HomeMy WebLinkAboutRevised Approve Resolution No. 4337, Changer Order 1, 2011 Water Renovations Project Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Andrew Kerr, Engineering Assistant Rick Hixson, City Engineer Chuck Winn, Assistant City Manager SUBJECT: 2011 Water Renovations, Change Order No. 1 MEETING DATE: August 29, 2011 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to sign Change Order No. 1 to the 2011 Water Renovations contract. BACKGROUND: This change order is being proposed to direct the contractor to remove approximately 616 linear feet of deteriorated vertical curbing on the west side of S. Bozeman Avenue in conjunction with the water line replacement trenching operations, and install new integral curb and gutter. This will allow for a better trench patch as well as facilitate a future milling and re-paving of S. Bozeman Ave. Driveway aprons and some service walks would also be removed and replaced in conjunction with the curb replacement. The quote provided by the contractor for this work is reasonable and approximately 25% less than we anticipated it could cost. UNRESOLVED ISSUES: None known. ALTERNATIVES: Do not replace the curbing at this time. FISCAL EFFECTS: The cost of this work is estimated to be $20,643.00, with final cost being determined by actual installed quantities. The proposed funding source for this work is the Fuel Tax fund; adequate funds are available in this fund to complete this work. Attachments: Resolution No. 4337 Change Order No. 1 Report compiled on: August 18, 2011 23 24 25 26 27 28 29 30 31