Loading...
HomeMy WebLinkAbout11- Tetra Tech Task order to address Methane Exceedances at Sanitary LandfillTASK ORDER/PROPOSAL CORRECTIVE ACTION TO ADDRESS METHANE EXCEEDANCES]NMETHANE MONITORING POINTS BLG-1 AND BLG-4 BOZEMAN SANITARY LANDFILL August 23, 2011 CLIENT: ' The Cily of Bozeman Tetra Tech, Inc. P.O. Box 1230 851 B,ridger Drive, Ste 6 Bozeman, Montana 59711-1230 Bozeman, MT 59715 Attention: Mr. Dustin Johnson Attention: MIL Mafk F. Pearson This task is presented to the City of Bozeman in response tnthe May 18, 2011 DEQ correspondence requesting additional oomocUwa measures be undertaken to address methane exueedanoee in methane monitoring points BLG'1 and BLG-4. K0ethameexneedanoem in pointBLG-1 will be addressed in an additional nnndifimaUun of the well head in the o|nseed landfill gas extraction (LGE) well GVV-10 in accordance with a previous task order. Spnoifica||y, the flexible pipe installed on LGE well GW-1 0 wellhead will be shortened and re-oriented to prevent the accumulation of condensate /in the flexible piping) from blocking gas extraction, N1eUhmneexceedances in point BLG-4mdD be addressed by installing an additional methane monitoring point south ofBLG-4. adjacent to the south property boundary of the landfill (or approximately 17 feet south of BLG-4). Methane/landfill gas monitoring will then be conducted in the new methane monitoring point. Therefore, the following tasks are proposed: SCOPE OF SERVICES: TASK 1- INSTALL ADDITIONAL METHANE MONITORING POINT Tetra Tech proposes bo subcontract JBR Environmental (JBR) to install one methane monitoring point approximately 8.5 feet south of the existing methane monitoring pointBLG-4. J8R was solicited for bid in consideration of installing the additional point proximal to a power One that exists along the south boundary of the landfill, JBF7 will use aGecprobeto''directpoah" the hole tnadepth of 25 feet. The Geoprube was selected because its mast height (18 feet) is less than that ofa comvent|ono/dri||imgrig(about 25 feet) and tMe/efo,e. can safely beoioeer|o the power lines. Underground utilities will be deemsd prior to drilling using the 'one-call' underground ub|dv locate service, his assumeda custom utility locate (at additional cost) will not benecessary, Drill cuttings will be examined and described by a Tetra Tech soil scientist or geologist. Well completion will consist of installing 1-h`oh outer-diameter (OD) and 3/4-inch inner-diameter (|D). Schedule 4D polyvinyl chloride (PVC) piping (slotted and blank) toa depth of25feet. Approximately 20 feet of slotted PVC piping will be used. The borehole will be backfiKed with 18-20 eH(oa sand around the slotted PVC interval and banbznite to the surface. The bentnnibawiN be hydrated as it is being placed above the silica sand interval. The PVC well will be protected by steel casing with a locking nap. The steel casing will be secured with a concrete grout. The one-inch well will be fitted with on air-tight, barbed valve to allow for gas monitoring. Tetra Tech Pa /of2 851 BricgorDc 8teV Bozeman, Montana 59715 Office: (406)582-8700 TASK 2 - PROJECT MANAGEMENT AND REPORTING It is expected that equilibrium conditions can be achieved within fourteen days after completion of the new methane monitoring point. After this time period, landfill gas monitoring will be conducted. Results will be included in a brief letter report to City of Bozeman and DEQ citing the well installation activity, monitoring results, and well log. The report to City of Bozeman and DEQ will also include the date of completion of the modification of well GW-1 0. PERIOD OF PERFORMANCE: Activities covered in this task order will begin upon approval of this task order and are anticipated to be completed by September 30, 2011. A brief report will be submitted to City of Bozeman and DEQ within three working days after monitoring of the new methane monitoring point has been conducted. COMPENSATION: Estimated costs to complete the foregoing scope of services are not to exceed $2,908. Attachment A details these costs. All services in this task order will be conducted on a time and materials basis. SPECIAL CONDITIONS: Execution of this Task Order constitutes acceptance of all terms and conditions contained in Tetra Tech's Professional Services Agreement with the City of Bozeman, dated January 3, 1994 and Amendment Nos. 1, 2, 3, and 4 of the Professional Services Agreement dated July 31, 1995; January 1, 1996; March 17, 1997; and December 10, 2001, respectively, CLIENT: CONSULTANT: NOTICE OF CON FIDE NTIALITYThis Task (ndi-i(Jiog aftachments) contains iofommfion con ficlenbal is Tetm Te('A Mc., its subsidiaries, anof stibcontrar*oTs. It rs inleoded army for City of Bozeman to considor Te ra Teoh pioviding pofessional services at the Bozomai7 Landfill. Aoy other usp is prohibited, vvithout the prior vvriffeo consont of Tetra Ted?. Tetra Tech 851 Bridger Dr., Ste 6 Bozeman, Montana 59715 Office: (406) 582-8780 Page 2 of 2 ATTACHMENT A CORRECTIVE ACTION TO ADDRESS (METHANE EXCEEDANCES IN METHANE MONITORING POINTS BLG -1 AND BLG-•4 BOZEMAN SANITARY LANDFILL August 23, 2011 Task 1 INSTALL ADDITIONAL METHANE MONITQRING POINT - Units Unlit Cost Amount JBR Environmental Methane Monitoring Point Completion Quote 1 $1,975 $1,975 Tetra Tech Project Manager/ Hydrogeologist, per hour 7 $85 $595 Tetra Tech markup of 10 (of subcontractor time and materials) $198 SUBTOTAL $2,768 Task 2 PR949CT MANA E ENT AND REPORTING Tetra Tech Project Manager/ Hydrogeologist, per hour Clerical or Administrative Assistant, per hour SUBTOTAL TOTAL Units Unit ost Arnount 1 $85 $86 1 $55 $55 $140 $2,908 August 23, 2011 Tetra Tech Page 1 of 1