Loading...
HomeMy WebLinkAboutNotice of Award for the Lower Yards paving Project, schedule 1 to Big Sky Asphalt.pdf Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Andrew Kerr, Engineering Assistant Rick Hixson, City Engineer Chuck Winn, Assistant City Manager SUBJECT: Lower Yards paving – Contract Award MEETING DATE: August 8, 2011 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to sign the Notice of Award to award the contract for the Lower Yards Paving Project, Schedule 1, to Big Sky Asphalt, Inc. in the amount of $58,987.44. BACKGROUND: Bids were opened July 12, 2011, for the Lower Yards Paving project. The project consists of asphalt paving improvements to the gravel parking area around the new Vehicle Maintenance Building. The project was broken into two schedules to allow for flexibility of award to meet the available budget. Schedule 1 consists of paving the area immediately around the Vehicle Maintenance Building. Schedule 2 consists of paving the area on the northerly portion of the yards adjacent to existing storage sheds. Three bids were received, with the low bidder being Big Sky Asphalt, Inc. of Bozeman, MT in the amount of $58,987.44 for Schedule 1 and $24,009.95 for Schedule 2. The bids appear to be competitive with the low bid being approximately 13% below the construction estimate ($95,422.55, total both schedules). A copy of the Certified Bid Tabulation is attached. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: Adequate funds are only available to complete Schedule 1. The total project cost including base bid, 5% contingency, and compaction and concrete testing is estimated to be $63,936.00. 22 Attachments: Bid Tabulation Notice of Award (3) Report compiled on July 26, 2011 23 24 25