HomeMy WebLinkAbout11- Change Order 21, City Shops - HRDC Bus Barn, BN BuildersduwU [ I o� yan6�obn arch
JOINT OWNER CHANGE ORDER
Project: �Cdy Shops/ HRDC Bus Barn
1821 N. Rouse Ave
Bozemen, MT 59715
To Contractor: BN Builders, Inc
2000 Stadium Or. Ste 102
Bozeman, KAT5A715
Date: April 4, 2011
Architect's Project No: 08-265
Contract Date: November 4, 2009
I
Owner �
ArchiteQt �
Contractor M
Field []
Other
Contract For: General Construction
The Contract hs changed mufollows:
Increase Contract Sum.
Reason for change:
CP#5O— Crane Voltage
CP#71— Heat Tape for Gutters
CP#75— Canopy Fix
CP#78— Heat Tape mtwayhbaygutter
Attachment(s):
QP#5O(10O96COB);CP#71(50% COB /5096HRDC);CP#75(5Q% COB /6O96HRDC);CP#78(S8%
COB/ 5O,&HRDC)
Total Contrac SumAdiustnent:
The original Contract Sum was
The net change by prev authorized Change Orders $ 239,264.63
The Contract Sum prior tothis Change Order was
The Contract Sum will be increased [by this Change Order by the amount of $
The new Contract Sum including this Change Order will be
City of Bozeman Contract Sum Ad
The original Contract Sum was
The net change bypreviously authorized Change Orders
The Contract Sum prior tu this Change Order was
The Contract Sum will be increased by this Change Order by the amount of
(66.3% of Total Change Order)
The new Contract Sum including this Change Order will be
HRDC Contract Sum Adiustment:
The original Contract Sum was
The net change by previously authorized Change Orders
The Contract Sum prior tm this Change Order was
The Contract Sum will be increased by this Change Order by the amount of
(33.79&of Total ChangoOnder)
The new Contract Sum including this Change Order will be
$ 858,368.59
$ 139.904,99
$ 998,273.58
$ 1.003706.26
Contract Time Adiustmeft
The Contract Time will be increased by_zero (0) days.
The date of Substantial Completion as of the date of this Change Order therefore is: November 24. 201
JOINT OWNER CHANGE ORDER C.O. #21
Not valid until signed,by Architect, contractor, and Owners.
Signatures:
Architect: Dowling Sandholm Architects By: Date: (0
15 West 14 Street — Suite 103
Helena, Mt 59601 Cx
Place Architecture By: Date:
118 E. Main St Sas44azeminejad
Bozeman, MT, 59715
Contractor: BN Builders, Inc By: Date:
2066 Stadium Dr,, Ste 102
Bozeman, MT 59715
Owner: City of Bozeman By: Date: 2-S
P.O. Box 1230 Chris Kukulski
Bozeman, MT 59771
Human Resource By: Date:
Development Council Lee Hazelbaker
32 South Tracy
Bozeman, MT 59715
Patie 2 of 2
File 21 f
00421 —Jointdoc
02/10/2011 1,0:45 FAX 406S88218G
Gallatin Eje,i r10, 11
101 Banz Lang
1309Mcit✓, M T59714
Name/Address - --
BN Builders Vic.
293 Roden Drive #2
Florence MT 59933
Description
Install Heat Tape on Wash Bay
Heat 11612 Ray Cable 120W Wet
11911 120V Jbox w ✓GFEp
Heat 11915 Ray Dowmpout 11anger Bracket
Heat 11900 Ray Power Connect Kit
Conduit 112" EMI`
Connector 162" EMT SS
Coupling 112 EMT SS
!Wire 10 7HHN Solid CU
Brea! cr TRQB 11.20 1 P 20A Bolt -1n
Box 4SQ 2.1/8 D 112" KG Sti.Cty
Cover 4SQ Blank 54 -C
Rick - Labor Camercial New Bucket Tr
Rick - Labor Commercial NmV
Lift Rental - Per Day
Signature
GALLATTN ELECTRIC INC.
