Loading...
HomeMy WebLinkAboutResolution 4315 Change Order No. 2, College and Huffine Pathway, Duneman ConstructionCOMMISSION RESOLUTION NO. 4315 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH DUNEMAN CONSTRUCTION, BELGRADE, MONTANA. WHEREAS, the City Commission did, on the 16th day of August, 2010, authorize award of the bid for the Construction of the College/Huffine Pathway to Duneman Construction, Belgrade, Montana; , M] WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Duneman Construction, Belgrade, Montana, as contained in Change Order #2, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 1 of 2 Resohilion No. 4313 Change order . PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 16"' day of May, 201 : VF USS W)k. KRA or ATTEST: ,„, C ; L 60 % U Pz� 83 co, Page 2 oft PROJECT TITLE: C6lege_&Huff ine Shared-Use Pathway – Bozeman (a CTEP pro'ect) CTEP PROJECT NO.: STPE 1299W) CHANGE ORDER NUMBER: DATE OF CHANGE ORDER: April 27,2011 CONTRACT DATE: September 3, 2010 / Notice to Proceed: October 4, 2010. Project is currently in Winter Shutdown with Anticipated Work Starting UD May 2, 2011 (Subiect to Weather Conditions) OWNER: City of Bozeman CONTRACTOR: Construction, Inc. Change orders must be accompanied by an itemized cost breakdown, i.e.: unit prices, negotiated lump sum prices, negotiated cost plus basis. Note all cost plus pricing tobe supported by documentation which supports the cost of that Item Description Quantity Unit Unit Price —7 Amount Basis — Ofunit Pric Number I Relocate Pul� ADA i - LS $7,20 +$7,20000 - Negotiated LS Cost Additive Alternate No I Work JUSTIFICATION OF CHANGE ORDER: Item 1:During construction, the work uncovered a buried electrical pull box at the corner of Ferguson Avenue and Huffine Lane. The pull box is in conflict with the proposed curb and gutter and ADA pedestrian ramp. The Contractor has coordinated with numerous potential electrical subcontractors to obtain a cost estimate with limited success over the course of the winter shutdown. The original proposal of $17,536.26 by another electrical subcontractor was rejected as excessive. The City since supplied the Contractor with a list of contractors that they usually send requests for signal work. Of those, it was noted that Gallatin Electric does a good job and is reasonable. Gallatin Electric has thoroughly acoped the work with MDT and provided this second quote. The pull box will be relocated –25'mutof the street. The work includes trenching, new conduit, approximately 1,000' of signal cable for loop sensors, re-using pedestrian pole cable, and new ground. In coordination with MDT, theacceptable traffic control would be candles along the shoulder of Huffine Lane. Full lane closure would likely not benecessary. Item 2: This Change Order will eliminate the bid Additive Alternate No, 1in its entirety. The proposed work, if constructed, would traverse thru a park area on the Montana State University (MSU) campus, of which MSU would have tu perpetually maintain. The widened path, if constructed, would not fit the purpose and need for the park area. Instead, it is desired by MSU to leave the narrower, existing sidewalk in place; that is and will remain to be suitable to meet K4SU'm purpose and need. Likewise, eliminating construction mf this item would eliminate concerning impacts tu park trees and shrubbery. Change Order Page 1 SUMMARY OF COST AND TIME: COST BREAKDOWN TIME BREAKDOWN: ORIGINAL CONTRACT PRICE: $439,719.15 START OF CONSTRUCTION: October4, 2010 PREVIOUS CHANGE ORDER AMOUNT: +$13,056.50 CALENDAR DAYS BY CONTRACT, 50(C.O. No. 1) CURRENT CONTRACT PRICE: $452,775.65 CONTRACT COMPLETION DATE: (The Proiect is in a Current Winter Shutdown. Estimated Completion May 21. 2011) AMOUNT OF THIS CHANGE ORDER: (-$11,750,00) — NUMBER OF DAYS GRANTED THIS CHANGE ORDER: 0 NEW CONTRACT PRICE 5441,025.65 NEW CONTRACT COMPLETION DATE: No Change. 20 Calendar Days Remain The completion date as set forth in the contract documents shall be (unchanged,_Increased, decreased) by Q_ calendar days. The date for completion of all work will be May 21, 2011 . based on 20 Calendar Days remaining, and if the Work proceeds from its current winter shutdown beginning May 2, 2011, which is the anticipated spring startup date based on current coordination, APPROVALS: Surety consent is required if the net increase of this change order and ali previous change orders exceeds 20% of the original contract amount. Note: The following Surety Consent is NA as this Change Order No. 2, along with the previously approved Change Order No. I does not exceed 20% of the original contract amount. SURETY CONSENT The surety hereby consents to the aforementioned contract change order and agrees that its bond or bonds shall apply and they extend to the contract as thereby modified or amended per this change order. The principal and the surety further agree that on or after execution of this consent, the penalty of the applicable performance bonds or bonds is hereby increased by $ (100% of the change order amount) and the penalty of the applicable labor and material bond or bonds is hereby increased by $ 11 —__ (100% of the change order amount). COUNTERSIGNED BY MONTANA RESIDENT AGENT SURETY (Engineer) ReGOMmen (Contractor) Accepted (Owner) Approved by: 0 Seal J,.2- 1 Z ) I Date 21 Z- Date — I JZ,7 12011 Date Change Order Page 2