Loading...
HomeMy WebLinkAboutTab 1 - Acid CIP Dilu Tank Dwg, dir 26759, rev 00 8 7 6 5 4 3 2 CIP CITRIC ACID TANK CONNECTION OTY. SERVICE DESCRIPTION A 1 TOP MANWAY 24"MANWAY ACCESS, HINGED LID B 1 OUTLET 6"FLANGED NOZZLE WITH GUSSETS AND 90'SIPHON ELBOW WITH VORTEX BREAKER C 1 TANK DRAIN 2"FLANGED NOZZLE WITH GUSSETS, FLUSH,AND VORTEX BREAKER 90' D 1 CIP RETURN 6"FLANGED NOZZLE WITH GUSSETS DOWNPIPE 6"FROM BOTTOM AND 1/4"WEEP HOLE C E 1 VENT 4"FLANGED NOZZLE WITH GUSSETS 105' F F 1 OVERFLOW 8"FLANGED NOZZLE WITH GUSSETS AND 90-SIPHON ELBOW(ANGLED UP) D G 1 FILL/RINSE WATER 3"FLANGED NOZZLE WITH GUSSETS AND SIDE WALL DISCHARGE 4X R36 45' 0 H 1 LEVEL TRANSMITTER 2"FLANGED NOZZLE WITH GUSSETS AND BLIND FLANGE TAPPED 1"FPT L J 1 LIMIT SWITCH LOW 2"FLANGED NOZZLE WITH GUSSETS AND BLIND FLANGE TAPPED 1-1/4"FPT K 1 LIMIT SWITCH HIGH 2"FLANGED NOZZLE WITH GUSSETS AND BLIND FLANGE TAPPED 1-1/4"FPT 58 MIN. FOR HEATER REMOVAL L 1 HEATER 8"FLANGED NOZZLE WITH GUSSETS M 1 TEMPERATURE TRANSMITTER 2"FLANGED NOZZLE WITH GUSSETS AND BLIND FLANGE TAPPED 1"FPT 160' N N 1 CITRIC ACID INLET 3/4"FLANGED NOZZLE WITH GUSSETS T 1 SAMPLE TAP 2"FLANGED NOZZLE WITH GUSSETS AND BLIND FLANGE TAPPED 1/2"FPT — A/R NAME PLATES ------------- - 4 HOLD DOWN LUGS ------------- {� — 3 LIFTING LUGS ------------- 180' — — 0' 0 O I \ E \ 325' / M 315 235' 270' L"�J' C 6 295 305' C PLAN VIEW ISOMETRIC VIEW NOT TO SCALE G A D E N All I B � O NOTES: B 1. MATERIALS OF CONSTRUCTION: TANK:FRP,SLOPED BOTTOM FITTINGS: FRP&316 SST GASKETS: EDPM HARDWARE: 18-8 OR 316 (120) 2. FIBERGLASS REINFORCED PLASTIC(FRP) STRAIGHT WALL 096 112 HEIGHT 105 3. SPECIFIC GRAVITY RATING: 1.9 0 4. BRIMFUL CAPACITY: 3,500 GALLONS T 0 5. FLABOLTES ESETORILLED STRADD ER ANSI B16.5 PRINCIPLE TANKO RATED. CENTERLINES. Q NOZZLES PROJECT 30 �O ALL FLANGES 4"AND SMALLER WILL BE CONICALLY GUSSETED. 6 © OM 9 20 12 6.GUSSETS, LIFTING LUGS,AND TANK HOLD DOWN BRACKETS ARE BY VENDOR AND NOT SHOWN FOR CLARITY. 0 3 --> DO NOT SCALE DRAWING <-- CODE IDEM.N0.17238 NAME DATE �7 REAR L UNLESS OTHERWISE SPECIFIED,THE FOLLOWING DRAWN BY F.WHACK 15SERZDia PALL Pall Corporation LEFT SIDE FRONT VIEW j\EAj4 VIEW INFORMATION PERTAINS ONLY TO THIS SHEET PROJECT ENGINEER L UAOpUE iSEr2010 ® Pall Advanced Separations Systems ELEVATION VIEW CE]INCNNENSIOHE ON IN: DLEAHCE ENGINEER A ❑INcxEsoNLv X.x ENGINEER Cortland, New York A ❑MIWMEIERS ONLY .%3 ENGINEER PS NIE NUMBER AEN90N ISIZE ❑IN tmm, ❑mm[N] .%%f CHECKER E HOWARD 3DSFPIU10 PC09-000006555 00 D ❑. %%%f DRAAHNG INME ALL INISHED SUR J"IN Nu JIM GIE x 5cnaN x i/a TANK,3500GAL,FR P,96D,AC I D,BOZEMAN,MT in: THIRD ARM SCAlE P."NUHBEA NAIERAL I NUMBER 64563 DOC au"" I M00026759 SHEET 1 al 1 PROJECTION 1 24 01.00163 Copyright 2010 PALL CORPORATION IMPORTANT:BEFORE AUEMPBNC TO OPERATE OR INSTALL THIS SYSTEM,IT IS ESSENTIAL TO This document may contain confidential technical data,including trade secrets READ AND UNDERSTAND THIS PRODUCTS OPERATION AND MWNTEMI MANUAL(SHIPPED proprietary to Pall Corporation. The drawing,design rights and all other disclosures UNDER SEPARATE COVERJ. FA/LURE TO REV ME OPERAI/OV AND MNNZENANCE MANUAL in this document are the properly fa Pall Corporation. Unauthorized use,copying, BEFORE ATTEMPBNG TO OPERATE ANY PALL CORPORATION EQUIPMENT MAY RESULT IN SERIOUS transited.distribution l0 third potties,manufacture,or reproduction in whole or in part is PERSONAL INJURY AND/OR PRODUCT DAMAGE,AND MAY 10ID ANY AND/OR ALL WARRANTIES. hib 8 7 6 5 4 3 2 1 ......M AUTOCAD cw n,—--Bomar.—.cio-min