HomeMy WebLinkAbout11- College and 11th Roundabout Agreement with Knife River of BelgradeAGREEMENT FORM
�
r � tk
�
THIS AGREEMENT is dated as of the . day of in the year 2011, by and between
CITY OF BOZEMAN, hereinafter called OWNS d KNIFE RIVER - BELGRADE
hereinafter called CONTRACTOR.
OWNER AND CONTRACTOR, in consideration of the mutual covenants hereinafter set forth,
agree as follows:
Article 1. WORK.
CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents.
The project work is generally described as follows: Reconstruction of the West College Street
and South l I"' Avenue intersection, to modify the current four -way stop controlled intersection
into a new roundabout. The work includes street excavation, subexcavation, gravel base course,
asphalt pavement, Portland Cement Concrete Pavement truck apron, curb and gutter, median
islands, sidewalk, storm drain., utility adjustments and relocations, street lighting, topsoil,
sprinkler irrigation relocations and sod.
The project for which the Work under the Contract Documents may be the whole or only a part is
generally described as follows: COLLEGE AND 11 in STREET ROUNDABOUT.
Article 2. CONTRACT TIME.
2.1 The Work will be completed within 60 days after the date when the contract time
commences to run as provided in the General Conditions. Work shall be complete by no
later than August 23, 2011. Final payment will be withheld until final completion and
acceptance of the Work, as stipulated in this Agreement.
12 Liquidated. Damages. OWNER and CONTRACTOR recognize that time is of the essence in
this Agreement and that OWNER will suffer financial loss if the Work is not substantially
complete within the time specified above, plus any extensions thereof allowed in accordance
with the General Conditions. They also recognize the delays, expense and difficulties
involved in proving, in a legal or arbitration proceeding, the actual loss suffered by OWNER
if the Work is not substantially complete on time. Accordingly, instead of requiring any
such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but
not as a penalty) CONTRACTOR shall pay OWNER two hundred dollars (5200.00), plus
engineering expenses as stipulated in the Contract Documents, for each day that expires after
the time specified herein until the Work is substantially complete.
Article 3. CONTRACT PRICE.
3.1 OWNER shall pay CONTRACTOR for performance of the Work in accordance with the
Contract Documents the sum (subject to adjustment as provided in the Contract Documents)
of Six Hundred Fif - Two Thousand Seven Hundred Forty-Seven Dollars and Thirty-Five
Cents ($ 652,747.35
Article 4. PAYMENT' PROCEDURES.
CONTRACTOR shall submit applications for payment in accordance with the General Conditions.
Applications for payment will be processed as provided in the General Conditions,
4.1 Progress Payments. OWNER will make progress payments monthly on account of the
contract price on the basis of CONTRACTOR'S application for payment as recommended by
ENGINEER. All progress payments will be on the basis of the progress of the Work
measured by the schedule of values provided for in the General Conditions.
4.1.1 The OWNER may retain five (5) percent of the amount due the CONTRACTOR in
accordance with the General Conditions and as outlined herein..
4.2 Final Payment. Upon final completion and acceptance of the Work in accordance with the
General Conditions, OWNER shall pay the remainder of the contract price as recommended
by ENGINEER.
Article 5. INTEREST.
All monies not paid when due hereunder shall bear interest at the simple rate established by
the Federal Cost of Money Rate commencing at the time of a claim..
Article 6. CONTRACTOR'S REPRESENTATIONS.
In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the
following representations:
6.1 CONTRACTOR has familiarized himself with the nature and extent of the Contract
Documents, Work, locality, and with all local conditions and federal, state and local laws,
ordinances, rules and regulations that in any manner may affect cost, progress or
performance of the Work.
6.2 CONTRACTOR has studied carefully all reports of investigations and tests of subsurface
and latentphysical conditions at the site or otherwise affecting cost, progress orperformance
of the Work which were relied upon by ENGINEER in the preparation of the drawings and
specifications and which have been identified in the modifications to the General Conditions,
6.3 CONTRACTOR has made or caused to be made examinations, investigations and tests and
studies of such reports and related data in addition to those referred to above as he deems
necessary for the performance of the Work at the contract price, within the contract time and
in accordance with the other terms and conditions of the Contract Documents, and no
additional examinations, investigations, tests, reports or similar data are or will be required
by CONTRAC'T'OR for such purposes.
