proper maintenance. Therefore replacing the packer bodies every four years will save about
$140,000 and maximize the value of the chassis. The packers are what generally wear out first. The grabber arm functions around 400
repetitions per day times 4 days per week is 1,600 reps per week times 4.33 equals 7,000 reps per month or 93,528 per year. With a life
expectancy of four years that is 336,000 reps.
ALTERNATIVES CONSIDERED
Buy new trucks with new chassis and body. Continue to operate with increasing repair costs, down time lowering resale value.
Lease new truck and packer for $75,000 annually if one is available.
ADVANTAGES OF APPROVAL
Saves $140,000 every 4 years per side load truck. With four side load trucks and 2 backup trucks, this adds up quickly.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: $10,000
FUNDING SOURCES
100% Solid Waste Division Enterprise Funds.
New
Replacement
Equipment
Project
FY17
Page 7
89
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW31
DEPARTMENT
COLLECTION
PROJECT NAME
SIDE LOAD REPLACEMENT TRUCK
FY13 FY14 FY15 FY16
$290,000
Unscheduled
DESCRIPTION OF PROJECT
Replacement of a current front-line residential collection truck, Asset #3367. This truck will will have over 12,000 hours at time of replacement.
ALTERNATIVES CONSIDERED
Continue to operate the existing truck with increasing operating and maintenance costs.
Lease a new, (or used), truck.
ADVANTAGES OF APPROVAL
Allow the division to continue to provide excellent service to over 7000 customers. Increased fuel economy; Reduced exhaust
emissions; Less down time; Increased productivity
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Operating and maintenance costs should be reduced by replacing an aging unit with a new more fuel efficient, cleaner running
truck
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY17
Page 8
90
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW32
DEPARTMENT
COLLECTION
PROJECT NAME
FRONTLOAD REPLACEMENT TRUCK
FY13 FY14 FY15 FY16
$270,000
Unscheduled
DESCRIPTION OF PROJECT
This truck is a replacement for Asset #3421; the collection of residential and commercial refuse. The new truck will ensure continued efficient,
cost-effective refuse collection that will allow the Division to meet the demands of a growing city while maintaining the standards the Bozeman
residents expect.
ALTERNATIVES CONSIDERED
To use existing truck that will have more than 10,000 hours of hard use. Repair costs will continue to increase and the resale
value will continue to decrease. The truck will also take an inordinate amount of shop time to maintain.
ADVANTAGES OF APPROVAL
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Maintenance costs: $12,000/year
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY17
Page 9
91
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW33
DEPARTMENT
COLLECTION
PROJECT NAME
SIDE LOAD PACKER - REPLACEMENT`
FY13 FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
This item is the replacement of equipment on one of our side-loading garbage trucks. It will replace the 2008 Curbtenter Packer on Asset
#3455 - 2008 Craine Carrier Chassis. The chassis should be good for 12,000-14,000 hours with proper maintenance. Therefore replacing the
packer bodies every four years will save about $140,000 and maximize the value of the chassis. The packers are what generally wear out first.
The grabber arm functions around 400 repetitions per day times 4 days per week is 1,600 reps per week times 4.33 equals 7,000 reps per
month or 93,528 per year. With a life expectancy of four years that is 336,000 reps.
ALTERNATIVES CONSIDERED
Buy new trucks with new chassis and body. Continue to operate with increasing repair costs, down time lowering resale value.
Lease new truck and packer for $75,000 annually if one is available.
ADVANTAGES OF APPROVAL
Saves $140,000 every 4 years per side load truck. With four side load trucks and 2 backup trucks, this adds up quickly.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: $10,000
FUNDING SOURCES
100% Solid Waste Division Enterprise Funds.
New
Replacement
Equipment
Project
FY17
$140,000
Page 10
92
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW34
DEPARTMENT
CURBSIDE
PROJECT NAME
Back-Up Recycling Truck
FY13
$70,000
FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
Purchase of a used recycling truck for back-up duties. Currently, we have one Curbside Recycling Truck. When it breaks down, it is extremely
difficult to serve customers. This equipment would help ensure that curbside recyling collection can still happen when the truck is out-of-service.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Continuity of operations when the primary equipment fails.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Solid Waste Enterprise Fund
New
Replacement
Equipment
Project
FY17
Page 11
93
CIP Project Fund
Solid Waste Collection
PROJECT NUMBER
SW35
DEPARTMENT
CURBSIDE
PROJECT NAME
Curbside Recycling Truck - Replacement
FY13 FY14 FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
This would be a new chassis and new sideload recycling body, to replace the exising Curbside Recycling Truck, which is expected to be at the
end of its useful life in 2017.
ALTERNATIVES CONSIDERED
Lease
ADVANTAGES OF APPROVAL
To maintain a level of service to the curbside recycling customers
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Maintenance costs are $15,000/year & Operating costs are $15,000/year
FUNDING SOURCES
Solid Waste Enterprise Fund
New
Replacement
Equipment
Project
FY17
$220,000
Page 12