001/003
Change
Ord er
- Project
Cate
Trac king #
2/1012011
3258
Galfatin Electric CQ#
: Glient CO #
- Project
Washhay Heat Tape
Qt y
Cost
Markup
Total
100
371.00
15.00%
426.65
1
127.67
15.00%
146,82
1
12.61
15,00%
14.50
1
175
22.53
33.25
15.00 %0
25.41
6
d.$4
15.00%
38.24
18
3.2A
15.0[1° /n
15.00%
0.97
550
1
132.00
15.00n y
3.73
151.80
1
15.56
15.00'0/4
17.89
2
1.84
15.00%
2.12 112
6
0.64
15.000/0
16
600.00
15.00%
690.00
2
720
15,00%
518.00
10000
. .
15.00%
115.40
Phone # Fax # _ E -mail .
406u3$4-21�ai0- 38 -21i3t risk
9���t #in�lrirv(rp
$1,462.37
Vverhead & Profit
BNBuilders OH & Profite Subcontractors X296,24
Total. $2,708.61
Wednesday, March 2, 2011
Sash KazemfNejad
Place Architecture, PLLC
RE.' Change Proposal � CP# 76
Bozeman City Bus Barn ® 509012
Dear Sash KaZemiNeiad,
This letter is to request authorization to proceed with the following extra work.
CP Number: 76
Description- Heat Tape on Washbay Gutter
Proposed Amt. $ 2,708.61
Days Requested: 0 days
,Scope of Work (see attached for detailed cost summary):
Provide labor, equipment and materials to install heat tape on washbay gu tters per owner request.
anticipated that the work will take approximately I week, but no addition o er It is
can take place concurrent with canopy fixes (included on CP 75). al GC's are included for this work if it
Fj Please sign below and return a cOPY Of this letter to indicate your acceptance of this extra work and approve the
price for this work. Addltlonal costs may apply if authorization is received after ,
E] 13N]Builders has proceeded with this work per previous ROM approval (attached). This change Proposal represents
the final price for this work,
El ENBUIlders has proceeded with this work based on owner approval Via email (see attached) or verbal direction.
This change proposal represents the final Price for this work.
Submitted y:
V') Accepted by: mate:
Jay Sash KaZeMlNejad
,5 co "Uilaers Place Architecture, PLLC
Date: 2/09/11
To:Jenae
Regarding: Canopy
TOTAL PRICE-, $ 1447.00
Respectively Submitted,
Mike Pearson
Welding and Machine Inc.
(406) 586-1934 Phone
(406) 586-5371 Fax
The following is the brake down for this job,
& Machine
$1,447.00 1
UI4DU[qUk--jb Overhead & Profit
BNBuilders OH & Profite Subcontractors �$450.00
$144.70
Total. $5,041.70
Wednesday, March 2, 2011
Sash KazemiNejad
Place Architecture, PLLC
RE: Change Proposal - CP# 75
Bozeman City Bus Barn - 509012
Dear Sash KazemiNejad,
This letter is to request authorization to Proceed with the following extra work.
CP Number: 75
Description: Canopy Fix - per owner request
Proposed Amt. $ 5,041.70
Days Requested: 0 days
SC Work (see attached for detailed cost summary):
Provide labor, equipment & materials to modify building canopies per owner request. CP includes quoted sub
cost along with 1 week of addt'l field management based an the schedule given by the subcontractor.
Rease sign below and return a copy of this letter to indicate your acceptance of this extra work and approve the
price for this work. Additional costs MY apply if authorization is received after ,
BNSuffders has proceeded with this work Per Previous ROM approval (attached) This change proposal r P
the final price for this work. , is hang r sal e resents
u
171 BNB liders has proceeded with this work based on owner approval Via email (see attached) or verbal direction.
This change Proposal represents the final Price for this work.
