Loading...
HomeMy WebLinkAboutResolution No. 4326, Change order 1, Hyalite-Sourdough Water Treatment Plant Membrane Equipment.pdf Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer Chuck Winn, Assistant City Manager SUBJECT: Hyalite/Sourdough Water Treatment Plant – Membrane Equipment Procurement Project – Change Order No. 1. MEETING DATE: July 25th, 2011 AGENDA ITEM TYPE: Consent RECOMMENDATION: Motion and vote to approve and authorize the City Manager to sign Hyalite/Sourdough Water Treatment Plant – Membrane Equipment Procurement Project – Change Order No. 1. BACKGROUND: Attached is a copy of change order number 1 for the above referenced project. The change order is to alter some of the insurance requirements contained in the contract documents. The alterations in contract language included in this change have been reviewed by both engineering and legal staff and have been found to be acceptable. There is no change in contract price or time involved with this change order. UNRESOLVED ISSUES: None ALTERNATIVES: Disapprove FISCAL EFFECTS: This is a no cost change order Attachments: Change Order No 1, Resolution No 4326 Report compiled on: 7/12/11 88 89 90 1 of 2 COMMISSION RESOLUTION NO. 4326 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH PALL CORPORATION, PORT WASHINGTON, NEW YORK. WHEREAS, the City Commission did, on the 24th day of May 2010, authorize award of the bid for the City of Bozeman Hyalite/Sourdough Water Treatment Plant – Membrane Equipment Procurement project, to Pall Corporation, Port Washington, New York; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Pall Corporation, as contained in Change Order No. 1, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 91 Resolution No. 4326, Change Order 1 for WTP Membrane Procurement 2 of 2 PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 25th day of July 2011. __________________________________________ JEFFREY K. KRAUSS Mayor ATTEST: ________________________________________ STACY ULMEN, CMC City Clerk APPROVED AS TO FORM: _____________________________________________ GREG SULLIVAN City Attorney 92