HomeMy WebLinkAbout11- Lower Yards Paving Project Notice of Award to Big Sky AsphaltNOTICE OF AWARD Dated:— TO: Biq Sky Asphalt, Inc ADDRESS: 1220 N. Rouse Ave, Bozeman, IVIT 59715 PROJECT: City of Bozeman Lower Yards Paving Projec CONTRACT FOR: Paving improvements for the City of Bozeman's Lower Yards, 1812 N. Rouse Avenue. You are notified that your Bid dated July 12, 2011, for the above Contract has been considered. You are the apparent Successful Bidder and have been awarded a Contract for Schedule 1 (Areas 1 and 2), paving improvements The Contract Price of your Contract is: fifty eight thousand nine hundred eigh!y seven and 4411 Dollars ($58,987.44). Three copies of the proposed Contract Documents accompany this Notice of Award. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award, that is, by 1 You must deliver to the OWNER 3 fully executed counterparts of the Agreement including all the Contract Documents and Drawings, 2. You must deliver with the executed Agreement the Contract Security (Bonds) as specified in the Instruction to Bidders (page 8), General Conditions (paragraph 5.01) and Supplementary Conditions (paragraph SC-5.02). 3, List other conditions precedent: You must deliver with the executed Agreement the Certificates of Insurance as specified in the General Conditions (paragraph 5.03). Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned, to annul this Notice of Award, and to declare your Bid Security forfeited. Within ten (10) days after you comply with these conditions, OWNER will return to you one fully signed counterpart of the Agreement with the Contract Documents CITY OF BOZEMAN, MONTANA 0 ATTE 13 Zj�� BY; B (CITY MANAGER) AIAI&-,AA 1, 114C701 CO DATE: Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Andrew Kerr, Engineering Assistant Rich. Hixson, City Engineer Chuck Winn, Assistant City Manager SUBJECT: Lower Yards paving — Contract Award MEETING DATE: August 8, 2011 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to sign the Notice of Award to award the contract for the Lower Yards Paving Project, Schedule 1, to Big Sky Asphalt, Inc. in the amount of $58,987.44. BACKGROUND: Bids were opened July 12, 2011, for the Lower Yards Paving project. The project consists of asphalt paving improvements to the gravel parking area around the new Vehicle Maintenance Building. The project was broken into two schedules to allow for flexibility of award to meet the available budget. Schedule 1 consists of paving the area immediately around the Vehicle Maintenance Building. Schedule 2 consists of paving the area on the northerly portion of the yards adjacent to existing storage sheds. Three bids were received, with the low bidder being Big Sky Asphalt, Inc. of Bozeman, MT in the amount of $58,987.44 for Schedule 1 and $24,009.95 for Schedule 2. The bids appear to be competitive with the low bid being approximately 13% below the construction estimate ($95,422.55, total both schedules). A copy of the Certified Bid Tabulation is attached. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: Adequate funds are only available to complete Schedule 1. The total project cost including base bid, 5% contingency, and compaction and concrete testing is estimated to be $63,936.00. Attachments: Bad Tabulation Notice of Award (3) Report compiled on July 26, 2011 w z co 0 20 w a. w LL LL U) 00 >- uj 3: 0 CS O C5 y. 0 Lli < 0 Uj 06 U') O. 0 "D cla 11 C M N C� Z) ca 1r) 0) co U) co LO N on M7 CD C) M as CN co fia T 63 0 M ED 0 cu . E ° _ . C ', 14- O z C 13 r (D cu Gfl G ci N cc L) co to F (o 0 (o V) m E N Lo ttl ai (D CJ m 05 in 67 ca 'o E rij CD 0 0 .—, 0 c 0) z u IV O C5 y. 0 Lli < 0 Uj 06