Accepted by: Date
Submitte * ,
AA CA
Sc _c tt 7
ttjay
Builders Sa- KazemiNejad U ers Place Architecture, pLLC
Gallatin Electric, Inc
101 Bartz Lane, Belgrade XT 5 9 714
TO:
BN Builders
M Rodeo Drive #2
Florence MT 59833
Proposal # 1664
Date: 1/2412011
Phone: 406-396-0664
Fax: brian.nostrant@bnbuilders.com
Project: Specifications: Electrical
Scope Of Work:
PLANS AND SPECIFICATIONS.
Heat tape in gutter on 4 corners
Install heat tape on 1 0' gutters in the 4 corners of the office area on shop roofs.
Price includes all heat tape, conduit, Oft rentals, material and labor.
Two Thousand Five Hundred Eighteen dollars and .24/1 00
'Proposal - $2t - 518.24
r �,L �*Z -�
ft is understood and agreed that we shall not be liable for any loss, damage, or delays occasioned by fire, strikes, or material stolen after delivery
upon premises, lookouts, acts of God, public enemy, accidents, boycotts, material shortage, disturbed labor conditions, delayed delivery of
material from seller's suppliers, force majeure, inclement weather, floods, freight embargoes, causes incidental to national emergencies, war,
or other causes beyond the reasonable control of the seller, whether of like or different character, or other causes beyond his control. Prices
quoted in this contract are based upon present prices and upon the condition of the proposal being accepted within thirty days. Aiso general
conditions which are standard for specialty contractors in the oonstruction, industry.
In the event of significant delay or price increase of material occurring during the performance of the contract through no fault of the Contractor,
the contract sum, time of performance, or contract requirements shall be equitably adjusted by change order in accordance with the procedures
of the contract documents. A change in price of an item of material shall be considered significant when the price of an item is between
the date of this contract and the date of installation,
- TERMS
Due Upon Completion
TliLS PROPOSAL ISSUBMMINDUPLJCATE Ott ELECTROACALLY,nTMNTOUS 0F ONE COPY WITS J
SIGNATM VIA MAIL OR ff-'ECTRONICALLYWILL CON'Sn=A CONMACT
406-388-2126 P
406-388-2186 F
rick (a).gallatinelectrieservice.com
ACCEPTED
BY
Z
project #: 509012 CP 71
Bozeman City Bus Barn
1812 N. Rouse Avenue
B N B Bozeman, NIT 59715
BNBuilders Phone: 406-582-7412
Fax: 406-582-7436
Contractor
DescriDtion
Amount
Gaflatin Electric
Provide labor, materials, and equipment in the
four gutters on the high roof on the City Shops
and Bus Barn.
$2,518,24
BNB MSU Office
Is
5300.00
13NIBuMers
Overhead & Profit
$45.00
BNBuilders
OH & Profit Subcontractors
$251-82
Total. $3,115.06
Tuesday, January 25, 2011
Sash KazemlNejad
Place Architecture, PLLC
RE: Change Proposal - CP# 71
Bozeman City Bus Barn - 509012
Dear Sash KazemlNejad,
This letter is to request authorization to proceed with the following extra 'work:
CP Number 71
Description: Heat Tape for Gutters
Proposed Amt- $ 3,115.06
Days Requested: 0 days
Scope of Work (see attached for detailed cost summary):
Provide labor, materials, and equipment for installing heat tape on the four corners of the higher gutters per
Architect's request,
please sign below and return a copy of this letter to indicate your acceptance of this extra work and approve the
for this work. Additional costs may apply if authorization is received after .
