Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Bob Murray, Project Engineer
Rick Hixson, City Engineer
Chuck Winn, Assistant City Manager
SUBJECT: Bozeman Water Reclamation Facility, Digester No. 3 and Solids
Dewatering Building Project – Change Order No. 2.
MEETING DATE: August 22nd, 2011
AGENDA ITEM TYPE: Consent
RECOMMENDATION: Motion and vote to approve and authorize City Manager to sign
Bozeman Water Reclamation Facility, Digester No. 3 and Solids Dewatering Building Project –
Change Order No. 2.
BACKGROUND: Attached is a copy of change order number 2 for the above referenced
project. This change order includes twenty four items. Six of the items are credits while the
other eighteen are additions. Pages two through five of the attached document titled “Change
Order No. 2 Summary” provides a short description of each of the items involved with this
change. Additionally, the remainder of the document contains the detailed backup cost
information for each item.
With the exception of CPR 48, the change order is a wash financially. CRP 48 is an owner
requested change to enclose the sludge load out bay for $150,000. When the overall project was
repackaged and portions rebid, one of the elements that was removed was the sludge storage
building. This was going to be where dewatered sludge was stored through the winter months.
The plan was to dewater the sludge during the summer months and then continue to utilize the
sludge ponds during the winter. The plant staff has analyzed the situation and found that it is
much more cost effective and efficient to dewater the sludge year round and haul it to the Logan
landfill for composting. In order to do this, the sludge load out bay must be enclosed in order to
keep the dewatered sludge from freezing. This item also requires an extension of contract time
of 118 days for substantial completion and 68 days for final completion. No other change in
contract time is being provided with this change. The final recommended increase in cost and
time extension for this change is reasonable and commensurate with the work involved.
UNRESOLVED ISSUES: None
ALTERNATIVES: As suggested by the City Commission.
66
FISCAL EFFECTS: Overall this change order increases the contract amount by $150,187.69
from $5,321,791.10 to $5,471,978.79. This will decrease the contingency on the project from
$442,478.25 to $292,290.56.
Attachments: Change Order No 1, Resolution No 4332
Report compiled on: 8/11/11
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
1 of 2
COMMISSION RESOLUTION NO. 4332
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN,
MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT
WITH MCALVAIN CIVIL CONSTRUCTORS, INC., BOISE, IDAHO.
WHEREAS, the City Commission did, on the 17th day of February 2010, authorize award of the bid
for the Bozeman WRF Digester No. 3 and Solids Dewatering project, to McAlvain Civil Constructors, Inc.,
Boise, Idaho; and
WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or
modifications of the specifications and/or plans of the contract be made by resolution; and
WHEREAS, it has become necessary in the prosecution of the work to make alterations or
modifications to the specifications and/or plans of the contract.
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman,
Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a
municipal corporation, and McAlvain Civil Constructors, Inc., as contained in Change Order No. 2, attached
hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to
execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed
to attest such signature.
269
Resolution No. 4332, Change Order 2 for WRF Digester No. 3 & Solids Dewatering
2 of 2
PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a
regular session thereof held on the 22nd day of August 2011.
__________________________________________
JEFFREY K. KRAUSS
Mayor
ATTEST:
________________________________________
STACY ULMEN, CMC
City Clerk
APPROVED AS TO FORM:
_____________________________________________
GREG SULLIVAN
City Attorney
270