Loading...
HomeMy WebLinkAboutRevised Amendment to the Professional Services Agreement with Great West Engineering for Closure of Class IV Cell, Landfill Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Dustin Johnson, Project Engineer Richard Hixson, City Engineer SUBJECT: Amendment to Professional Services Agreement with Great West Engineering in an amount not to exceed $33,000. For the design, surveying, bidding, and construction management services for the closure of the Class IV cell (construction waste) at the City owned Story Mill Landfill. MEETING DATE: August 29, 2011 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize City Manager to sign Amendment to Professional Services Agreement with Great West Engineering for the closure of the Class IV cell at the Story Mill Landfill. BACKGROUND: The City of Bozeman Solid Waste Division has been contracted with Great West Engineering since 1998. The nature of the contract has been to update closure and post closure costs during the operation of the landfill, track landfill capacity, update any necessary base maps, and prepare all engineering documents for closure of the landfill cells. Previously the City closed the active class II cell at the Story Mill Landfill. The class II cell was the primary cell used for disposal of house hold waste. The City chose to keep the class IV cell open. The class IV cell is used for disposal of building materials such as asphalt, wood, and concrete. For the last five years the class IV cell was reserved for city operations disposal only because of its limited capacity. By next spring the class IV cell will reach capacity, and we need to begin the process of closing the cell. This closure will be the end of all permitted landfill cells at the Story Mill Landfill. Great West Engineering has proposed to provide the necessary engineering services to close out the class IV according to State and Federal standards. They propose to perform this on an hourly rate basis with the cost not to exceed $33,000. Initial estimates for the construction cost for this closure are approximately $150,000. This amount is reasonable based on the work to be performed. The actual closure work with be bid next spring and the work awarded to the lowest responsive bidder. 10 FISCAL EFFECTS: The entire project will be funded through the Solid Waste Landfill Closure/Post-Closure Fund. This fund has a balance of $1,660,876.97 and is required by the Department of Environmental Quality to be reserved solely for the closure and post-closure monitoring of the landfill cells. ALTERNATIVES: As suggested by the City Commission. Attachments: Task Order FF from Great West Engineering Amendment No. 2 to Professional Services Agreement Report compiled on: 8/11/2011 11 12 13 14 15 16 17 18 19