BNBuilders has proceeded with this work per previous ROM approval (attached). This change proposal represents
the final price for this work,
rj BNBuilders has proceeded with this work based on owner approval via email (see attached) or verbal direction,
This change proposal represents the final price for this work,
Submitted by: Accepted by: Date:
Sash KazemlNejad
AA
U-
LU
ua
is
GRID TC
CE
14 1 18(-0"
1 5 -
F --------------------- .3 - - -
ALTERNATE LENGTH OH RAKE SERI
Bozeman City Bus Barn BNB Project # 509012
1812 N, Rouse Avenue
Bozeman, MT 59715
Date: November 10, 2010
Submitted To: Mike Wiseman
Dowling Sandholm Architects
55 West 14th Street
Helena, MT 59601
Tel. 406-556-0113
Submitted By. Jenae Benner
BNBuilders, Inc
293 Rodeo Drive
Florence, MT 59833
Tel: 406-375-6920 Fax; 406-375-6921
Subject: Crane Voltage
Discipline: Electrical
Subcontf •
Subcontractor RFI No:
Question Date Required- 11/17/2010
As discussed between Mike Wiseman (DSA) and Brian Nostrant (BNB) on 11/5/10, the overhead crane as specified, submitted,
approved and ordered requires 440v power. The power called out on the panel schedule on E2.1 is 208v. This can be remedied
with the addition of a transformer or a new crane unit can be ordered. Please advise as to how to proceed.
Answer
Please put together pricing for supplying and installing the required transformer. As discussed, the unit should be mounted outside the
building, a wall mount kit may be preferred. Attached is a sketch showing 2 possible locations, and below are Wade!s comments on which
location is preferred (location I based on traffic flow). Please indicate required bollards and/or cone pads (if not wall mounted) and which
location would be most cost effective.
Wade: "I like location 1 due to the bollard and traffic flow, location 2 would work also as long as the
sformer was not too far away from the building due to the vehicle traffic flow along the side of the building,
vina snow etc.
I remember Brian saying that there was a issue with underground utilities in area 2.
As always it comes down to the balance of functionality verses cost, That being said, if the transformer could be
protected in area 2 It will probably be the cost effective place to put it.
If area 2 is used, I would like to mention that during our walk around I noticed that there was a step down just as
you exited the west side man doors. There was discussion of building the area up with some sort of material,
Should we be pouring a concrete pad for this transformer, I would also like to look at the cost of including that to
encompass the door area."
attached sketch
Answered by. IMichael Wiseman i Date Answered, T=
Copies To: Company& Contact Fax Notes
Page 1 of 9
mo.
of Pages
PROPOS 13M T
AL , 1TED T
PHONE
DATE
4
STREET
JOB NMAE
CITY, STATE AW ZIP CODE
Joaf LOCAT"N
ARCHITECT DATE OF FLAN
JOB PHONE
We hereby submit specifications and estimates for
4
p .
0_0
"Zzek
hereby to furnish material and labor complete in accordance with ❑bove specifications, for the sum of.
dollars
Payment to be made as follows.
Ali ma terial is guaranteed to be as specified. All work to be completed in a workman. .1. 2
like manner according to standard praclices- Any alteration or deviolion from above
Authorized,—"'
specifications involving extra casts will be executed only upon written orders, and Signature
orne an extra charge over and above the esilmote, All agreements contingent
will bee
upon strikes;, accidents or delays beyond our control. Owner to carry fire, tornado Note: This proposal may be
and other necessary insurance. Our workers are full . y covered by Workmen's Com• withdrawn by us if not accepted - -day.-
pensallon Insurance.
-The above prices. specifications
and conditions are sotislociory and are hereby accepted. You are authorized
to do that work as sope<ttied. Payment will be made as outlined above. Signature
Date of Acceptance . , __—Signature
PACO-WS-3
PAIR ED IN U.S.A.
Gallatin Electric, Inc
101 Bartz Lane
Belgrade, MT 59714
% �9,
389-2,12
"'ft'42imic; - �wo
Name / Address
BN Builders Inc.
