HomeMy WebLinkAboutResolution 4334 Authorizing award of alternative project delivery contract for Bogert Pool Renovation*�
COMMISSION RESOLUTION NO. 4334
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN,
MONTANA, AUTHORIZING THE AWARD OF AN ALTERNATIVE PROJECT
DELIVERY CONTRACT FOR THE BOGERT POOL RENOVATION
WHEREAS, § 18-2-502, MCA, authorizes the City to use and alternative project delivery
contract. A governing body that uses an alternative project delivery contract shall determine that the proposal
meets at least two of the sets of criteria described in § 18-2-502, MCA, subsections (2)(a) through (2)(c) and
the provisions of subsection (3).
WHEREAS, Bogert Pool Renovations must be completed within the time constraints specified in §
75-10-736, MCA, and therefore the project has significant schedule ramifications and using the alternative
project contract is necessary to meet critical deadlines by shortening the duration of construction.
WHEREAS, the type of this project includes aspects of value engineering and construction
planning that would contribute to significant cost savings by allowing the contractor to complete the final
design and construction of the project.
WHEREAS, the scope of the project is highly specialized in nature, such that only contractors
qualified to design and construct pool renovations of this type, the project therefore presents significant
technical complexities that necessitate the use of an alternative delivery project contract.
Montana:
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman,
Section I
That Chris Kukulski, Bozeman City Manager, is authorized to execute on behalf of the City of
Bozeman an alternative delivery contract for the Bogert Pool Renovation.
Section 2
That Chris Kukulski, Bozeman City Manager, will ensure that the contract will be awarded in an
appropriate planner that will not encourage favoritism or bias nor substantially diminish competition, by
conducting the process in such a manner that only qualified contractors will be eligible, and that the award
will be based upon experience and expertise of the applicants.
PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a
regular session thereof held on the 29th day of August 2011.
01 13 *
ATTES
Stay.h
City erk� �EB3 a,
Je y uss, ayor