6.4 CONTRACTOR has correlated the results of all such observations, examinations,
investigations, tests, reports and data with the terms and conditions of the Contract
Documents.
6.5 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or
discrepancies that he has discovered in the Contract Documents and the written resolution
thereof by ENGINEER is acceptable to CONTRACTOR.
Article 7. CONTRACT DOCUMENTS.
The Contract Documents which comprise the entire Agreement between OWNER and
CONTRAC'T'OR are attached to this Agreement, made a part hereof and consist of the following:
7.1 This Agreement.
7.2 Exhibits to this Agreement (if any).
7.3 Performance Bond, Payment Bond, and Bid Bond.
7.4 Invitation to Bid.
7.5 Instructions to Bidders and Bid Form.
7.6 Certificate(s) of Insurance.
7.7 General Conditions.
7.8 Supplementary Conditions.
7.9 Wage Rates.
7.10 Special Provisions and Measurement and Payment.
7.11 Montana Public Works Specifications, Fifth Edition, dated 2003, with addenda, and City of
Bozeman Modifications to Montana Public Works Standard Specifications Fourth Edition,
March 2004, including Addenda No.. 1, 2, and 3.
7.12 Technical Specifications
7.13 Appendix A.
7..14 Addenda listed on the Bid forms,
7.15 CONTRACTOR'S executed Bid forms.
7.16 Documentation submitted by CONTRACTOR prior to Notice of Award.
7.17 Notice of Award.
7.18 Notice to Proceed.
7.19 Any modification, including Change Orders, duly delivered after execution of Agreement.
7.20 Any Notice of Partial Utilization.
7.21 Notice of Substantial Completion,
7.22 Notices of Final Completion and Acceptance.
7.23 Non - Discrimination Affirmation Dorm
There are no Contract Documents other than those listed above in this Article 7. The Contract
Documents may only be altered, amended or repealed by a modification (as defined in the General
Conditions).
Article 8. MISCELLANEOUS.
81 Terms used in this Agreement which are defined in the General Conditions shall have the
meanings indicated in the General Conditions,
8.2 This Agreement and all of the covenants hereof shall inure to the benefit of and be binding
upon the OWNER and the CONTRACTOR respectively and his partners, successors,
assigns, and legal representatives. Neither the OWNER nor the CONTRACTOR shall have
the right to assign, transfer or sublet his interest or obligations hereunder without written
consent of the other party. The OWNER reserves the right to withdraw at any time from any
subcontractor where Work has proven unsatisfactory the right to be engaged in or employed
upon any part ofthe Work.
8.3 In the event it becomes necessary for either party to this Agreement to retain an attorney to
enforce any of the terms or conditions of this Agreement or to give any notice required
herein, then the prevailing party or the party giving notice shall be entitled to reasonable
attorney's fees and costs.
8.4 Any amendment of modifications of this Agreement or any provisions herein shall be made
in writing and executed in the same manner as this original document and shall after
execution become a part of this Agreement.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the day and year first
above written.
