Loading...
HomeMy WebLinkAboutApprove Signing and Striping plan for Bike Lane on Peach Street.pdf Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Andrew Kerr, Engineering Assistant Rick Hixson, City Engineer Chuck Winn, Assistant City Manager SUBJECT: Peach Street Bike Lanes MEETING DATE: June 6, 2011 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve signing and striping plan for bike lane designations on Peach Street from N. 7th Avenue to Rouse Avenue. BACKGROUND: At the March 21, 2011 Commission meeting, the City Commission approved the designation of bike lanes on Peach Street from N. 7th Avenue to Rouse Avenue, and directed staff to bring back a signing and striping plan for approval. The attached plan shows bike lane designations as directed by the Commission: parking will remain on the north side from Rouse Avenue to N. 6th Avenue, parking will be eliminated on the south side for the entire length and on the north side from N. 7th Avenue to N. 6th Avenue, and the roadway centerline will transition between 7th and 6th to allow for the required three-foot centerline shift. UNRESOLVED ISSUES: None identified. ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: The estimated cost for the required signs and markings to install bike lanes is $15,620, with the lane line work being done by contract and the signing and other pavement marking work done by the Sign Department. Currently there is $17,500 designated in the Street Maintenance fund for bike lanes. The maintenance cost of these bikes lanes is estimated to be approximately $1,400 per year for annual re-striping, sign depreciation, and occasional replacement of bike lane symbols. Attachments: Peach St. Bike Lanes Signing & Striping Plan Report compiled on: May 19, 2011 100 101