HomeMy WebLinkAboutResolution 4317 Change Order 1, College and 11th, Knife RiverCOMMISSION RESOLUTION NO. 4317 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH KNIFE RIVER, BELGRADE, MONTANA. WHEREAS, the City Commission did, on the 2 " ' d day of May 2011, authorize award of the bid for the College Street and 11"' Avenue Roundabout Project, to Knife River - Belgrade, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Knife River - Belgrade, as contained in Change Order No. 1, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. I of 2 Re•ohnioa No, 4317, Chuage Order I for 11' College Roundahow. PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 13"' day of June, 2011. USS ATTEST.' STA7 City C 6r :G SULLIVAN Attorney 2 of 2 CHANGE ORDER No. 01 DATE OF ISSUANCE. .Tune 1, 2011 EFFECTIVE DATE Unon Owner Authorization OWNER Citv of Bozeman Montana CONTRACTOR Knife River - Belgrade Contract: Dated Mav 17, 2011 Project: College and 11" Street Roundabout OWNER's Contract No ENGINEER Robert Peccia and Associates ENGINEER's Contract No. You are directed to make the following changes in the Contract Documents: Description: Item 1; This change would affect Bid Item No. 55 — Waterline Insulation. The work is to change the water lisle insulation board from 100 psi to 60 psi board. This change will lower the unit price for this work from $95.00 per square yard to $60.00 per square yard, for a difference of $35.00 per square yard. The pricing is based on using BSI 60 psi foam boards with 4 -foot widths. The estimated quantity of this item is 205 square yards, Based on estimated quantities, this change would reduce the contract price by 'Seven Thousand One Hundred Seventy -Five Dollars and Zero Cents (47,175.00). Item 2: This change would affect Bid Item No. 41 -- Electrical. The work is to install additional electrical conduit and pull boxes in preparation for the Owner to install future Rectangular Rapid Flashing Beacons (RRFB) at each cross walk. The work requires revisions to pull box types in some locations, some additional new pull boxes, and additional conduit to run to each pedestrian cross -walk sign base, and conduit elbow sweeps and stubs up thru the sign base to allow for future conductors to be pulled thru the conduit and sign posts. The change would increase the contract price by Five Thousand Nine Hundred Seventy -Five Dollars and Zero Cents (+$5,975.00). Reason for Change Order: Item 1: 1.00 psi board is no longer used for this application by the City due to the historic bid prices received. The City now routinely uses 60 psi board for this application. Item 2: City desires to facilitate future installation of Rectangular Rapid Flashing Beacons (RRFB) at each cross walk. RRFB's are pedestrian activated amber flashers to draw driver's attention to pedestrians at the crosswalk. Actual installation of RRFB will occur after the roundabout is operational if necessary to provide additional pedestrian crossing protections. Attachments: (Dist documents supporting change):. May 20, 2011 Knife River better of Proposed Pricing; May 31, 2011 Knife River Letter, Supplemental to Item 2; Proposed Plan of Electrical Modifications for Item 2 CHANGE IN CONTRACT PRICE: Original Contract Price $ 652.747.35 Net Increase (Decrease) from previous Change Orders No. to $ N/A Contract Price prior to this Change Order: $ 652 Net increase (decrease) of this Change Order: CHANGE IN CONTRACT TIMES: Original Contract Times: Substantial Completion: 60 calendar days Ready for final payment: (days or dates Net change from previous Change Orders No. _ to No. _ Substantial Completion: No Change Ready for final payment: -__days) Contract Times prior to this Change Order: Substantial Completion: 60 calendar days Ready for final payment- ( days s or dates) Net increase (decrease) this Change Order: Substantial Completion: Zero 0 Page 1 of 3 C Documents and SetUngs\steve.baeth \Local Settings \Temporary Internet Files\ Con tent. Outlook\ 7XBB2L8M \Roundabout_Changeorder_No1 RBVbyBMKdoc $ (-1 decrease Contract Price with all approved Change Orders: S 651 547.35 Ready for final payment: (days) Contract Times with all approved Change Orders: Substantial Completion: 60 calendar days Ready for final payment: (days or dates) Contractor certifies and agrees that there are no additional costs or claims for extra work, additional time, delays or omitted items, of any nature whatsoever, associated with the subject change order items, except as identified and set forth herein and unless expressly stated otherwise in the Change Order. And further, that the price agreed -upon herein represents the full cost and value for the subject work performed and the materials supplied under the terms of the contrail end th4t wptk Stuantities and value were properly determined and are correct, EJCDC 1910 -8 -B (1996 Edition Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Conti of America and the Construction Specifications Institute. Page 2 of 3 C; \Documents and Settingststeve.baetMl_ocaP Setting slTemporary Internet Files\ Con tent. 0ullock1 7XB62L8M \Roundabout_ChangeOrder_No I_ R EVbyBM Kdoc