ONT '0
B
(JOINT VENTURE)
By
Title
City of Bozeman
(0 ER)
B4
(CITY MANAGER)
APPROVED AS TO FORM:
ITY ATIIORNY)
(SEAL &)
(ATTEST
(SEAL &)
(ATTEST)
S�T
A�
-6
04/26/2011 15:36
�J1BZ1103A College & I Ith Roundabout
* ** Knife River - Steve Baeth BID TOTALS
Biditem
Description
uantity
Knits
(Unit Price
Bid Total
i
Mobilization /Bond /Ins /Submittals
1.000
LS
32,500.00
32,500.00
2
Survey /Staking /Testing
1.000
LS
31,150.00
31,150.00
3
Traffic Control
1.000
LS
9,250.00
9,250.00
4
Erosion Control /Permits
1.000
LS
3,000.00
3,000,00
5
Remove Trees
18.000
EA
110,00
1,980.00
6
Remove Structure
1.000
EA
1,200.00
1,200.00
7
Street Exc & Removals
1,145,000
CY
25.00
28 „625.00
8
Subexcavation
2,168.000
CY
18.00
39,024.00
9
Crushed Base Course 1 -112" Minus
578.000
CY
27.00
15,606.00
10
Plant Mix Bit Surf
605.000
TN
75.00
45,375.00
11
Cone Iavement 9" Colored/Pattemed
374.000
SY
95.00
35,530.00
12
Special Borrow
2,318.000
CY
30.00
69,540,00
13
Flowable Fill
12.700
CY
100.00
1,270.00
14
Remove Storm Drain
323.000
LF
25.00
8,07500
15
Remove Manholes
2.000
EA
1,500,00
3,000.00
16
Remove Curb Inlets
1000
EA
275.00
825.00
17
8" PVC Storm Drain
I0.000
LF
26.00
260.00
18
12" PVC Storm Drain
120.000
LF
30.00
3,600.00
19
15" PVC Storm Drain
140.000
LF
34.00
4,760.00
20
18" PVC Storm Drain
38.000
LF
54.00
2,052.00
21
RCP 18" C1 -3 Storm Drain
62.000
LF
55.00
3,410.00
22
Manhole 48"
3,000
EA
3,000.00
9,000.00
23
Manhole 60"
1.000
EA
3,500,00
3,500.00
24
Manhole 60" Special Design
1.000
EA
3,800.00
3,800,00
25
24" Riser Inlet
1.000
EA
800.00
800,00
M
36" Curb Inlet
1000
EA
1,600.00
3,200.00
27
48" Manhole /Curb Inlet
1000
EA
2,000.00
4,000.00
28
Manhole Lid & Frame
1.000
EA
600.00
600.00
29
Concrete Sidewalk 4"
1,228.500
SY
38.00
46,683.00
30
Concrete Sidewalk 6"
89.000
SY
45.00
4,005.00
3I
Concrete Median Cap
164.300
SY
30.00
4,929.00
32
Detectable Warning Devices
28.800
SY
275.00
7,92.0.00
33
Concrete Median Curb
512.100
LF
8.00
4,096.80
34
Concrete Curb & Gutter
1,210.700
LF
9.50
11,501.65
35
Sodding/Topsoil
965.000
SY
11.00
10,615.00
16
Landscaping
1.000
LS
8,000.00
8,000.00
17
Rip Rap
8.000
CY
95,00
760.00
38
Retaining Wall
96.000
SF
26.00
2,496.00
19
Bollards
6,000
EA
450.00
2,700.00
!0
Remove &, Salvage Luminaires
6.000
EA
600.00
3,600.00
11
Electrical
1.000
LS
45,000.00
45,000.00
12
Sign Removal
20.000
EA
80.00
1,600.00
13
Sign Installation
48.000
EA
400.00
19,200.00
4
Flexible Delincators
20.000
EA
68.00
1,360.00
15
Pavement Markings
1.000
LS
49,000.00
49,000.00
16
Remove Water Service
1.000
EA
550.00
550.00
17
ReIocate Sprinkler System
4.000
EA
2,000.00
8,000.00
8
Adjust Water Service Line
1.000
EA
2,500.00
2,500.00
-9
Adjust Manholes
2.000
EA
250.00
500.00
;0
Adjust Water Valve
2.000
EA
110.00
220.00
I
Adjust Curb Box
1.000
EA
75.00
75,00
�2
Adjust Gas Valve
1.000
EA
110.00
110.00
3
Monument Box
1.000
EA
350.00
350,00
1
04/26/2011 15:36
JIBZI 103A College & 1 lth. Roundabout
* ** Knife River - Steve Baeth BID TOTALS
Biditern
Description
Quantftv
Units
Unit Price
Bid Total
54
Geotextile- Stabilization
3,841.000
SY
1.90
7,297.90
55
Waterline Insulation
205.000
SY
95.00
19,475.00
56
MC -70 Prime
2,732.000
SY
4.2.5
11,61 1.00
57
Asphalt Sea] Coat
2,732,000
SY
5.00
13,660.00
Bid Total =_ -- = -> $652,747.35