293 Rodeo Drive 42
Florence MT 59833
Date
Tracking #
11/1512010
3065 CO #10
92 wo
HRDC CITY SHOP/BUS BARN
1812 N Rouse Ave
Brian Cell 406-396-0664
Office 582-7412
Signature
Phone #
. . .... .... -
Gallatin Electric CO#
Client CO #
Project
RF1 439 CO 410
r c1G gai iatinelectricservlce.corn
RF1 #39 CO 910
Description
Qty
Cost
Markup
Total
RF1439 Location 41
Conduit 3/4" EMT
30
11.70
1 15.00%
13.46
Connector 3/4 EMT Camp TC1 12A
4
1.48
15.00%
1.70
Coupling 3/4 EMT WP
4
2.04
15.00%
2.35
Fitting 3/4 LB w/cover EALB & ESCV
1
7.69
15.00%
8.84
Strap 3/4" EMT I hole 8302
4
1.00
15.00%
1.15
Conduit 1/2" EMT
20
3.80
15.00%
4,37
Connector 1/2" EMT Comp
4
1,20
15,00%
1.38
Coupling 1/2 EMT 611
2
0,60
15.00%
0.69
Strap 1/2" EMT I Hole 8301
2
0.14
15.00%
0.16
Conduit 3/4" sea] tight
5
9.00
15,00%
10'35
Connector'3/4 STR Flex UT
2
6.02
15.00%
6.92
Conduit 112" seal tight
5
3.70
15.00%
4.26
Connector 112" Sir L/T Flex
2
2.42
15.00%
2.78
Disconnect 600V Disconnect
1
151.92
15.00%
174.71
Disconnect 250V outdoor
1
120,37
15,00%
138,43
208-480V Transformer Rain Proof
1
1,323.67
15.00%
1,522.22
Conduit 1/2" Flex
10
6.00
15,00%
6.90
Connector 1/2" Flex DC Str Sqz
2
1.68
15,00%
1.93
Wire 10 THHN 19 Sir CU
200
30.00
15,00 %
34.50
Wire 8 THHK STR CU
150
48.00
15,00%
55.20
Labor
16
675.36
15.00%
776.66
L Total 52,768.916
Signature
Phone #
Fax #
E-mail
406-388-2126
406-398-2186
r c1G gai iatinelectricservlce.corn
Contractor
Description
Amount
Gallatin Electric
Transformer
$2,768.96
Superior Concrete, LTD,
Concrete Pad and Bollards
$1,995.00
Peak Paintino
Paint Bollards @ $15 each
�30.Ob
BNBuilders
Overhead & Profit
$0.00
BNBuilders
OH & Profit Subcontractors
$479.40
Total. $5,273.36
Friday, November 19, 2010
Mike Wiseman
Dowling Sandholm Architects
55 West 14th Street
Helena, MT 59601
RE. Change Proposal - CP# 56
Bozeman City Bus Barn - 509012
Dear Mike Wiseman,
This letter is to request authorization to proceed with the following extra work:
CP Number; 56
Descriptiom Crane Voltage - RFI #39
Proposed Amt: $ 5,273.36
Days Requested. YES
Scope of Work (see attached for detailed cost summary):
Provide labor, material, and equipment for a transformer to feed the crane in the city shops, concrete pad,
and two bollards for a complete system per RFI #39.
*once approved the material will be ordered and the work performed weather permitting. This work will not
be guaranteed to be performed by the contract end date.
Please sign below and return a copy of this letter to indicate your acceptance of this extra work and approve the
price for this work. Additional costs may apply if authorization is received after
Fj BNBuilders has proceeded with this work per previous ROM approval (attached). This change' roposal represents
the final price for this work.
BNBuilders has proceeded with this work based on owner approval via email (see attached) or verbal direction
This change proposal represents the final price for this work.
by: Accepted by. Date:
Benner_L) Mike Wiseman
tiers Dowling Sandhc1m Architects
Not valid until signed by Architect, Contractor, and Owners.
Signatures:
Architect: Dowling Sandholm Architects By: Date:
15 West 14 Street— Suite 103 Mike Wiseman
Helena, Mt 59601
Place Architecture By: Date:
118 E. Main St Sash Kazeminejad
Bozeman, MT, 59715
Contractor: BN Builders, Inc By: Date:
2066 Stadium Dr., Ste 102 Scott Jay
Bozeman, MT 59715
Owner: City of Bozeman By: Date:
P.O. Box 1230 Chris Kukulski
Bozeman, MT 59771
Human Resource By: Date:
Development Council Lee Hazelbaker
32 South Tracy
Bozeman, IVIT 59715
Page 2 of 2
File 21 f
CO--#21—Jointdoc